CHAPTER I: GENERAL

I: General description

II: Natural conditions of bridge construction area

III: Scope and applicable specification

CHAPTER II: TECHNOLOGY PROCESS

I: Construction sequences

II: Technology steps

1. Production and erection of scaffolding

2. Testing temporary pier and scaffolding

3. Install beam formwork

4. Beam bearing installation

5. Installation of reinforcement, duct and high strength cable

6. Placing concrete for beam

   • Concrete mix design

   • Concrete materials

   • Construction plan layout

   • Construction Equipment

   • Arrangement manpower

   • Concrete mixing

   • Provide concrete

   • Method for decrease concrete mix temperature

   • Pour concrete
Hanoi – Hochiminh city railway line                  Do Vang Bridge’s construction
bridges safety improvement project               technology of beam casted on
scaffolding
   • Tamping

   • Curing

   • Emegency occurrences that may happen and resolving method

7. Prestressed cable tension

   • Preparation work

   • Stressing equipment.

   • Prestressed cable tension

8. Grouting the duct

9. Moval of scaffoldings, formworks

CHAPTER III: MATERIAL REGULATIONS

I: General

II: Materials

1. Reinforcement

2. Prestressed anchor

3. Duct

4. Concrete

5. Pumped grout

CHAPTER IV: LABOUR SAFETY

I: Labour safety when frecting and removing scaffolding

II: Labour safety while casting concrete

III: Labour safety while dragging prestress

APPENDIX

More Related Content

Similar to 02.contents

03.chapter i
03.chapter i03.chapter i
03.chapter iGTVT
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter iiGTVT
 
Construction of prestressed concrete structures
Construction of prestressed concrete structuresConstruction of prestressed concrete structures
Construction of prestressed concrete structuressanmilan
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction systemAnuj Singhal
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)varun km
 
DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN
 DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN
DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPANfaishalniet
 
Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptxAnanthakumar75
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMVineeshkumar K V
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
Bstructure report
Bstructure reportBstructure report
Bstructure reportMegan Chung
 

Similar to 02.contents (20)

03.chapter i
03.chapter i03.chapter i
03.chapter i
 
04.chapter ii
04.chapter ii04.chapter ii
04.chapter ii
 
presentation
presentationpresentation
presentation
 
Construction of prestressed concrete structures
Construction of prestressed concrete structuresConstruction of prestressed concrete structures
Construction of prestressed concrete structures
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 
DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN
 DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN
DEVELOPMENT OF MODERN PRESTRESSED CONCRETE BRIDGES IN JAPAN
 
Special structure
Special structureSpecial structure
Special structure
 
Construction of bridges
Construction of bridgesConstruction of bridges
Construction of bridges
 
Tunneling
TunnelingTunneling
Tunneling
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt
 
Sub Structure Construction.pptx
Sub Structure Construction.pptxSub Structure Construction.pptx
Sub Structure Construction.pptx
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
 
Pumped Concrete
Pumped Concrete Pumped Concrete
Pumped Concrete
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Training
TrainingTraining
Training
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
 
Burj khalifa Dubai
Burj khalifa DubaiBurj khalifa Dubai
Burj khalifa Dubai
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 

More from GTVT

Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
Biện pháp thay dàn cầu đường sắt Tân An -  Bình ĐịnhBiện pháp thay dàn cầu đường sắt Tân An -  Bình Định
Biện pháp thay dàn cầu đường sắt Tân An - Bình ĐịnhGTVT
 
De cuong tn 17
De cuong tn 17De cuong tn 17
De cuong tn 17GTVT
 
Cong nghe duc dam i
Cong nghe duc dam iCong nghe duc dam i
Cong nghe duc dam iGTVT
 
Liên kết trong kết cấu thép
Liên kết trong kết cấu thépLiên kết trong kết cấu thép
Liên kết trong kết cấu thépGTVT
 
2.de cuong thi cong coc ep
2.de cuong thi cong coc ep2.de cuong thi cong coc ep
2.de cuong thi cong coc epGTVT
 
06.chapter iv
06.chapter iv06.chapter iv
06.chapter ivGTVT
 
05.chapter iii
05.chapter iii05.chapter iii
05.chapter iiiGTVT
 
22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)GTVT
 
22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)GTVT
 
22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)GTVT
 
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)GTVT
 
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)GTVT
 
22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)GTVT
 
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)GTVT
 
22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)GTVT
 

More from GTVT (18)

Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
Biện pháp thay dàn cầu đường sắt Tân An -  Bình ĐịnhBiện pháp thay dàn cầu đường sắt Tân An -  Bình Định
Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
 
De cuong tn 17
De cuong tn 17De cuong tn 17
De cuong tn 17
 
Cong nghe duc dam i
Cong nghe duc dam iCong nghe duc dam i
Cong nghe duc dam i
 
Liên kết trong kết cấu thép
Liên kết trong kết cấu thépLiên kết trong kết cấu thép
Liên kết trong kết cấu thép
 
2.de cuong thi cong coc ep
2.de cuong thi cong coc ep2.de cuong thi cong coc ep
2.de cuong thi cong coc ep
 
06.chapter iv
06.chapter iv06.chapter iv
06.chapter iv
 
05.chapter iii
05.chapter iii05.chapter iii
05.chapter iii
 
22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)
 
22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)
 
22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)
 
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
 
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
 
22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)
 
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
 
22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)
 

02.contents

  • 1. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding CONTENTS CHAPTER I: GENERAL I: General description II: Natural conditions of bridge construction area III: Scope and applicable specification CHAPTER II: TECHNOLOGY PROCESS I: Construction sequences II: Technology steps 1. Production and erection of scaffolding 2. Testing temporary pier and scaffolding 3. Install beam formwork 4. Beam bearing installation 5. Installation of reinforcement, duct and high strength cable 6. Placing concrete for beam • Concrete mix design • Concrete materials • Construction plan layout • Construction Equipment • Arrangement manpower • Concrete mixing • Provide concrete • Method for decrease concrete mix temperature • Pour concrete
  • 2. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding • Tamping • Curing • Emegency occurrences that may happen and resolving method 7. Prestressed cable tension • Preparation work • Stressing equipment. • Prestressed cable tension 8. Grouting the duct 9. Moval of scaffoldings, formworks CHAPTER III: MATERIAL REGULATIONS I: General II: Materials 1. Reinforcement 2. Prestressed anchor 3. Duct 4. Concrete 5. Pumped grout CHAPTER IV: LABOUR SAFETY I: Labour safety when frecting and removing scaffolding II: Labour safety while casting concrete III: Labour safety while dragging prestress APPENDIX