The document summarizes a river and parks rehabilitation project for the city of San Angelo, Texas. It outlines the project team members from the city and other organizations. It then describes the directives for the project, which were to provide bank stabilization, design new and renovate existing trails, add appropriate amenities, and focus on the downtown area. It includes maps showing the extent of work for bank stabilization, trail rehabilitation, and lighting additions. Highlighted areas on the maps call out specific project elements like bridges and public spaces.
Global Terrorism and its types and prevention ppt.
Concho River & Parks Rehabilitation Project
1. PROJECT TEAM
CITY OF SAN ANGELO
Alvin New, Mayor
Harold Dominguez, City Manager
Rick Weise, Assistant City Manager
Carl White, Director of Special Projects
SAN ANGELO CITY COUNCIL
John David Fields
Dwain Morrison
Johnny Silvas
Fredd B. Adams II
Kendall Herschfeld
Charlotte Farmer
Paul Alexander
UPPER COLORADO RIVER AUTHORITY
Stephen Brown
Fred Teagarden
Chuck Brown
Scott McWilliams
Ellen Groth
PROJECT DESIGN TEAM
Kinney Franke Architects AIA
Design Team:
Craig Kinney
Kye Franke
Brooks Wehner
James Haynes
Structural, McClanahan and Associates
MEP Engineering, Power Systems, Inc.
Civil Engineering, SKG Engineering
6 27 11
CONCHO RIVER AND PARKS REHABILITATION PROJECT CITY COUNCIL PRESENTATION
CITY OF SAN ANGELO
2. Path along the Concho River showing slab stone stabilization
3. PROJECT NARRATIVE
The Concho River and Trails Improvement project was created from the 1/2 cent
sales tax to renovate and improve the great treasure that runs through San Angelo:
our river. Directives from the City were to:
1. Provide as much bank stabilization as possible for our budget, using long term and
aesthetically pleasing solutions.
2. Design new trails and renovate existing trails.
3. Design appropriate features/amenities along the trail that would enhance the
river experience for all.
4. Pay extra attention to the downtown core area.
4. EXTENT OF WORK - BANK STABILIZATION
E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
ET
TRE
IN GS
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
5. EXTENT OF WORK - TRAIL REHABILITATION
E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
EET
STR
IN G
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
6. EXTENT OF WORK - LIGHTING
E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
EET
STR
IN G
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
7. HIGHLIGHTED AREAS
E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
EET
STR
ING
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
VE
DA
VE
GAR
IS A
E
IV
ARR
DR
U RE
R
VE
RI
H
BEA
8. E T
TRE
ES S
OAK
OAKES STREET BRIDGE
E ET
STR
R NE
D BOU
CHA
EET
STR
IN G
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
12. E T
TRE
ES S
OAK
NEFF’S FOUNTAIN
E ET
STR
R NE
D BOU
CHA
EET
STR
IN G
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
16. E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
ET
TRE
IN GS
GAMES COURT
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
20. E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
ET
TRE
IN GS
IRVING STREET BRIDGE
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
24. E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
KOENIGHEIM STREET BRIDGE
ET
TRE
IN GS
IRV
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
AVE
ARD
E
RIS
IV
G
DR
U RE
HAR R
VE
RI
BEA
25.
26.
27.
28. E T
TRE
ES S
OAK
E ET
STR
R NE
D BOU
CHA
ET
TRE
IN GS
IRV
HIGH PEDESTRIAN BRIDGE
EET
M STR
HEI
NIG
KO E
EET
STR
ABE
AVE
VE
ARD
IS A
E
IV
REG
ARR
DR
R
VE
EAU
RI
H
B