SlideShare a Scribd company logo
1 of 58
Download to read offline
November, 2004




EMBRAER 170/190
   Program


      Luís Carlos Affonso
           Senior Vice President
 Engineering and New Product Development
Forward Looking Statement



 This presentation includes forward-looking statements or statements about events or
 circumstances which have not occurred. We have based these forward-looking statements
 largely on our current expectations and projections about future events and financial trends
 affecting our business and our future financial performance. These forward-looking
 statements are subject to risks, uncertainties and assumptions, including, among other
 things: general economic, political and business conditions, both in Brazil and in our
 market. The words “believes,” “may,” “will,” “estimates,” “continues,” “anticipates,” “intends,”
 “expects” and similar words are intended to identify forward-looking statements. We
 undertake no obligations to update publicly or revise any forward-looking statements
 because of new information, future events or other factors. In light of these risks and
 uncertainties, the forward-looking events and circumstances discussed in this presentation
 might not occur. Our actual results could differ substantially from those anticipated in our
 forward-looking statements.




                 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   2
Filling the Seat Capacity Gap

 Seat Capacity
      160


                                                                                        Narrow Body Large Aircraft
     120



       80

                                                                                50 Seat
                                          37 - 44 Seat                          ERJ 145
       40
                                          ERJ 135/140
                   30 Seat
                 turboprops
        0
                 200                 400                  600                  800                    1000                 1200                   1400
                                                             Stage Length
                                                             Nautical Miles (nm)

                 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
EMBRAER 170/190 Family
                                                                                                                      EMBRAER 170
                                                                                                                       EMBRAER 170
                                                                                                                        70/78 Seats
                                                                                                                         70/78 Seats



                                                                                                                      EMBRAER 175
                                                                                                                       EMBRAER 175
                                                                                                                        78/86 Seats
                                                                                                                         78/86 Seats



                                                                                                                      EMBRAER 190
                                                                                                                       EMBRAER 190
                                                                                                                       98/106 Seats
                                                                                                                        98/106 Seats



                                                                                                                      EMBRAER 195
                                                                                                                       EMBRAER 195
                                                                                                                      108/118 Seats
                                                                                                                       108/118 Seats

        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
Designed to Exceed Market Requirements

  Passenger:
    High passenger comfort and appeal


  Operator:
    Low operating costs
    Easy maintenance
    Operational flexibility and low turnaround time
    Commonality within the family
    High maturity from entry into service


  Environment:
    Meet/exceed future environmental requirements

           THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   5
EMBRAER 170/190 challenges

    ✈ New platform

    ✈ New technologies (e.g. Fly-by-wire)

    ✈ Larger scales

    ✈ New configuration

    ✈ Simultaneous Development

    ✈ Aggressive requirements and time to market

    ✈ New market segment

    ✈ Innovative business model : risk partnership
         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   6
Program
Strategies
A Customer-Driven Design
                   Advisory Boards, Steering Groups and
                     Man-machine Interface Meetings:

                   1st AAB                     2nd AAB                       3rd AAB                     1st SG
      1999         SJC - Brazil
                   March
                                               FLL - USA
                                               April
                                                                             PAR - France
                                                                             September
                                                                                                         SJC & LAX
                                                                                                         October
                   7 Airlines                  9 Airlines                    20 Airlines                 11 Airlines

                   2nd SG                      4th AAB                       3rd SG
      2000         SJC & LAX
                   January
                                               FLL - USA
                                               June
                                                                             SJC - Brazil
                                                                             November
                   13 Airlines                 24 Airlines                   16 Airlines

                   1st MMI                     5th AAB                       2nd MMI                     3rd MMI                  4th MMI
      2001         SJC – Brazil
                   April
                                               SJC - Brazil
                                               April
                                                                             PAR - France
                                                                             May
                                                                                                        SJC - Brazil
                                                                                                        July
                                                                                                                                  SJC - Brazil
                                                                                                                                  September
                   11 Airlines                 27 Airlines                   6 Airlines                 11 Airlines               9 Airlines

                   5th MMI                     6th MMI                        Interior SG                  Maintenance MMI
      2002         SJC – Brazil
                   April
                                               SJC – Brazil
                                               May
                                                                              PAR – France
                                                                              June
                                                                                                           SJC – Brazil
                                                                                                           August
                   9 Airlines                  10 Airlines                    23 Airlines                  17 Airlines

        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.           8
Simultaneous Development


                       1999                2000                  2001                  2002                 2003                   2004           2005         2006

                                                                                                                                  Fev/04
  EMBRAER 170


                                                                                                                                                 4º Q/04
  EMBRAER 175


                                                                                                                                                           3º Q/05
  EMBRAER 190




  EMBRAER 195                                                                                                                                              2º Q/06




                THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.                        9
Partners
                                                                                                   PARKER
                                                                                                 - Fuel system                         C&D
                                      HONEYWELL / GRIMES                                   - Flight Control system                     - Interior               LIEBHER
                                           - Avionics
                                                                                             - Hydraulic system                        (USA)                 - Landing Gear
                                             - Lights
HAMILTON SUNDSTRAND                        - Wingtips                                                (USA)                                                    (GERMANY)
      - Electrical system                     (USA)
 - Air Management system
            (USA)                                                                                                                                 HAMILTON
                                                                     GAMESA                                                                      SUNDSTRAND
                                                                  - Empennages                                                                     - Tail Cone
                                                                 - Rear Fuselage                                                                      - APU
                                                                     (SPAIN)                                                                          (USA)


         KAWASAKI
                                                                                                                                                            LATECOERE
          - Wing stub
                                                                                                                                                         - Center fuselage I
      - Control Surfaces
                                                                                                                   SONACA                               - Center fuselage III
- Wing main box (190/195 only)
                                                                                                              - Center Fuselage II                            - Doors
   - Winglets (190/195 only)
                                                                                                                    - Slats                                  (FRANCE)
            (JAPAN)
                                                                                                                  (BELGIUM)



 SAINT GOBAIN
   - Radome                                                                                                   GEAE
     (USA)                                                                                                   -Engine
                                                                                                           - Nacelles
                                                                                                              (USA)


                       THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.                           10
A World-Wide Partnership Project




                                           chorus




         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   11
A Joint Design Teaming Effort
                                                      JDP in 1999




                                    300 partner members
                                         at Embraer



     All partners co-located at Embraer since early design
         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   12
Integration Supported by a World-Wide Portal



                                                                                   800 people

                    900 people
                                                                                                                                             300 people




                                 1500 people




... A virtual team co-location for detailed design and manufacturing
            THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.                13
State of the art development tools




                                                                                                                             Real




            DMU




          THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
Investment Breakdown
                                            EMBRAER 170/190
                                                      US$ 900 Million

                                                                                            Material
                                  Partners                                                  7%
                                  R&D
                                  34%



                                                                                                        Labor
                                                                                                        33%
                   Building
                   & Equipment
                     12%
                                                             Other
                                                             14%




        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   15
Product
Characteristics
The Double-Bubble Design


                                                                                            Spacious cabin feeling

                                                                                            Four abreast seating:

                                                                                            Large headroom

                                                                                            Bins can accommodate roll-on bags
                                                                                            as big as 24 x 16 x 10 in

                                                                                            Superior ground service access and
                                                                                            baggage handling

                                                                                            Large cargo hold




        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   FC 14/Nov/02 17
Cross Section Comparison

          A318/320                                                                                       EMBRAER 170
                                               18”                                                                                           18.25”
                                                                                                                                             18.25”




                                 19”                                                                                                19.75”
                                                                                                                                    19.75”

                 3.63 m                                                                                           2.74 m
                                                                                                                   2.74 m
           0.605 m/pax                                                                                          0.685 m/pax
                                                                                                                0.685 m/pax
           Cabin width Per pax                                                                               Cabin width Per pax




  Double-bubble design gives passengers seamless level of comfort

          THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.              18
First Class Cross Section


  54” (137.2 cm) wide double
  seat
  Modified bin to
  accommodate aisle offset




            THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   19
Interior Noise
    ✈ 77.5 dB(A) average inside passengers cabin and 77.0 dB(A) inside cockpit.

EMBRAER 170




             Cockpit:                                               81
             77.0 dBA
                                                                    80

                                                                    79                                                                                     Maximum: 78.4
                                                                    78      Average: 77.5
                                                                    77

                                                                    76
                                                                            Minimum: 76.3
                                                                    75
Assumptions:
- FL 390; Typical Cruise Speed
-Average of 5 points across each seat row (4 seats + aisle)
-Measured in accordance to SAE ARP 1323
                          THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.                   20
Range from Dallas

                                                                                                                                 EMBRAER 170
                                                                                                                                 EMBRAER 175
                                                                                                                                 EMBRAER 190
                                                                                                                                 EMBRAER 195


                                                                                                                            FAR Domestic Reserves

                                                                                                                            Taxi allowance
                                                                                                                              14 minutes

                                                                                                                            Air Maneuvers
                                                                                                                               3 minutes

                                                                                                                            Cruise
                                                                                                                               ISA

                                                                                                                            Wind
                                                                                                                               85% Annual Reliability

                                                                                                                            Pax Weight & Baggage
                                                                                                                              90.7 kg (200 lb)


         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
Range from Paris

                                                                                                                                 EMBRAER 170
                                                                                                                                 EMBRAER 175
                                                                                                                                 EMBRAER 190
                                                                                                                                 EMBRAER 195


                                                                                                                           JAR OPS Reserves

                                                                                                                           Taxi allowance
                                                                                                                             14 minutes

                                                                                                                           Air Maneuvers
                                                                                                                              3 minutes

                                                                                                                           Cruise
                                                                                                                              ISA

                                                                                                                           Wind
                                                                                                                              85% Annual Reliability

                                                                                                                           Pax Weight & Baggage
                                                                                                                              90.7 Kg (200 lb)


         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
Range from Brasília

                                                                                                                                 EMBRAER 170
                                                                                                                                 EMBRAER 175
                                                                                                                                 EMBRAER 190
                                                                                                                                 EMBRAER 195


                                                                                                                         FAR International
                                                                                                                         Reserves

                                                                                                                         Taxi allowance
                                                                                                                           14 minutes

                                                                                                                         Air Maneuvers
                                                                                                                            3 minutes

                                                                                                                         Cruise
                                                                                                                            ISA

                                                                                                                         Wind
                                                                                                                            85% Annual Reliability

                                                                                                                         Pax Weight & Baggage
                                                                                                                            90.7 kg (200 lb)


         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
External Noise
   ✈ The EMBRAER 170/190 Family comply with current and future Environmental
     Requirements (ICAO Stage IV – 2006)




         Note: STD versions equipped with E5 engines.
              THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   24
Emissions
  ✈ The EMBRAER 170/190 Family has large margins to 1999 ICAO Annex 16
    Stage IV emissions requirements


                                                      EMBRAER 170/175 EMBRAER 190/195
                                                         CF34-8E5        CF34-10E5
        Pollutant                                         Level                   Margin                      Level                   Margin

        HC (g/kN)                                            0.5                     97%                         5.0                        74%

        CO (g/kN)                                           42.5                     64%                        47.4                        60%

        Nox (g/kN)                                          43.2                     31%                        44.4                        24%

        Smoke (SN)                                          11.1                     59%                        13.5                        47%

           THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.         25
Airborne Tecnology




         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   26
Conventional Architecture




         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   27
System Main Features
        Right Level of Integration




         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   28
Family Commonality - LRUs

                                                   EMBRAER 170
                                                                                                            95%

                                                   EMBRAER 175
                                                                                                                                            85%

                                                   EMBRAER 190
                                                                                                            95%

                                                   EMBRAER 195


    ✈ Common pilot type rating
    ✈ High level of commonality of system components
    ✈ 100% cockpit commonality
    ✈ 100% of flying qualities commonality due to the Fly-by-Wire system
           THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.         29
Ground Operations
        Four doors fuselage and appropriate GSE clearances expedite
                              turnaround time
                              FUEL SERVICE
                                                                         BAGGAGE
 BAGGAGE                                                                 CARGO                                      Very low TAT
 CARGO
                                                               GALLEY
                                                               SERVICE                                              Adequate positioning
                1m                      BAGGAGE
   GALLEY
  SERVICE               BAGGAGE
                                        LOADER                                                                      of Ground Service
                                                                                  POTABLE
                        LOADER
                         1m
                                                                                  WATER                             points

                                                                                                                    Two baggage/cargo
AIR
COND.                                                                                                               compartments

                                                                                                                    Low GSE collision risk

                                                                                                                    Simultaneous pax and
                                                                            LAVATORY                                service cabin flows
            PASSENGER BRIDGE                                                SERVICE



                   THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   GO 14/Nov/02 30
EMBRAER 170/190 Economic Life
    The EMBRAER 170 airframe is conceived for a economic life
    of 80,000 flight cycles, approximately 30 years of operation.




          THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   31
Maintenance Checks Interval
   The EMBRAER 170/190 family has the longest maintenance checks
                    intervals in the industry.




 Assumptions: 2,500 FH/year; 1.33 FH/FC; 0.5 AH/FH (APU)
 Note: Values in FH estimated according to the downtime periods for each aircraft further maintenance plan document
 MA 15/Mar/04
                      THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   32
Maintenance Plan Benchmarking




                                               Target ERJ 170: 1.0 MH/ FH
                                               Actual: 0.7 MH/ FH
        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   33
10 Years Downtime Projection
 With Longest Intervals and shorter downtimes, the EMBRAER family
              has defined new productivity standards.




Assumptions: 2,500 FH/year; 1.33 FH/FC; 0.5 AH/FH (APU)
Note: Values in FH estimated according to the downtime periods for each aircraft further maintenance plan document
                         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   34
DMC Comparison
      Cost-effective use of new technologies results in very competitive
                       direct maintenance costs (DMCs)
                                                               Maintenance Cost Comparison

              180%


              160%


              140%


              120%
 DMC/FH (%)




              100%


              80%


              60%


              40%


              20%


               0%
                     E170             E175               E190               E195            CRJ700             CRJ900              B717            B737-600   A318
                            THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.      GO 14/Nov/02 35
Profitable by Design
*Based on Total Operating Cost                                                                                                                             USA
500 sm for EMBRAER 170/175                  BREAK-EVEN*                                       PROFIT                                                       Environment

600 sm for EMBRAER 190/195



    EMBRAER 170
    78 seat
                                                      40 PAX (51%)                                    38 PAX


   EMBRAER 175
   86 seats
                                                      44 PAX (51%)                                    42 PAX



   EMBRAER 190
   106 seats
                                                      57 PAX (54%)                                                           49 PAX



    EMBRAER 195
    118 seats
                                                      62 PAX (53%)                                                           56 PAX
              *Based on Total Operating Costs; Average OW net fare 500 sm USD 90; 600 sm USD 98
                          THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.            36
EMBRAER 170
Program Status
Fleet Status
   22 aircraft delivered
                                                                                                                         6 aircraft delivered
   Flight Cycles: 14468
                                                                                                                         Flight Cycles: 4457
   Flight Hours: 20228
                                                                                                                         Flight Hours: 6517




                                                                                                                        6 aircraft delivered
                                                                                                                        Flight Cycles: 4186

   2 aircraft delivered                                                                                                 Flight Hours: 4466

   Flight Cycles: 274
   Flight Hours: 467                                                                               Total
                                                                                                           36 aircraft delivered
                                                                                                           Flight Cycles: 23385
                                                                                                           Flight Hours: 31678
               THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   38
EMBRAER 170 Operation




        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   39
New Functionalities
                                                    Dec04                                                                                             Mar/Apr05



✈ Emergency locator transmitter (ELT) with Pos. Report
✈ Quick Access Recorder (QAR)
✈ Autobrake
✈ Lightning Sensor System (LSS)
✈ Single FMS
✈ VNAV
✈ WX radar and FMS map information on PFD
✈ Airline FMS 1




                                                                                                                                              ✈ CAT III a with autoland
                                                                                                                                              ✈ SATCOM
                                                                                                                                              ✈ Electronic Checklist
                                                                                                                                              ✈ Airline FMS 2
                                                                                                                                              ✈ Enhanced Transponder



                     THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.                       40
New Functionalities
        Jan05                             Jul05                                    Sep05                                      Nov05                       Jan06

✈ Cabin Surveillance System (CSS)

                    ✈ PC Power Outlets on Seats
                    ✈ Freeze protection Kit
                    ✈ In Flight Intertainement (IFE)
                    ✈ Landing Gear Bay Fire protection

                                                                               ✈ Full Provisions for DGPS
                                                                               ✈ Envelope Extendion to -2000ft
                                                                               ✈ Stowage locations for
                                                                                     Laptops and mobile phone

                                                                                                             ✈ Steep Approach Certification
                                                                                                             ✈ CAT III b
                                                                                                             ✈ HUD repeater + LVTO
                                                                                                             ✈ Airline FMS3
                                                                                                             ✈ VDR Mode 2

                                                                                                                                       ✈ System CMC: Fault Modeling

                   THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.                     41
EMBRAER 175
Program Status
EMBRAER 175 - Fuselage




       FWD CENTRAL FUS I                                                AFT CENTRAL FUS II
         ( FWD PLUG )                                                      ( AFT PLUG )
                                      838,2                                                                 939,8
                                      (33in)                                                                (37in)




         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   43
EMBRAER 175 - Flight Test
            2h                                            S/N 0014
     :   19
  FH




1st Flight – June 14th, 2003


                     ✈ Type Certification: 4th Quarter, 2004

                                                                                                                                                    S/N 0017
                                                                                                     9h
                                                                                             :    12
                                                                                          FH




                                                                                      1st Flight – August, 7h, 2003
                   THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.              44
EMBRAER 190
Program Status
Differences EMBRAER 170 x EMBRAER 190


                                                                                        Wing




  CF34-10E Engine




                                                     Main Landing Gear


                                                                                                                                                Horizontal Stabilizer
               THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.                           46
EMBRAER 190 - Fuselage




                                    Fwd Plug                                  Aft Plug


                                    2407.2 mm                                3716.8 mm
                                       (94.8 in)                               (146.3 in)




        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   47
EMBRAER 190 - Flight Test Campaign
                     A/C 190-01                                                                                                        A/C 190-03

          FH                                                                                                        FH
 ~ 2 95                                                                                                   ~ 50




 First Flight – Mar/04                                                                                 First Flight – Jul/04




          FH
 ~ 3 00




First Flight – May/04                                                                                  First Flight – 18/Sep/04


                     A/C 190-02                                                                                                        A/C 190-04
                         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   48
EMBRAER 190 - Ground Test Campaign
                    Empennage – Static Test
                              ✈ Limit and Ultimate load cases
                                finished.



                                        Full Scale Static Test
                                                  ✈ Wing Down Bending finished and Wing Up Bending
                                                    Limit Load scheduled to this week.


                                                           Fatigue Test
                                                                    ✈ Wing Junction accomplished;
                                                                    ✈ Test device assembly on-going;
                                                                    ✈ Test Start scheduled for Jan 05.



                                                                                Tire Burst Test
                                                                                          ✈ Test Start scheduled for early November.


        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   49
Satellite TV




                      A320                                                                                              Prototype




                                                                                                                   Radome

      LiveTV System available on EMBRAER 190´s jetBlue from 1st A/C
           THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   50
Single and Dual HUD




                                             Certification Date: Nov/05
         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   51
ETOPS - Extended Range Operations

  ✈ ETOPS 75 minutes Dec/2005
  ✈ ETOPS 90 min + over-water
  ✈ ETOPS 90/120 minutes Combination: Aug/2006


        Without ETOPS
                                                                                                                     With ETOPS




  Non viable routes
             THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   52
EMBRAER 190 - Certification Dates

          ✈ Type Certification 3rd Quarter, 2005
          ✈ 1st Delivery: 3rd Quarter, 2005




         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   53
EMBRAER 195
Program Status
EMBRAER 195 - Fuselage




                                  Fwd Plug                                      Fwd Plug

                                    3220 mm                                     5317 mm
                                   (126.8 in)                                   (209.3 in)




        THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   55
EMBRAER 195 - Certification Dates




                       ✈ 1st Flight: 4th Quarter, 2004
                       ✈ Type Certification 2nd Quarter, 2006
                       ✈ 1st Delivery: 3rd Quarter, 2006


         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   56
Enthusiastic Market’s Receptivity




         THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   57
Thank you !
Thank you !




    THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.   58

More Related Content

Viewers also liked

2007* Airline Marketing Embraer Day 2007
2007* Airline Marketing Embraer Day 20072007* Airline Marketing Embraer Day 2007
2007* Airline Marketing Embraer Day 2007Embraer RI
 
2005 - Embraer Paris Air Show Presentation Commercial Aviation
2005 - Embraer Paris Air Show Presentation   Commercial Aviation2005 - Embraer Paris Air Show Presentation   Commercial Aviation
2005 - Embraer Paris Air Show Presentation Commercial AviationEmbraer RI
 
2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...
2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...
2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...Embraer RI
 
2004 - Presentation Made In Canada With Canaccord Capital
2004 - Presentation Made In Canada With Canaccord Capital2004 - Presentation Made In Canada With Canaccord Capital
2004 - Presentation Made In Canada With Canaccord CapitalEmbraer RI
 
Commercial aviation emb day mar2011
Commercial aviation emb day mar2011Commercial aviation emb day mar2011
Commercial aviation emb day mar2011Embraer RI
 
Executive Aviation Presentation - Farnborough Airshow
Executive Aviation Presentation - Farnborough AirshowExecutive Aviation Presentation - Farnborough Airshow
Executive Aviation Presentation - Farnborough AirshowEmbraer RI
 
Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)Embraer RI
 

Viewers also liked (8)

2007* Airline Marketing Embraer Day 2007
2007* Airline Marketing Embraer Day 20072007* Airline Marketing Embraer Day 2007
2007* Airline Marketing Embraer Day 2007
 
2005 - Embraer Paris Air Show Presentation Commercial Aviation
2005 - Embraer Paris Air Show Presentation   Commercial Aviation2005 - Embraer Paris Air Show Presentation   Commercial Aviation
2005 - Embraer Paris Air Show Presentation Commercial Aviation
 
2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...
2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...
2003* Road Show Sales Finance Nov 03 (ApresentaçãO Encontra Se DisponíVel Ape...
 
2004 - Presentation Made In Canada With Canaccord Capital
2004 - Presentation Made In Canada With Canaccord Capital2004 - Presentation Made In Canada With Canaccord Capital
2004 - Presentation Made In Canada With Canaccord Capital
 
Commercial aviation emb day mar2011
Commercial aviation emb day mar2011Commercial aviation emb day mar2011
Commercial aviation emb day mar2011
 
Executive Aviation Presentation - Farnborough Airshow
Executive Aviation Presentation - Farnborough AirshowExecutive Aviation Presentation - Farnborough Airshow
Executive Aviation Presentation - Farnborough Airshow
 
Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)
 
20 -- Caracteristicas de los aviones comodidad y muchos datos ok mb
20 --  Caracteristicas de los aviones comodidad y muchos datos ok mb20 --  Caracteristicas de los aviones comodidad y muchos datos ok mb
20 -- Caracteristicas de los aviones comodidad y muchos datos ok mb
 

Similar to 2004* 5o.Encontro Anual De Investidores Da Embraer Programa Embraer 170 190(DisponíVel Apenas Em InglêS)

2005* Ubs 6th Annual Conference Embraer Presentation
2005* Ubs 6th Annual Conference   Embraer Presentation2005* Ubs 6th Annual Conference   Embraer Presentation
2005* Ubs 6th Annual Conference Embraer PresentationEmbraer RI
 
Santander Conference - Cancun
Santander Conference - CancunSantander Conference - Cancun
Santander Conference - CancunEmbraer RI
 
2005 - Chinese Market Presentation May 2005
2005 - Chinese Market Presentation May 20052005 - Chinese Market Presentation May 2005
2005 - Chinese Market Presentation May 2005Embraer RI
 
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...Embraer RI
 
2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate Overview2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate OverviewEmbraer RI
 
Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006Embraer RI
 
Industrial EMBRAER DAY 2006
Industrial EMBRAER DAY 2006Industrial EMBRAER DAY 2006
Industrial EMBRAER DAY 2006Embraer RI
 

Similar to 2004* 5o.Encontro Anual De Investidores Da Embraer Programa Embraer 170 190(DisponíVel Apenas Em InglêS) (7)

2005* Ubs 6th Annual Conference Embraer Presentation
2005* Ubs 6th Annual Conference   Embraer Presentation2005* Ubs 6th Annual Conference   Embraer Presentation
2005* Ubs 6th Annual Conference Embraer Presentation
 
Santander Conference - Cancun
Santander Conference - CancunSantander Conference - Cancun
Santander Conference - Cancun
 
2005 - Chinese Market Presentation May 2005
2005 - Chinese Market Presentation May 20052005 - Chinese Market Presentation May 2005
2005 - Chinese Market Presentation May 2005
 
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...
 
2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate Overview2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate Overview
 
Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006
 
Industrial EMBRAER DAY 2006
Industrial EMBRAER DAY 2006Industrial EMBRAER DAY 2006
Industrial EMBRAER DAY 2006
 

More from Embraer RI

Embraer march 2016 book ri
Embraer march 2016 book riEmbraer march 2016 book ri
Embraer march 2016 book riEmbraer RI
 
5.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.155.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.15Embraer RI
 
4.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev74.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev7Embraer RI
 
3.0 embraer day march 2016 final2
3.0 embraer day march 2016 final23.0 embraer day march 2016 final2
3.0 embraer day march 2016 final2Embraer RI
 
2.0 embraer day agenda
2.0 embraer day agenda2.0 embraer day agenda
2.0 embraer day agendaEmbraer RI
 
1.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v21.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v2Embraer RI
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3Embraer RI
 
Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)Embraer RI
 
Embraer february 2016 book ri
Embraer february 2016 book riEmbraer february 2016 book ri
Embraer february 2016 book riEmbraer RI
 
Embraer december 2015 book ri
Embraer december 2015 book riEmbraer december 2015 book ri
Embraer december 2015 book riEmbraer RI
 
5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_site5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_siteEmbraer RI
 
Embraer november 2015 book ri
Embraer november 2015 book riEmbraer november 2015 book ri
Embraer november 2015 book riEmbraer RI
 
1 embraer 3-q15_results_final
1 embraer 3-q15_results_final1 embraer 3-q15_results_final
1 embraer 3-q15_results_finalEmbraer RI
 
5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-final5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-finalEmbraer RI
 
2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-final2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-finalEmbraer RI
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3Embraer RI
 
Embraer 3 q15_results_final
Embraer 3 q15_results_finalEmbraer 3 q15_results_final
Embraer 3 q15_results_finalEmbraer RI
 
2015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev92015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev9Embraer RI
 
Embraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer RI
 
Embraer august 2015 book ri
Embraer august 2015 book riEmbraer august 2015 book ri
Embraer august 2015 book riEmbraer RI
 

More from Embraer RI (20)

Embraer march 2016 book ri
Embraer march 2016 book riEmbraer march 2016 book ri
Embraer march 2016 book ri
 
5.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.155.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.15
 
4.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev74.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev7
 
3.0 embraer day march 2016 final2
3.0 embraer day march 2016 final23.0 embraer day march 2016 final2
3.0 embraer day march 2016 final2
 
2.0 embraer day agenda
2.0 embraer day agenda2.0 embraer day agenda
2.0 embraer day agenda
 
1.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v21.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v2
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3
 
Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)
 
Embraer february 2016 book ri
Embraer february 2016 book riEmbraer february 2016 book ri
Embraer february 2016 book ri
 
Embraer december 2015 book ri
Embraer december 2015 book riEmbraer december 2015 book ri
Embraer december 2015 book ri
 
5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_site5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_site
 
Embraer november 2015 book ri
Embraer november 2015 book riEmbraer november 2015 book ri
Embraer november 2015 book ri
 
1 embraer 3-q15_results_final
1 embraer 3-q15_results_final1 embraer 3-q15_results_final
1 embraer 3-q15_results_final
 
5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-final5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-final
 
2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-final2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-final
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3
 
Embraer 3 q15_results_final
Embraer 3 q15_results_finalEmbraer 3 q15_results_final
Embraer 3 q15_results_final
 
2015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev92015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev9
 
Embraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer 2 q15_results_final
Embraer 2 q15_results_final
 
Embraer august 2015 book ri
Embraer august 2015 book riEmbraer august 2015 book ri
Embraer august 2015 book ri
 

2004* 5o.Encontro Anual De Investidores Da Embraer Programa Embraer 170 190(DisponíVel Apenas Em InglêS)

  • 1. November, 2004 EMBRAER 170/190 Program Luís Carlos Affonso Senior Vice President Engineering and New Product Development
  • 2. Forward Looking Statement This presentation includes forward-looking statements or statements about events or circumstances which have not occurred. We have based these forward-looking statements largely on our current expectations and projections about future events and financial trends affecting our business and our future financial performance. These forward-looking statements are subject to risks, uncertainties and assumptions, including, among other things: general economic, political and business conditions, both in Brazil and in our market. The words “believes,” “may,” “will,” “estimates,” “continues,” “anticipates,” “intends,” “expects” and similar words are intended to identify forward-looking statements. We undertake no obligations to update publicly or revise any forward-looking statements because of new information, future events or other factors. In light of these risks and uncertainties, the forward-looking events and circumstances discussed in this presentation might not occur. Our actual results could differ substantially from those anticipated in our forward-looking statements. THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 2
  • 3. Filling the Seat Capacity Gap Seat Capacity 160 Narrow Body Large Aircraft 120 80 50 Seat 37 - 44 Seat ERJ 145 40 ERJ 135/140 30 Seat turboprops 0 200 400 600 800 1000 1200 1400 Stage Length Nautical Miles (nm) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
  • 4. EMBRAER 170/190 Family EMBRAER 170 EMBRAER 170 70/78 Seats 70/78 Seats EMBRAER 175 EMBRAER 175 78/86 Seats 78/86 Seats EMBRAER 190 EMBRAER 190 98/106 Seats 98/106 Seats EMBRAER 195 EMBRAER 195 108/118 Seats 108/118 Seats THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
  • 5. Designed to Exceed Market Requirements Passenger: High passenger comfort and appeal Operator: Low operating costs Easy maintenance Operational flexibility and low turnaround time Commonality within the family High maturity from entry into service Environment: Meet/exceed future environmental requirements THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 5
  • 6. EMBRAER 170/190 challenges ✈ New platform ✈ New technologies (e.g. Fly-by-wire) ✈ Larger scales ✈ New configuration ✈ Simultaneous Development ✈ Aggressive requirements and time to market ✈ New market segment ✈ Innovative business model : risk partnership THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 6
  • 8. A Customer-Driven Design Advisory Boards, Steering Groups and Man-machine Interface Meetings: 1st AAB 2nd AAB 3rd AAB 1st SG 1999 SJC - Brazil March FLL - USA April PAR - France September SJC & LAX October 7 Airlines 9 Airlines 20 Airlines 11 Airlines 2nd SG 4th AAB 3rd SG 2000 SJC & LAX January FLL - USA June SJC - Brazil November 13 Airlines 24 Airlines 16 Airlines 1st MMI 5th AAB 2nd MMI 3rd MMI 4th MMI 2001 SJC – Brazil April SJC - Brazil April PAR - France May SJC - Brazil July SJC - Brazil September 11 Airlines 27 Airlines 6 Airlines 11 Airlines 9 Airlines 5th MMI 6th MMI Interior SG Maintenance MMI 2002 SJC – Brazil April SJC – Brazil May PAR – France June SJC – Brazil August 9 Airlines 10 Airlines 23 Airlines 17 Airlines THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 8
  • 9. Simultaneous Development 1999 2000 2001 2002 2003 2004 2005 2006 Fev/04 EMBRAER 170 4º Q/04 EMBRAER 175 3º Q/05 EMBRAER 190 EMBRAER 195 2º Q/06 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 9
  • 10. Partners PARKER - Fuel system C&D HONEYWELL / GRIMES - Flight Control system - Interior LIEBHER - Avionics - Hydraulic system (USA) - Landing Gear - Lights HAMILTON SUNDSTRAND - Wingtips (USA) (GERMANY) - Electrical system (USA) - Air Management system (USA) HAMILTON GAMESA SUNDSTRAND - Empennages - Tail Cone - Rear Fuselage - APU (SPAIN) (USA) KAWASAKI LATECOERE - Wing stub - Center fuselage I - Control Surfaces SONACA - Center fuselage III - Wing main box (190/195 only) - Center Fuselage II - Doors - Winglets (190/195 only) - Slats (FRANCE) (JAPAN) (BELGIUM) SAINT GOBAIN - Radome GEAE (USA) -Engine - Nacelles (USA) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 10
  • 11. A World-Wide Partnership Project chorus THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 11
  • 12. A Joint Design Teaming Effort JDP in 1999 300 partner members at Embraer All partners co-located at Embraer since early design THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 12
  • 13. Integration Supported by a World-Wide Portal 800 people 900 people 300 people 1500 people ... A virtual team co-location for detailed design and manufacturing THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 13
  • 14. State of the art development tools Real DMU THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
  • 15. Investment Breakdown EMBRAER 170/190 US$ 900 Million Material Partners 7% R&D 34% Labor 33% Building & Equipment 12% Other 14% THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 15
  • 17. The Double-Bubble Design Spacious cabin feeling Four abreast seating: Large headroom Bins can accommodate roll-on bags as big as 24 x 16 x 10 in Superior ground service access and baggage handling Large cargo hold THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. FC 14/Nov/02 17
  • 18. Cross Section Comparison A318/320 EMBRAER 170 18” 18.25” 18.25” 19” 19.75” 19.75” 3.63 m 2.74 m 2.74 m 0.605 m/pax 0.685 m/pax 0.685 m/pax Cabin width Per pax Cabin width Per pax Double-bubble design gives passengers seamless level of comfort THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 18
  • 19. First Class Cross Section 54” (137.2 cm) wide double seat Modified bin to accommodate aisle offset THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 19
  • 20. Interior Noise ✈ 77.5 dB(A) average inside passengers cabin and 77.0 dB(A) inside cockpit. EMBRAER 170 Cockpit: 81 77.0 dBA 80 79 Maximum: 78.4 78 Average: 77.5 77 76 Minimum: 76.3 75 Assumptions: - FL 390; Typical Cruise Speed -Average of 5 points across each seat row (4 seats + aisle) -Measured in accordance to SAE ARP 1323 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 20
  • 21. Range from Dallas EMBRAER 170 EMBRAER 175 EMBRAER 190 EMBRAER 195 FAR Domestic Reserves Taxi allowance 14 minutes Air Maneuvers 3 minutes Cruise ISA Wind 85% Annual Reliability Pax Weight & Baggage 90.7 kg (200 lb) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
  • 22. Range from Paris EMBRAER 170 EMBRAER 175 EMBRAER 190 EMBRAER 195 JAR OPS Reserves Taxi allowance 14 minutes Air Maneuvers 3 minutes Cruise ISA Wind 85% Annual Reliability Pax Weight & Baggage 90.7 Kg (200 lb) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
  • 23. Range from Brasília EMBRAER 170 EMBRAER 175 EMBRAER 190 EMBRAER 195 FAR International Reserves Taxi allowance 14 minutes Air Maneuvers 3 minutes Cruise ISA Wind 85% Annual Reliability Pax Weight & Baggage 90.7 kg (200 lb) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT.
  • 24. External Noise ✈ The EMBRAER 170/190 Family comply with current and future Environmental Requirements (ICAO Stage IV – 2006) Note: STD versions equipped with E5 engines. THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 24
  • 25. Emissions ✈ The EMBRAER 170/190 Family has large margins to 1999 ICAO Annex 16 Stage IV emissions requirements EMBRAER 170/175 EMBRAER 190/195 CF34-8E5 CF34-10E5 Pollutant Level Margin Level Margin HC (g/kN) 0.5 97% 5.0 74% CO (g/kN) 42.5 64% 47.4 60% Nox (g/kN) 43.2 31% 44.4 24% Smoke (SN) 11.1 59% 13.5 47% THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 25
  • 26. Airborne Tecnology THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 26
  • 27. Conventional Architecture THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 27
  • 28. System Main Features Right Level of Integration THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 28
  • 29. Family Commonality - LRUs EMBRAER 170 95% EMBRAER 175 85% EMBRAER 190 95% EMBRAER 195 ✈ Common pilot type rating ✈ High level of commonality of system components ✈ 100% cockpit commonality ✈ 100% of flying qualities commonality due to the Fly-by-Wire system THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 29
  • 30. Ground Operations Four doors fuselage and appropriate GSE clearances expedite turnaround time FUEL SERVICE BAGGAGE BAGGAGE CARGO Very low TAT CARGO GALLEY SERVICE Adequate positioning 1m BAGGAGE GALLEY SERVICE BAGGAGE LOADER of Ground Service POTABLE LOADER 1m WATER points Two baggage/cargo AIR COND. compartments Low GSE collision risk Simultaneous pax and LAVATORY service cabin flows PASSENGER BRIDGE SERVICE THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. GO 14/Nov/02 30
  • 31. EMBRAER 170/190 Economic Life The EMBRAER 170 airframe is conceived for a economic life of 80,000 flight cycles, approximately 30 years of operation. THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 31
  • 32. Maintenance Checks Interval The EMBRAER 170/190 family has the longest maintenance checks intervals in the industry. Assumptions: 2,500 FH/year; 1.33 FH/FC; 0.5 AH/FH (APU) Note: Values in FH estimated according to the downtime periods for each aircraft further maintenance plan document MA 15/Mar/04 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 32
  • 33. Maintenance Plan Benchmarking Target ERJ 170: 1.0 MH/ FH Actual: 0.7 MH/ FH THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 33
  • 34. 10 Years Downtime Projection With Longest Intervals and shorter downtimes, the EMBRAER family has defined new productivity standards. Assumptions: 2,500 FH/year; 1.33 FH/FC; 0.5 AH/FH (APU) Note: Values in FH estimated according to the downtime periods for each aircraft further maintenance plan document THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 34
  • 35. DMC Comparison Cost-effective use of new technologies results in very competitive direct maintenance costs (DMCs) Maintenance Cost Comparison 180% 160% 140% 120% DMC/FH (%) 100% 80% 60% 40% 20% 0% E170 E175 E190 E195 CRJ700 CRJ900 B717 B737-600 A318 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. GO 14/Nov/02 35
  • 36. Profitable by Design *Based on Total Operating Cost USA 500 sm for EMBRAER 170/175 BREAK-EVEN* PROFIT Environment 600 sm for EMBRAER 190/195 EMBRAER 170 78 seat 40 PAX (51%) 38 PAX EMBRAER 175 86 seats 44 PAX (51%) 42 PAX EMBRAER 190 106 seats 57 PAX (54%) 49 PAX EMBRAER 195 118 seats 62 PAX (53%) 56 PAX *Based on Total Operating Costs; Average OW net fare 500 sm USD 90; 600 sm USD 98 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 36
  • 38. Fleet Status 22 aircraft delivered 6 aircraft delivered Flight Cycles: 14468 Flight Cycles: 4457 Flight Hours: 20228 Flight Hours: 6517 6 aircraft delivered Flight Cycles: 4186 2 aircraft delivered Flight Hours: 4466 Flight Cycles: 274 Flight Hours: 467 Total 36 aircraft delivered Flight Cycles: 23385 Flight Hours: 31678 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 38
  • 39. EMBRAER 170 Operation THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 39
  • 40. New Functionalities Dec04 Mar/Apr05 ✈ Emergency locator transmitter (ELT) with Pos. Report ✈ Quick Access Recorder (QAR) ✈ Autobrake ✈ Lightning Sensor System (LSS) ✈ Single FMS ✈ VNAV ✈ WX radar and FMS map information on PFD ✈ Airline FMS 1 ✈ CAT III a with autoland ✈ SATCOM ✈ Electronic Checklist ✈ Airline FMS 2 ✈ Enhanced Transponder THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 40
  • 41. New Functionalities Jan05 Jul05 Sep05 Nov05 Jan06 ✈ Cabin Surveillance System (CSS) ✈ PC Power Outlets on Seats ✈ Freeze protection Kit ✈ In Flight Intertainement (IFE) ✈ Landing Gear Bay Fire protection ✈ Full Provisions for DGPS ✈ Envelope Extendion to -2000ft ✈ Stowage locations for Laptops and mobile phone ✈ Steep Approach Certification ✈ CAT III b ✈ HUD repeater + LVTO ✈ Airline FMS3 ✈ VDR Mode 2 ✈ System CMC: Fault Modeling THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 41
  • 43. EMBRAER 175 - Fuselage FWD CENTRAL FUS I AFT CENTRAL FUS II ( FWD PLUG ) ( AFT PLUG ) 838,2 939,8 (33in) (37in) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 43
  • 44. EMBRAER 175 - Flight Test 2h S/N 0014 : 19 FH 1st Flight – June 14th, 2003 ✈ Type Certification: 4th Quarter, 2004 S/N 0017 9h : 12 FH 1st Flight – August, 7h, 2003 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 44
  • 46. Differences EMBRAER 170 x EMBRAER 190 Wing CF34-10E Engine Main Landing Gear Horizontal Stabilizer THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 46
  • 47. EMBRAER 190 - Fuselage Fwd Plug Aft Plug 2407.2 mm 3716.8 mm (94.8 in) (146.3 in) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 47
  • 48. EMBRAER 190 - Flight Test Campaign A/C 190-01 A/C 190-03 FH FH ~ 2 95 ~ 50 First Flight – Mar/04 First Flight – Jul/04 FH ~ 3 00 First Flight – May/04 First Flight – 18/Sep/04 A/C 190-02 A/C 190-04 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 48
  • 49. EMBRAER 190 - Ground Test Campaign Empennage – Static Test ✈ Limit and Ultimate load cases finished. Full Scale Static Test ✈ Wing Down Bending finished and Wing Up Bending Limit Load scheduled to this week. Fatigue Test ✈ Wing Junction accomplished; ✈ Test device assembly on-going; ✈ Test Start scheduled for Jan 05. Tire Burst Test ✈ Test Start scheduled for early November. THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 49
  • 50. Satellite TV A320 Prototype Radome LiveTV System available on EMBRAER 190´s jetBlue from 1st A/C THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 50
  • 51. Single and Dual HUD Certification Date: Nov/05 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 51
  • 52. ETOPS - Extended Range Operations ✈ ETOPS 75 minutes Dec/2005 ✈ ETOPS 90 min + over-water ✈ ETOPS 90/120 minutes Combination: Aug/2006 Without ETOPS With ETOPS Non viable routes THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 52
  • 53. EMBRAER 190 - Certification Dates ✈ Type Certification 3rd Quarter, 2005 ✈ 1st Delivery: 3rd Quarter, 2005 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 53
  • 55. EMBRAER 195 - Fuselage Fwd Plug Fwd Plug 3220 mm 5317 mm (126.8 in) (209.3 in) THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 55
  • 56. EMBRAER 195 - Certification Dates ✈ 1st Flight: 4th Quarter, 2004 ✈ Type Certification 2nd Quarter, 2006 ✈ 1st Delivery: 3rd Quarter, 2006 THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 56
  • 57. Enthusiastic Market’s Receptivity THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 57
  • 58. Thank you ! Thank you ! THE INFORMATION CONTAINED HEREIN IS THE PROPERTY OF EMBRAER AND SHALL NOT BE COPIED OR USED WITHOUT EMBRAER’S WRITTEN CONSENT. 58