Inception and Planning Workshop
Sustaining and Enhancing the Momentum for
Innovation and Learning around the System of Ric...
- “Enhance rainfed smallholder farmers capacity
confronting climate change sustainably by
applying SRI through Participato...
The immediate objectives of the projects:
1. To increase the capacity of the SRI Secretariat to be
functioned well as a co...
Target Province for
mplementing
Mekong SRI Poject
1. Obj 1: To increase the capacity of the SRI Secretariat to be
functioned well as a coordination body to promote SRI
appl...
Obj. 2: To identify appropriate techniques through
participatory action researches at research institutes,
academic school...
3. To strengthen the capacity of human resources at national, provincial,
district and farmers level to promote SRI applic...
Annual Workplan from April to Dec 2013
No Activities
Semester 1 Budget/ Person
Apr May June Output resource responsible
1
...
Annual Workplan from April to Dec 2013
No Activities
1 Semester 2 Budget/ Person
June July Aug Sep Oct Nov Dec Output reso...
Thank You
Upcoming SlideShare
Loading in...5
×

Cambodia Group, AIT SRI

164

Published on

Published in: Travel, Health & Medicine
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
164
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Cambodia Group, AIT SRI

  1. 1. Inception and Planning Workshop Sustaining and Enhancing the Momentum for Innovation and Learning around the System of Rice Intensification (SRI) in the Lower Mekong River Basin Cambodia Group
  2. 2. - “Enhance rainfed smallholder farmers capacity confronting climate change sustainably by applying SRI through Participatory Action Research in order to improve food security, income and occupational health status”. Project Goal
  3. 3. The immediate objectives of the projects: 1. To increase the capacity of the SRI Secretariat to be functioned well as a coordination body to promote SRI application; 2. To identify appropriate techniques through participatory action researches at research institutes, academic schools and farmer level ; 3. To strengthen the capacity of human resources at national, provincial, district and farmers level to promote SRI; Project Objective
  4. 4. Target Province for mplementing Mekong SRI Poject
  5. 5. 1. Obj 1: To increase the capacity of the SRI Secretariat to be functioned well as a coordination body to promote SRI application; - Organize SRI net work meeting - Gathering all relevant information on SRI from Stakeholders and make them available for contribution; - Provide technical backstopping visit for strengthening SRI application; - Coordinate with public Institutions and NGOs for SRI promotion and application Activities
  6. 6. Obj. 2: To identify appropriate techniques through participatory action researches at research institutes, academic schools and farmer level; - Conduct participatory appraisal - Carry out baseline survey - Identify critical SRI practices for conducting more researches - Conduct participatory action researches on farms and at stations; - Conduct conference/seminar for share learning experiences with internal and national stakeholders; - Document all findings from the PAR Activities
  7. 7. 3. To strengthen the capacity of human resources at national, provincial, district and farmers level to promote SRI application; - Conduct inception and planning workshop - Conduct mini-TOT at target provinces, - Conduct Farmer Field School (FFS) and Student Field School; - Set up on farms demonstration in FFS; - Organize study visits; - Organize post-FFS activities; - Set up M&E system to identify and promote SRI application; - Develop extension materials - Conduct annual workshop Activities
  8. 8. Annual Workplan from April to Dec 2013 No Activities Semester 1 Budget/ Person Apr May June Output resource responsible 1 Prepare Country Strategy Paper A draft CSP Finalize Country Strategy Paper A final CSP 2 Set up Project Structure - Identify PMU institution and member Structure PMU - Establish LMU and select district staff Structure LMU
  9. 9. Annual Workplan from April to Dec 2013 No Activities 1 Semester 2 Budget/ Person June July Aug Sep Oct Nov Dec Output resource Responsibl e 4 Conduct National Project Inception workshop 1st W Final Workplan, Dissimilation information 8000 PMU 5 Conduct Participatory Rural Appraisal Report 6000 PMU and Expert 6 Indentify targeted districts and farmers Selected targets PMU 7 Base line survey Background information 7000 PMU 8 Design CFPAR and develop curricula of Mini-TOT, FFS and post-FFS on PAR Curriculum developed 10,000 PMU