Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Upcoming SlideShare
GSS Session VI Mr A K Sacheti
Next
Download to read offline and view in fullscreen.

3

Share

Download to read offline

KRISHI VIGYAN KENDRA PROPSAL case study

Download to read offline

Berasia tehsil BHOPAL

Related Books

Free with a 30 day trial from Scribd

See all

KRISHI VIGYAN KENDRA PROPSAL case study

  1. 1. • Take a stock of appropriate technologies in agro ecosystem perspective in a continuum for overall improvement in the social and economic well being of the farming community VISION • Bringing desirable behavioral change associated with awareness, knowledge, skill and attitude among the farmers and other stakeholders for technology led growth in farming allied enterprises MISSION KRISHI VIGYAN KENDRAS
  2. 2. Why Krishi Vigyan Kendra in BERASIA ? Agronomy Horticulture Animal husbandry Agriculture Engineering Source primary survey
  3. 3. Planning and conducting survey of the operational area Planning and conducting production- oriented, need-based short and long duration training courses Developing and organizing non-formal educational programmes Organizing farm science clubs, both in rural schools and in villages Developing and maintaining the campus farms and demonstration units the Integrated rural Development in collaboration with concerned organization Implementing all such schemes of the ICAR and other related organizations Objectives of Krishi Vigyan Kendras (KVKs)
  4. 4. The sources of funding of the Host Institute, specially NGOs, and its audit reports for the preceding three years should be studied to know the financial position and stability of the Host Institute site should be surrounded with sufficient number of villages having farmers, farm women, labourers etc. The farm area should be a piece of contiguous land, cultivable with permanent source of water supply at least for drinking and part of the area to be irrigated Place should have educational and other civic facilities for the staff and their families. The location of KVK may be as far as possible in the central part of the tehsil and easily accessible. Plan of the location of the proposed land in the district along with the development plan of the land should accompany the proposal. The organization should have clear and marketable title to the land/property. The land should be free from all encumbrances, attachments and litigation. The land proposed should be absolute property of the organization and not a single or joint property in the name of any individual State agricultural universities/Govt. organizations Executive order from the competent authority The land should be free of cost and rent. The land should be in the name of the host organization. The minimum requirement of land for the establishment of KVK is 20 ha. SELECTION CRITERIA FOR KVK
  5. 5. Krishi Vigyan Kendra in Huzur • Host Organization- Director, CIAE (ICAR), • Year of Sanction-1979 ICAR Madhya Pradesh Budget Analysis 2017-18 • Total expenditure for 2017-18 is estimated to be Rs 1,69,954 crore, an 8.5% increase over the revised estimate of 2016-17. The revised estimate for 2016-17 is Rs 2,083 crore lower than the budgeted target • Agriculture -Rs 33,564 crore has been allocated for the Agriculture Budget in 2017-18. Rs 400 crore has been allocated to the Rashtriya Krishi Vikas Yojana, and Rs 40 and 46 crore has been allocated for agricultural mechanization and agricultural equipment. • Horticulture -Rs 92 allocated for Rashtriya Krishi Vikash Yojna . • Allocations to the departments of Rural Development increased by 7% respectively, over the revised estimates of 2016-17. • Skill Development: Rs 100 crore has been allocated under skill development scheme, for the ‘Mukhya mantri Kaushal Samwardhan and Kaushalya Scheme’, to train 2.5 lakh youngsters and two lakh women.
  6. 6. Distance form krishi vigyan kendra berasia(outskirt) tehsil -Harrakheda -12.9 km -Runaha -23 km -Kolu khedi -13km -Graha kalan -29.8 -Dungariya -25km -Sunaya -24.6km -Lataria -24km -Kulhor -11.9km -Babachiya -23km -Gunga -26km
  7. 7. TEHSIL MAP BERASIA BERASIA land should be in the name of the host organization. the location of the proposed land in the district along with the development plan of the land should accompany the proposal surrounded with sufficient number of villages The location of KVK possible in the central part of the tehsil and easily accessible have educational and other civic facilities for the staff and their families. ANGEL HIGH SCHOOL Parameter for the site selection in Berasia WATER BODIES
  8. 8. Activities of Krishi Vigyan Kendra identify the location specificity of technologies Frontline demonstration Training of farmers and farmwomen Create awareness about frontier technologies ICAR provides fund for the implementation of KVK scheme through the Zonal Project Directorates Host Organizations strictly based on the financial rules and procedure issued by the GOI (GFR, 2005) and ICAR from time to time. Financing of Krishi Vigyan Kendra
  • KaxPatel

    Sep. 11, 2019
  • PavaniReddys

    Mar. 11, 2019
  • VasundharaKolte

    Mar. 12, 2018

Berasia tehsil BHOPAL

Views

Total views

2,440

On Slideshare

0

From embeds

0

Number of embeds

2

Actions

Downloads

44

Shares

0

Comments

0

Likes

3

×