Project Charter
         Project Title:

                                         Pharmex 1-1-1 Inventory Allocations Project
                       Project Team                                                          Stakeholders
              Role                               Name                                Role                              Name
Proje ct Sponsor                   Rod Stone                            Six Sigma Champion?
Proje ct Le a de r                 Craig Laski                          Dav Sparks
                                                                           e                             Rod Stone
Te a m Me mbe rs                                                        Shipping clerks                  Craig Laski
Scott Citrowski                    Craig Laski                          Inventory control                Mike Casale
                                   Rod Stone                            Picking clerks                   Chris Oberdick
                                   Mike Casale                          Order entry clerks               Mel Jackson
                                   Chris Oberdick                       Customer serv  ice reps.         Scott Citrowski
                                   Mel Jackson                          Inside / outside sales reps.     POK customers

Problem Statement                                                       Goal Statement
                                     If the quantity of labels on the
                                     order line is more that what is
                                         in stock in one physical
 Inv entory of large quantities of
                                       primary warehouse location
   labels are stored in different                                        The primary goal of the Pharmex 1-1-1 project is to create
                                      causes multiple locations to
  non-adjacent locations in the                                         one customer order, one shipment and one inv       oice per each
                                      be printed on the pick ticket.
warehouse. This causes extra                                            POK customer order. A second goal is to reduce the picking
                                      These locations may or may
forklift travel time. It also lends                                       errors and forklift travel times. The third goal is to reduce
                                          not hav e the inventory.
  itself to creating back orders                                           back orders and increase order line fill rates to 98.5%.
                                    Usually, what is in the primary
    or partial order shipments.
                                    location is picked and shipped
                                     causing either a back order or
                                             partial shipment.


COPQ Summary                                                            VOC - key customers
 The contributors to cost of
poor quality is excess forklift
                                                                         DOD - US Department of Defense. Pharmacy opening kits,
 travel (labor and time), over
                                                                          (POK) customers in any of the 48 main land states. CVS
  manufacturing, increased
                                                                            pharmacy. W algreen's pharmacy. Shopko pharmacy.
     inv entory, customer
                                                                                 Caremark pharmacy. RiteAid pharmacy.
dissatisfaction, reprocessing
       order lines (B/O).

Scope                              Project Plan                                      Pla n                             Actua l
Initiate the project               Start of project                                           1/2/2008                           1/15/2008
Define the business rules          End of Define                                             1/20/2008                           1/20/2008
Measure B/O and fill rates         End of Measure                                             2/5/2008                            2/5/2008
Present current order statistics End of Analyze                                              2/12/2008                           2/12/2008
Results of improvements %'s     End of Improve                                               3/12/2008                           3/12/2008
Close the project in production End of Control/Project                                        4/1/2008                           3/15/2008
SI POC Process Map for Pharmex 1-1-1 I nventory Allocations Project


          Su pplier s                         I n put s          Pr ocess               Ou t put s            Cu st om er s
                                        Stock equipment         En t er t he
    Pharmacy equipment                    in warehouse         or d er l i n es
                                         process the PO          Pr i n t t h e        Printed order
             Vendors                         receipt           p i ck t i ck et      acknowledgment              US DOD
         Pharmex order                                          Ver i f y q t y
                                                             an d l ocat i on         Updated order
               entry                    Order pick ticket           Go t o              pick ticket              CVS POK
                                          Warehouse            l ocat i on t o         Create order
                                          location of         p i ck t h e q t y     BOL and packing
  Pharmex manufacturing                     product           St age or d er               list              Walgreen’s POK
                                            Quantity         f or sh i p p i n g
                                        allocated to the     Gen er at e t h e          Create the
                                            order line            i nvoi ce              invoice               RiteAid POK


       PO receipt            Customer order         Print pick ticket              Pick order          Ship and invoice




© OPEX Resources Ltd. 2010
Fishbone Diagram for Pharmex 1-1-1 I nventory Allocations Project

                                                                                People
               Measurement                  Machine/Equipment
                                                                                Waste time
                                            Forklifts
        % order fill rates
                                                                    To much travel time             Can’t locate inventory




                                        Tied up with other orders
                 Qty of Back orders

                                                                                                               Increase
                                                                                                                in Back
Streamline the B/ O processing                                               Qty in locations                    Orders
                                                                             incorrect
                                      Locations not arranged
                                      logically
Ensure qty is avail for order
                                                                                                I n different whse locations




                    Methods                   Environment                     Materials
                    Processes
© OPEX Resources Ltd. 2010
                                              Whse locations                  Inventory
Pharmex 1-1-1 Inventory Allocations Project
Scatter plot of types of orders and % of fill rates.




                                                                                Pharmex 1-1-1- Inventory Allocations Project



                               Fill                                                         POK, 100                                                        STD, 100
                                                                                                                                                                  POK, 100
                               rates                              STD, 99      STD, 99                            STD, 99          STD, 99
                               by                                                                   STD, 98
                                        Rates 89 - 100%




                               order
                               type


                               Linear
                                                                                                                        POK, 92
                               (Fill
                                                                                                                                               POK, 91
                               rates
                                                                                                                                                    POK, 90
                               by
                                                          POK , 89                                         POK, 89                        POK, 89
                               order
                                                                        POK, 88      POK, 88
                               type)

                                                                                                          Order Types




POK STD RUSH SD ND 1D 2D BO Custom
POK         STD         POK    STD    POK                         POK         STD        POK        STD          POK         STD          POK        POK        POK        STD         POK
         89          99     88     99                        88         100         98         89           99          92           99         89         91         90         100         100
Fill rates by order type
1-1-1 I nventory Allocations Project

                                                   Process or Product
                                        Failure Modes and Effects Analysis (FMEA)

ocess     Pharmex 1-1-1
          Inventory
                                                                         FMEA Date (Orig) ______________ (Rev) _____________
 oduct    Allocations
ame:      Project



 rocess
                                              S                      O                        D   R       Actions                          S   O   D   R
Step or      Potential    Potential Failure                                                                                    Actions
                                              E   Potential Causes   C    Current Controls    E   P     Recommend    Resp.                 E   C   E   P
 roduct    Failure Mode       Effects                                                                                           Taken
                                              V                      C                        T   N         ed                             V   C   T   N
  Part

rder      Partial qty     Rush                    Can not locate         Look for more                  Pre pick    Picking Write
cking     shipped         manufacture         8   the inventory      5   inventory in other   3   120                       locations on   8   5   3   120
                                                                         locations                                          pick ticket
                          Order shipped           Shipped QTY            Move inventory               Rotate        Invento Move
                          with partial qty    7   that is in the     8   prior to picking     9   504 inventory     ry      inventory      7   8   9   504
                                                  one location

                                                                                                   0                                                   0

                                                                                                   0                                                   0
                                                                                                   0                                                   0
                                                                                                   0                                                   0
                                                                                                   0                                                   0
                                                                                                   0                                                   0
                                                                                                   0                                                   0
                                                                                                   0                                                   0
                                                                                                   0                                                   0
                                                                                                   0                                                   0
Proposed Process Map - Pharmex 1-1-1 I nventory Allocations Project


      Sup pl ie rs                   I n put s          Pr ocess             Out put s        Cust om e rs
                                  Process the PO         Ent er t h e
                                    receipt, put        or der lines
       Pharmacy
       equipment                  away stock and         Pr in t t h e
                                 update inventory       pick t icket        Printed order
         Vendors                      location.          Ver if y qt y    acknowledgment         US DOD
                                                      an d locat ion          Verify qty
     Pharmex order                                         Go t o          ordered vs qty
                                  Print Order Pick      locat ion t o     allocated and qty
           entry                        ticket         pick t h e qt y          picked           CVS POK
                                        Verify         St age or der
                                   qty/ product in    f or sh ippin g
                                    warehouse         Gen er at e t h e     Create order
       Pharmex                   location via cycle                       BOL and packing
                                                          inv oice
     manufacturing                    counts.                                   list          Walgreen’s POK

   PO receipt
                               Customer order         Print pick ticket      Create the
update inventory                                                               invoice         RiteAid POK


                                                                                Pick order     Ship and invoice
                             Control I nventory by taking Cycle Counts

© OPEX Resources Ltd. 2010
Proposed Order picking process flow




                                                                          Process PO receipt -
                                                                   Warehouse Inventory Receiving person



                                                                                            Arrange product in same or adjacent inventory locations
                                Put away product update inventory location -
                                                                                             reduce fork lift travel, increase visibility of products –
                                           Warehouse person
                                                                                                             Inventory Control person


                                                                    Take Inventory Cycle Counts to verify
                                                                           products/qty/locations -
                                                                          Inventory Control person




                                                             Verify qty ordered vs qty allocated vs qty picked -
                                                                           Order verification person




                                                                  Create BOL, Ship order, Create Invoice -
                                                                              Shipping person
•   Partial orders / incomplete late orders metrics of proposed solution:
     – Inventory control department to report inventory cycle count errors by product,
         location, qty – in terms of dollars variance and % of qty error variance.
          • Goal to be 99.96 % accurate
     – Order control department to report on % of partial, incomplete and late orders –
       in terms of qty on the order vs qty shipped and scheduled ship date on the order
       vs actual ship date
          • Goal to be 99 % on time and 98.5 % complete orders (reducing back orders)
     – Shipping department to report on amount of back orders broken down by shift /
       daily / weekly / monthly totals
          • Goal to be 98.5 % one order, one shipment, one invoice (reducing back orders)
     – Customer service department to report on amount of returns classified by reason
       codes, customer numbers, product codes listing order numbers and reasons for
       complaints
          • Goal to reduce number of returns and customer complaints month over month trending

More Related Content

What's hot

Case Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectCase Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectJohn William
 
IMG Medical Group Presentation
IMG Medical Group PresentationIMG Medical Group Presentation
IMG Medical Group Presentationwlskas
 
2003 administrative decision TOR wgde & Technical Guidelines adopted 1 10
2003 administrative decision TOR wgde & Technical Guidelines adopted 1 102003 administrative decision TOR wgde & Technical Guidelines adopted 1 10
2003 administrative decision TOR wgde & Technical Guidelines adopted 1 10Africa Diamonds
 
IN-SPEC Catalog 2011
IN-SPEC Catalog 2011IN-SPEC Catalog 2011
IN-SPEC Catalog 2011rstapf
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync
 

What's hot (7)

Case Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing ProjectCase Study-Calcium Carbide Sourcing Project
Case Study-Calcium Carbide Sourcing Project
 
IMG Medical Group Presentation
IMG Medical Group PresentationIMG Medical Group Presentation
IMG Medical Group Presentation
 
About DAETEC
About DAETECAbout DAETEC
About DAETEC
 
2003 administrative decision TOR wgde & Technical Guidelines adopted 1 10
2003 administrative decision TOR wgde & Technical Guidelines adopted 1 102003 administrative decision TOR wgde & Technical Guidelines adopted 1 10
2003 administrative decision TOR wgde & Technical Guidelines adopted 1 10
 
IN-SPEC Catalog 2011
IN-SPEC Catalog 2011IN-SPEC Catalog 2011
IN-SPEC Catalog 2011
 
ThermX1-Report
ThermX1-ReportThermX1-Report
ThermX1-Report
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well Logs
 

Viewers also liked

Six Sigma Project Charter
Six Sigma Project CharterSix Sigma Project Charter
Six Sigma Project CharterVijay Rasam
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 
Unity America Project Charter
Unity America Project CharterUnity America Project Charter
Unity America Project CharterJ Patrick Reirdon
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Eng Marzouk
 

Viewers also liked (7)

Six Sigma Project Charter
Six Sigma Project CharterSix Sigma Project Charter
Six Sigma Project Charter
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
Unity America Project Charter
Unity America Project CharterUnity America Project Charter
Unity America Project Charter
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...
 

Similar to Pharmex Six Sigma Project

How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wmsSubhan Novianda
 
IT-focused Project Management in a Biopharmaceutical Manufacturing Environment
IT-focused Project Management in a Biopharmaceutical Manufacturing EnvironmentIT-focused Project Management in a Biopharmaceutical Manufacturing Environment
IT-focused Project Management in a Biopharmaceutical Manufacturing EnvironmentBruce Kozuma
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxwoodruffeloisa
 
Project backup repository and avoiding requirements creep
Project backup repository and avoiding requirements creepProject backup repository and avoiding requirements creep
Project backup repository and avoiding requirements creepAswin Vijayakumar
 
Kenakore Brochure 2011
Kenakore Brochure 2011Kenakore Brochure 2011
Kenakore Brochure 2011Brent Newblom
 
Export presentation updated january 27, 2011
Export presentation updated january 27, 2011Export presentation updated january 27, 2011
Export presentation updated january 27, 20119gllc
 
Production Support
Production SupportProduction Support
Production Supportr_shanki
 
PacWest FracDB Capabilities: A Sophisticated Market Analysis Tool
PacWest FracDB Capabilities: A Sophisticated Market Analysis ToolPacWest FracDB Capabilities: A Sophisticated Market Analysis Tool
PacWest FracDB Capabilities: A Sophisticated Market Analysis ToolAlexander Robart
 
Distribution Analyitics Order Merge Justification
Distribution Analyitics Order Merge JustificationDistribution Analyitics Order Merge Justification
Distribution Analyitics Order Merge JustificationRichard Houdlette
 
Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply ChainNatashaS7
 
Quality Control Proposal
Quality Control ProposalQuality Control Proposal
Quality Control ProposalMaia Reshef
 
Ecpp barcelona kostis kaggelides 2013 en
Ecpp barcelona kostis kaggelides 2013 enEcpp barcelona kostis kaggelides 2013 en
Ecpp barcelona kostis kaggelides 2013 enKostis Kaggelides
 
Benchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse EfficiencyBenchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse EfficiencyMichael Mikitka, CAE
 
Odoo for Health Care
Odoo for Health Care Odoo for Health Care
Odoo for Health Care Gaurav Kumar
 

Similar to Pharmex Six Sigma Project (20)

Supply Chain in Abbot
Supply Chain in AbbotSupply Chain in Abbot
Supply Chain in Abbot
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wms
 
IT-focused Project Management in a Biopharmaceutical Manufacturing Environment
IT-focused Project Management in a Biopharmaceutical Manufacturing EnvironmentIT-focused Project Management in a Biopharmaceutical Manufacturing Environment
IT-focused Project Management in a Biopharmaceutical Manufacturing Environment
 
Supply chain
Supply chainSupply chain
Supply chain
 
The essential of Six Sigma
The essential of Six SigmaThe essential of Six Sigma
The essential of Six Sigma
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
 
Project backup repository and avoiding requirements creep
Project backup repository and avoiding requirements creepProject backup repository and avoiding requirements creep
Project backup repository and avoiding requirements creep
 
Kenakore Brochure 2011
Kenakore Brochure 2011Kenakore Brochure 2011
Kenakore Brochure 2011
 
Van putten
Van puttenVan putten
Van putten
 
Export presentation updated january 27, 2011
Export presentation updated january 27, 2011Export presentation updated january 27, 2011
Export presentation updated january 27, 2011
 
Production Support
Production SupportProduction Support
Production Support
 
PacWest FracDB Capabilities Overview, Nov 2011
PacWest FracDB Capabilities Overview, Nov 2011PacWest FracDB Capabilities Overview, Nov 2011
PacWest FracDB Capabilities Overview, Nov 2011
 
PacWest FracDB Capabilities: A Sophisticated Market Analysis Tool
PacWest FracDB Capabilities: A Sophisticated Market Analysis ToolPacWest FracDB Capabilities: A Sophisticated Market Analysis Tool
PacWest FracDB Capabilities: A Sophisticated Market Analysis Tool
 
Distribution Analyitics Order Merge Justification
Distribution Analyitics Order Merge JustificationDistribution Analyitics Order Merge Justification
Distribution Analyitics Order Merge Justification
 
Chemical Supply Chain
Chemical Supply ChainChemical Supply Chain
Chemical Supply Chain
 
Quality Control Proposal
Quality Control ProposalQuality Control Proposal
Quality Control Proposal
 
Ecpp barcelona kostis kaggelides 2013 en
Ecpp barcelona kostis kaggelides 2013 enEcpp barcelona kostis kaggelides 2013 en
Ecpp barcelona kostis kaggelides 2013 en
 
Benchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse EfficiencyBenchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
Benchmarking & Best Practices - Increasing Productivity & Warehouse Efficiency
 
Odoo for Health Care
Odoo for Health Care Odoo for Health Care
Odoo for Health Care
 
Dr. Reddy's Laboratory
Dr. Reddy's LaboratoryDr. Reddy's Laboratory
Dr. Reddy's Laboratory
 

Pharmex Six Sigma Project

  • 1. Project Charter Project Title: Pharmex 1-1-1 Inventory Allocations Project Project Team Stakeholders Role Name Role Name Proje ct Sponsor Rod Stone Six Sigma Champion? Proje ct Le a de r Craig Laski Dav Sparks e Rod Stone Te a m Me mbe rs Shipping clerks Craig Laski Scott Citrowski Craig Laski Inventory control Mike Casale Rod Stone Picking clerks Chris Oberdick Mike Casale Order entry clerks Mel Jackson Chris Oberdick Customer serv ice reps. Scott Citrowski Mel Jackson Inside / outside sales reps. POK customers Problem Statement Goal Statement If the quantity of labels on the order line is more that what is in stock in one physical Inv entory of large quantities of primary warehouse location labels are stored in different The primary goal of the Pharmex 1-1-1 project is to create causes multiple locations to non-adjacent locations in the one customer order, one shipment and one inv oice per each be printed on the pick ticket. warehouse. This causes extra POK customer order. A second goal is to reduce the picking These locations may or may forklift travel time. It also lends errors and forklift travel times. The third goal is to reduce not hav e the inventory. itself to creating back orders back orders and increase order line fill rates to 98.5%. Usually, what is in the primary or partial order shipments. location is picked and shipped causing either a back order or partial shipment. COPQ Summary VOC - key customers The contributors to cost of poor quality is excess forklift DOD - US Department of Defense. Pharmacy opening kits, travel (labor and time), over (POK) customers in any of the 48 main land states. CVS manufacturing, increased pharmacy. W algreen's pharmacy. Shopko pharmacy. inv entory, customer Caremark pharmacy. RiteAid pharmacy. dissatisfaction, reprocessing order lines (B/O). Scope Project Plan Pla n Actua l Initiate the project Start of project 1/2/2008 1/15/2008 Define the business rules End of Define 1/20/2008 1/20/2008 Measure B/O and fill rates End of Measure 2/5/2008 2/5/2008 Present current order statistics End of Analyze 2/12/2008 2/12/2008 Results of improvements %'s End of Improve 3/12/2008 3/12/2008 Close the project in production End of Control/Project 4/1/2008 3/15/2008
  • 2. SI POC Process Map for Pharmex 1-1-1 I nventory Allocations Project Su pplier s I n put s Pr ocess Ou t put s Cu st om er s Stock equipment En t er t he Pharmacy equipment in warehouse or d er l i n es process the PO Pr i n t t h e Printed order Vendors receipt p i ck t i ck et acknowledgment US DOD Pharmex order Ver i f y q t y an d l ocat i on Updated order entry Order pick ticket Go t o pick ticket CVS POK Warehouse l ocat i on t o Create order location of p i ck t h e q t y BOL and packing Pharmex manufacturing product St age or d er list Walgreen’s POK Quantity f or sh i p p i n g allocated to the Gen er at e t h e Create the order line i nvoi ce invoice RiteAid POK PO receipt Customer order Print pick ticket Pick order Ship and invoice © OPEX Resources Ltd. 2010
  • 3. Fishbone Diagram for Pharmex 1-1-1 I nventory Allocations Project People Measurement Machine/Equipment Waste time Forklifts % order fill rates To much travel time Can’t locate inventory Tied up with other orders Qty of Back orders Increase in Back Streamline the B/ O processing Qty in locations Orders incorrect Locations not arranged logically Ensure qty is avail for order I n different whse locations Methods Environment Materials Processes © OPEX Resources Ltd. 2010 Whse locations Inventory
  • 4. Pharmex 1-1-1 Inventory Allocations Project Scatter plot of types of orders and % of fill rates. Pharmex 1-1-1- Inventory Allocations Project Fill POK, 100 STD, 100 POK, 100 rates STD, 99 STD, 99 STD, 99 STD, 99 by STD, 98 Rates 89 - 100% order type Linear POK, 92 (Fill POK, 91 rates POK, 90 by POK , 89 POK, 89 POK, 89 order POK, 88 POK, 88 type) Order Types POK STD RUSH SD ND 1D 2D BO Custom POK STD POK STD POK POK STD POK STD POK STD POK POK POK STD POK 89 99 88 99 88 100 98 89 99 92 99 89 91 90 100 100 Fill rates by order type
  • 5. 1-1-1 I nventory Allocations Project Process or Product Failure Modes and Effects Analysis (FMEA) ocess Pharmex 1-1-1 Inventory FMEA Date (Orig) ______________ (Rev) _____________ oduct Allocations ame: Project rocess S O D R Actions S O D R Step or Potential Potential Failure Actions E Potential Causes C Current Controls E P Recommend Resp. E C E P roduct Failure Mode Effects Taken V C T N ed V C T N Part rder Partial qty Rush Can not locate Look for more Pre pick Picking Write cking shipped manufacture 8 the inventory 5 inventory in other 3 120 locations on 8 5 3 120 locations pick ticket Order shipped Shipped QTY Move inventory Rotate Invento Move with partial qty 7 that is in the 8 prior to picking 9 504 inventory ry inventory 7 8 9 504 one location 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
  • 6. Proposed Process Map - Pharmex 1-1-1 I nventory Allocations Project Sup pl ie rs I n put s Pr ocess Out put s Cust om e rs Process the PO Ent er t h e receipt, put or der lines Pharmacy equipment away stock and Pr in t t h e update inventory pick t icket Printed order Vendors location. Ver if y qt y acknowledgment US DOD an d locat ion Verify qty Pharmex order Go t o ordered vs qty Print Order Pick locat ion t o allocated and qty entry ticket pick t h e qt y picked CVS POK Verify St age or der qty/ product in f or sh ippin g warehouse Gen er at e t h e Create order Pharmex location via cycle BOL and packing inv oice manufacturing counts. list Walgreen’s POK PO receipt Customer order Print pick ticket Create the update inventory invoice RiteAid POK Pick order Ship and invoice Control I nventory by taking Cycle Counts © OPEX Resources Ltd. 2010
  • 7. Proposed Order picking process flow Process PO receipt - Warehouse Inventory Receiving person Arrange product in same or adjacent inventory locations Put away product update inventory location - reduce fork lift travel, increase visibility of products – Warehouse person Inventory Control person Take Inventory Cycle Counts to verify products/qty/locations - Inventory Control person Verify qty ordered vs qty allocated vs qty picked - Order verification person Create BOL, Ship order, Create Invoice - Shipping person
  • 8. Partial orders / incomplete late orders metrics of proposed solution: – Inventory control department to report inventory cycle count errors by product, location, qty – in terms of dollars variance and % of qty error variance. • Goal to be 99.96 % accurate – Order control department to report on % of partial, incomplete and late orders – in terms of qty on the order vs qty shipped and scheduled ship date on the order vs actual ship date • Goal to be 99 % on time and 98.5 % complete orders (reducing back orders) – Shipping department to report on amount of back orders broken down by shift / daily / weekly / monthly totals • Goal to be 98.5 % one order, one shipment, one invoice (reducing back orders) – Customer service department to report on amount of returns classified by reason codes, customer numbers, product codes listing order numbers and reasons for complaints • Goal to reduce number of returns and customer complaints month over month trending