Cargo Sous terrain
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
805
On Slideshare
780
From Embeds
25
Number of Embeds
3

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 25

http://www.globalenergybasel.com 19
http://www.gib-foundation.org 5
http://wordpress.dev 1

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Cargo sous TerrainCargo concept for integrated palletbased underground transportation 1
  • 2. Cargo sous Terrain highlights at oneglance1. Project drivenbyfuturecustomersneeds and desires (consequentlymarketdriven)1. Realisation through private financing1. Trafficsegregation1. In general, proven and tested technology only 2
  • 3. System Design Cargosous Terrain • Focus on logistics – needs, full integrations ! • “Committed traffic” ensuresRequirements profitability System CargoTube • Design of cargo moving systems Design based on the know how of the technology partners Technology • Setting up project organization with local partners 3
  • 4. Multidisziplinary Project setup Cargo sous Terrain • Short PoC phase (12 month) Construction Mechatronic Logistics Business- Operatins Oecology modelUsers (logistics) • Short planing phase (12 month) Proof of Concept CargoTube Inc • Short building phase & (40 km / year) Operators Planing associations universities authorities Investors politics 4
  • 5. Private financing • Low costs – Construction – Financing – Operations • Revenues – Operations – CO2-certificates – Increase of land price – Compensation from state – Multiple use of tunnel 5
  • 6. Life Quality • Improve • Life quality • Supply reliability • Reduced • CO2 • Pollution • Noise • Energy • Land usage • ….. 6
  • 7. Technicalconsiderations • Diameter : 4.5 – 6 mfor – 3 palette tracks – One tunnel – both ways – Multiple use of tunnel (generating additional revenue) • Speed: 20 – 30 km/h 7
  • 8. • Proof of conceptCargo sous Terrain Switzerland (80 km) Vision • Surface for humans Extension north Zurich Winterthur Extension east • Supplies underground • Water, gas, electricity is underground, its time for Cityeast cargo underground • Quality of live increases Suhr Cityouest Härkingen Cargo sous Terrain • Low cost – high performance CargoTube phase 1 • Sustainable Warehouses,, Crossdocking, Shoppingcenters, • profitable Further phases Interfaces to train und trucksExtension ouest Container link from harbor to• Harbor link Hamburg (37 km) logistic center Project proposal: City quality• World Bank (transport carbon division): check up 8
  • 9. Cargosous Terrain • Technology partners are ligned up – Logistics – Mechatronics – Geoengineering – Financial engineering • First results indicate profitable investment !BAV 9
  • 10. For your attention andfuture partnership to success 10