SlideShare a Scribd company logo
1 of 53
Download to read offline
Supporting
Your Child in
Learning
Mathematics
      Yeap Ban Har
  Marshall Cavendish Institute
          Singapore

 banhar.yeap@pathlight.org.sg




 Slides are available at
www.banhar.blogspot.com
Type     Mark     Number      Type     Mark     Number
          Value                         Value
 MCQ     1 mark    10 (10%)    SAQ     2 marks   5 (10%)
 MCQ     2 marks   5 (10%)             3 marks
 SAQ     1 mark    10 (10%)    LAQ     4 marks   13 (50%)
                                       5 marks
 SAQ     2 marks   5 (10%)




Paper 1 (50 min)              Paper 2 (1 hr 40 min)
Type     Mark     Number      Type     Mark     Number
          Value                         Value
 MCQ      1 mark   10 (10%)    SAQ     2 marks   10 (20%)
 MCQ     2 marks   10 (20%)            3 marks
 SAQ     2 marks   10 (20%)    LAQ     4 marks   8 (30%)
                                       5 marks




Paper 1 (1 hr)                Paper 2 (1 hr 15 min)
The rationale of teaching mathematics is that it is “a good
       vehicle for the development and improvement of a
                    person’s intellectual competence”.
Ministry of Education 2006
Find the value of 12.2 ÷ 4 .




                           Answer : 3.05 [B1]




                                    Example 1
3 .05
     12.20           4   12.20
                         12
  12    20 hundredths
                           0.20
Number Bond Method         0.20
                              0
                     Long Division Method
A show started at 10.55 a.m. and ended
at 1.30 p.m. How long was the show in
hours and minutes?



                       2 h 30 min


           11 a.m.                  1.30 p.m.



                     Answer : 2 h 35 min [B1]

                                        Example 2
   Find <y in the figure below.

                        70 o
                     70 o      y
                       70 o




   360o – 210o = 150o




                                   Example 3
The height of the classroom door is about __.

(1)    1m
(2)    2m
(3)   10 m
(4)   20 m




                                   Example 4
Ministry of Education 2006
Cup cakes are sold at 40 cents each.
What is the greatest number of cup cakes that
can be bought with $95?


   $95 ÷ 40 cents = 237.5
                      Answer: 237 cupcakes




                               Example 5
From January to August last year, Mr
Tang sold an average of 4.5 cars per
month, He did not sell any car in the
next 4 months. On average, how many
cars did he sell per month last year?

    4.5 x 8 = 36

    36 ÷ 12 = 3


                              Example 7
Mr Tan rented a car for 3 days. He was
charged $155 per day and 60 cents for
every km that he travelled. He paid
$767.40. What was the total distance
that he travelled for the 3 days?

    $767.40 – 3 x $155 = $302.40

$302.40 ÷ 60 cents per km = 504 km


                               Example 7
Mr Tan rented a car for 3 days. He was
charged $155 per day and 60 cents for
every km that he travelled. He paid
$767.40. What was the total distance
that he travelled for the 3 days?

    767.40 – 3 x 155 = 302.40

    302.40 ÷ 0.60 = 504
    He travelled 504 km.

                               Example 7
Ministry of Education 2006
Ministry of Education 2006
Students in the highest international benchmark are able
   to apply their knowledge in a variety of situations and
                              able to explain themselves.
1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97
The first 97 whole numbers are added up.
What is the ones digit in the total?




                                 Problem 1
1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97
The first 97 whole numbers are added up.
What is the ones digit in the total?




                                 Problem 1
1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97
The first 97 whole numbers are added up.
What is the ones digit in the total?




                                 Problem 1
1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97
The first 97 whole numbers are added up.
What is the ones digit in the total?

 The method is difficult to communicate in
 written form. Hence, the problem is
 presented in the MCQ format where credit is
 not given for written method.



                                 Problem 1
   A figure is formed by arranging equilateral
    triangles pieces of sides 3 cm in a line. The
    figure has a perimeter of 93 cm. How many
    pieces of the equilateral triangles are used?




               93 cm ÷ 3 cm = 31
               31 – 2 = 29
                       29 pieces are used.
                                             Problem 2
Structure 1 Structure 2   Structure 3   Structure 4       Structure 5


             Structure     Number of Rods     Height in cm
                 1                 12                 3
                 2                 20                 3
                 3                 28                 6
                 4                 33                 6
                 5                 41                 9
                 6



                                                      Problem 3
Structure 1 Structure 2   Structure 3   Structure 4       Structure 5


             Structure     Number of Rods     Height in cm
                 1                 12                 3
                 2                 20                 3
                 3                 28                 6
                 4                 33                 6
                 5                 41                 9
                 6                 46                 9



                                                      Problem 3
Structure 1 Structure 2   Structure 3   Structure 4       Structure 5


             Structure     Number of Rods     Height in cm
                 1                 12                 3
                 2                 20                 3
                 3                 28                 6
                 4                 33                 6
                 5                 41                 9
                 6                 46                 9
                119

                                                      Problem 3
Structure 1 Structure 2   Structure 3   Structure 4       Structure 5


             Structure     Number of Rods     Height in cm


                 2                                    3


                 4                                    6


                 6                                    9
                119

                                                      Problem 3
Structure 1 Structure 2   Structure 3   Structure 4         Structure 5


             Structure     Number of Rods     Height in cm


                 2                                    3


                 4                                    6


                 6                                    9
                119                                   180

                                                       Problem 3
Structure 1 Structure 2   Structure 3   Structure 4         Structure 5


             Structure     Number of Rods     Height in cm
                 1                 12                 3
                 2                 20                 3
                 3                 28                 6
                 4                 33                 6
                 5                 41                 9
                 6                 46                 9
                119                                   180

                                                       Problem 3
Structure 1 Structure 2   Structure 3    Structure 4         Structure 5


             Structure     Number of Rods       Height in cm
                 1                 12                  3
                 2                 20                  3
                 3                 28                  6
                 4                 33                  6
                 5                 41                  9
                 6                 46                  9
                119                                    180

                           119 – 3 = 116  58     58 x 13 = 754
Structure 1 Structure 2   Structure 3    Structure 4         Structure 5


             Structure     Number of Rods       Height in cm
                 1                 12                  3
                 2                 20                  3
                 3                 28                  6
                 4                 33                  6
                 5                 41                  9
                 6                 46                  9
                119               782                  180

                           119 – 3 = 116  58     58 x 13 = 754
Ministry of Education 2006
1    2    3    4    5    6    7     8

9    10   11   12   13   14   15    16

17   18   19   20   21   22   23    24

25   26   27   28   29   30   31    32

33   34   35   36   37   38   39    40

41   42   43   44   45   46   47    48

49   50   51   52   53   54   55    56


                                   Problem 4
Table 1 consists of numbers from 1 to 56. Kay and Lin are given a plastic
frame that covers exactly 9 squares of Table 1 with the centre square
darkened.




(a) Kay puts the frame on 9 squares as shown in the figure below.

                             3       4    5

                            11            13

                            19      20    21


                                 What is the average of the 8 numbers that can
                                 be seen in the frame?
Table 1 consists of numbers from 1 to 56. Kay and Lin are given a plastic
frame that covers exactly 9 squares of Table 1 with the centre square
darkened.




(a) Kay puts the frame on 9 squares as shown in the figure below.

                                                  3+4+5+11+13+19+20 = 96
                             3       4    5       96 ÷ 8 = 12

                            11            13        Alternate Method
                                                    4 x 24 = 96
                            19      20    21        96 ÷ 8 = 12


                                 What is the average of the 8 numbers that can
                                 be seen in the frame?
(b) Lin puts the frame on some other 9 squares.
    The sum of the 8 numbers that can be seen in the frame is 272.
    What is the largest number that can be seen in the frame?


                  1     2     3     4     5     6     7     8

                  9    10    11    12     13    14    15    16

                 17    18    19    20     21    22    23    24

                 25    26    27    28     29    30    31    32

                 33    34    35    36     37    38    39    40

                 41    42    43    44     45    46    47    48

                 49    50    51    52     53    54    55    56
40 cm x 30 cm x 60 cm = 72 000 cm3
72 000 cm3 ÷ 5 x 3 = 43 200 cm3
43 200 cm3 ÷ 1800 cm2 = 24 cm

                                     Problem 5
40 cm x 30 cm x 60 cm = 72 000 cm3
72 000 cm3 ÷ 5 x 2 = 28 800 cm3
28 800 cm3 ÷ 1200 cm2 = 24 cm

                                     Problem 5
Rena used stickers of four different shapes
to make a pattern. The first 12 stickers are
shown below. What was the shape of the
47th sticker?
            ………?
1st                         12th      47th




                                   Problem 6
   88 children took part in a swimming
    competition. 1/3 of the boys and 3/7 of the
    girls wore swimming goggles. Altogether 34
    children wore swimming goggles. How many
    girls wore swimming goggles on that day?
88




34        54
34 – 20 = 14                        54 – 34 = 20




34



     3 x 7 = 21 girls wear goggles
Visualization
John had 1.5 m of copper
wire. He cut some of the
wire to bend into the
shape shown in the figure
below. In the figure, there
are 6 equilateral triangles
and the length of XY is 19
cm. How much of the
copper wire was left?
John had 1.5 m of copper
wire. He cut some of the
wire to bend into the
shape shown in the figure
below. In the figure, there
are 6 equilateral triangles
and the length of XY is 19
cm. How much of the
copper wire was left?
John had 1.5 m of copper
wire. He cut some of the
wire to bend into the
shape shown in the figure
below. In the figure, there
are 6 equilateral triangles
and the length of XY is 19
cm. How much of the
copper wire was left?
John had 1.5 m of copper
wire. He cut some of the
wire to bend into the
shape shown in the figure
below. In the figure, there
are 6 equilateral triangles
and the length of XY is 19
cm. How much of the
copper wire was left?
John had 1.5 m of copper
wire. He cut some of the
wire to bend into the
shape shown in the figure
below. In the figure, there
are 6 equilateral triangles
and the length of XY is 19
cm. How much of the
copper wire was left?


   19 cm x 5 = 95 cm

   150 cm – 95 cm = 55 cm

   55 cm was left.

More Related Content

What's hot

Math 8 - Solving Problems Involving Linear Functions
Math 8 - Solving Problems Involving Linear FunctionsMath 8 - Solving Problems Involving Linear Functions
Math 8 - Solving Problems Involving Linear FunctionsCarlo Luna
 
Module 3 answer key
Module 3 answer keyModule 3 answer key
Module 3 answer keyNRWEG3
 
Module 1 answer key
Module 1 answer keyModule 1 answer key
Module 1 answer keyNRWEG3
 
Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1
Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1
Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1PuworkUtara OnSlideshare
 
2jam bhn per. pmr 2010
2jam bhn per. pmr 20102jam bhn per. pmr 2010
2jam bhn per. pmr 2010Ieda Adam
 
Seminar for Parents in Seoul
Seminar for Parents in SeoulSeminar for Parents in Seoul
Seminar for Parents in SeoulJimmy Keng
 
Assignment1 set1
Assignment1 set1Assignment1 set1
Assignment1 set1wsf6276
 
1 6 mathematics_class06
1 6 mathematics_class061 6 mathematics_class06
1 6 mathematics_class06Anirudh Gupta
 
Mathematics mathematics elementary
Mathematics   mathematics elementaryMathematics   mathematics elementary
Mathematics mathematics elementaryMirza Akmal
 
The Model Method for Upper Primary
The Model Method for Upper PrimaryThe Model Method for Upper Primary
The Model Method for Upper PrimaryJimmy Keng
 

What's hot (20)

Factoring (2)
Factoring (2)Factoring (2)
Factoring (2)
 
Topic 1
Topic 1Topic 1
Topic 1
 
Math 8 - Solving Problems Involving Linear Functions
Math 8 - Solving Problems Involving Linear FunctionsMath 8 - Solving Problems Involving Linear Functions
Math 8 - Solving Problems Involving Linear Functions
 
Module 3 answer key
Module 3 answer keyModule 3 answer key
Module 3 answer key
 
Module 1 answer key
Module 1 answer keyModule 1 answer key
Module 1 answer key
 
Maths Quiz
Maths QuizMaths Quiz
Maths Quiz
 
Math Rathon
Math RathonMath Rathon
Math Rathon
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1
Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1
Ujian Penilaian Semester 1 Matematik Tahun 3 Kertas 1
 
Numerical reasoning I
Numerical reasoning INumerical reasoning I
Numerical reasoning I
 
Fraction
FractionFraction
Fraction
 
Fraction
FractionFraction
Fraction
 
2jam bhn per. pmr 2010
2jam bhn per. pmr 20102jam bhn per. pmr 2010
2jam bhn per. pmr 2010
 
Seminar for Parents in Seoul
Seminar for Parents in SeoulSeminar for Parents in Seoul
Seminar for Parents in Seoul
 
Assignment1 set1
Assignment1 set1Assignment1 set1
Assignment1 set1
 
Maths T5 W3
Maths T5 W3Maths T5 W3
Maths T5 W3
 
1 6 mathematics_class06
1 6 mathematics_class061 6 mathematics_class06
1 6 mathematics_class06
 
Mathematics mathematics elementary
Mathematics   mathematics elementaryMathematics   mathematics elementary
Mathematics mathematics elementary
 
Cuaderno de trabajo 8º basico i semestre
Cuaderno de trabajo 8º basico i semestreCuaderno de trabajo 8º basico i semestre
Cuaderno de trabajo 8º basico i semestre
 
The Model Method for Upper Primary
The Model Method for Upper PrimaryThe Model Method for Upper Primary
The Model Method for Upper Primary
 

Similar to Seminar for Parents at Beacon Primary School

8th Alg - Lesson 5.4
8th Alg - Lesson 5.48th Alg - Lesson 5.4
8th Alg - Lesson 5.4jdurst65
 
Senior maths mangawhai
Senior maths mangawhaiSenior maths mangawhai
Senior maths mangawhaiJacqui Sharp
 
(8) Lesson 5.5 - The Pythagorean Theorem
(8) Lesson 5.5 - The Pythagorean Theorem(8) Lesson 5.5 - The Pythagorean Theorem
(8) Lesson 5.5 - The Pythagorean Theoremwzuri
 
Grade 2 3 patterns
Grade 2  3 patternsGrade 2  3 patterns
Grade 2 3 patternssusan70
 
Class 2 CBSE Maths Sample Paper Term 1 Model 1
Class 2 CBSE Maths Sample Paper Term 1 Model 1Class 2 CBSE Maths Sample Paper Term 1 Model 1
Class 2 CBSE Maths Sample Paper Term 1 Model 1Sunaina Rawat
 
Answers for practice for third period exam 2011
Answers for practice for third period exam 2011Answers for practice for third period exam 2011
Answers for practice for third period exam 2011Dulce Garza
 
CLASS V MATHS PATTERN
CLASS V MATHS PATTERNCLASS V MATHS PATTERN
CLASS V MATHS PATTERNRc Os
 
Ms. amrhein
Ms. amrheinMs. amrhein
Ms. amrheinAmrhe1sa
 
jawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdf
jawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdfjawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdf
jawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdfNORAINIBINTISEMANMoe
 
Class 4 Cbse Maths Sample Paper Term 1 Model 1
Class 4 Cbse Maths Sample Paper Term 1 Model 1Class 4 Cbse Maths Sample Paper Term 1 Model 1
Class 4 Cbse Maths Sample Paper Term 1 Model 1Sunaina Rawat
 
Maths home learning wb 29th june
Maths home learning wb 29th juneMaths home learning wb 29th june
Maths home learning wb 29th junechrispenny85
 

Similar to Seminar for Parents at Beacon Primary School (20)

Mathematics 3
Mathematics 3Mathematics 3
Mathematics 3
 
Mathsclub.pptx
Mathsclub.pptxMathsclub.pptx
Mathsclub.pptx
 
8th Alg - Lesson 5.4
8th Alg - Lesson 5.48th Alg - Lesson 5.4
8th Alg - Lesson 5.4
 
Nift old question paper masters in design gat
Nift old question paper masters in design gatNift old question paper masters in design gat
Nift old question paper masters in design gat
 
Mba april 2010 sem 1,2,3,4
Mba april 2010 sem 1,2,3,4Mba april 2010 sem 1,2,3,4
Mba april 2010 sem 1,2,3,4
 
Senior maths mangawhai
Senior maths mangawhaiSenior maths mangawhai
Senior maths mangawhai
 
(8) Lesson 5.5 - The Pythagorean Theorem
(8) Lesson 5.5 - The Pythagorean Theorem(8) Lesson 5.5 - The Pythagorean Theorem
(8) Lesson 5.5 - The Pythagorean Theorem
 
Grade 2 3 patterns
Grade 2  3 patternsGrade 2  3 patterns
Grade 2 3 patterns
 
Đề Thi HK2 Toán 6 - THCS Văn Thân
Đề Thi HK2 Toán 6 - THCS Văn ThânĐề Thi HK2 Toán 6 - THCS Văn Thân
Đề Thi HK2 Toán 6 - THCS Văn Thân
 
Class 2 CBSE Maths Sample Paper Term 1 Model 1
Class 2 CBSE Maths Sample Paper Term 1 Model 1Class 2 CBSE Maths Sample Paper Term 1 Model 1
Class 2 CBSE Maths Sample Paper Term 1 Model 1
 
Answers for practice for third period exam 2011
Answers for practice for third period exam 2011Answers for practice for third period exam 2011
Answers for practice for third period exam 2011
 
CLASS V MATHS PATTERN
CLASS V MATHS PATTERNCLASS V MATHS PATTERN
CLASS V MATHS PATTERN
 
Ms. amrhein
Ms. amrheinMs. amrhein
Ms. amrhein
 
Mathematics 1
Mathematics 1Mathematics 1
Mathematics 1
 
jawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdf
jawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdfjawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdf
jawapan-modul-aktiviti-pintar-bestari-matematik-tingkatan-3.pdf
 
1150 day 9
1150 day 91150 day 9
1150 day 9
 
Class 4 Cbse Maths Sample Paper Term 1 Model 1
Class 4 Cbse Maths Sample Paper Term 1 Model 1Class 4 Cbse Maths Sample Paper Term 1 Model 1
Class 4 Cbse Maths Sample Paper Term 1 Model 1
 
class_vi_paper_1.pdf
class_vi_paper_1.pdfclass_vi_paper_1.pdf
class_vi_paper_1.pdf
 
Maths home learning wb 29th june
Maths home learning wb 29th juneMaths home learning wb 29th june
Maths home learning wb 29th june
 
Mth10revsheets (1)
Mth10revsheets (1)Mth10revsheets (1)
Mth10revsheets (1)
 

More from Jimmy Keng

Three-Day Course Day 1
Three-Day Course Day 1Three-Day Course Day 1
Three-Day Course Day 1Jimmy Keng
 
Maths Hub June 2015 Day 1 and Day 2
Maths Hub June 2015 Day 1 and Day 2Maths Hub June 2015 Day 1 and Day 2
Maths Hub June 2015 Day 1 and Day 2Jimmy Keng
 
Maths Hub Day 1
Maths Hub Day 1Maths Hub Day 1
Maths Hub Day 1Jimmy Keng
 
Math Plus Kansas City
Math Plus Kansas CityMath Plus Kansas City
Math Plus Kansas CityJimmy Keng
 
TIMSS Selected
TIMSS SelectedTIMSS Selected
TIMSS SelectedJimmy Keng
 
Primary Mathematics Fractions
Primary Mathematics FractionsPrimary Mathematics Fractions
Primary Mathematics FractionsJimmy Keng
 
Blake School Presentation Grade 1
Blake School Presentation Grade 1Blake School Presentation Grade 1
Blake School Presentation Grade 1Jimmy Keng
 
PCN Word Problems
PCN Word ProblemsPCN Word Problems
PCN Word ProblemsJimmy Keng
 
2104 WSU Cutouts
2104 WSU Cutouts2104 WSU Cutouts
2104 WSU CutoutsJimmy Keng
 
2014 WSU Handouts
2014 WSU Handouts2014 WSU Handouts
2014 WSU HandoutsJimmy Keng
 
2014 WSU Day 2
2014 WSU Day 22014 WSU Day 2
2014 WSU Day 2Jimmy Keng
 
2014 WSU Day 1 Slides
2014 WSU Day 1 Slides2014 WSU Day 1 Slides
2014 WSU Day 1 SlidesJimmy Keng
 
Se01 abc's of singapore math through whole numbers
Se01 abc's of singapore math through whole numbersSe01 abc's of singapore math through whole numbers
Se01 abc's of singapore math through whole numbersJimmy Keng
 
Sd09 visualization
Sd09 visualizationSd09 visualization
Sd09 visualizationJimmy Keng
 

More from Jimmy Keng (20)

Three-Day Course Day 1
Three-Day Course Day 1Three-Day Course Day 1
Three-Day Course Day 1
 
Maths Hub June 2015 Day 1 and Day 2
Maths Hub June 2015 Day 1 and Day 2Maths Hub June 2015 Day 1 and Day 2
Maths Hub June 2015 Day 1 and Day 2
 
Maths Hub Day 1
Maths Hub Day 1Maths Hub Day 1
Maths Hub Day 1
 
Math Plus Kansas City
Math Plus Kansas CityMath Plus Kansas City
Math Plus Kansas City
 
TIMSS Selected
TIMSS SelectedTIMSS Selected
TIMSS Selected
 
Primary Mathematics Fractions
Primary Mathematics FractionsPrimary Mathematics Fractions
Primary Mathematics Fractions
 
Blake School Presentation Grade 1
Blake School Presentation Grade 1Blake School Presentation Grade 1
Blake School Presentation Grade 1
 
PCN Word Problems
PCN Word ProblemsPCN Word Problems
PCN Word Problems
 
Blake Grade 6
Blake Grade 6Blake Grade 6
Blake Grade 6
 
Blake grade 5
Blake grade 5Blake grade 5
Blake grade 5
 
Blake Grade 4
Blake Grade 4Blake Grade 4
Blake Grade 4
 
Blake Grade 3
Blake Grade 3Blake Grade 3
Blake Grade 3
 
Blake Grade 2
Blake Grade 2Blake Grade 2
Blake Grade 2
 
Blake Grade 1
Blake Grade 1Blake Grade 1
Blake Grade 1
 
2104 WSU Cutouts
2104 WSU Cutouts2104 WSU Cutouts
2104 WSU Cutouts
 
2014 WSU Handouts
2014 WSU Handouts2014 WSU Handouts
2014 WSU Handouts
 
2014 WSU Day 2
2014 WSU Day 22014 WSU Day 2
2014 WSU Day 2
 
2014 WSU Day 1 Slides
2014 WSU Day 1 Slides2014 WSU Day 1 Slides
2014 WSU Day 1 Slides
 
Se01 abc's of singapore math through whole numbers
Se01 abc's of singapore math through whole numbersSe01 abc's of singapore math through whole numbers
Se01 abc's of singapore math through whole numbers
 
Sd09 visualization
Sd09 visualizationSd09 visualization
Sd09 visualization
 

Recently uploaded

Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 

Recently uploaded (20)

Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 

Seminar for Parents at Beacon Primary School

  • 1. Supporting Your Child in Learning Mathematics Yeap Ban Har Marshall Cavendish Institute Singapore banhar.yeap@pathlight.org.sg Slides are available at www.banhar.blogspot.com
  • 2.
  • 3. Type Mark Number Type Mark Number Value Value MCQ 1 mark 10 (10%) SAQ 2 marks 5 (10%) MCQ 2 marks 5 (10%) 3 marks SAQ 1 mark 10 (10%) LAQ 4 marks 13 (50%) 5 marks SAQ 2 marks 5 (10%) Paper 1 (50 min) Paper 2 (1 hr 40 min)
  • 4. Type Mark Number Type Mark Number Value Value MCQ 1 mark 10 (10%) SAQ 2 marks 10 (20%) MCQ 2 marks 10 (20%) 3 marks SAQ 2 marks 10 (20%) LAQ 4 marks 8 (30%) 5 marks Paper 1 (1 hr) Paper 2 (1 hr 15 min)
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. The rationale of teaching mathematics is that it is “a good vehicle for the development and improvement of a person’s intellectual competence”.
  • 11. Find the value of 12.2 ÷ 4 . Answer : 3.05 [B1] Example 1
  • 12. 3 .05 12.20 4 12.20 12 12 20 hundredths 0.20 Number Bond Method 0.20 0 Long Division Method
  • 13. A show started at 10.55 a.m. and ended at 1.30 p.m. How long was the show in hours and minutes? 2 h 30 min 11 a.m. 1.30 p.m. Answer : 2 h 35 min [B1] Example 2
  • 14. Find <y in the figure below. 70 o 70 o y 70 o  360o – 210o = 150o Example 3
  • 15. The height of the classroom door is about __. (1) 1m (2) 2m (3) 10 m (4) 20 m Example 4
  • 17. Cup cakes are sold at 40 cents each. What is the greatest number of cup cakes that can be bought with $95?  $95 ÷ 40 cents = 237.5 Answer: 237 cupcakes Example 5
  • 18. From January to August last year, Mr Tang sold an average of 4.5 cars per month, He did not sell any car in the next 4 months. On average, how many cars did he sell per month last year? 4.5 x 8 = 36 36 ÷ 12 = 3 Example 7
  • 19. Mr Tan rented a car for 3 days. He was charged $155 per day and 60 cents for every km that he travelled. He paid $767.40. What was the total distance that he travelled for the 3 days? $767.40 – 3 x $155 = $302.40 $302.40 ÷ 60 cents per km = 504 km Example 7
  • 20. Mr Tan rented a car for 3 days. He was charged $155 per day and 60 cents for every km that he travelled. He paid $767.40. What was the total distance that he travelled for the 3 days? 767.40 – 3 x 155 = 302.40 302.40 ÷ 0.60 = 504 He travelled 504 km. Example 7
  • 23. Students in the highest international benchmark are able to apply their knowledge in a variety of situations and able to explain themselves.
  • 24. 1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97 The first 97 whole numbers are added up. What is the ones digit in the total? Problem 1
  • 25. 1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97 The first 97 whole numbers are added up. What is the ones digit in the total? Problem 1
  • 26. 1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97 The first 97 whole numbers are added up. What is the ones digit in the total? Problem 1
  • 27. 1 + 2 + 3 + 4 + 5 + … + 95 + 96 + 97 The first 97 whole numbers are added up. What is the ones digit in the total? The method is difficult to communicate in written form. Hence, the problem is presented in the MCQ format where credit is not given for written method. Problem 1
  • 28. A figure is formed by arranging equilateral triangles pieces of sides 3 cm in a line. The figure has a perimeter of 93 cm. How many pieces of the equilateral triangles are used? 93 cm ÷ 3 cm = 31 31 – 2 = 29 29 pieces are used. Problem 2
  • 29. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 1 12 3 2 20 3 3 28 6 4 33 6 5 41 9 6 Problem 3
  • 30. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 1 12 3 2 20 3 3 28 6 4 33 6 5 41 9 6 46 9 Problem 3
  • 31. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 1 12 3 2 20 3 3 28 6 4 33 6 5 41 9 6 46 9 119 Problem 3
  • 32. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 2 3 4 6 6 9 119 Problem 3
  • 33. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 2 3 4 6 6 9 119 180 Problem 3
  • 34. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 1 12 3 2 20 3 3 28 6 4 33 6 5 41 9 6 46 9 119 180 Problem 3
  • 35. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 1 12 3 2 20 3 3 28 6 4 33 6 5 41 9 6 46 9 119 180 119 – 3 = 116  58 58 x 13 = 754
  • 36. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure Number of Rods Height in cm 1 12 3 2 20 3 3 28 6 4 33 6 5 41 9 6 46 9 119 782 180 119 – 3 = 116  58 58 x 13 = 754
  • 38. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Problem 4
  • 39. Table 1 consists of numbers from 1 to 56. Kay and Lin are given a plastic frame that covers exactly 9 squares of Table 1 with the centre square darkened. (a) Kay puts the frame on 9 squares as shown in the figure below. 3 4 5 11 13 19 20 21 What is the average of the 8 numbers that can be seen in the frame?
  • 40. Table 1 consists of numbers from 1 to 56. Kay and Lin are given a plastic frame that covers exactly 9 squares of Table 1 with the centre square darkened. (a) Kay puts the frame on 9 squares as shown in the figure below. 3+4+5+11+13+19+20 = 96 3 4 5 96 ÷ 8 = 12 11 13 Alternate Method 4 x 24 = 96 19 20 21 96 ÷ 8 = 12 What is the average of the 8 numbers that can be seen in the frame?
  • 41. (b) Lin puts the frame on some other 9 squares. The sum of the 8 numbers that can be seen in the frame is 272. What is the largest number that can be seen in the frame? 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
  • 42. 40 cm x 30 cm x 60 cm = 72 000 cm3 72 000 cm3 ÷ 5 x 3 = 43 200 cm3 43 200 cm3 ÷ 1800 cm2 = 24 cm Problem 5
  • 43. 40 cm x 30 cm x 60 cm = 72 000 cm3 72 000 cm3 ÷ 5 x 2 = 28 800 cm3 28 800 cm3 ÷ 1200 cm2 = 24 cm Problem 5
  • 44. Rena used stickers of four different shapes to make a pattern. The first 12 stickers are shown below. What was the shape of the 47th sticker?             ………? 1st 12th 47th Problem 6
  • 45. 88 children took part in a swimming competition. 1/3 of the boys and 3/7 of the girls wore swimming goggles. Altogether 34 children wore swimming goggles. How many girls wore swimming goggles on that day?
  • 46.
  • 47. 88 34 54
  • 48. 34 – 20 = 14 54 – 34 = 20 34 3 x 7 = 21 girls wear goggles
  • 49. Visualization John had 1.5 m of copper wire. He cut some of the wire to bend into the shape shown in the figure below. In the figure, there are 6 equilateral triangles and the length of XY is 19 cm. How much of the copper wire was left?
  • 50. John had 1.5 m of copper wire. He cut some of the wire to bend into the shape shown in the figure below. In the figure, there are 6 equilateral triangles and the length of XY is 19 cm. How much of the copper wire was left?
  • 51. John had 1.5 m of copper wire. He cut some of the wire to bend into the shape shown in the figure below. In the figure, there are 6 equilateral triangles and the length of XY is 19 cm. How much of the copper wire was left?
  • 52. John had 1.5 m of copper wire. He cut some of the wire to bend into the shape shown in the figure below. In the figure, there are 6 equilateral triangles and the length of XY is 19 cm. How much of the copper wire was left?
  • 53. John had 1.5 m of copper wire. He cut some of the wire to bend into the shape shown in the figure below. In the figure, there are 6 equilateral triangles and the length of XY is 19 cm. How much of the copper wire was left? 19 cm x 5 = 95 cm 150 cm – 95 cm = 55 cm 55 cm was left.