11 June 2013, Madrid© Torresol Energy
GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH
15 HOURS OF THERMAL STORAGE SYSTEM
WORKSHOP ON APPLICATIONS OF SOLAR FORECASTING
Juan Ignacio Burgaleta
Director of Technology
© Torresol Energy 211 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
INDEX
1. Torresol Energy
2. The GEMASOLAR Plant
3. Innovations
4. Operation
5. Construction
6. Commercial operation
7. Conclusions
© Torresol Energy 311 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
1. Torresol Energy
• Engineering, consulting, and systems inte-
gration company. Founded in 1956.
• Very active in Solar Energy since 2000.
– Technology developer: SENERtrough collector system, Sensol
software, heliostats, heliostat axis drive mechanisms, molten salt
technology (as storage system and as heat transfer fluid) central
tower receiver… amongst many other innovations.
– PSA Tower Prototype
– Turn Key Projects: Andasol 1 & 2, in Granada; Extresol 1, 2
& 3, in Badajoz; one plant in La Garrovilla (Badajoz); one
plant in Alvarado (Badajoz); and two plants in Navalvillar de
Pela (Badajoz).
60% 40%
• 100% “Mubadala Development
Company” stockholding.
• Mubadala Development Company”
belongs to the Abu Dhabi Emirate.
• Goal: development and commer-
cialization of innovative technologies
in renewable, alternative and sus-
tainable energies.
A STRONG ALLIANCE
© Torresol Energy 411 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
1. Torresol Energy
GEMASOLAR
(Tower)
VALLE 1
(PTC)
VALLE 2
(PTC)
© Torresol Energy 511 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
2. The GEMASOLAR Plant
© Torresol Energy 611 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
2. The GEMASOLAR Plant
• Storage system
Solar energy
Solar field and
central tower receiver
Molten salts
storage system
• Generation system
Molten salts
storage system
Steam
generation
system
Turbine/generator
system Grid
© Torresol Energy 711 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
2. The GEMASOLAR Plant
• High thermal storage capacity (24 hours).
• The same fluid is used for heat transfer and storage.
• The molten salts reach highest temperatures (565ºc) maximizing thermodynamic efficiency.
• The whole piping system is contained in an small area, reducing the heat losses, the
maintenance costs and minimizing the possibility of leaks.
• Lower operation risk (No mobile piping system. No swivel joints. No thermal oil).
• Highest cycle efficiency.
Advantages of Central Tower with Molten Salt Technology
© Torresol Energy 811 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
2. The GEMASOLAR Plant
© Torresol Energy 911 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
3. Innovations (Heliostats)
• High surface (115 m2).
• High optic quality and precision.
• Integrated facet mirror-structure.
• Innovative system of facets union.
• Reduced manufacturing, assembly and
maintenance costs.
Developed by SENER
© Torresol Energy 1011 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
3. Innovations (Receiver)
• Optimize size to minimize thermal losses.
• High flow of incident radiation.
• Optimize the design to the maximum temperature
of the metal.
• Thermal maximum efficiency.
• Designed for 25 years of operation.
Solar receiver
Prototype receiver testing in
the PSA of Almería
Receiver Developed by SENER with
PSA-CIEMAT colaboration
© Torresol Energy 1111 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
3. Innovations
Solar Field Control System
• Innovative Control system of solar
field composed by 2650 heliostats,
positioned at north, south, east and
west of the tower.
• Optimize the electricity consumption
of the heliostat actuation system.
• Development of a new pointing
strategy that guarantees the good
distribution of the solar flow incident
in the receiver.
• Reduce the time of heliostats de-
focusing.
Developed by SENER
© Torresol Energy 1211 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
3. Innovations
Molten Salt Storage System
– Tranference fluid and thermal
storage: Nitate molten salts 60%
Na NO3 y 40% KNO3.
– 15 hours of thermal storage
capacity, operating with turbine in
nominal conditions.
– Operatoin tempeature 565.
– Pumping of salts to the receiver
placed in the tower at 140 m.
Power block, molten salt storage system of
the GEMASOLAR Plant
Developed by SENER
© Torresol Energy 1311 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
4. Operation
GEMASOLAR Flow Diagram
© Torresol Energy 1411 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
4. Operation
GEMASOLAR Daytime Operation
© Torresol Energy 1511 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
4. Operation
GEMASOLAR Daytime Operation during Cloudy Periods
© Torresol Energy 1611 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
GEMASOLAR Nightime Operation
4. Operation
© Torresol Energy 1711 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
5. Construction
Aerial view of the GEMASOLAR Power Block
© Torresol Energy 1811 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
5. Construction
© Torresol Energy 1911 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
5. Construction
Aerial view of the GEMASOLAR Plant
© Torresol Energy 2011 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
6. Commercial Operation
© Torresol Energy 2111 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
6. Commercial Operation
• Commissioning activities started November 2010:
− Heliostats calibration.
− Salt molten in a temporary installation and stored in the cold tank (November –
December 2010)
• End of April 2011 plant synchronized.
Start up and Commissioning
© Torresol Energy 2211 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
• From early May 2011 providing electricity to the grid.
• End June, 24 hours of uninterrupted electricity production.
• On July 6 2011 performance test, result exceeded theoretical prediction.
• Excellent hourly production predictions.
6. Commercial Operation
© Torresol Energy 2311 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
6. Commercial Operation
Starting & Shutting Down the Receiver
• Every day the receiver temperature changes quickly from the environmental conditions till
operation conditions (565ºC)
• Procedures to control all the parameters-components which affect the receiver filling and
drainage developed by Torresol Energy to secure the efficiency and the security (delicate
operation)
• Complex system: Sincronization between Solard Field (heliostats) and the Central
Receiver System (CRS)
• Thermography cameras are part of the control tool for the radiation flow onto the receiver
and are synchronized with the solar field software (heliostats pointing)
© Torresol Energy 2411 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
6. Commercial Operation
Starting & Shutting Down the Receiver
• Importance of a good reciever drainage
• The molten salt must be between 260ºC and 565ºC.
• Operational improvements extend the daily
production
• Calibration of the heliostats: Targets located below
the receiver to calibrate the heliostats
© Torresol Energy 2511 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
Actual Guarantee
– Receiver Thermal Power 135 MWTh 120 MWTh
– Net Electrical Production 414.3 MWh 302 MWh
– Receiver Outlet Salts Temp. 565 ºC 565 ºC
– Gross Power 19.9 MW 19.9 MW
– Net Power 17.0 MW 17.0 MW
24 h Overall Performance Test passed on July 6th, 2011
6. Commercial Operation
© Torresol Energy 2611 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
6. Commercial Operation
Production dates. From 16-08-2011, 00:00 hour to 17-08-2011, 00:00 hour
© Torresol Energy 2711 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
6. Commercial Operation
Non-stop operation in Winter time
© Torresol Energy 2811 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
6. Commercial Operation
Turbine continuously running at nominal power in summer
© Torresol Energy 2911 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
12 DAYS OF CONTINUOUS PRODUCTION
6. Commercial Operation
© Torresol Energy 3011 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
7. Next Steps
• We, and most of the analysts, consider that the
technology of Central Tower Plants with Molten Salts
has higher opportunities to achieve the grid parity in
a shorter period of time due to:
− Larger future cost reduction.
− Size to be increased.
− New equipment yet to be developed.
− Affordable construction materials.
• Next Tower Plant with Molten Salt Storage System:
− + 500 MWt receiver ( +12.000 heliostats)
− Storage System capacity depending on Market
requirements
© Torresol Energy 3111 June 2013, Madrid
GEMASOLAR: A THERMAL SOLAR POWER PLANT
WITH 15 HOURS OF THERMAL STORAGE SYSTEM
7. Conclusions
• GEMASOLAR is the first commercial-scale plant featuring a central tower
molten salt receiver with thermal storage capabilities supplying electricity
to the grid from May 2011.
• The molten salt thermal storage system helps avoid fluctuations in power
supply and enables to produce electricity during 15 hours in the absence
of solar radiation.
• The 19.9 MWe GEMASOLAR Plant became the first CSP ever to
generate uninterrupted electricity for 24 hour at full capacity.
• Next Tower Plant and Molten Salt System with increased power
11 June 2013, Madrid© Torresol Energy
Thank you

More Related Content

Viewers also liked

Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)IrSOLaV Pomares
 
Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...IrSOLaV Pomares
 
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)IrSOLaV Pomares
 
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)IrSOLaV Pomares
 
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)IrSOLaV Pomares
 
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...IrSOLaV Pomares
 
The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...IrSOLaV Pomares
 
Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)IrSOLaV Pomares
 
A New Generation of Molten Salt
A New Generation of Molten SaltA New Generation of Molten Salt
A New Generation of Molten SaltYara International
 
CSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation reportCSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation reportIrSOLaV Pomares
 
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)IrSOLaV Pomares
 
Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]Smithers Apex
 
solar power by molten salt technology
solar power by molten salt technologysolar power by molten salt technology
solar power by molten salt technologymadhu124521
 
Introduction to Phase Change Materials #PSBPcomfort
Introduction to Phase Change Materials #PSBPcomfortIntroduction to Phase Change Materials #PSBPcomfort
Introduction to Phase Change Materials #PSBPcomfortSu Butcher
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentationMalika Alix
 
phase changing material
phase changing materialphase changing material
phase changing materialprashantchikya
 
Concentrated Solar Power Course - Session 1 : Fundamentals
Concentrated Solar Power Course - Session 1 : FundamentalsConcentrated Solar Power Course - Session 1 : Fundamentals
Concentrated Solar Power Course - Session 1 : FundamentalsLeonardo ENERGY
 
csp (concentrated solar power) technology
csp (concentrated solar power) technologycsp (concentrated solar power) technology
csp (concentrated solar power) technologyArvind Dautaniya
 
Solar Power Tower
Solar Power TowerSolar Power Tower
Solar Power TowerArpan_07
 

Viewers also liked (20)

Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)Managing the energy purchasing - Jorge gonzalez (Gesternova)
Managing the energy purchasing - Jorge gonzalez (Gesternova)
 
Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...Future guidelines on solar forecasting the research view - David Pozo (Univer...
Future guidelines on solar forecasting the research view - David Pozo (Univer...
 
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
Forecasting commercial services from IrSOLaV - Luis Martin (IRSOLAV)
 
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)Forecasting commercial services from S2M - Juan Liria (Sun2Market)
Forecasting commercial services from S2M - Juan Liria (Sun2Market)
 
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
Forecasting energy fo pv system - Miguel Martínez (Wenner Solar)
 
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
Workshop on Applications of Solar Radiation Forecasting - Introduction - Jesú...
 
The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...
 
Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)Future guidelines the meteorological view - Isabel Martínez (AEMet)
Future guidelines the meteorological view - Isabel Martínez (AEMet)
 
A New Generation of Molten Salt
A New Generation of Molten SaltA New Generation of Molten Salt
A New Generation of Molten Salt
 
CSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation reportCSP, CPV or PV solar plant simulation report
CSP, CPV or PV solar plant simulation report
 
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
General situation of solar thermal energy - Eduardo Iglesias (Protermosolar)
 
Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]
 
solar power by molten salt technology
solar power by molten salt technologysolar power by molten salt technology
solar power by molten salt technology
 
Introduction to Phase Change Materials #PSBPcomfort
Introduction to Phase Change Materials #PSBPcomfortIntroduction to Phase Change Materials #PSBPcomfort
Introduction to Phase Change Materials #PSBPcomfort
 
Solar energy presentation
Solar energy presentationSolar energy presentation
Solar energy presentation
 
phase changing material
phase changing materialphase changing material
phase changing material
 
Concentrated Solar Power Course - Session 1 : Fundamentals
Concentrated Solar Power Course - Session 1 : FundamentalsConcentrated Solar Power Course - Session 1 : Fundamentals
Concentrated Solar Power Course - Session 1 : Fundamentals
 
csp (concentrated solar power) technology
csp (concentrated solar power) technologycsp (concentrated solar power) technology
csp (concentrated solar power) technology
 
Writing a Literature Review- handout
Writing a Literature Review- handout Writing a Literature Review- handout
Writing a Literature Review- handout
 
Solar Power Tower
Solar Power TowerSolar Power Tower
Solar Power Tower
 

Similar to Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torresol Energy)

Hybrid gas turbine system
Hybrid gas turbine systemHybrid gas turbine system
Hybrid gas turbine systemRoshReji
 
EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016Tina Damos
 
concentrated solar power .pptx
concentrated solar power .pptxconcentrated solar power .pptx
concentrated solar power .pptxsaswath5
 
Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...ako_corporate
 
recent trends, researches in thermal engineering
recent trends, researches in thermal engineeringrecent trends, researches in thermal engineering
recent trends, researches in thermal engineeringvenumadugula
 
IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...
IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...
IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...IRJET Journal
 
Concerntatini solar plant ppt
Concerntatini solar plant pptConcerntatini solar plant ppt
Concerntatini solar plant pptkarmbir saini
 
Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.Abengoa
 
Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2Brett Wightman
 
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...ako_corporate
 
Agua caliente vs Energía Solar
Agua caliente vs Energía SolarAgua caliente vs Energía Solar
Agua caliente vs Energía SolarPedro Rodríguez
 
Final english airsource catalog: ecoAIR
Final english airsource catalog: ecoAIRFinal english airsource catalog: ecoAIR
Final english airsource catalog: ecoAIRAdrián Pérez
 
Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”
Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”
Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”Agencia Andaluza de la Energía
 
Gould - Thermal Energy Storage
Gould - Thermal Energy StorageGould - Thermal Energy Storage
Gould - Thermal Energy StorageGW Solar Institute
 
Redesign and Fabrication of Solar Power Tower using CAD and FEM Analysis
Redesign and Fabrication of Solar Power Tower using CAD and  FEM AnalysisRedesign and Fabrication of Solar Power Tower using CAD and  FEM Analysis
Redesign and Fabrication of Solar Power Tower using CAD and FEM AnalysisIJMER
 
Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10R2S Apresentações
 
Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)MitchellDong
 

Similar to Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torresol Energy) (20)

AKOTRACE: Case Study Andasol III
AKOTRACE: Case Study Andasol IIIAKOTRACE: Case Study Andasol III
AKOTRACE: Case Study Andasol III
 
Hybrid gas turbine system
Hybrid gas turbine systemHybrid gas turbine system
Hybrid gas turbine system
 
EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016
 
concentrated solar power .pptx
concentrated solar power .pptxconcentrated solar power .pptx
concentrated solar power .pptx
 
Solar tower
Solar towerSolar tower
Solar tower
 
Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...Special AKOTRACE®  Electrical Heat Tracing Solution for Gemasolar Solar Power...
Special AKOTRACE® Electrical Heat Tracing Solution for Gemasolar Solar Power...
 
recent trends, researches in thermal engineering
recent trends, researches in thermal engineeringrecent trends, researches in thermal engineering
recent trends, researches in thermal engineering
 
IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...
IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...
IRJET- Modeling of Small Scale Solar Power Plant for Electricity and Cooling ...
 
Concerntatini solar plant ppt
Concerntatini solar plant pptConcerntatini solar plant ppt
Concerntatini solar plant ppt
 
Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.Parabolic trough technology vs tower technology.
Parabolic trough technology vs tower technology.
 
Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2Asis company overview english noc_vf_rev2
Asis company overview english noc_vf_rev2
 
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
SPECIAL AKOTRACE® ELECTRICAL HEAT TRACING SYSTEM FOR THE SAMCASOL 1 & 2 THERM...
 
Agua caliente vs Energía Solar
Agua caliente vs Energía SolarAgua caliente vs Energía Solar
Agua caliente vs Energía Solar
 
Final english airsource catalog: ecoAIR
Final english airsource catalog: ecoAIRFinal english airsource catalog: ecoAIR
Final english airsource catalog: ecoAIR
 
Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”
Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”
Laboratorio de Sistemas de Energías Terrestres de “El Arenosillo”
 
Gould - Thermal Energy Storage
Gould - Thermal Energy StorageGould - Thermal Energy Storage
Gould - Thermal Energy Storage
 
Redesign and Fabrication of Solar Power Tower using CAD and FEM Analysis
Redesign and Fabrication of Solar Power Tower using CAD and  FEM AnalysisRedesign and Fabrication of Solar Power Tower using CAD and  FEM Analysis
Redesign and Fabrication of Solar Power Tower using CAD and FEM Analysis
 
Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10
 
Storelectric
Storelectric Storelectric
Storelectric
 
Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)Solar Power Generation 2011 (Las Vegas, NV)
Solar Power Generation 2011 (Las Vegas, NV)
 

More from IrSOLaV Pomares

Solar radiation ground measured data quality assessment report
 Solar radiation ground measured data quality assessment report Solar radiation ground measured data quality assessment report
Solar radiation ground measured data quality assessment reportIrSOLaV Pomares
 
Typical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plantsTypical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plantsIrSOLaV Pomares
 
Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...IrSOLaV Pomares
 
Programa jornada predicción
Programa jornada predicciónPrograma jornada predicción
Programa jornada predicciónIrSOLaV Pomares
 
Assessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb courseAssessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb courseIrSOLaV Pomares
 
Time series solar radiation forecasting
Time series solar radiation forecastingTime series solar radiation forecasting
Time series solar radiation forecastingIrSOLaV Pomares
 
Solar resource assessment luis martin
Solar resource assessment luis martinSolar resource assessment luis martin
Solar resource assessment luis martinIrSOLaV Pomares
 
Solar radiation forecasting with wrf model in the iberian peninsula
Solar radiation forecasting with wrf model in the iberian peninsulaSolar radiation forecasting with wrf model in the iberian peninsula
Solar radiation forecasting with wrf model in the iberian peninsulaIrSOLaV Pomares
 
Solar radiation forecasting with non lineal statistical techniques and qualit...
Solar radiation forecasting with non lineal statistical techniques and qualit...Solar radiation forecasting with non lineal statistical techniques and qualit...
Solar radiation forecasting with non lineal statistical techniques and qualit...IrSOLaV Pomares
 
Review solar prediction iea 07-06
Review solar prediction iea 07-06Review solar prediction iea 07-06
Review solar prediction iea 07-06IrSOLaV Pomares
 
Quality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarkingQuality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarkingIrSOLaV Pomares
 
Luis martin jornada becarios 2006
Luis martin jornada becarios 2006Luis martin jornada becarios 2006
Luis martin jornada becarios 2006IrSOLaV Pomares
 
Luis martin oldenburg 7-2007
Luis martin   oldenburg 7-2007Luis martin   oldenburg 7-2007
Luis martin oldenburg 7-2007IrSOLaV Pomares
 
Lmp solar reroucesassessment.ru
Lmp solar reroucesassessment.ruLmp solar reroucesassessment.ru
Lmp solar reroucesassessment.ruIrSOLaV Pomares
 
Ispra 2007 luis martín2
Ispra 2007 luis martín2Ispra 2007 luis martín2
Ispra 2007 luis martín2IrSOLaV Pomares
 
Global solar radiation forecasting with non lineal statistical techniques and...
Global solar radiation forecasting with non lineal statistical techniques and...Global solar radiation forecasting with non lineal statistical techniques and...
Global solar radiation forecasting with non lineal statistical techniques and...IrSOLaV Pomares
 
Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2
Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2
Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2IrSOLaV Pomares
 
Comparación de técnicas predictivas basadas en series temporales aplicadas al...
Comparación de técnicas predictivas basadas en series temporales aplicadas al...Comparación de técnicas predictivas basadas en series temporales aplicadas al...
Comparación de técnicas predictivas basadas en series temporales aplicadas al...IrSOLaV Pomares
 

More from IrSOLaV Pomares (19)

Solar radiation ground measured data quality assessment report
 Solar radiation ground measured data quality assessment report Solar radiation ground measured data quality assessment report
Solar radiation ground measured data quality assessment report
 
Typical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plantsTypical Meteorological Year Report for CSP, CPV and PV solar plants
Typical Meteorological Year Report for CSP, CPV and PV solar plants
 
Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...Technical report site assessment of solar resource for a csp plant. correctio...
Technical report site assessment of solar resource for a csp plant. correctio...
 
Programa jornada predicción
Programa jornada predicciónPrograma jornada predicción
Programa jornada predicción
 
Assessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb courseAssessment and evaluation of solar resources adb course
Assessment and evaluation of solar resources adb course
 
Time series solar radiation forecasting
Time series solar radiation forecastingTime series solar radiation forecasting
Time series solar radiation forecasting
 
Solar resource assessment luis martin
Solar resource assessment luis martinSolar resource assessment luis martin
Solar resource assessment luis martin
 
Solar radiation forecasting with wrf model in the iberian peninsula
Solar radiation forecasting with wrf model in the iberian peninsulaSolar radiation forecasting with wrf model in the iberian peninsula
Solar radiation forecasting with wrf model in the iberian peninsula
 
Solar radiation forecasting with non lineal statistical techniques and qualit...
Solar radiation forecasting with non lineal statistical techniques and qualit...Solar radiation forecasting with non lineal statistical techniques and qualit...
Solar radiation forecasting with non lineal statistical techniques and qualit...
 
Review solar prediction iea 07-06
Review solar prediction iea 07-06Review solar prediction iea 07-06
Review solar prediction iea 07-06
 
Quality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarkingQuality of ground data for assessment and benchmarking
Quality of ground data for assessment and benchmarking
 
Luis martin jornada becarios 2006
Luis martin jornada becarios 2006Luis martin jornada becarios 2006
Luis martin jornada becarios 2006
 
Luis martin oldenburg 7-2007
Luis martin   oldenburg 7-2007Luis martin   oldenburg 7-2007
Luis martin oldenburg 7-2007
 
Lmp solar reroucesassessment.ru
Lmp solar reroucesassessment.ruLmp solar reroucesassessment.ru
Lmp solar reroucesassessment.ru
 
List of references 2013
List of references 2013List of references 2013
List of references 2013
 
Ispra 2007 luis martín2
Ispra 2007 luis martín2Ispra 2007 luis martín2
Ispra 2007 luis martín2
 
Global solar radiation forecasting with non lineal statistical techniques and...
Global solar radiation forecasting with non lineal statistical techniques and...Global solar radiation forecasting with non lineal statistical techniques and...
Global solar radiation forecasting with non lineal statistical techniques and...
 
Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2
Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2
Evaluation of wrf and ecmwf forecasts for spain iea 4th ciemat v2
 
Comparación de técnicas predictivas basadas en series temporales aplicadas al...
Comparación de técnicas predictivas basadas en series temporales aplicadas al...Comparación de técnicas predictivas basadas en series temporales aplicadas al...
Comparación de técnicas predictivas basadas en series temporales aplicadas al...
 

Recently uploaded

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 

Recently uploaded (20)

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 

Gemasolar a thermal solar power plant with 15 hours, Ignacio Burgaleta (Torresol Energy)

  • 1. 11 June 2013, Madrid© Torresol Energy GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM WORKSHOP ON APPLICATIONS OF SOLAR FORECASTING Juan Ignacio Burgaleta Director of Technology
  • 2. © Torresol Energy 211 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM INDEX 1. Torresol Energy 2. The GEMASOLAR Plant 3. Innovations 4. Operation 5. Construction 6. Commercial operation 7. Conclusions
  • 3. © Torresol Energy 311 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 1. Torresol Energy • Engineering, consulting, and systems inte- gration company. Founded in 1956. • Very active in Solar Energy since 2000. – Technology developer: SENERtrough collector system, Sensol software, heliostats, heliostat axis drive mechanisms, molten salt technology (as storage system and as heat transfer fluid) central tower receiver… amongst many other innovations. – PSA Tower Prototype – Turn Key Projects: Andasol 1 & 2, in Granada; Extresol 1, 2 & 3, in Badajoz; one plant in La Garrovilla (Badajoz); one plant in Alvarado (Badajoz); and two plants in Navalvillar de Pela (Badajoz). 60% 40% • 100% “Mubadala Development Company” stockholding. • Mubadala Development Company” belongs to the Abu Dhabi Emirate. • Goal: development and commer- cialization of innovative technologies in renewable, alternative and sus- tainable energies. A STRONG ALLIANCE
  • 4. © Torresol Energy 411 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 1. Torresol Energy GEMASOLAR (Tower) VALLE 1 (PTC) VALLE 2 (PTC)
  • 5. © Torresol Energy 511 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 2. The GEMASOLAR Plant
  • 6. © Torresol Energy 611 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 2. The GEMASOLAR Plant • Storage system Solar energy Solar field and central tower receiver Molten salts storage system • Generation system Molten salts storage system Steam generation system Turbine/generator system Grid
  • 7. © Torresol Energy 711 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 2. The GEMASOLAR Plant • High thermal storage capacity (24 hours). • The same fluid is used for heat transfer and storage. • The molten salts reach highest temperatures (565ºc) maximizing thermodynamic efficiency. • The whole piping system is contained in an small area, reducing the heat losses, the maintenance costs and minimizing the possibility of leaks. • Lower operation risk (No mobile piping system. No swivel joints. No thermal oil). • Highest cycle efficiency. Advantages of Central Tower with Molten Salt Technology
  • 8. © Torresol Energy 811 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 2. The GEMASOLAR Plant
  • 9. © Torresol Energy 911 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 3. Innovations (Heliostats) • High surface (115 m2). • High optic quality and precision. • Integrated facet mirror-structure. • Innovative system of facets union. • Reduced manufacturing, assembly and maintenance costs. Developed by SENER
  • 10. © Torresol Energy 1011 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 3. Innovations (Receiver) • Optimize size to minimize thermal losses. • High flow of incident radiation. • Optimize the design to the maximum temperature of the metal. • Thermal maximum efficiency. • Designed for 25 years of operation. Solar receiver Prototype receiver testing in the PSA of Almería Receiver Developed by SENER with PSA-CIEMAT colaboration
  • 11. © Torresol Energy 1111 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 3. Innovations Solar Field Control System • Innovative Control system of solar field composed by 2650 heliostats, positioned at north, south, east and west of the tower. • Optimize the electricity consumption of the heliostat actuation system. • Development of a new pointing strategy that guarantees the good distribution of the solar flow incident in the receiver. • Reduce the time of heliostats de- focusing. Developed by SENER
  • 12. © Torresol Energy 1211 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 3. Innovations Molten Salt Storage System – Tranference fluid and thermal storage: Nitate molten salts 60% Na NO3 y 40% KNO3. – 15 hours of thermal storage capacity, operating with turbine in nominal conditions. – Operatoin tempeature 565. – Pumping of salts to the receiver placed in the tower at 140 m. Power block, molten salt storage system of the GEMASOLAR Plant Developed by SENER
  • 13. © Torresol Energy 1311 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 4. Operation GEMASOLAR Flow Diagram
  • 14. © Torresol Energy 1411 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 4. Operation GEMASOLAR Daytime Operation
  • 15. © Torresol Energy 1511 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 4. Operation GEMASOLAR Daytime Operation during Cloudy Periods
  • 16. © Torresol Energy 1611 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM GEMASOLAR Nightime Operation 4. Operation
  • 17. © Torresol Energy 1711 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 5. Construction Aerial view of the GEMASOLAR Power Block
  • 18. © Torresol Energy 1811 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 5. Construction
  • 19. © Torresol Energy 1911 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 5. Construction Aerial view of the GEMASOLAR Plant
  • 20. © Torresol Energy 2011 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 6. Commercial Operation
  • 21. © Torresol Energy 2111 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 6. Commercial Operation • Commissioning activities started November 2010: − Heliostats calibration. − Salt molten in a temporary installation and stored in the cold tank (November – December 2010) • End of April 2011 plant synchronized. Start up and Commissioning
  • 22. © Torresol Energy 2211 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM • From early May 2011 providing electricity to the grid. • End June, 24 hours of uninterrupted electricity production. • On July 6 2011 performance test, result exceeded theoretical prediction. • Excellent hourly production predictions. 6. Commercial Operation
  • 23. © Torresol Energy 2311 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 6. Commercial Operation Starting & Shutting Down the Receiver • Every day the receiver temperature changes quickly from the environmental conditions till operation conditions (565ºC) • Procedures to control all the parameters-components which affect the receiver filling and drainage developed by Torresol Energy to secure the efficiency and the security (delicate operation) • Complex system: Sincronization between Solard Field (heliostats) and the Central Receiver System (CRS) • Thermography cameras are part of the control tool for the radiation flow onto the receiver and are synchronized with the solar field software (heliostats pointing)
  • 24. © Torresol Energy 2411 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 6. Commercial Operation Starting & Shutting Down the Receiver • Importance of a good reciever drainage • The molten salt must be between 260ºC and 565ºC. • Operational improvements extend the daily production • Calibration of the heliostats: Targets located below the receiver to calibrate the heliostats
  • 25. © Torresol Energy 2511 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM Actual Guarantee – Receiver Thermal Power 135 MWTh 120 MWTh – Net Electrical Production 414.3 MWh 302 MWh – Receiver Outlet Salts Temp. 565 ºC 565 ºC – Gross Power 19.9 MW 19.9 MW – Net Power 17.0 MW 17.0 MW 24 h Overall Performance Test passed on July 6th, 2011 6. Commercial Operation
  • 26. © Torresol Energy 2611 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 6. Commercial Operation Production dates. From 16-08-2011, 00:00 hour to 17-08-2011, 00:00 hour
  • 27. © Torresol Energy 2711 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 6. Commercial Operation Non-stop operation in Winter time
  • 28. © Torresol Energy 2811 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 6. Commercial Operation Turbine continuously running at nominal power in summer
  • 29. © Torresol Energy 2911 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 12 DAYS OF CONTINUOUS PRODUCTION 6. Commercial Operation
  • 30. © Torresol Energy 3011 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 7. Next Steps • We, and most of the analysts, consider that the technology of Central Tower Plants with Molten Salts has higher opportunities to achieve the grid parity in a shorter period of time due to: − Larger future cost reduction. − Size to be increased. − New equipment yet to be developed. − Affordable construction materials. • Next Tower Plant with Molten Salt Storage System: − + 500 MWt receiver ( +12.000 heliostats) − Storage System capacity depending on Market requirements
  • 31. © Torresol Energy 3111 June 2013, Madrid GEMASOLAR: A THERMAL SOLAR POWER PLANT WITH 15 HOURS OF THERMAL STORAGE SYSTEM 7. Conclusions • GEMASOLAR is the first commercial-scale plant featuring a central tower molten salt receiver with thermal storage capabilities supplying electricity to the grid from May 2011. • The molten salt thermal storage system helps avoid fluctuations in power supply and enables to produce electricity during 15 hours in the absence of solar radiation. • The 19.9 MWe GEMASOLAR Plant became the first CSP ever to generate uninterrupted electricity for 24 hour at full capacity. • Next Tower Plant and Molten Salt System with increased power
  • 32. 11 June 2013, Madrid© Torresol Energy Thank you