Hanoi – Hochiminh city railway line                        Do Vang Bridge’s construction
bridges safety improvement project                     technology of beam casted on
scaffolding


                                CHAPTER I: GENERAL
I. GENERAL DESCRIPTION
   Do Vang bridge at Km432+420 in the construction package CP1C is one of nine
construction packages of Ha Noi – Ho Chi Minh city railway line bridges safety
improvement project.
   Do Vang bridge is over Rao Nay River on Kim Hoa commune, Tuyen Hoa District,
Quang Binh Province. The bridge has 4 prestressed-concrete spans and 2 steel truss
spans, total length of bridge is 230.4m. The length of steel truss is long enough to meet
navigable clearance requirement and create least impact to the natural flow.
II. NATURAL CONDITIONS OF BRIDGE CONSTRUCTION AREA
1. Topographic conditions
    The topographic at the construction site for the Do Vang Bridge, a bank river is
mountain slope with small grade and other bank river is relative flat ground with rice –
field, fram produce, thicket.
    In general, the area is relatively convenient for transport materials during
construction process.
2. Hydrological conditions
    Rao Nay River belongs to Gianh river system, has characteristics of Rivers in Central
Area that be short and sloping
   The estimated water level for construction is H= 0.4m.
3. Climatic, meteorological conditions

   • Rainfall

    The climate at Quang Binh and surroundings is affected by Middle Zone climate. It
comprises of two evident seasons: dry season from December to the August of the next
year, water level of the river lowers that often lead to drought. Raining season lasts from
September to December. The rainfall focusses in this season and causes to flood.
    + Average annual rainfall                    : 2,066mm
    + Daily maximum rainfall                     : 332 mm

   • Wind and Typhoon

    + The main wind direction in summer          : East wind (Apr to Sept)

                                            1
Hanoi – Hochiminh city railway line                           Do Vang Bridge’s construction
bridges safety improvement project                        technology of beam casted on
scaffolding

    + Average wind speed                            : 3.3 m/s – 4 m/s
    + The main wind direction in winter             : North and Northwest wind (Oct to
                                                     March)
    + Maximum wind speed                            : 20 - 25 m/s

    • Air temperature

    The temperature is quite hight, hottest in summer (from Apr to Sept), coldest in
January.

    + Average annual temperature          : 25°7

    + Average maximum temperature         : 29°9

    + Average minimum temperature         : 22°9

    + Absolute maximum temperature : 40°9

    + Absolute minimum temperature        : 9°2

    + Temperature amplitude in contiuous months of a year and in continuous days is
    not great, about 5 ÷ 8°C.

4. Geological conditions

    The result of investigation drilling at bored hole shows that geology of the main
bridge area is divided into the following layers:

- Layer 1a: Poorly-Plastic clay (CL) is white gray with low compressibility.
- Layer 1b: Dusty clay (ML-CL) is brown gray, black spot with low compressibility.
 - Layer 2: Poorly- plastic clay (CL) is yellow gray or black gray, white spot with low.
- Layer 3: Medium weathered, cracked granite with white gray, black spot, hardness
    grade of VII-VIII, TCR=71%, RQD=62%.
-   Layer 4: Medium weathered, cracked granite is gray, white spot, TCR=85%,
    RQD=70%.
III. SCOPE AND APPLICABLE SPECIFICATION

1. Scope
    Scope of project: permanently design by reinforced concrete and prestressed
reinforced concrete.

                                             2
Hanoi – Hochiminh city railway line                        Do Vang Bridge’s construction
bridges safety improvement project                     technology of beam casted on
scaffolding

    Using reinforcement concrete for construction 5 piers and 2 abutments on the bed-
rock and the pile cap with diameter D= 1.2-1.5m, length 7.5m-13m.
    The span structure is 4 span prestressed reinforcement concrete and 2 span steel tr uss,
span structure layout is 2x24.4m+2x66.4m+2x24.4m.
    + Length of bridge (distance of 2 center line of abutment) is 230.4m.
    Design load:
    + Load T-15D, Pedestrian load 30x10-3 MPa in accordance with bridge design
      standards No. 22 TCN 272-05.
2. Applicable standard for establishment construction technology.

   Approved technical design and construction design.

   Specification of Project

   TCVN5439:1991 “Cement”

   TCVN 2682:1989 “Portland cement”

   TCVN 1770:1986 “Construction sand”

   TCVN 1771:1987 “Ballast, stone use for construction”

   TCVN 1772:1987 “The method of determines content of stone contaminant”

   TCVN 4732:1989 “Construction devitrified stone”

   TCXD127:1985 “Direction for use fine sand in concrete and cement”

   TCVN 4314:1986 “Construction cement”

   22TCN60-84 “Cement concrete”

   TCVN 4506:1987 “Water uses for concrete”

   TCVN 5440:1995 “Check and stability assessment of concrete”

   TCVN 5592:1991 “Heavy concrete. Moist nature curing demand”

   TCVN 6025:1995 “Grade division for compressive strength”

   TCVN 5726:1993 “The method of prism strength definition and elasticity modulus“



                                             3
Hanoi – Hochiminh city railway line                       Do Vang Bridge’s construction
bridges safety improvement project                    technology of beam casted on
scaffolding

   TCVN171:1989 “The nondestructive method uses untrasonic machine and rebound
   hammer for compressive strength definition”

   TCVN 3106:1993 “The method of slump of concrete definition”

   TCVN 3118:1993 “The check method of concrete strength development”

   TCXD 305:2004 “Mass concrete”

   TCXD173:1989 “Plastic agent KDT2 for cement and construction concrete”

   TCVN 3101:1979 “Cold- draw cacbonaceous steel wire for reinforcement”

   TCVN 1651:1985 “Hot- rolling reinforcement”

   TCVN 5709:1993 “Hot- rolling cacbonaceous steel for construction”

   TCVN 6052:1995 “Iron scaffolding”

   TCN 22- 272 - 05 “Specification for bridge design”

   TCN 22- 247 – 98 “Work execution and acceptance regulations”

   TCN 22-288-02 “Steel bridge and structure” .

   Ability for mobilization materials, equipments of contractor




                                           4

More Related Content

Viewers also liked

04.chapter ii
04.chapter ii04.chapter ii
04.chapter iiGTVT
 
Common Construction Accidents
Common Construction AccidentsCommon Construction Accidents
Common Construction AccidentsJonathan Damashek
 
Permitting part3 9.2.2010
Permitting part3 9.2.2010Permitting part3 9.2.2010
Permitting part3 9.2.2010CCSE Host
 
Controlling electrical appliances using human gestures
Controlling electrical appliances using human gesturesControlling electrical appliances using human gestures
Controlling electrical appliances using human gesturesrajaganapathy28091100
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safetymrmackenzie
 
Types of weathering
Types of weatheringTypes of weathering
Types of weatheringSabeh Khan
 
Capstone Project - Strengthening of Sturctures
Capstone Project - Strengthening of SturcturesCapstone Project - Strengthening of Sturctures
Capstone Project - Strengthening of SturcturesTanaka Muswerakuenda
 
Weathering - GEOLOGY (engineering geology- kannur university )
Weathering - GEOLOGY (engineering geology- kannur university )Weathering - GEOLOGY (engineering geology- kannur university )
Weathering - GEOLOGY (engineering geology- kannur university )Vishnudev C
 

Viewers also liked (15)

04.chapter ii
04.chapter ii04.chapter ii
04.chapter ii
 
Construction Safety.
Construction Safety.Construction Safety.
Construction Safety.
 
Common Construction Accidents
Common Construction AccidentsCommon Construction Accidents
Common Construction Accidents
 
Permitting part3 9.2.2010
Permitting part3 9.2.2010Permitting part3 9.2.2010
Permitting part3 9.2.2010
 
Safety of vehicles
Safety of vehiclesSafety of vehicles
Safety of vehicles
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
Controlling electrical appliances using human gestures
Controlling electrical appliances using human gesturesControlling electrical appliances using human gestures
Controlling electrical appliances using human gestures
 
Hazard reportgs
Hazard reportgsHazard reportgs
Hazard reportgs
 
Dmlawyer
DmlawyerDmlawyer
Dmlawyer
 
Chenab Bridge
Chenab BridgeChenab Bridge
Chenab Bridge
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
 
Safety and security
Safety and securitySafety and security
Safety and security
 
Types of weathering
Types of weatheringTypes of weathering
Types of weathering
 
Capstone Project - Strengthening of Sturctures
Capstone Project - Strengthening of SturcturesCapstone Project - Strengthening of Sturctures
Capstone Project - Strengthening of Sturctures
 
Weathering - GEOLOGY (engineering geology- kannur university )
Weathering - GEOLOGY (engineering geology- kannur university )Weathering - GEOLOGY (engineering geology- kannur university )
Weathering - GEOLOGY (engineering geology- kannur university )
 

Similar to 03.chapter i

101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_AkhtarJavad Akhtar
 
02.contents
02.contents02.contents
02.contentsGTVT
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructionsVinay Vb
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdfPpt Creater
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationAmir Amdani
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed linkVicky Matwan
 
Modern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionModern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionStefan Lammert
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGE
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGEMECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGE
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGEEditorIJAERD
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setuRatulDas36
 
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...IRJET Journal
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineeringAdil Shaikh
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxMansimishra351962
 
Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...Md. Shahadot Hossain
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanAamir Rajput Khan
 

Similar to 03.chapter i (20)

101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
02.contents
02.contents02.contents
02.contents
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
Construction of bridges
Construction of bridgesConstruction of bridges
Construction of bridges
 
Tunnel constructions
Tunnel constructionsTunnel constructions
Tunnel constructions
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdf
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Modern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionModern fastening systems in tunnel construction
Modern fastening systems in tunnel construction
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Tunneling
Tunneling Tunneling
Tunneling
 
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGE
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGEMECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGE
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGE
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setu
 
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tu...
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptx
 
Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...Rules and regulation of transmission and distribution of natural gas and its ...
Rules and regulation of transmission and distribution of natural gas and its ...
 
Tunnel PDF.pdf
Tunnel PDF.pdfTunnel PDF.pdf
Tunnel PDF.pdf
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir Khan
 

More from GTVT

Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
Biện pháp thay dàn cầu đường sắt Tân An -  Bình ĐịnhBiện pháp thay dàn cầu đường sắt Tân An -  Bình Định
Biện pháp thay dàn cầu đường sắt Tân An - Bình ĐịnhGTVT
 
De cuong tn 17
De cuong tn 17De cuong tn 17
De cuong tn 17GTVT
 
Cong nghe duc dam i
Cong nghe duc dam iCong nghe duc dam i
Cong nghe duc dam iGTVT
 
Liên kết trong kết cấu thép
Liên kết trong kết cấu thépLiên kết trong kết cấu thép
Liên kết trong kết cấu thépGTVT
 
2.de cuong thi cong coc ep
2.de cuong thi cong coc ep2.de cuong thi cong coc ep
2.de cuong thi cong coc epGTVT
 
06.chapter iv
06.chapter iv06.chapter iv
06.chapter ivGTVT
 
22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)GTVT
 
22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)GTVT
 
22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)GTVT
 
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)GTVT
 
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)GTVT
 
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)GTVT
 
22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)GTVT
 
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)GTVT
 
22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)GTVT
 

More from GTVT (17)

Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
Biện pháp thay dàn cầu đường sắt Tân An -  Bình ĐịnhBiện pháp thay dàn cầu đường sắt Tân An -  Bình Định
Biện pháp thay dàn cầu đường sắt Tân An - Bình Định
 
De cuong tn 17
De cuong tn 17De cuong tn 17
De cuong tn 17
 
Cong nghe duc dam i
Cong nghe duc dam iCong nghe duc dam i
Cong nghe duc dam i
 
Liên kết trong kết cấu thép
Liên kết trong kết cấu thépLiên kết trong kết cấu thép
Liên kết trong kết cấu thép
 
2.de cuong thi cong coc ep
2.de cuong thi cong coc ep2.de cuong thi cong coc ep
2.de cuong thi cong coc ep
 
06.chapter iv
06.chapter iv06.chapter iv
06.chapter iv
 
22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)22 tcn 18 79 (phu luc 9-14)
22 tcn 18 79 (phu luc 9-14)
 
22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)22 tcn 18 79 (phu luc 1-8)
22 tcn 18 79 (phu luc 1-8)
 
22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)22 tcn 18 79 (chuong 7, nen va mong)
22 tcn 18 79 (chuong 7, nen va mong)
 
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
22 tcn 18 79 (chuong 6, ket cau bt, khoi xay va da xay)
 
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-3, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-2, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
22 tcn 18 79 (chuong 5-1, ket cau bt toan khoi va btct)
 
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
22 tcn 18 79 (chuong 4, ket cau thep lien hop voi ban btct)
 
22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)22 tcn 18 79 (chuong 3, ket cau thep)
22 tcn 18 79 (chuong 3, ket cau thep)
 
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
22 tcn 18 79 (chuong 2, tai trong va he so tai trong)
 
22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)22 tcn 18 79 (chuong 1, quy dinh co ban)
22 tcn 18 79 (chuong 1, quy dinh co ban)
 

03.chapter i

  • 1. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding CHAPTER I: GENERAL I. GENERAL DESCRIPTION Do Vang bridge at Km432+420 in the construction package CP1C is one of nine construction packages of Ha Noi – Ho Chi Minh city railway line bridges safety improvement project. Do Vang bridge is over Rao Nay River on Kim Hoa commune, Tuyen Hoa District, Quang Binh Province. The bridge has 4 prestressed-concrete spans and 2 steel truss spans, total length of bridge is 230.4m. The length of steel truss is long enough to meet navigable clearance requirement and create least impact to the natural flow. II. NATURAL CONDITIONS OF BRIDGE CONSTRUCTION AREA 1. Topographic conditions The topographic at the construction site for the Do Vang Bridge, a bank river is mountain slope with small grade and other bank river is relative flat ground with rice – field, fram produce, thicket. In general, the area is relatively convenient for transport materials during construction process. 2. Hydrological conditions Rao Nay River belongs to Gianh river system, has characteristics of Rivers in Central Area that be short and sloping The estimated water level for construction is H= 0.4m. 3. Climatic, meteorological conditions • Rainfall The climate at Quang Binh and surroundings is affected by Middle Zone climate. It comprises of two evident seasons: dry season from December to the August of the next year, water level of the river lowers that often lead to drought. Raining season lasts from September to December. The rainfall focusses in this season and causes to flood. + Average annual rainfall : 2,066mm + Daily maximum rainfall : 332 mm • Wind and Typhoon + The main wind direction in summer : East wind (Apr to Sept) 1
  • 2. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding + Average wind speed : 3.3 m/s – 4 m/s + The main wind direction in winter : North and Northwest wind (Oct to March) + Maximum wind speed : 20 - 25 m/s • Air temperature The temperature is quite hight, hottest in summer (from Apr to Sept), coldest in January. + Average annual temperature : 25°7 + Average maximum temperature : 29°9 + Average minimum temperature : 22°9 + Absolute maximum temperature : 40°9 + Absolute minimum temperature : 9°2 + Temperature amplitude in contiuous months of a year and in continuous days is not great, about 5 ÷ 8°C. 4. Geological conditions The result of investigation drilling at bored hole shows that geology of the main bridge area is divided into the following layers: - Layer 1a: Poorly-Plastic clay (CL) is white gray with low compressibility. - Layer 1b: Dusty clay (ML-CL) is brown gray, black spot with low compressibility. - Layer 2: Poorly- plastic clay (CL) is yellow gray or black gray, white spot with low. - Layer 3: Medium weathered, cracked granite with white gray, black spot, hardness grade of VII-VIII, TCR=71%, RQD=62%. - Layer 4: Medium weathered, cracked granite is gray, white spot, TCR=85%, RQD=70%. III. SCOPE AND APPLICABLE SPECIFICATION 1. Scope Scope of project: permanently design by reinforced concrete and prestressed reinforced concrete. 2
  • 3. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding Using reinforcement concrete for construction 5 piers and 2 abutments on the bed- rock and the pile cap with diameter D= 1.2-1.5m, length 7.5m-13m. The span structure is 4 span prestressed reinforcement concrete and 2 span steel tr uss, span structure layout is 2x24.4m+2x66.4m+2x24.4m. + Length of bridge (distance of 2 center line of abutment) is 230.4m. Design load: + Load T-15D, Pedestrian load 30x10-3 MPa in accordance with bridge design standards No. 22 TCN 272-05. 2. Applicable standard for establishment construction technology. Approved technical design and construction design. Specification of Project TCVN5439:1991 “Cement” TCVN 2682:1989 “Portland cement” TCVN 1770:1986 “Construction sand” TCVN 1771:1987 “Ballast, stone use for construction” TCVN 1772:1987 “The method of determines content of stone contaminant” TCVN 4732:1989 “Construction devitrified stone” TCXD127:1985 “Direction for use fine sand in concrete and cement” TCVN 4314:1986 “Construction cement” 22TCN60-84 “Cement concrete” TCVN 4506:1987 “Water uses for concrete” TCVN 5440:1995 “Check and stability assessment of concrete” TCVN 5592:1991 “Heavy concrete. Moist nature curing demand” TCVN 6025:1995 “Grade division for compressive strength” TCVN 5726:1993 “The method of prism strength definition and elasticity modulus“ 3
  • 4. Hanoi – Hochiminh city railway line Do Vang Bridge’s construction bridges safety improvement project technology of beam casted on scaffolding TCVN171:1989 “The nondestructive method uses untrasonic machine and rebound hammer for compressive strength definition” TCVN 3106:1993 “The method of slump of concrete definition” TCVN 3118:1993 “The check method of concrete strength development” TCXD 305:2004 “Mass concrete” TCXD173:1989 “Plastic agent KDT2 for cement and construction concrete” TCVN 3101:1979 “Cold- draw cacbonaceous steel wire for reinforcement” TCVN 1651:1985 “Hot- rolling reinforcement” TCVN 5709:1993 “Hot- rolling cacbonaceous steel for construction” TCVN 6052:1995 “Iron scaffolding” TCN 22- 272 - 05 “Specification for bridge design” TCN 22- 247 – 98 “Work execution and acceptance regulations” TCN 22-288-02 “Steel bridge and structure” . Ability for mobilization materials, equipments of contractor 4