10.051 MOTOR LAUNCH
Approval Date: 6th
, October 1999
Reviewed on : 23 October 2007 Version: 1.00
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-1/4
Purpose
The launch will be used to execute hydrological measurements in rivers, canals and reservoirs.
Many of the measurements will be made in very shallow water.
Conditions & Requirements
• The launch shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The launch shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• The launch shall be constructed of Grade A quality shipbuilding steel.
All corrosive materials shall be provided with full and durable coating.
• All coatings used shall provide full protection against rusting and corrosion to the steel
body, structural parts, and components of the launch.
• All parts, structural members and components of the launch remaining exposed to water
shall be provided with complete cathodic protection.
• The launch shall be very sturdy, unsinkable and shall have an adequate stability.
• The launch shall be easy to operate and maintain.
• All hull sections shall be accessible from the inside for quick repair of damage to the
hull. The float material shall be removable to give access to the hull.
• The launch shall have an expected technical lifetime of not less than 15 years.
• The launch and the engines shall be capable to operate for at least 6 months without any
major servicing.
• The launch shall have floatation chambers filled with closed cell foam.
• The launch shall be provided with appropriate fenders.
• The launch’s welded and/or riveted joints shall be designed to avoid leakage while taking
into account the hostile environment of operation e.g. shallow water, high flow rate, floating
debris, high sediment loads.
• The launch shall have a cabin to accommodate equipment and staff.
• The cabin shall, at port and starboard side, have sitting/sleeping benches.
• The cabin shall have windows that can be opened and a lockable door.
• The cabin shall have provisions to safely install and operate the following equipment:
echosounder, DGPS system, ADCP, laptop PC, helmsman display, power supply with car
batteries.
• The cabin shall have a stable table for the operator, to spread maps and paper charts, to
make notes etc.
• On deck adequate workspace (at least 3 x 3 m2
) should be provided to carry out
hydrological measurements.
• The rear deck shall be provided with an awning.
• The launch shall be supplied with the accessories as needed for effective deployment.
• The launch shall be fitted with two inboard diesel engines.
• The engines shall be operated by a remote control system, located in the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• A break water arrangement shall be provided in the front.
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-2/4
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
• Arrangements shall be made for safe working on the launch.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• A maintenance manual, related to the type and model of the launch, shall be part of the
delivery
• The launch shall be fitted with a transducer trunk pipe (transducer well).
• The internal diameter of the trunk pipe shall be sufficient to pas both the high frequency
echosounder transducer and a low frequency echosounder transducer or an ADCP.
• It shall be easy to install or recover the transducers and / or the ADCP.
• The transducer trunk pipe shall be installed in or very close to the centre of the hull. In
forward / backward direction, it may be in the middle of the launch.
• The transducer trunk pipe shall have a top cover to avoid water entering the launch, in
particular while sailing.
• The top cover shall pass the transducer rod and its cable but prevent water to enter the
launch.
• The transducer trunk pipe shall be at least as high as the sideboards of the launch.
• The transducer trunk pipe shall be flush with the launch hull; it shall not protrude below
the launch hull.
• The trunk pipe shall be tightly fixed to the launch and shall be properly supported.
• The trunk pipe shall be waterproof, corrosion proof and very sturdy. The trunk pipe shall
be so constructed that it cannot break off, tear apart or suffer any other damage that
may result in water entering (seeping or flushing) into the launch.
• At the lower end of the trunk pipe, a bottom lid or dummy transducer shall close the
trunk pipe during fast sailing. The trunk pipe lid shall be smoothly fitted in the curved
shape of the hull; i.e. it should not disrupt the flow of water along the hull.
• The bottom lid shall be easily installable/removable from above through the trunk pipe,
while the launch is floating.
• The transducer and support rod shall be vertically adjustable and also removable.
• The transducer and its support rod shall be tightly fixed in the trunk pipe to avoid
vibrations during sailing.
• It shall be possible to immerse the transducer deeper than the lower end of the
transducer trunk pipe.
cross section view
top view
Example of where the trunk pipe could be mounted close to the centre
line, avoiding disruption of the structural design of the launch.
trunk pipe
trunk pipe
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-3/4
Specifications
1. Launch
construction material Grade A quality shipbuilding steel.
length 12 m ± 0.5 m
width 3.5 m ±0.25 m
draft ≤1.0 m
free board ≥0.5 m
bottom shape flat or slightly catamaran
propulsion 2 Nos. of 50 kW (65 HP) inboard diesel engines
propeller 2 Nos, 3-blade bronze
carrying capacity ≥6000 kg pay load
2. Engine
power ≥50 kW (approx. 65 HP)
operation four stroke, natural aspirated
revolutions 1800 rpm at rated power
cylinders 4
fuel diesel
direct injection
air filter
fuel filter
cooling water cooled direct using river water
belt driven water pump and fan
intake scoop bars across opening to prevent entry of debris
sea-cock/valve allowing unrestricted flow of water, closed for cleaning
full flow strainer/filter preventing clogging of the pump by smaller particles
electrical 12 V electrical starter
generator with battery charger
gauges oil pressure
water temperature
battery voltage
battery charging
lubrication forced feed
replaceable filters
3. Cabin
length 5 m ±0.5 m
height ample sitting height
door lockable
door width >1 m
windows glass, possibility to open, closed water tight
windshield glass, fitted with screen wipers
4. Launch outfit
anchor adequate for size of launch, fitted with 5 m chain and rope for
water depth of 50 m and current velocity of 5 m/s
fuel tanks 2 Nos, 100 L each
echo-sounder indicator type, fitted in the launch
compass magnetic type, fitted in the launch
fenders 4 of Coir type
life-jacket 8 nos
life-buoy 8 pieces with at least 50 m line, readily available on board
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-4/4
fire extinguisher 4 Nos, >5 kg
The fire extinguishers shall be readily accessible in the motor compartment (if any), in the cabin
and on deck.
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall be possible for mounting
a duly compensated magnetic compass on to the launch for use in positioning the launch for
flow measurements. Arrangements shall exist for mounting the launch outfit (Bracket) and for
dropping of the anchor to keep the launch stationary, during flow measurements. These can
only be specified after selection of the survey instruments and other relevant equipment.
Arrangements shall be made for safe working on the launch.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.
10.051 MOTOR LAUNCH
As per HP-I
Approval Date: 6th
, October 1999 Version: 1.00
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-5/4
Purpose
The launch will be used to execute hydrological measurements in rivers, canals and reservoirs.
Many of the measurements will be made in very shallow water.
Conditions & Requirements
• The launch shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The launch shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• The launch shall be constructed of Grade A quality shipbuilding steel.
All corrosive materials shall be provided with full and durable coating.
• All coatings used shall provide full protection against rusting and corrosion to the steel
body, structural parts, and components of the launch.
• All parts, structural members and components of the launch remaining exposed to water
shall be provided with complete cathodic protection.
• The launch shall be very sturdy, unsinkable and shall have an adequate stability.
• The launch shall be easy to operate and maintain.
• All hull sections shall be accessible from the inside for quick repair of damage to the
hull. The float material shall be removable to give access to the hull.
• The launch shall have an expected technical lifetime of not less than 15 years.
• The launch and the engines shall be capable to operate for at least 6 months without any
major servicing.
• The launch shall have floatation chambers filled with closed cell foam.
• The launch shall be provided with appropriate fenders.
• The launch’s welded and/or riveted joints shall be designed to avoid leakage while taking
into account the hostile environment of operation e.g. shallow water, high flow rate, floating
debris, high sediment loads.
• The launch shall have a cabin to accommodate equipment and staff.
• The cabin shall, at port and starboard side, have sitting/sleeping benches.
• The cabin shall have windows that can be opened and a lockable door.
• The cabin shall have provisions to safely install and operate the following equipment:
echosounder, DGPS system, ADCP, laptop PC, helmsman display, power supply with car
batteries.
• The cabin shall have a stable table for the operator, to spread maps and paper charts, to
make notes etc.
• On deck adequate workspace (at least 3 x 3 m2
) should be provided to carry out
hydrological measurements.
• The rear deck shall be provided with an awning.
• The launch shall be supplied with the accessories as needed for effective deployment.
• The launch shall be fitted with two inboard diesel engines.
• The engines shall be operated by a remote control system, located in the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• A break water arrangement shall be provided in the front.
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-6/4
• Arrangements shall be made for safe working on the launch.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• A maintenance manual, related to the type and model of the launch, shall be part of the
delivery
• The launch shall be fitted with a transducer trunk pipe (transducer well).
• The internal diameter of the trunk pipe shall be sufficient to pas both the high frequency
echosounder transducer and a low frequency echosounder transducer or an ADCP.
• It shall be easy to install or recover the transducers and / or the ADCP.
• The transducer trunk pipe shall be installed in or very close to the centre of the hull. In
forward / backward direction, it may be in the middle of the launch.
• The transducer trunk pipe shall have a top cover to avoid water entering the launch, in
particular while sailing.
• The top cover shall pass the transducer rod and its cable but prevent water to enter the
launch.
• The transducer trunk pipe shall be at least as high as the sideboards of the launch.
• The transducer trunk pipe shall be flush with the launch hull; it shall not protrude below
the launch hull.
• The trunk pipe shall be tightly fixed to the launch and shall be properly supported.
• The trunk pipe shall be waterproof, corrosion proof and very sturdy. The trunk pipe shall
be so constructed that it cannot break off, tear apart or suffer any other damage that
may result in water entering (seeping or flushing) into the launch.
• At the lower end of the trunk pipe, a bottom lid or dummy transducer shall close the
trunk pipe during fast sailing. The trunk pipe lid shall be smoothly fitted in the curved
shape of the hull; i.e. it should not disrupt the flow of water along the hull.
• The bottom lid shall be easily installable/removable from above through the trunk pipe,
while the launch is floating.
• The transducer and support rod shall be vertically adjustable and also removable.
• The transducer and its support rod shall be tightly fixed in the trunk pipe to avoid
vibrations during sailing.
• It shall be possible to immerse the transducer deeper than the lower end of the
transducer trunk pipe.
cross section view
top view
Example of where the trunk pipe could be mounted close to the centre
line, avoiding disruption of the structural design of the launch.
trunk pipe
trunk pipe
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-7/4
Specifications
5. Launch
construction material Grade A quality shipbuilding steel.
length 12 m ± 0.5 m
width 3.5 m ±0.25 m
draft ≤1.0 m
free board ≥0.5 m
bottom shape flat or slightly catamaran
propulsion 2 Nos. of 50 kW (65 HP) inboard diesel engines
propeller 2 Nos, 3-blade bronze
carrying capacity ≥6000 kg pay load
6. Engine
power ≥50 kW (approx. 65 HP)
operation four stroke, natural aspirated
revolutions 1800 rpm at rated power
cylinders 4
fuel diesel
direct injection
air filter
fuel filter
cooling water cooled direct using river water
belt driven water pump and fan
intake scoop bars across opening to prevent entry of debris
sea-cock/valve allowing unrestricted flow of water, closed for cleaning
full flow strainer/filter preventing clogging of the pump by smaller particles
electrical 12 V electrical starter
generator with battery charger
gauges oil pressure
water temperature
battery voltage
battery charging
lubrication forced feed
replaceable filters
7. Cabin
length 5 m ±0.5 m
height ample sitting height
door lockable
door width >1 m
windows glass, possibility to open, closed water tight
windshield glass, fitted with screen wipers
8. Launch outfit
anchor adequate for size of launch, fitted with 5 m chain and rope for
water depth of 50 m and current velocity of 5 m/s
fuel tanks 2 Nos, 100 L each
echo-sounder indicator type, fitted in the launch
compass magnetic type, fitted in the launch
fenders 4 of Coir type
life-jacket 8 nos
life-buoy 8 pieces with at least 50 m line, readily available on board
Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-8/4
fire extinguisher 4 Nos, >5 kg
The fire extinguishers shall be readily accessible in the motor compartment (if any), in the cabin
and on deck.
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall be possible for mounting
a duly compensated magnetic compass on to the launch for use in positioning the launch for
flow measurements. Arrangements shall exist for mounting the launch outfit (Bracket) and for
dropping of the anchor to keep the launch stationary, during flow measurements. These can
only be specified after selection of the survey instruments and other relevant equipment.
Arrangements shall be made for safe working on the launch.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.

More Related Content

What's hot

Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)Marine Study
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)Marvin Furton
 
Motion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsMotion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsParijat Sinha
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser DesignKon Aguek
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck platingCorrodere
 
Project report on ship rudder
Project report on ship rudderProject report on ship rudder
Project report on ship rudderMummina Sekhar
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsCraig Carter
 
Ship construction project
Ship construction projectShip construction project
Ship construction projectMummina Sekhar
 
Nmlc ef4 module1 day01 ships stresses
Nmlc ef4 module1 day01   ships stressesNmlc ef4 module1 day01   ships stresses
Nmlc ef4 module1 day01 ships stressesJohn Roy Daulong
 

What's hot (20)

Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Rig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton AspelundRig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton Aspelund
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Stern Tube and Shafting Arrangements
Stern Tube and Shafting ArrangementsStern Tube and Shafting Arrangements
Stern Tube and Shafting Arrangements
 
Ship terms
Ship termsShip terms
Ship terms
 
ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)
 
Motion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsMotion stability and control in marine surface vessels
Motion stability and control in marine surface vessels
 
Ship Construction- Bulkhead
Ship Construction- BulkheadShip Construction- Bulkhead
Ship Construction- Bulkhead
 
Schmidt
SchmidtSchmidt
Schmidt
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
212790628 fpso
212790628 fpso212790628 fpso
212790628 fpso
 
Hatch ways
Hatch waysHatch ways
Hatch ways
 
Offshore Riser Design
Offshore Riser DesignOffshore Riser Design
Offshore Riser Design
 
Well completion
Well completionWell completion
Well completion
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
 
Project report on ship rudder
Project report on ship rudderProject report on ship rudder
Project report on ship rudder
 
Zero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on ShipsZero Pollution Solutions for Age Old Problems on Ships
Zero Pollution Solutions for Age Old Problems on Ships
 
Ship construction project
Ship construction projectShip construction project
Ship construction project
 
Nmlc ef4 module1 day01 ships stresses
Nmlc ef4 module1 day01   ships stressesNmlc ef4 module1 day01   ships stresses
Nmlc ef4 module1 day01 ships stresses
 

Viewers also liked

Dwlr, float type with shaft encoder (sw)
Dwlr, float type with shaft encoder (sw)Dwlr, float type with shaft encoder (sw)
Dwlr, float type with shaft encoder (sw)hydrologyproject0
 
Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecasting
 Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecasting Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecasting
Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecastinghydrologyproject0
 
Download-manuals-surface water-manual-surfacewateryearbook
 Download-manuals-surface water-manual-surfacewateryearbook Download-manuals-surface water-manual-surfacewateryearbook
Download-manuals-surface water-manual-surfacewateryearbookhydrologyproject0
 
Cableway guidance note 1 design
Cableway guidance note 1   designCableway guidance note 1   design
Cableway guidance note 1 designhydrologyproject0
 
Download-manuals-water quality-wq-training-37measurementofoxidisednitrogen
 Download-manuals-water quality-wq-training-37measurementofoxidisednitrogen Download-manuals-water quality-wq-training-37measurementofoxidisednitrogen
Download-manuals-water quality-wq-training-37measurementofoxidisednitrogenhydrologyproject0
 
Download-manuals-water quality-wq-training-40measurementofchlorophyll-a
 Download-manuals-water quality-wq-training-40measurementofchlorophyll-a Download-manuals-water quality-wq-training-40measurementofchlorophyll-a
Download-manuals-water quality-wq-training-40measurementofchlorophyll-ahydrologyproject0
 
Mp sw the effect of contaminated shahpura lake on ground water environment, ...
Mp  sw the effect of contaminated shahpura lake on ground water environment, ...Mp  sw the effect of contaminated shahpura lake on ground water environment, ...
Mp sw the effect of contaminated shahpura lake on ground water environment, ...hydrologyproject0
 

Viewers also liked (15)

Steel boat (5.5m)
Steel boat (5.5m)Steel boat (5.5m)
Steel boat (5.5m)
 
Dwlr, float type with shaft encoder (sw)
Dwlr, float type with shaft encoder (sw)Dwlr, float type with shaft encoder (sw)
Dwlr, float type with shaft encoder (sw)
 
Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecasting
 Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecasting Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecasting
Download-manuals-hydrometeorology-technical papers-telemetryforfloodforecasting
 
Specification laminarflow
Specification laminarflowSpecification laminarflow
Specification laminarflow
 
Gec97
Gec97Gec97
Gec97
 
Download-manuals-surface water-manual-surfacewateryearbook
 Download-manuals-surface water-manual-surfacewateryearbook Download-manuals-surface water-manual-surfacewateryearbook
Download-manuals-surface water-manual-surfacewateryearbook
 
Gem sfeatures
Gem sfeaturesGem sfeatures
Gem sfeatures
 
Cableway guidance note 1 design
Cableway guidance note 1   designCableway guidance note 1   design
Cableway guidance note 1 design
 
Final gw handbook 190514
Final gw handbook 190514Final gw handbook 190514
Final gw handbook 190514
 
Master plan final 2002
Master plan final 2002Master plan final 2002
Master plan final 2002
 
Laser distance meter
Laser distance meterLaser distance meter
Laser distance meter
 
Download-manuals-water quality-wq-training-37measurementofoxidisednitrogen
 Download-manuals-water quality-wq-training-37measurementofoxidisednitrogen Download-manuals-water quality-wq-training-37measurementofoxidisednitrogen
Download-manuals-water quality-wq-training-37measurementofoxidisednitrogen
 
Puducherry
Puducherry Puducherry
Puducherry
 
Download-manuals-water quality-wq-training-40measurementofchlorophyll-a
 Download-manuals-water quality-wq-training-40measurementofchlorophyll-a Download-manuals-water quality-wq-training-40measurementofchlorophyll-a
Download-manuals-water quality-wq-training-40measurementofchlorophyll-a
 
Mp sw the effect of contaminated shahpura lake on ground water environment, ...
Mp  sw the effect of contaminated shahpura lake on ground water environment, ...Mp  sw the effect of contaminated shahpura lake on ground water environment, ...
Mp sw the effect of contaminated shahpura lake on ground water environment, ...
 

Similar to Motor launch

SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxAllenDizon3
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxdevmarineacademy
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine surveyDonald Mccann
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
Depth integrating winch operated
Depth integrating winch operatedDepth integrating winch operated
Depth integrating winch operatedhydrologyproject0
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Hassan Moursy
 
Design Aspects of Gates of Dam
Design Aspects of Gates of DamDesign Aspects of Gates of Dam
Design Aspects of Gates of DamTushar Dholakia
 
Ships_Deck_Fittings.pptx
Ships_Deck_Fittings.pptxShips_Deck_Fittings.pptx
Ships_Deck_Fittings.pptxGracielaAguayo2
 
Ship dry docking
Ship dry dockingShip dry docking
Ship dry dockingJishnu Saji
 
Marine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptMarine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptdevmarineacademy
 
Installation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management SystemsInstallation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management SystemsGina Carolan
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 

Similar to Motor launch (20)

Frp boat (7m)
Frp boat (7m)Frp boat (7m)
Frp boat (7m)
 
SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptx
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine survey
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Depth integrating winch operated
Depth integrating winch operatedDepth integrating winch operated
Depth integrating winch operated
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
 
Design Aspects of Gates of Dam
Design Aspects of Gates of DamDesign Aspects of Gates of Dam
Design Aspects of Gates of Dam
 
Ships_Deck_Fittings.pptx
Ships_Deck_Fittings.pptxShips_Deck_Fittings.pptx
Ships_Deck_Fittings.pptx
 
Casing design
Casing designCasing design
Casing design
 
Ship dry docking
Ship dry dockingShip dry docking
Ship dry docking
 
Boat outfit
Boat outfitBoat outfit
Boat outfit
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
Marine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptMarine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.ppt
 
Installation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management SystemsInstallation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management Systems
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Point integrating
Point integratingPoint integrating
Point integrating
 
Dry docking operations
Dry docking operationsDry docking operations
Dry docking operations
 

More from hydrologyproject0

More from hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Recently uploaded

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 

Recently uploaded (20)

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 

Motor launch

  • 1. 10.051 MOTOR LAUNCH Approval Date: 6th , October 1999 Reviewed on : 23 October 2007 Version: 1.00 Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-1/4 Purpose The launch will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The launch shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The launch shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • The launch shall be constructed of Grade A quality shipbuilding steel. All corrosive materials shall be provided with full and durable coating. • All coatings used shall provide full protection against rusting and corrosion to the steel body, structural parts, and components of the launch. • All parts, structural members and components of the launch remaining exposed to water shall be provided with complete cathodic protection. • The launch shall be very sturdy, unsinkable and shall have an adequate stability. • The launch shall be easy to operate and maintain. • All hull sections shall be accessible from the inside for quick repair of damage to the hull. The float material shall be removable to give access to the hull. • The launch shall have an expected technical lifetime of not less than 15 years. • The launch and the engines shall be capable to operate for at least 6 months without any major servicing. • The launch shall have floatation chambers filled with closed cell foam. • The launch shall be provided with appropriate fenders. • The launch’s welded and/or riveted joints shall be designed to avoid leakage while taking into account the hostile environment of operation e.g. shallow water, high flow rate, floating debris, high sediment loads. • The launch shall have a cabin to accommodate equipment and staff. • The cabin shall, at port and starboard side, have sitting/sleeping benches. • The cabin shall have windows that can be opened and a lockable door. • The cabin shall have provisions to safely install and operate the following equipment: echosounder, DGPS system, ADCP, laptop PC, helmsman display, power supply with car batteries. • The cabin shall have a stable table for the operator, to spread maps and paper charts, to make notes etc. • On deck adequate workspace (at least 3 x 3 m2 ) should be provided to carry out hydrological measurements. • The rear deck shall be provided with an awning. • The launch shall be supplied with the accessories as needed for effective deployment. • The launch shall be fitted with two inboard diesel engines. • The engines shall be operated by a remote control system, located in the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • A break water arrangement shall be provided in the front.
  • 2. Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-2/4 • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck. • Arrangements shall be made for safe working on the launch. • Bollards and fairleads are to be provided on the deck for mooring purpose. • A maintenance manual, related to the type and model of the launch, shall be part of the delivery • The launch shall be fitted with a transducer trunk pipe (transducer well). • The internal diameter of the trunk pipe shall be sufficient to pas both the high frequency echosounder transducer and a low frequency echosounder transducer or an ADCP. • It shall be easy to install or recover the transducers and / or the ADCP. • The transducer trunk pipe shall be installed in or very close to the centre of the hull. In forward / backward direction, it may be in the middle of the launch. • The transducer trunk pipe shall have a top cover to avoid water entering the launch, in particular while sailing. • The top cover shall pass the transducer rod and its cable but prevent water to enter the launch. • The transducer trunk pipe shall be at least as high as the sideboards of the launch. • The transducer trunk pipe shall be flush with the launch hull; it shall not protrude below the launch hull. • The trunk pipe shall be tightly fixed to the launch and shall be properly supported. • The trunk pipe shall be waterproof, corrosion proof and very sturdy. The trunk pipe shall be so constructed that it cannot break off, tear apart or suffer any other damage that may result in water entering (seeping or flushing) into the launch. • At the lower end of the trunk pipe, a bottom lid or dummy transducer shall close the trunk pipe during fast sailing. The trunk pipe lid shall be smoothly fitted in the curved shape of the hull; i.e. it should not disrupt the flow of water along the hull. • The bottom lid shall be easily installable/removable from above through the trunk pipe, while the launch is floating. • The transducer and support rod shall be vertically adjustable and also removable. • The transducer and its support rod shall be tightly fixed in the trunk pipe to avoid vibrations during sailing. • It shall be possible to immerse the transducer deeper than the lower end of the transducer trunk pipe. cross section view top view Example of where the trunk pipe could be mounted close to the centre line, avoiding disruption of the structural design of the launch. trunk pipe trunk pipe
  • 3. Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-3/4 Specifications 1. Launch construction material Grade A quality shipbuilding steel. length 12 m ± 0.5 m width 3.5 m ±0.25 m draft ≤1.0 m free board ≥0.5 m bottom shape flat or slightly catamaran propulsion 2 Nos. of 50 kW (65 HP) inboard diesel engines propeller 2 Nos, 3-blade bronze carrying capacity ≥6000 kg pay load 2. Engine power ≥50 kW (approx. 65 HP) operation four stroke, natural aspirated revolutions 1800 rpm at rated power cylinders 4 fuel diesel direct injection air filter fuel filter cooling water cooled direct using river water belt driven water pump and fan intake scoop bars across opening to prevent entry of debris sea-cock/valve allowing unrestricted flow of water, closed for cleaning full flow strainer/filter preventing clogging of the pump by smaller particles electrical 12 V electrical starter generator with battery charger gauges oil pressure water temperature battery voltage battery charging lubrication forced feed replaceable filters 3. Cabin length 5 m ±0.5 m height ample sitting height door lockable door width >1 m windows glass, possibility to open, closed water tight windshield glass, fitted with screen wipers 4. Launch outfit anchor adequate for size of launch, fitted with 5 m chain and rope for water depth of 50 m and current velocity of 5 m/s fuel tanks 2 Nos, 100 L each echo-sounder indicator type, fitted in the launch compass magnetic type, fitted in the launch fenders 4 of Coir type life-jacket 8 nos life-buoy 8 pieces with at least 50 m line, readily available on board
  • 4. Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-4/4 fire extinguisher 4 Nos, >5 kg The fire extinguishers shall be readily accessible in the motor compartment (if any), in the cabin and on deck. Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall be possible for mounting a duly compensated magnetic compass on to the launch for use in positioning the launch for flow measurements. Arrangements shall exist for mounting the launch outfit (Bracket) and for dropping of the anchor to keep the launch stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the launch. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser.
  • 5. 10.051 MOTOR LAUNCH As per HP-I Approval Date: 6th , October 1999 Version: 1.00 Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-5/4 Purpose The launch will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The launch shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The launch shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • The launch shall be constructed of Grade A quality shipbuilding steel. All corrosive materials shall be provided with full and durable coating. • All coatings used shall provide full protection against rusting and corrosion to the steel body, structural parts, and components of the launch. • All parts, structural members and components of the launch remaining exposed to water shall be provided with complete cathodic protection. • The launch shall be very sturdy, unsinkable and shall have an adequate stability. • The launch shall be easy to operate and maintain. • All hull sections shall be accessible from the inside for quick repair of damage to the hull. The float material shall be removable to give access to the hull. • The launch shall have an expected technical lifetime of not less than 15 years. • The launch and the engines shall be capable to operate for at least 6 months without any major servicing. • The launch shall have floatation chambers filled with closed cell foam. • The launch shall be provided with appropriate fenders. • The launch’s welded and/or riveted joints shall be designed to avoid leakage while taking into account the hostile environment of operation e.g. shallow water, high flow rate, floating debris, high sediment loads. • The launch shall have a cabin to accommodate equipment and staff. • The cabin shall, at port and starboard side, have sitting/sleeping benches. • The cabin shall have windows that can be opened and a lockable door. • The cabin shall have provisions to safely install and operate the following equipment: echosounder, DGPS system, ADCP, laptop PC, helmsman display, power supply with car batteries. • The cabin shall have a stable table for the operator, to spread maps and paper charts, to make notes etc. • On deck adequate workspace (at least 3 x 3 m2 ) should be provided to carry out hydrological measurements. • The rear deck shall be provided with an awning. • The launch shall be supplied with the accessories as needed for effective deployment. • The launch shall be fitted with two inboard diesel engines. • The engines shall be operated by a remote control system, located in the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • A break water arrangement shall be provided in the front. • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck.
  • 6. Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-6/4 • Arrangements shall be made for safe working on the launch. • Bollards and fairleads are to be provided on the deck for mooring purpose. • A maintenance manual, related to the type and model of the launch, shall be part of the delivery • The launch shall be fitted with a transducer trunk pipe (transducer well). • The internal diameter of the trunk pipe shall be sufficient to pas both the high frequency echosounder transducer and a low frequency echosounder transducer or an ADCP. • It shall be easy to install or recover the transducers and / or the ADCP. • The transducer trunk pipe shall be installed in or very close to the centre of the hull. In forward / backward direction, it may be in the middle of the launch. • The transducer trunk pipe shall have a top cover to avoid water entering the launch, in particular while sailing. • The top cover shall pass the transducer rod and its cable but prevent water to enter the launch. • The transducer trunk pipe shall be at least as high as the sideboards of the launch. • The transducer trunk pipe shall be flush with the launch hull; it shall not protrude below the launch hull. • The trunk pipe shall be tightly fixed to the launch and shall be properly supported. • The trunk pipe shall be waterproof, corrosion proof and very sturdy. The trunk pipe shall be so constructed that it cannot break off, tear apart or suffer any other damage that may result in water entering (seeping or flushing) into the launch. • At the lower end of the trunk pipe, a bottom lid or dummy transducer shall close the trunk pipe during fast sailing. The trunk pipe lid shall be smoothly fitted in the curved shape of the hull; i.e. it should not disrupt the flow of water along the hull. • The bottom lid shall be easily installable/removable from above through the trunk pipe, while the launch is floating. • The transducer and support rod shall be vertically adjustable and also removable. • The transducer and its support rod shall be tightly fixed in the trunk pipe to avoid vibrations during sailing. • It shall be possible to immerse the transducer deeper than the lower end of the transducer trunk pipe. cross section view top view Example of where the trunk pipe could be mounted close to the centre line, avoiding disruption of the structural design of the launch. trunk pipe trunk pipe
  • 7. Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-7/4 Specifications 5. Launch construction material Grade A quality shipbuilding steel. length 12 m ± 0.5 m width 3.5 m ±0.25 m draft ≤1.0 m free board ≥0.5 m bottom shape flat or slightly catamaran propulsion 2 Nos. of 50 kW (65 HP) inboard diesel engines propeller 2 Nos, 3-blade bronze carrying capacity ≥6000 kg pay load 6. Engine power ≥50 kW (approx. 65 HP) operation four stroke, natural aspirated revolutions 1800 rpm at rated power cylinders 4 fuel diesel direct injection air filter fuel filter cooling water cooled direct using river water belt driven water pump and fan intake scoop bars across opening to prevent entry of debris sea-cock/valve allowing unrestricted flow of water, closed for cleaning full flow strainer/filter preventing clogging of the pump by smaller particles electrical 12 V electrical starter generator with battery charger gauges oil pressure water temperature battery voltage battery charging lubrication forced feed replaceable filters 7. Cabin length 5 m ±0.5 m height ample sitting height door lockable door width >1 m windows glass, possibility to open, closed water tight windshield glass, fitted with screen wipers 8. Launch outfit anchor adequate for size of launch, fitted with 5 m chain and rope for water depth of 50 m and current velocity of 5 m/s fuel tanks 2 Nos, 100 L each echo-sounder indicator type, fitted in the launch compass magnetic type, fitted in the launch fenders 4 of Coir type life-jacket 8 nos life-buoy 8 pieces with at least 50 m line, readily available on board
  • 8. Equipment Specification: MOTOR LAUNCH Version 1.00 10.051-8/4 fire extinguisher 4 Nos, >5 kg The fire extinguishers shall be readily accessible in the motor compartment (if any), in the cabin and on deck. Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall be possible for mounting a duly compensated magnetic compass on to the launch for use in positioning the launch for flow measurements. Arrangements shall exist for mounting the launch outfit (Bracket) and for dropping of the anchor to keep the launch stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the launch. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser.