UNIT - III




  Principles
      Of
Motion Economy
Principles Of Motion Economy
• A better method of doing a job is one which consume minimum
  of time and energy in performing limb     ( hand, foot, legs etc)
  motions in order to complete the job and this is possible due to
  economizing the use of motion.
• They were first used by Frank Gilbreth, the founder of motion
  study, and have been amplified by other workers, notably
  Professor Barnes. They may be grouped under three headings
     Use of the human body.
     Arrangement of the workplace.
     Design of tools and equipment.
Rules Concerning Human Body
• Both hands should be used for productive work.
• Both the hands start and finish their motions at same time.
• The two hands should not be idle at the same time except during
  periods of rest.
• Motions of the arms should be symmetrical and in opposite
  directions
• Motion should be smooth and continuous.
• Work should be arranged so that eye movements are confined to a
  comfortable area, without the need for frequent changes of focus.
• Continuous curved movements are to be preferred to straight-line
  motions involving sudden and sharp changes in direction.
Rules Concerning Workplace Layout &
Material Handling
• Definite and fixed stations should be provided for all tools
  and materials to permit habit formation.
• Tools and materials should be pre-positioned to reduce
  searching.
• Gravity feed, bins and containers should be used to deliver
  the materials as close to the point of use as possible.
• Tools, materials and controls should be located within the
  maximum working area and as near to the worker as
  possible.
• Materials and tools should be arranged to permit the best
  sequence of motions.
• The colour of the workplace should contrast with that of the
  work and thus reduce eye fatigue.
Rules Concerning Design of Tools and
Equipment
• The hands should be relieved of all work of "holding" the
  workpiece where this can be done by a jig, fixture or foot-
  operated device.
• Two or more tools should be combined wherever possible.
• Where each finger performs some specific movement, as in
  typewriting, the load should be distributed in accordance with the
  inherent capacities of the fingers.
• Handles such as those on cranks and large screwdrivers should
  be designed so as to permit as much of the surface of the hand
  as possible.
• Levers, crossbars and hand wheels should be so placed that the
  operator can use them with the least change in body position.
Work Place Layout
Design of Work place layout
(a) Materials and tools should be available at their predetermined
   places and close to the worker.
(b) Tools and materials should preferably be located in the order in
   which they will be used.
(c) The supply of materials or parts, if similar work is to be done by
   each hand, should be duplicated. That is materials or parts to be
   assembled by right hand should be kept on right hand side and those
   to be assembled by the left hand should be kept on left hand side.
(d) Gravity should be employed, wherever possible, to make raw
   materials reach the operator and to deliver material at its destination
   (e.g., dropping material through a chute).
(e) Height of the chair and work bench should be arranged in a way
   that permits comfortable
Design of Work place layout
(f) An instrument with a pointer should be employed for check readings
    where as for quantitative readings, digital type of instrument should be
    preferred.
(g) Hand tools should be possible to be picked up with least disturbance
    or rhythm and symmetry of movements.
(h) Foot pedals should be used, wherever possible, for clamping
    declamping and for disposal of finished work.
(i) Handles, levers and foot pedals should be
 possible to be operated without changing body position.
(j) Work place must be properly illuminated and
should be free from glare to avoid eye strain.
(k) Work place should be free from the presence of
 disagreeable elements like heat, smoke, dust,
 noise, excess humidity, vibrations etc.
Suggested work place layout
• A work place layout with different areas and typical dimensions. It
  shows the left hand covering the maximum working area and the right
  hand covering the normal working area.
1. Normal working area
It is within the easy reach of the operator.
Suggested work place layout
2. Maximum Working Area
It is accessible with full arm stretch. Figure shows work place layout for
   assembling small component parts. A-1 is the actual working area and the
   place of assembly (POA) where four component parts P-1, P-2, P-3, and
   P-4 are assembled together. Bins containing P-1, P-2, P-3, and P-4 and
   commonly employed tools (CET) (like screw driver, plier, etc.) lie in the
   normal working area A-2. Occasionally required Tools (ORT)
(hammers etc.) lie in the maximum working
area A-3. After the assembly has been made
at POA, it is dropped into the cut portion in
 the work table – PDA (Place for dropping
                                                          POA


assemblies) from where the assembly is
delivered at its destination with the help of a
conveyer. This work place arrangement satisfies
Suggested work place layout
3. Other areas
• Other areas include studies related to fatigue, losses
  caused due to fatigue, rest pauses, amount of energy
  consumed, shift work and age considerations.
Work Measurement
Work measurement
• Work measurement is a technique to establish the time
  required for a qualified worker to carry out a specified job at
  a defined level of performance.

Objectives of Work Measurement
1. To reduce or eliminate non-productive time.
2. To fix the standard time for doing a job.
3. To develop standard data for future reference.
4. To improve methods.
The Techniques Of Work Measurement
• Time study;
• Activity sampling, and its extension, rated activity
  sampling;
• Synthesis from standard data;
• Predetermined motion time systems;(PMTS)
• Estimating;
• Analytical estimating;
• Comparative estimating.
Time Study
• Time study is a work measurement technique for
  recording the times and rates of working for the
  elements of a specified job carried out under
  specified conditions, and for analyzing the data so
  as to obtain the time necessary for carrying out the
  job at a defined level of performance.
Basic Time Study Equipment
•   A stopwatch;
•   A study board;
•   Pencils;
•   Time study forms.
•   Slide rules;
•   A reliable clock, with seconds hand;
•   Measuring instruments such as tape measure, steel rule,
    micrometer, spring balance, and tachometer (revolution
    counter).
Predetermined Motion Time System
(PMTS)
• PMTS is a work measurement technique where by
  times, established for basic human motions (classified
  according to the nature of the motion and the conditions
  under which it is made) are used to build up the time for a
  job at a defined level of performance.
• Few well-known systems using this concept are
    1. M.T.M. : Method Time Measurement.
    2. W.F.S. : Work Factor System.
    3. M.T.A. : Motion Time Analysis.
    4. D.M.T. : Dimensional Motion Times.
    5. B.M.T. : Basic Motion Times.
Objects and Uses of PMTS
• It is very useful in Method Analysis
• Improving the work and method before starting
  the work on the job.
• It sets time standard for different jobs.
• It assist in constructing time formulae.
• It provides a basis for wage plans and labour
  cost estimation.
• It facilitates training of the workers and
  supervisors
Advantages of PMTS
• It eliminates inaccuracies associated with watch
  time study.
• It is superior to stop watch time study
• Job can be arrived at without going to the place of
  working area.
• No rating factors is employed
• Job cost in considerably reduced than standard
  time study
• PMTS helps in tools and product design
Application of PMTS
• Machining work.
• Maintenance work.
• Assembly Jobs
• servicing and
• Office work

More Related Content

What's hot

3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
Lizzette Danan
 
Work study and ergonomics
Work study and ergonomicsWork study and ergonomics
Work study and ergonomics
Akshay Karande
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
Pratibha Khemchandani
 

What's hot (20)

Motion Economy
Motion EconomyMotion Economy
Motion Economy
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Motion economy work design_
Motion economy work design_Motion economy work design_
Motion economy work design_
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
CYCLE AND CHRONOCYCLE GRAPH
CYCLE AND CHRONOCYCLE GRAPHCYCLE AND CHRONOCYCLE GRAPH
CYCLE AND CHRONOCYCLE GRAPH
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Time study
Time studyTime study
Time study
 
Work measurement
Work measurementWork measurement
Work measurement
 
Chronocycle graph
Chronocycle graphChronocycle graph
Chronocycle graph
 
Work study and ergonomics
Work study and ergonomicsWork study and ergonomics
Work study and ergonomics
 
Work study
Work studyWork study
Work study
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Method Study
Method Study Method Study
Method Study
 
Time study
Time studyTime study
Time study
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 
Introduction to time study
Introduction to time studyIntroduction to time study
Introduction to time study
 
motion study
motion studymotion study
motion study
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 
Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work study
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 

Similar to Lecture 3 motion economy work study

Method Study
Method StudyMethod Study
Method Study
ajithsrc
 
Flashlight assembly - Methods Engineering
Flashlight assembly - Methods EngineeringFlashlight assembly - Methods Engineering
Flashlight assembly - Methods Engineering
Angelica Angelo Ocon
 

Similar to Lecture 3 motion economy work study (20)

Work study
Work studyWork study
Work study
 
Motion economy work design by selman kaymaz
Motion economy  work design by selman kaymazMotion economy  work design by selman kaymaz
Motion economy work design by selman kaymaz
 
INDUSTRAIL PPT.pptx
INDUSTRAIL PPT.pptxINDUSTRAIL PPT.pptx
INDUSTRAIL PPT.pptx
 
Time study part 2
Time study part 2Time study part 2
Time study part 2
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
3...work study
3...work study3...work study
3...work study
 
Motion economy and work design
Motion economy and work designMotion economy and work design
Motion economy and work design
 
PRODUCTION PLANNING AND CONTROL-WORK STUDY
PRODUCTION  PLANNING AND CONTROL-WORK STUDYPRODUCTION  PLANNING AND CONTROL-WORK STUDY
PRODUCTION PLANNING AND CONTROL-WORK STUDY
 
Work Study.ppt
Work Study.pptWork Study.ppt
Work Study.ppt
 
all about basis of -Motion-Economy.pptx
all about  basis of -Motion-Economy.pptxall about  basis of -Motion-Economy.pptx
all about basis of -Motion-Economy.pptx
 
Method Study
Method StudyMethod Study
Method Study
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
Industrialengineeringintro ppt
Industrialengineeringintro pptIndustrialengineeringintro ppt
Industrialengineeringintro ppt
 
Time and motion study
Time and motion study Time and motion study
Time and motion study
 
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
 
IE training
IE training IE training
IE training
 
IE Training
IE Training IE Training
IE Training
 
Flashlight assembly - Methods Engineering
Flashlight assembly - Methods EngineeringFlashlight assembly - Methods Engineering
Flashlight assembly - Methods Engineering
 
Garments
Garments Garments
Garments
 
method study
method studymethod study
method study
 

Recently uploaded

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 

Lecture 3 motion economy work study

  • 1. UNIT - III Principles Of Motion Economy
  • 2. Principles Of Motion Economy • A better method of doing a job is one which consume minimum of time and energy in performing limb ( hand, foot, legs etc) motions in order to complete the job and this is possible due to economizing the use of motion. • They were first used by Frank Gilbreth, the founder of motion study, and have been amplified by other workers, notably Professor Barnes. They may be grouped under three headings  Use of the human body.  Arrangement of the workplace.  Design of tools and equipment.
  • 3. Rules Concerning Human Body • Both hands should be used for productive work. • Both the hands start and finish their motions at same time. • The two hands should not be idle at the same time except during periods of rest. • Motions of the arms should be symmetrical and in opposite directions • Motion should be smooth and continuous. • Work should be arranged so that eye movements are confined to a comfortable area, without the need for frequent changes of focus. • Continuous curved movements are to be preferred to straight-line motions involving sudden and sharp changes in direction.
  • 4. Rules Concerning Workplace Layout & Material Handling • Definite and fixed stations should be provided for all tools and materials to permit habit formation. • Tools and materials should be pre-positioned to reduce searching. • Gravity feed, bins and containers should be used to deliver the materials as close to the point of use as possible. • Tools, materials and controls should be located within the maximum working area and as near to the worker as possible. • Materials and tools should be arranged to permit the best sequence of motions. • The colour of the workplace should contrast with that of the work and thus reduce eye fatigue.
  • 5. Rules Concerning Design of Tools and Equipment • The hands should be relieved of all work of "holding" the workpiece where this can be done by a jig, fixture or foot- operated device. • Two or more tools should be combined wherever possible. • Where each finger performs some specific movement, as in typewriting, the load should be distributed in accordance with the inherent capacities of the fingers. • Handles such as those on cranks and large screwdrivers should be designed so as to permit as much of the surface of the hand as possible. • Levers, crossbars and hand wheels should be so placed that the operator can use them with the least change in body position.
  • 7. Design of Work place layout (a) Materials and tools should be available at their predetermined places and close to the worker. (b) Tools and materials should preferably be located in the order in which they will be used. (c) The supply of materials or parts, if similar work is to be done by each hand, should be duplicated. That is materials or parts to be assembled by right hand should be kept on right hand side and those to be assembled by the left hand should be kept on left hand side. (d) Gravity should be employed, wherever possible, to make raw materials reach the operator and to deliver material at its destination (e.g., dropping material through a chute). (e) Height of the chair and work bench should be arranged in a way that permits comfortable
  • 8. Design of Work place layout (f) An instrument with a pointer should be employed for check readings where as for quantitative readings, digital type of instrument should be preferred. (g) Hand tools should be possible to be picked up with least disturbance or rhythm and symmetry of movements. (h) Foot pedals should be used, wherever possible, for clamping declamping and for disposal of finished work. (i) Handles, levers and foot pedals should be possible to be operated without changing body position. (j) Work place must be properly illuminated and should be free from glare to avoid eye strain. (k) Work place should be free from the presence of disagreeable elements like heat, smoke, dust, noise, excess humidity, vibrations etc.
  • 9. Suggested work place layout • A work place layout with different areas and typical dimensions. It shows the left hand covering the maximum working area and the right hand covering the normal working area. 1. Normal working area It is within the easy reach of the operator.
  • 10. Suggested work place layout 2. Maximum Working Area It is accessible with full arm stretch. Figure shows work place layout for assembling small component parts. A-1 is the actual working area and the place of assembly (POA) where four component parts P-1, P-2, P-3, and P-4 are assembled together. Bins containing P-1, P-2, P-3, and P-4 and commonly employed tools (CET) (like screw driver, plier, etc.) lie in the normal working area A-2. Occasionally required Tools (ORT) (hammers etc.) lie in the maximum working area A-3. After the assembly has been made at POA, it is dropped into the cut portion in the work table – PDA (Place for dropping POA assemblies) from where the assembly is delivered at its destination with the help of a conveyer. This work place arrangement satisfies
  • 11. Suggested work place layout 3. Other areas • Other areas include studies related to fatigue, losses caused due to fatigue, rest pauses, amount of energy consumed, shift work and age considerations.
  • 13. Work measurement • Work measurement is a technique to establish the time required for a qualified worker to carry out a specified job at a defined level of performance. Objectives of Work Measurement 1. To reduce or eliminate non-productive time. 2. To fix the standard time for doing a job. 3. To develop standard data for future reference. 4. To improve methods.
  • 14. The Techniques Of Work Measurement • Time study; • Activity sampling, and its extension, rated activity sampling; • Synthesis from standard data; • Predetermined motion time systems;(PMTS) • Estimating; • Analytical estimating; • Comparative estimating.
  • 15. Time Study • Time study is a work measurement technique for recording the times and rates of working for the elements of a specified job carried out under specified conditions, and for analyzing the data so as to obtain the time necessary for carrying out the job at a defined level of performance.
  • 16. Basic Time Study Equipment • A stopwatch; • A study board; • Pencils; • Time study forms. • Slide rules; • A reliable clock, with seconds hand; • Measuring instruments such as tape measure, steel rule, micrometer, spring balance, and tachometer (revolution counter).
  • 17. Predetermined Motion Time System (PMTS) • PMTS is a work measurement technique where by times, established for basic human motions (classified according to the nature of the motion and the conditions under which it is made) are used to build up the time for a job at a defined level of performance. • Few well-known systems using this concept are 1. M.T.M. : Method Time Measurement. 2. W.F.S. : Work Factor System. 3. M.T.A. : Motion Time Analysis. 4. D.M.T. : Dimensional Motion Times. 5. B.M.T. : Basic Motion Times.
  • 18. Objects and Uses of PMTS • It is very useful in Method Analysis • Improving the work and method before starting the work on the job. • It sets time standard for different jobs. • It assist in constructing time formulae. • It provides a basis for wage plans and labour cost estimation. • It facilitates training of the workers and supervisors
  • 19. Advantages of PMTS • It eliminates inaccuracies associated with watch time study. • It is superior to stop watch time study • Job can be arrived at without going to the place of working area. • No rating factors is employed • Job cost in considerably reduced than standard time study • PMTS helps in tools and product design
  • 20. Application of PMTS • Machining work. • Maintenance work. • Assembly Jobs • servicing and • Office work