SlideShare a Scribd company logo
1 of 4
DASTAGIRI BASHA.
 THERMAL
POWERPLANT.
U.T.C.L-APCW.
SOP FOR TOTAL POWER FAILURE INCLUDING DCS FAILURE.
BOILER DESK ENGINEER.

1. INFORM AND COORDINATE WITH FIELD OPERATOR FOR LOCAL/FIELD OPERATION.

2. DISTRIBUTE THE C.Ls to EACH BOILER AND INSTRUCT THEM TO

      A).MANUALLY OPEN STARTUP VENT/EMRV FOR DEPRESSURISE THE BOILER.
      B).MANUALLY OPEN CO VENT/PA DUCT VENTS FOR RELEASING GASES.
      C).CLOSE MAIN STEAM STOP VALVE.

3. ENSURE THE PRESSURE DROPPING IN BOILERS FROM MAIN STEAM PRESSURE GAUGES.

4. ENSURE THAT BOTH ID FAN DAMPERS ARE IN OPEN CONDITION.

5. ENSURE THAT BOTH PA & SA FAN DAMPERS ARE IN OPEN CONDITION.

6. ENSURE THAT BED ASH IS NOT DRAINING.

7. CHECK THE WORK DONE BY C.Ls

8. ALL THE MOTORS L.P.B.S. STOP PUSH BUTTON TO BE LOCKED.

9. COORDINATE WITH BOILER & TURBINE OPERATORS FOR TAKING CORRECTIVE ACTION FOR
BOXUP.

10. STOP THE AHP SYSTEM IF THESE ARE IN RUNNING STATE.
TURBINE DESK ENGINEER

  1.  INFORM TO THE TURBINE FIELD OPERATOR THAT TOATL POWER AND DCS FAILED.
  2.  ENSURE THAT ESV GOT CLOSED.
  3.  ENSURE THAT EOP GOT STARTED
  4.  INFORM TO ELECTRICAL ENGINEER THAT TO SWITCH ON BARRING GEAR MOTOR FROM
      FIELD WITH DG SET OTHERWISE ROTATING MANUALLY.
  5. COORDINATE WITH THE FIELD OPERATOR FOR LOCAL OPERATION.
  6. EJECTOR TO BE ISOLATED FROM STEAM & AIR SIDE AND TO BE KEPT IN MANUAL MODE.
  7. GSC STEAM SIDE TO BE CLOSED.
  8. STEAM TO TURBINE GLANDS TO BE ISLOATED.
  9. VACUUM BREAK VALVE TO BE OPENED
  10. ENSURE THE DEAREATOR LEVEL.
  11. CLOSE ALL MOTORISED ISOLATION VALVES MANUALLY AND CLOSE ALL TURBINE
      EXTRACTION MOTORISED VALVES.
  12. OPEN THE ALL TURBINE CASING AND GLAND STEAM DRAINS AND AUXILARAY STEAM
      DRAINS.
  13. MANUALLY CLOSE THE STEAM DUMP MOTORISED VALVE.
  14. CLOSE THE CONDESATE TO DEAERATOR LINE ISOLATION VALVE AFTER CONTROL
      STATION .




AFTER RESUMING THE IMPORT SUPPLY.

BOILER DESK ENGINEER
  1. COORDINATE WITH ELECTRICAL ENGINEER FOR RESTART THE AUXILARIES.
  2. COORDINATE WITH BOILER OPERATOR FOR RESUMING SUPPLY.
  3. TAKE I.D. FANS INTO SERVICE AFTER GETTING CLEARANCE FROM
     ELECTRICAL ENGINEER & MAINTAIN THE DRAFT.
  4. TO START THE INSTRUMENT & SERVICE AIR COMPRESSORS.
  5. TAKE A.C.W. PUMP INTO SERVICE.
  6. TAKE BOILER FEED PUMP INTO SERVICE AND MAINTAIN THE DRUM LEVEL
     AFTER GETTING CLEARANCE.
  7. TO START THE BOILER AS PER OUR STANDARD PROCEDURE.
  8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.
TURBINE DESK ENGINEER

  1. COORDINATE WITH TURBINE OPERATOR FOR RESUMING SUPPLY
     NORMALLY.
  2. AFTER GETTING CLEARANCE FROM ELECTRICAL ENGINEER TO START THE
     AUXILARIES.
  3. ENSURE A.C.W. PUMP IS IN SERVICE.
  4. ENSURE COOLING WATER FLOW FOR LUBE OIL COOLERS AND GENERATOR
     COOLERS.
  5. TO START C.E.P & MAINTAIN NORMAL C.R.T. LEVEL.
  6. TO MAINTAIN NORMAL DEAREATOR LEVEL.
  7. TO START THE TURBINE AS PER OUR STANDARD PROCEDURE.
  8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.

More Related Content

Similar to Sop for total_power_failure.[1]

DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
Mike Brusselers
 
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
Mike Brusselers
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
mark robertson
 
Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdf
Madan Karki
 
Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13
-
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
Angel Jr. Vacaro
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
Mowaten Masry
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
Amardeep Jadeja
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATION
Moiz Akhter
 

Similar to Sop for total_power_failure.[1] (20)

Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testes
 
105 gc6 low n ox
105 gc6 low n ox105 gc6 low n ox
105 gc6 low n ox
 
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
 
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKSDRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 
Training on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdfTraining on OJT of Boiler Operation00.pdf
Training on OJT of Boiler Operation00.pdf
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 
Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
Summer Internship final reports
Summer Internship final reportsSummer Internship final reports
Summer Internship final reports
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
 
R & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdfR & AC LAB MANNUAL FINAL.docx.pdf
R & AC LAB MANNUAL FINAL.docx.pdf
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
 
CAMLESS ENGINE
CAMLESS ENGINECAMLESS ENGINE
CAMLESS ENGINE
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATION
 

Recently uploaded

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 

Sop for total_power_failure.[1]

  • 2. SOP FOR TOTAL POWER FAILURE INCLUDING DCS FAILURE. BOILER DESK ENGINEER. 1. INFORM AND COORDINATE WITH FIELD OPERATOR FOR LOCAL/FIELD OPERATION. 2. DISTRIBUTE THE C.Ls to EACH BOILER AND INSTRUCT THEM TO A).MANUALLY OPEN STARTUP VENT/EMRV FOR DEPRESSURISE THE BOILER. B).MANUALLY OPEN CO VENT/PA DUCT VENTS FOR RELEASING GASES. C).CLOSE MAIN STEAM STOP VALVE. 3. ENSURE THE PRESSURE DROPPING IN BOILERS FROM MAIN STEAM PRESSURE GAUGES. 4. ENSURE THAT BOTH ID FAN DAMPERS ARE IN OPEN CONDITION. 5. ENSURE THAT BOTH PA & SA FAN DAMPERS ARE IN OPEN CONDITION. 6. ENSURE THAT BED ASH IS NOT DRAINING. 7. CHECK THE WORK DONE BY C.Ls 8. ALL THE MOTORS L.P.B.S. STOP PUSH BUTTON TO BE LOCKED. 9. COORDINATE WITH BOILER & TURBINE OPERATORS FOR TAKING CORRECTIVE ACTION FOR BOXUP. 10. STOP THE AHP SYSTEM IF THESE ARE IN RUNNING STATE.
  • 3. TURBINE DESK ENGINEER 1. INFORM TO THE TURBINE FIELD OPERATOR THAT TOATL POWER AND DCS FAILED. 2. ENSURE THAT ESV GOT CLOSED. 3. ENSURE THAT EOP GOT STARTED 4. INFORM TO ELECTRICAL ENGINEER THAT TO SWITCH ON BARRING GEAR MOTOR FROM FIELD WITH DG SET OTHERWISE ROTATING MANUALLY. 5. COORDINATE WITH THE FIELD OPERATOR FOR LOCAL OPERATION. 6. EJECTOR TO BE ISOLATED FROM STEAM & AIR SIDE AND TO BE KEPT IN MANUAL MODE. 7. GSC STEAM SIDE TO BE CLOSED. 8. STEAM TO TURBINE GLANDS TO BE ISLOATED. 9. VACUUM BREAK VALVE TO BE OPENED 10. ENSURE THE DEAREATOR LEVEL. 11. CLOSE ALL MOTORISED ISOLATION VALVES MANUALLY AND CLOSE ALL TURBINE EXTRACTION MOTORISED VALVES. 12. OPEN THE ALL TURBINE CASING AND GLAND STEAM DRAINS AND AUXILARAY STEAM DRAINS. 13. MANUALLY CLOSE THE STEAM DUMP MOTORISED VALVE. 14. CLOSE THE CONDESATE TO DEAERATOR LINE ISOLATION VALVE AFTER CONTROL STATION . AFTER RESUMING THE IMPORT SUPPLY. BOILER DESK ENGINEER 1. COORDINATE WITH ELECTRICAL ENGINEER FOR RESTART THE AUXILARIES. 2. COORDINATE WITH BOILER OPERATOR FOR RESUMING SUPPLY. 3. TAKE I.D. FANS INTO SERVICE AFTER GETTING CLEARANCE FROM ELECTRICAL ENGINEER & MAINTAIN THE DRAFT. 4. TO START THE INSTRUMENT & SERVICE AIR COMPRESSORS. 5. TAKE A.C.W. PUMP INTO SERVICE. 6. TAKE BOILER FEED PUMP INTO SERVICE AND MAINTAIN THE DRUM LEVEL AFTER GETTING CLEARANCE. 7. TO START THE BOILER AS PER OUR STANDARD PROCEDURE. 8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.
  • 4. TURBINE DESK ENGINEER 1. COORDINATE WITH TURBINE OPERATOR FOR RESUMING SUPPLY NORMALLY. 2. AFTER GETTING CLEARANCE FROM ELECTRICAL ENGINEER TO START THE AUXILARIES. 3. ENSURE A.C.W. PUMP IS IN SERVICE. 4. ENSURE COOLING WATER FLOW FOR LUBE OIL COOLERS AND GENERATOR COOLERS. 5. TO START C.E.P & MAINTAIN NORMAL C.R.T. LEVEL. 6. TO MAINTAIN NORMAL DEAREATOR LEVEL. 7. TO START THE TURBINE AS PER OUR STANDARD PROCEDURE. 8. ENSURE THAT ALL THE EQUIPMENT IN NORMAL CONDITION.