MONTHLY HYDRAULIC SYSTEM CHECKS AND MAINTENANCE
INCLUDES MAIN HPU AND DOGHOUSE, SUBSTRUCTURE AND DRAWWORKS SKID, MAST,
DRAWWORKS AND HPU, TOP DRIVE AND HPU, ST80 AND MUD PUMPS
NOTE: THE CATWALK IS ON A SEPARATE 90 DAY WORK ORDER
MAIN HPU AND DOGHOUSE
NOTE: ALL MAIN HPU PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES AND
COUPLING CHECKS
1. CHECK THE CONDITION OF DRIVE COUPLING BETWEEN THE MAIN HYDRAULIC PUMP AND DRIVE
MOTOR
2. CHANGE TANK MOUNTED RETURN FILTER ELEMENT – SEE THE FILTER SECTION FOR ELEMENT PART
NUMBERS
3. CHANGE HPU PRESSURE FILTER ELEMENT - SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS
4. CHECK TANK DESICCANT BREATHER(S). REPLACE IF DESICCANT HAS COMPLETELY CHANGED COLOR
FROM BLUE TO PINK.
SEE THE FILTER SECTION FOR BREATHER PART NUMBER
NOTE: ALL TANKS MUST BE EQUIPPED WITH A DESICCANT BREATHER
5. TOP UP THE HYDRAULIC TANK IF NECESSARY TO LEVELS INDICATED ON TANK.
NOTE: THERE IS AN ALARM IN THE DOGHOUSE FOR LOW OIL LEVEL AND A SHUTDOWN FOR LOW,
LOW OIL LEVEL
6. WITH THE MAIN HPU PUMP RUNNING CONFIRM THE PRESSURE IS 2300 TO 2500 PSI.
IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT.
7. SHUT OFF THE MAIN HPU PUMP AND START THE BACK UP/SKIDDING ENGINE. CONFIRM THE PUMP
PRESSURE IS 500 PSI IN START-UP MODE AND 2300 TO 2500 PSI IN RUNNING MODE.
IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT.
8. LISTEN FOR ANY HISSING NOISE FROM THE MAIN PUMP MOUNTED RELIEF VALVE. CHECK FOR VERY
HOT RETURN LINE HOSE ON THE RELIEF.
IF EITHER CONDITION EXISTS CONTACT THE MECHANIC IMMEDIATELY FOR ADJUSTMENT.
9. SHUT OFF THE HYDRAULIC COOLER FAN AND USE A PRESSURE WASHER TO CLEAN THE COOLER CORE.
THE PRESSURE WASHER MUST BE SET BELOW 500PSI TO PREVENT DAMAGE TO THE COOLER.
10. CONFIRM THE HYDRAULIC COOLER SWITCH IS SET TO AUTO. THE HAND SETTING IS FOR DIAGNOSTIC
PURPOSES ONLY. CONFIRM THE HYDRAULIC TANK TEMPERATURE IS BELOW 125F. USE THE TANK
MOUNTED THERMOMETER OR HMI SCREEN IN THE DOGHOUSE TO DETERMINE TANK TEMPERATURE.
NOTE: IF THE TEMPERATURE IS ABOVE 125F THEN SOMETHING IS WRONG WITH THE HYDRAULIC
SYSTEM. CONTACT A MECHANIC IMMEDIATELY FOR REPAIRS OR DAMAGE TO THE HYDRAULIC
SYSTEM CAN RESULT FROM OVERHEATING.
11. CONFIRM THE HYDRAULIC COOLING FAN TURNS ON AT 120F AND OFF AT 115F. THIS TEMPERATURE
RANGE CAN VARY BY +-5F.
NOTE: IF THE FAN DOESN’T TURN ON BY 125F CONTACT A MECHANIC IMMEDIATELY FOR REPAIRS OR
DAMAGE TO THE HYDRAULIC SYSTEM CAN RESULT FROM OVERHEATING.
12. CONFIRM THE MAIN HYDRAULIC PUMP SWITCH IS SET TO AUTO. THIS ALLOWS THE PUMP TO BE
TURNED ON/OFF FROM THE DOGHOUSE. THE HAND SETTING IS FOR DIAGNOSTIC PURPOSES ONLY.
13. WITH THE MAIN HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF
LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE
DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND
FITTINGS MUST BE REPLACED.
14. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR
HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
SUBSTRUCTURE AND DRAWWORKS SKID
1. WITH THE MAIN HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF
LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE
DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND
FITTINGS MUST BE REPLACED.
2. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR
HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
3. ENSURE ALL ISOLATION BALL VALVES ON SETUP VALVE BANKS ARE CLOSED. BALL VALVES SHOULD
ONLY BE OPENED DURING RIG SETUP OPERATIONS.
MAST
1. WITH THE MAIN HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF
LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE
DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND
FITTINGS MUST BE REPLACED.
2. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR
HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
3. ENSURE ALL ISOLATION BALL VALVES ON SETUP VALVE BANKS ARE CLOSED. BALL VALVES SHOULD
ONLY BE OPENED DURING RIG SETUP OPERATIONS.
4. ENSURE THE HEATING LOOP BALL VALVE ON THE MAST VALVE BANK IS CLOSED IN WARM WEATHER
AND ONLY OPEN WHEN THE AMBIENT TEMPERATURE IS BELOW FREEZING.
NOTE: LEAVING THE BALL VALVE OPEN DURING WARM WEATHER CAN OVERHEAT THE VALVE
BANK AND DAMAGE THE SEALS
RIGMASTER DRAWWORKS
NOTE: ALL PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES
1. CHANGE CHAIN OIL SPIN-ON FILTER – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS
2. VERIFY CORRECT OIL LEVEL IN CHAIN CASE SIGHT GLASS
3. CHANGE PLANETARY OIL SPIN-ON FILTER – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS
4. VERIFY CORRECT OIL LEVEL IN PLANETARY SIGHT GLASS
5. CHECK CHAIN CASE DESICCANT BREATHER. REPLACE IF DESICCANT HAS COMPLETELY CHANGED
COLOR FROM BLUE TO PINK - SEE THE FILTER SECTION FOR BREATHER PART NUMBERS
NOTE: ALL DRAWWORKS CHAIN CASES MUST BE EQUIPPED WITH A DESICCANT BREATHER
6. WITH THE MAIN HPU PUMP RUNNING CONFIRM THE BRAKE SUPPLY PRESSURE IS 1900 TO 2100 PSI.
IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT.
7. WITH THE DRAWWORKS BRAKES RELEASED CONFIRM THE BRAKE RELEASE PRESSURE IS 1900 TO 2100
PSI.
IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT.
8. CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR
FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS
MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED.
9. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR
HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
TESCO TOP DRIVE AND HPU
NOTE: TOP DRIVE HPU PUMP MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES AND
COUPLING CHECKS
1. CHECK THE CONDITION OF DRIVE COUPLING BETWEEN THE HPU PUMP AND DRIVE MOTOR
2. CHANGE TANK MOUNTED RETURN FILTER ELEMENT – SEE THE FILTER SECTION FOR ELEMENT PART
NUMBERS
3. CHANGE TOP DRIVE GEARBOX FILTER ELEMENT – SEE THE FILTER SECTION FOR ELEMENT PART
NUMBERS
4. CHECK HYDRAULIC TANK DESICCANT BREATHER. REPLACE IF DESICCANT HAS COMPLETELY CHANGED
COLOR FROM BLUE TO PINK
SEE THE FILTER SECTION FOR BREATHER PART NUMBER
NOTE: ALL TANKS MUST BE EQUIPPED WITH A DESICCANT BREATHER
5. TOP UP THE HYDRAULIC TANK IF NECESSARY TO LEVELS INDICATED ON TANK.
NOTE: THERE IS TANK MOUNTED SWITCH THAT SHUTS DOWN THE HPU IN A LOW OIL LEVEL
CONDITION
6. WITH THE HPU PUMP RUNNING AND NO ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE IS
50-100 PSI.
IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT.
7. WITH THE HPU PUMP RUNNING AND ANY ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE IS
1900-2100 PSI.
IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT.
8. WITH THE HPU PUMP RUNNING AND NO ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE
SWITCH IS NOT TRIPPED (GREEN LIGHT ON DRILLERS PANEL SHOULD BE OFF).
9. WITH THE HPU PUMP RUNNING AND ANY ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE
SWITCH IS TRIPPED (GREEN LIGHT ON DRILLERS PANEL SHOULD BE ON).
10. AFTER THE HPU HAS BEEN RUNNING FOR SEVERAL HOURS CONFIRM THE TANK TEMPERATURE IS
BELOW 130F.
NOTE: IF THE TEMPERATURE IS ABOVE 130F THEN SOMETHING IS WRONG WITH THE HYDRAULIC
SYSTEM. CONTACT A MECHANIC IMMEDIATELY FOR REPAIRS OR DAMAGE TO THE HYDRAULIC
SYSTEM CAN RESULT FROM OVERHEATING.
11. CONFIRM THE TANK HEATER IS OPERATIONAL. USE THE TANK THERMOMETER AND CONFIRM THE
HEATER TURNS OFF WHEN THE OIL TEMPERATURE REACHES THE DIAL SETTING.
12. WITH THE HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS
ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE
DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND
FITTINGS MUST BE REPLACED.
13. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR
HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
NOV ST80
NOTE: MAIN HPU PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGE
1. CHANGE THE SUPPLY PRESSURE FILTER ELEMENT - SEE THE FILTER SECTION FOR ELEMENT PART
NUMBERS
2. WITH THE HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS
ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE
DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND
FITTINGS MUST BE REPLACED.
3. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR
HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
MUD PUMPS
NOTE: MUD PUMP LUBE PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES AND
COUPLING CHECKS
1. CHECK THE CONDITION OF DRIVE COUPLING BETWEEN THE LUBE PUMPS AND DRIVE MOTORS
2. CHANGE SPIN-ON LUBE FILTER – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS
3. CHECK MUD PUMP POWER END CASE DESICCANT BREATHER(S). REPLACE IF DESICCANT HAS
COMPLETELY CHANGED COLOR FROM BLUE TO PINK - SEE THE FILTER SECTION FOR BREATHER PART
NUMBERS
NOTE: ALL MUD PUMPS MUST BE EQUIPPED WITH A DESICCANT BREATHER
4. TOP UP THE MUD PUMP CASE IF NECESSARY TO LEVELS INDICATED ON DIP STICK OR SIGHT GLASS.
5. WITH THE LUBE PUMP RUNNING CONFIRM THE PRESSURE IS 50-100 PSI.
IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT.
6. WITH THE MUD PUMP RUNNING CONFIRM THE PRESSURE FROM THE INTERNAL LUBE PUMP IS 5-10
PSI.
7. WITH THE LUBE PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS
ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE
DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND
FITTINGS MUST BE REPLACED.
8. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR
HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.

More Related Content

What's hot

Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Manohar Tatwawadi
 
Hyster n005 (h110 ft) forklift service repair manual
Hyster n005 (h110 ft) forklift service repair manualHyster n005 (h110 ft) forklift service repair manual
Hyster n005 (h110 ft) forklift service repair manualfksefkskemm
 
Hyster n005 (h100 ft) forklift service repair manual
Hyster n005 (h100 ft) forklift service repair manualHyster n005 (h100 ft) forklift service repair manual
Hyster n005 (h100 ft) forklift service repair manualjfjskeksemmmd
 
Hyster n005 (h80 ft) forklift service repair manual
Hyster n005 (h80 ft) forklift service repair manualHyster n005 (h80 ft) forklift service repair manual
Hyster n005 (h80 ft) forklift service repair manualfjkskekmdmme
 
Hyster N005 (H80FT) Forklift Service Repair Manual
Hyster N005 (H80FT) Forklift Service Repair ManualHyster N005 (H80FT) Forklift Service Repair Manual
Hyster N005 (H80FT) Forklift Service Repair Manualufujsjekemme
 
Hyster n005 (h90 ft) forklift service repair manual
Hyster n005 (h90 ft) forklift service repair manualHyster n005 (h90 ft) forklift service repair manual
Hyster n005 (h90 ft) forklift service repair manualfjsexswkfkmsem
 
control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - SwethaSwetha Sundaram
 

What's hot (9)

Fire pumps
Fire pumpsFire pumps
Fire pumps
 
Tab Fire Pump Testing
Tab Fire Pump TestingTab Fire Pump Testing
Tab Fire Pump Testing
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
 
Hyster n005 (h110 ft) forklift service repair manual
Hyster n005 (h110 ft) forklift service repair manualHyster n005 (h110 ft) forklift service repair manual
Hyster n005 (h110 ft) forklift service repair manual
 
Hyster n005 (h100 ft) forklift service repair manual
Hyster n005 (h100 ft) forklift service repair manualHyster n005 (h100 ft) forklift service repair manual
Hyster n005 (h100 ft) forklift service repair manual
 
Hyster n005 (h80 ft) forklift service repair manual
Hyster n005 (h80 ft) forklift service repair manualHyster n005 (h80 ft) forklift service repair manual
Hyster n005 (h80 ft) forklift service repair manual
 
Hyster N005 (H80FT) Forklift Service Repair Manual
Hyster N005 (H80FT) Forklift Service Repair ManualHyster N005 (H80FT) Forklift Service Repair Manual
Hyster N005 (H80FT) Forklift Service Repair Manual
 
Hyster n005 (h90 ft) forklift service repair manual
Hyster n005 (h90 ft) forklift service repair manualHyster n005 (h90 ft) forklift service repair manual
Hyster n005 (h90 ft) forklift service repair manual
 
control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - Swetha
 

Similar to DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS

1997 chevrolet lumina service repair manual
1997 chevrolet lumina service repair manual1997 chevrolet lumina service repair manual
1997 chevrolet lumina service repair manualjjfksekdmejik
 
1996 chevrolet lumina service repair manual
1996 chevrolet lumina service repair manual1996 chevrolet lumina service repair manual
1996 chevrolet lumina service repair manualhfhjskedme
 
1995 chevrolet lumina service repair manual
1995 chevrolet lumina service repair manual1995 chevrolet lumina service repair manual
1995 chevrolet lumina service repair manualfjjsekwsxkdmmem
 
Sop for total_power_failure.[1]
Sop for total_power_failure.[1]Sop for total_power_failure.[1]
Sop for total_power_failure.[1]dastak
 
Pentair #320 chlorinator manual
Pentair #320 chlorinator manualPentair #320 chlorinator manual
Pentair #320 chlorinator manualDavid Hackney
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger Vibropac
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series Vibropac
 
Coluna de Calibração _ Milton Roy
Coluna de Calibração _ Milton RoyColuna de Calibração _ Milton Roy
Coluna de Calibração _ Milton RoyVibropac
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning systemtercelchile
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning systemtercelchile
 
Heavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series PumpsHeavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series PumpsAnivarya pumps
 
Anaesthesia machine by Dr. shailendra
Anaesthesia machine by Dr. shailendra Anaesthesia machine by Dr. shailendra
Anaesthesia machine by Dr. shailendra Shailendra Satpute
 
Db4429 5514 plano de teste stanadyne
Db4429 5514 plano de teste stanadyneDb4429 5514 plano de teste stanadyne
Db4429 5514 plano de teste stanadyneJunior Iung
 

Similar to DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS (15)

1997 chevrolet lumina service repair manual
1997 chevrolet lumina service repair manual1997 chevrolet lumina service repair manual
1997 chevrolet lumina service repair manual
 
1996 chevrolet lumina service repair manual
1996 chevrolet lumina service repair manual1996 chevrolet lumina service repair manual
1996 chevrolet lumina service repair manual
 
1995 chevrolet lumina service repair manual
1995 chevrolet lumina service repair manual1995 chevrolet lumina service repair manual
1995 chevrolet lumina service repair manual
 
Sop for total_power_failure.[1]
Sop for total_power_failure.[1]Sop for total_power_failure.[1]
Sop for total_power_failure.[1]
 
Fmp 8000 manual
Fmp 8000 manualFmp 8000 manual
Fmp 8000 manual
 
Pentair #320 chlorinator manual
Pentair #320 chlorinator manualPentair #320 chlorinator manual
Pentair #320 chlorinator manual
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series
 
Coluna de Calibração _ Milton Roy
Coluna de Calibração _ Milton RoyColuna de Calibração _ Milton Roy
Coluna de Calibração _ Milton Roy
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Heavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series PumpsHeavy Duty Gear Pumps / AERN Series Pumps
Heavy Duty Gear Pumps / AERN Series Pumps
 
Anaesthesia machine by Dr. shailendra
Anaesthesia machine by Dr. shailendra Anaesthesia machine by Dr. shailendra
Anaesthesia machine by Dr. shailendra
 
089414 2
089414 2089414 2
089414 2
 
Db4429 5514 plano de teste stanadyne
Db4429 5514 plano de teste stanadyneDb4429 5514 plano de teste stanadyne
Db4429 5514 plano de teste stanadyne
 

DRILLING RIG MONTHLY HYDRAULIC SYSTEM SERVICE AND CHECKS

  • 1. MONTHLY HYDRAULIC SYSTEM CHECKS AND MAINTENANCE INCLUDES MAIN HPU AND DOGHOUSE, SUBSTRUCTURE AND DRAWWORKS SKID, MAST, DRAWWORKS AND HPU, TOP DRIVE AND HPU, ST80 AND MUD PUMPS NOTE: THE CATWALK IS ON A SEPARATE 90 DAY WORK ORDER MAIN HPU AND DOGHOUSE NOTE: ALL MAIN HPU PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES AND COUPLING CHECKS 1. CHECK THE CONDITION OF DRIVE COUPLING BETWEEN THE MAIN HYDRAULIC PUMP AND DRIVE MOTOR 2. CHANGE TANK MOUNTED RETURN FILTER ELEMENT – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 3. CHANGE HPU PRESSURE FILTER ELEMENT - SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 4. CHECK TANK DESICCANT BREATHER(S). REPLACE IF DESICCANT HAS COMPLETELY CHANGED COLOR FROM BLUE TO PINK. SEE THE FILTER SECTION FOR BREATHER PART NUMBER NOTE: ALL TANKS MUST BE EQUIPPED WITH A DESICCANT BREATHER 5. TOP UP THE HYDRAULIC TANK IF NECESSARY TO LEVELS INDICATED ON TANK. NOTE: THERE IS AN ALARM IN THE DOGHOUSE FOR LOW OIL LEVEL AND A SHUTDOWN FOR LOW, LOW OIL LEVEL 6. WITH THE MAIN HPU PUMP RUNNING CONFIRM THE PRESSURE IS 2300 TO 2500 PSI. IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT. 7. SHUT OFF THE MAIN HPU PUMP AND START THE BACK UP/SKIDDING ENGINE. CONFIRM THE PUMP PRESSURE IS 500 PSI IN START-UP MODE AND 2300 TO 2500 PSI IN RUNNING MODE. IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT. 8. LISTEN FOR ANY HISSING NOISE FROM THE MAIN PUMP MOUNTED RELIEF VALVE. CHECK FOR VERY HOT RETURN LINE HOSE ON THE RELIEF. IF EITHER CONDITION EXISTS CONTACT THE MECHANIC IMMEDIATELY FOR ADJUSTMENT. 9. SHUT OFF THE HYDRAULIC COOLER FAN AND USE A PRESSURE WASHER TO CLEAN THE COOLER CORE. THE PRESSURE WASHER MUST BE SET BELOW 500PSI TO PREVENT DAMAGE TO THE COOLER.
  • 2. 10. CONFIRM THE HYDRAULIC COOLER SWITCH IS SET TO AUTO. THE HAND SETTING IS FOR DIAGNOSTIC PURPOSES ONLY. CONFIRM THE HYDRAULIC TANK TEMPERATURE IS BELOW 125F. USE THE TANK MOUNTED THERMOMETER OR HMI SCREEN IN THE DOGHOUSE TO DETERMINE TANK TEMPERATURE. NOTE: IF THE TEMPERATURE IS ABOVE 125F THEN SOMETHING IS WRONG WITH THE HYDRAULIC SYSTEM. CONTACT A MECHANIC IMMEDIATELY FOR REPAIRS OR DAMAGE TO THE HYDRAULIC SYSTEM CAN RESULT FROM OVERHEATING. 11. CONFIRM THE HYDRAULIC COOLING FAN TURNS ON AT 120F AND OFF AT 115F. THIS TEMPERATURE RANGE CAN VARY BY +-5F. NOTE: IF THE FAN DOESN’T TURN ON BY 125F CONTACT A MECHANIC IMMEDIATELY FOR REPAIRS OR DAMAGE TO THE HYDRAULIC SYSTEM CAN RESULT FROM OVERHEATING. 12. CONFIRM THE MAIN HYDRAULIC PUMP SWITCH IS SET TO AUTO. THIS ALLOWS THE PUMP TO BE TURNED ON/OFF FROM THE DOGHOUSE. THE HAND SETTING IS FOR DIAGNOSTIC PURPOSES ONLY. 13. WITH THE MAIN HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED. 14. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
  • 3. SUBSTRUCTURE AND DRAWWORKS SKID 1. WITH THE MAIN HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED. 2. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS. 3. ENSURE ALL ISOLATION BALL VALVES ON SETUP VALVE BANKS ARE CLOSED. BALL VALVES SHOULD ONLY BE OPENED DURING RIG SETUP OPERATIONS.
  • 4. MAST 1. WITH THE MAIN HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED. 2. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS. 3. ENSURE ALL ISOLATION BALL VALVES ON SETUP VALVE BANKS ARE CLOSED. BALL VALVES SHOULD ONLY BE OPENED DURING RIG SETUP OPERATIONS. 4. ENSURE THE HEATING LOOP BALL VALVE ON THE MAST VALVE BANK IS CLOSED IN WARM WEATHER AND ONLY OPEN WHEN THE AMBIENT TEMPERATURE IS BELOW FREEZING. NOTE: LEAVING THE BALL VALVE OPEN DURING WARM WEATHER CAN OVERHEAT THE VALVE BANK AND DAMAGE THE SEALS
  • 5. RIGMASTER DRAWWORKS NOTE: ALL PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES 1. CHANGE CHAIN OIL SPIN-ON FILTER – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 2. VERIFY CORRECT OIL LEVEL IN CHAIN CASE SIGHT GLASS 3. CHANGE PLANETARY OIL SPIN-ON FILTER – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 4. VERIFY CORRECT OIL LEVEL IN PLANETARY SIGHT GLASS 5. CHECK CHAIN CASE DESICCANT BREATHER. REPLACE IF DESICCANT HAS COMPLETELY CHANGED COLOR FROM BLUE TO PINK - SEE THE FILTER SECTION FOR BREATHER PART NUMBERS NOTE: ALL DRAWWORKS CHAIN CASES MUST BE EQUIPPED WITH A DESICCANT BREATHER 6. WITH THE MAIN HPU PUMP RUNNING CONFIRM THE BRAKE SUPPLY PRESSURE IS 1900 TO 2100 PSI. IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT. 7. WITH THE DRAWWORKS BRAKES RELEASED CONFIRM THE BRAKE RELEASE PRESSURE IS 1900 TO 2100 PSI. IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT. 8. CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED. 9. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
  • 6. TESCO TOP DRIVE AND HPU NOTE: TOP DRIVE HPU PUMP MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES AND COUPLING CHECKS 1. CHECK THE CONDITION OF DRIVE COUPLING BETWEEN THE HPU PUMP AND DRIVE MOTOR 2. CHANGE TANK MOUNTED RETURN FILTER ELEMENT – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 3. CHANGE TOP DRIVE GEARBOX FILTER ELEMENT – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 4. CHECK HYDRAULIC TANK DESICCANT BREATHER. REPLACE IF DESICCANT HAS COMPLETELY CHANGED COLOR FROM BLUE TO PINK SEE THE FILTER SECTION FOR BREATHER PART NUMBER NOTE: ALL TANKS MUST BE EQUIPPED WITH A DESICCANT BREATHER 5. TOP UP THE HYDRAULIC TANK IF NECESSARY TO LEVELS INDICATED ON TANK. NOTE: THERE IS TANK MOUNTED SWITCH THAT SHUTS DOWN THE HPU IN A LOW OIL LEVEL CONDITION 6. WITH THE HPU PUMP RUNNING AND NO ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE IS 50-100 PSI. IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT. 7. WITH THE HPU PUMP RUNNING AND ANY ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE IS 1900-2100 PSI. IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT. 8. WITH THE HPU PUMP RUNNING AND NO ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE SWITCH IS NOT TRIPPED (GREEN LIGHT ON DRILLERS PANEL SHOULD BE OFF). 9. WITH THE HPU PUMP RUNNING AND ANY ROBOTICS FUNCTION SELECTED CONFIRM THE PRESSURE SWITCH IS TRIPPED (GREEN LIGHT ON DRILLERS PANEL SHOULD BE ON). 10. AFTER THE HPU HAS BEEN RUNNING FOR SEVERAL HOURS CONFIRM THE TANK TEMPERATURE IS BELOW 130F. NOTE: IF THE TEMPERATURE IS ABOVE 130F THEN SOMETHING IS WRONG WITH THE HYDRAULIC SYSTEM. CONTACT A MECHANIC IMMEDIATELY FOR REPAIRS OR DAMAGE TO THE HYDRAULIC SYSTEM CAN RESULT FROM OVERHEATING. 11. CONFIRM THE TANK HEATER IS OPERATIONAL. USE THE TANK THERMOMETER AND CONFIRM THE HEATER TURNS OFF WHEN THE OIL TEMPERATURE REACHES THE DIAL SETTING.
  • 7. 12. WITH THE HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED. 13. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
  • 8. NOV ST80 NOTE: MAIN HPU PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGE 1. CHANGE THE SUPPLY PRESSURE FILTER ELEMENT - SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 2. WITH THE HPU PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED. 3. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.
  • 9. MUD PUMPS NOTE: MUD PUMP LUBE PUMPS MUST BE SHUTDOWN AND LOCKED OUT FOR FILTER CHANGES AND COUPLING CHECKS 1. CHECK THE CONDITION OF DRIVE COUPLING BETWEEN THE LUBE PUMPS AND DRIVE MOTORS 2. CHANGE SPIN-ON LUBE FILTER – SEE THE FILTER SECTION FOR ELEMENT PART NUMBERS 3. CHECK MUD PUMP POWER END CASE DESICCANT BREATHER(S). REPLACE IF DESICCANT HAS COMPLETELY CHANGED COLOR FROM BLUE TO PINK - SEE THE FILTER SECTION FOR BREATHER PART NUMBERS NOTE: ALL MUD PUMPS MUST BE EQUIPPED WITH A DESICCANT BREATHER 4. TOP UP THE MUD PUMP CASE IF NECESSARY TO LEVELS INDICATED ON DIP STICK OR SIGHT GLASS. 5. WITH THE LUBE PUMP RUNNING CONFIRM THE PRESSURE IS 50-100 PSI. IF THE PRESSURE IS NOT WITHIN THIS RANGE CONTACT THE MECHANIC FOR ADJUSTMENT. 6. WITH THE MUD PUMP RUNNING CONFIRM THE PRESSURE FROM THE INTERNAL LUBE PUMP IS 5-10 PSI. 7. WITH THE LUBE PUMP RUNNING CHECK FOR LEAKING OR DAMAGED HOSES AND FITTINGS. IF LEAKS ARE DETECTED TIGHTEN HOSE OR FITTING. DO NOT OVER TIGHTEN. NPT FITTINGS MUST BE DISASSEMBLED AND RESEALED. ORB FITTINGS MUST HAVE O-RINGS REPLACED. DAMAGED HOSES AND FITTINGS MUST BE REPLACED. 8. CHECK FOR ANY LEAKING OR DAMAGED HYDRAULIC COMPONENTS. CONTACT MECHANIC OR HYDRAULIC TECHNICIAN FOR REPLACEMENT PARTS.