SPECIFICATIONS
โ€ข 47 km flood-control dike
โ€ข Six-lane causeway-expressway
with seven interchanges:
โ€ข Sucat, Paranaque
โ€ข Alabang, Muntinlupa
โ€ข San Pedro, Laguna
โ€ข Santa Rosa, Laguna
โ€ข Cabuyao, Laguna (2 exits)
โ€ข Calamba, Laguna (SLEx connector)
โ€ข Los Banos, Laguna (going to Bay)
โ€ข 700 hectares of reclaimed land
โ€ข 7 islands of 100 sq.m. each
โ€ข Intended for mixed-use real estate
development (Hotels, Office Bldgs,
Condominiums, Shopping Malls)
โ€ข Construction of Public Infrastructure is often:
โ€ข Time-Consuming โ€“ often takes years to accomplish
โ€ข Capital Intensive โ€“ costs money and labor
โ€ข Intended for long-term or permanent use
โ€ข Planning for Public Infrastructure should always:
โ€ข Absolutely Necessary โ€“ if viable alternatives exist, then
building structures should only be the last resort
โ€ข Minimally Invasive โ€“ it should not disrupt biodiversity and
ecological balance, especially in critical habitats
โ€ข Cost-effective โ€“ the benefits should greatly outweigh the
drawbacks (maximum gains for minimum cost)
โ€ข Involve consultations with concerned sectors to ensure
that their welfare will be given the utmost priority
โ€ข Conform to pre-existing laws
San Pedro River
Binan River
Cabuyao River
Pagsanjan River
Santa Cruz River
Morong River
Tanay River
โ€ข Pagsanjan
โ€ข Santa Cruz
โ€ข Mangangate
โ€ข Sapang Baho
โ€ข San Cristobal
โ€ข San Juan
โ€ข San Pedro
โ€ข Cabuyao
โ€ข Balanak
โ€ข Tunasan
โ€ข Maitem
โ€ข Molawin
โ€ข Calo
โ€ข Bay
โ€ข Pele
โ€ข Tanay
โ€ข Siniloan
โ€ข Morong
โ€ข Dampalit
โ€ข Pangil
โ€ข Marikina
(Manggahan)
Laguna de Bay is fed by waters
from 21 tributaries:
And has only ONE outlet to the
sea: Pasig River.
โ€ข Coca-Cola FEMSA Bottlers (Sta. Rosa)
โ€ข Mitsubishi Motors Philippines (Sta. Rosa)
โ€ข Toyota Motors Philippines (Sta. Rosa)
โ€ข Nissan Automotive Motors (Sta. Rosa)
โ€ข Monde Nissin Corporation (Sta. Rosa)
โ€ข Nestle Philippines (Cabuyao)
โ€ข Tanduay La Tondeรฑa Distillers (Cabuyao)
โ€ข Asia Brewery Incorporated (Cabuyao)
โ€ข Procter & Gamble Philippines (Cabuyao)
โ€ข Unilever Philippines (Cabuyao)
โ€ข Wyeth Philippines (Cabuyao)
โ€ข San Miguel Corporation (Cabuyao)
โ€ข Gardenia Bakeries Philippines (Biรฑan)
โ€ข United Laboratories โ€“ Amherst (Biรฑan)
โ€ข Universal Robina Corporation (Biรฑan)
โ€ข Toshiba Information Equipment (Biรฑan)
Mt. Gonzales
โ€œSungayโ€
(2326 ft.)
Mt. Makiling
(3580 ft.)
Mt. Banahaw
(7120 ft.)
Mt. San Cristobal
(4820 ft.)Mt. Batulao
(2667 ft)
Mt. Sembrano
(2444 ft.)
Mt. Tagapo
โ€œSusong Dalagaโ€
(2444 ft.)
Mt. Daraitan
(2359 ft.)
Mt. Kasilungan
(2251 ft.)
Mt. Manabu
(2493 ft.)
Areas shaded ORANGE
denote largely deforested
areas of the Laguna de
Bay watershed.
Maximum Depth: 20 m
Average Depth: 2.7 m
The deepest
parts of the Lake
(Deep Blue) are slowly
filled up with silt and
sediment, drastically
decreasing itโ€™s carrying
capacity
RED denotes the mean water level while
GREEN indicates a critical overflow level
The western
shoreline of the
lake is the area most
susceptible to flooding,
as it is lower than the eastern
shoreline (bounded by the Sierra
Madre Mountain Range)
NAPINDAN CHANNEL is the only
outlet of the Laguna de Bay to
the Sea.
Shaded in Red are parts of the
Laguna de Bay watershed which
were submerged in water during
Typhoon Ondoy (Ketsana)
Notice that Metro
Manila received the
worst flood. Other
than being the most
densely populated,
it is the only part
which is lower than
the mean water
level of Laguna de
Bay during storms.
โ€ข Reopen the Napindan Hydraulic Control Structure in Taguig
to allow the natural ebb and flow of brackish estuarine water
from Manila Bay to the lake through the Pasig River
โ€ข Utilize the Tapayan, Labasan & Taguig pumping stations to
control the volume of discharged water from the Lake
โ€ข Conduct regular periodic dredging of the lake bed to remove
accumulated silt and sediment, increasing the lakeโ€™s carrying
capacity
โ€ข Rehabilitate the Laguna de Bay watershed through discipline
and proper conservation procedures (reforestation, proper
waste disposal, wastewater treatment, removal of large fish
pens, population control of invasive species)
WHAT IS THE BEST SOLUTION?
In reality, the Laguna Lake
Expressway Dike PPP does not
solve anything at all. Rather, it
further aggravates the problem it
aims to solve, while it creates more
and more problems in the process.
And it costs PhP 124.91 billion.
(Expressway dike P64.91B + Reclamation
P57.89B + Right-of-Way- P2.1B)
San Pedro River
Binan River
Cabuyao River
Pagsanjan River
Santa Cruz River
Morong River
Tanay River
PAPAANO KUNG LUMINDOL?
PAPAANO KUNG BUMIGAY ANG DIKE
SA DAMI NG NAIIPONG TUBIG?
TUTULAN ANG LAGUNA
LAKESHORE EXPRESSWAY DIKE!
โ€ขBilang isang Public-Private Partnership,
Hindi ito pabor sa mamamayan
โ€ขTinantanggalan nito ng kabuhayan ang
mga mangingisda at mag-iitik
โ€ขSinisira nito ang kalikasan ng Lawa
โ€ขMaaring magdulot ito ng malaking sakuna
SAVE LAGUNA LAKE!
SAVE OUR FUTURE!

More Related Content

What's hot

Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...
Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...
Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...RituSaha3
ย 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)SQSY
ย 
Economic and Socialized Housing BP 220 (03)
Economic and Socialized Housing BP 220 (03)Economic and Socialized Housing BP 220 (03)
Economic and Socialized Housing BP 220 (03)SQSY
ย 
Public space and happiness
Public space and happinessPublic space and happiness
Public space and happinessMickielty
ย 
Structural System Overview
Structural System OverviewStructural System Overview
Structural System OverviewAmjed Bin-Ali
ย 
1214 A Carola - Sheet - A-109 - ROOF FRAMING PLAN
1214 A Carola - Sheet - A-109 - ROOF FRAMING PLAN1214 A Carola - Sheet - A-109 - ROOF FRAMING PLAN
1214 A Carola - Sheet - A-109 - ROOF FRAMING PLANCarlos Zapanta
ย 
Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015Jo Gijbels
ย 
Questionnaire, for an investigation about public space
Questionnaire, for an investigation about public spaceQuestionnaire, for an investigation about public space
Questionnaire, for an investigation about public spaceYousef
ย 
Project report on construction of hotel/hostel
Project report on construction of hotel/hostelProject report on construction of hotel/hostel
Project report on construction of hotel/hostelmuhammed iqbal
ย 
Full Report
Full ReportFull Report
Full ReportParas Patel
ย 
Smart Transportation Case Study by IBM
Smart Transportation Case Study by IBMSmart Transportation Case Study by IBM
Smart Transportation Case Study by IBMIBMTransportation
ย 
Streetscape final
Streetscape finalStreetscape final
Streetscape finalKumar Snehansu
ย 
Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracingsuddal
ย 
Lateral load resisting systems
Lateral load resisting systemsLateral load resisting systems
Lateral load resisting systemsAhmad T.
ย 
Peb structures
Peb structuresPeb structures
Peb structureshlksd
ย 
Community Architecture
Community ArchitectureCommunity Architecture
Community ArchitectureNick Wates
ย 
10.the industrial revolution,its effect on growth of town planning from the 1...
10.the industrial revolution,its effect on growth of town planning from the 1...10.the industrial revolution,its effect on growth of town planning from the 1...
10.the industrial revolution,its effect on growth of town planning from the 1...Noshad Ahmed Wahocho
ย 

What's hot (20)

Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...
Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...
Questionnaire on Assessment of Housing Conditions, Socioeconomic Structures a...
ย 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)
ย 
Economic and Socialized Housing BP 220 (03)
Economic and Socialized Housing BP 220 (03)Economic and Socialized Housing BP 220 (03)
Economic and Socialized Housing BP 220 (03)
ย 
Public space and happiness
Public space and happinessPublic space and happiness
Public space and happiness
ย 
Structural System Overview
Structural System OverviewStructural System Overview
Structural System Overview
ย 
1214 A Carola - Sheet - A-109 - ROOF FRAMING PLAN
1214 A Carola - Sheet - A-109 - ROOF FRAMING PLAN1214 A Carola - Sheet - A-109 - ROOF FRAMING PLAN
1214 A Carola - Sheet - A-109 - ROOF FRAMING PLAN
ย 
Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015
ย 
Questionnaire, for an investigation about public space
Questionnaire, for an investigation about public spaceQuestionnaire, for an investigation about public space
Questionnaire, for an investigation about public space
ย 
Project report on construction of hotel/hostel
Project report on construction of hotel/hostelProject report on construction of hotel/hostel
Project report on construction of hotel/hostel
ย 
Bracing connections
Bracing connectionsBracing connections
Bracing connections
ย 
Community Hubs guide
Community Hubs guideCommunity Hubs guide
Community Hubs guide
ย 
Resilient City
Resilient CityResilient City
Resilient City
ย 
Full Report
Full ReportFull Report
Full Report
ย 
Smart Transportation Case Study by IBM
Smart Transportation Case Study by IBMSmart Transportation Case Study by IBM
Smart Transportation Case Study by IBM
ย 
Streetscape final
Streetscape finalStreetscape final
Streetscape final
ย 
Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracing
ย 
Lateral load resisting systems
Lateral load resisting systemsLateral load resisting systems
Lateral load resisting systems
ย 
Peb structures
Peb structuresPeb structures
Peb structures
ย 
Community Architecture
Community ArchitectureCommunity Architecture
Community Architecture
ย 
10.the industrial revolution,its effect on growth of town planning from the 1...
10.the industrial revolution,its effect on growth of town planning from the 1...10.the industrial revolution,its effect on growth of town planning from the 1...
10.the industrial revolution,its effect on growth of town planning from the 1...
ย 

Viewers also liked

Corporate social responsibility of coca cola
Corporate social responsibility of coca  colaCorporate social responsibility of coca  cola
Corporate social responsibility of coca colaAnkita Kamble
ย 
Respect the Environment - Ldl lesson
Respect the Environment - Ldl lessonRespect the Environment - Ldl lesson
Respect the Environment - Ldl lesson1gymmandra
ย 
Corporate Social Responsibility Initiatives in India
Corporate Social Responsibility Initiatives in India Corporate Social Responsibility Initiatives in India
Corporate Social Responsibility Initiatives in India Olivier Tisun
ย 
ENVIRONMENT ISSUES
ENVIRONMENT ISSUES ENVIRONMENT ISSUES
ENVIRONMENT ISSUES Meet Gondaliya
ย 
NTUST MBA CSR Presentation
NTUST MBA CSR Presentation NTUST MBA CSR Presentation
NTUST MBA CSR Presentation cuhkbschool
ย 
MBA 691 - Business Ethics - Coca-Cola Water Sustainability
MBA 691 - Business Ethics - Coca-Cola Water SustainabilityMBA 691 - Business Ethics - Coca-Cola Water Sustainability
MBA 691 - Business Ethics - Coca-Cola Water Sustainabilitymarhenbun
ย 
materials of sewer
materials of sewermaterials of sewer
materials of sewerManish Goyal
ย 
Recycle & ReUse of Waste Water.
Recycle & ReUse of Waste Water.Recycle & ReUse of Waste Water.
Recycle & ReUse of Waste Water.mehditanim
ย 
Reduce recycle reuse
Reduce recycle reuseReduce recycle reuse
Reduce recycle reuseRichard Jackson
ย 
Save our Environment
Save our EnvironmentSave our Environment
Save our EnvironmentRAMYA KUMAR
ย 
recycle reduce reuse
recycle reduce reuserecycle reduce reuse
recycle reduce reuseSidra Afzal
ย 
Coca Cola CSR
Coca Cola CSR Coca Cola CSR
Coca Cola CSR ritesh_13dec
ย 
Reduce, Reuse and Recycle (3R)
Reduce, Reuse and Recycle (3R)Reduce, Reuse and Recycle (3R)
Reduce, Reuse and Recycle (3R)rebina
ย 

Viewers also liked (14)

Pipeline Maintenance with RFID
Pipeline Maintenance with RFIDPipeline Maintenance with RFID
Pipeline Maintenance with RFID
ย 
Corporate social responsibility of coca cola
Corporate social responsibility of coca  colaCorporate social responsibility of coca  cola
Corporate social responsibility of coca cola
ย 
Respect the Environment - Ldl lesson
Respect the Environment - Ldl lessonRespect the Environment - Ldl lesson
Respect the Environment - Ldl lesson
ย 
Corporate Social Responsibility Initiatives in India
Corporate Social Responsibility Initiatives in India Corporate Social Responsibility Initiatives in India
Corporate Social Responsibility Initiatives in India
ย 
ENVIRONMENT ISSUES
ENVIRONMENT ISSUES ENVIRONMENT ISSUES
ENVIRONMENT ISSUES
ย 
NTUST MBA CSR Presentation
NTUST MBA CSR Presentation NTUST MBA CSR Presentation
NTUST MBA CSR Presentation
ย 
MBA 691 - Business Ethics - Coca-Cola Water Sustainability
MBA 691 - Business Ethics - Coca-Cola Water SustainabilityMBA 691 - Business Ethics - Coca-Cola Water Sustainability
MBA 691 - Business Ethics - Coca-Cola Water Sustainability
ย 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
ย 
Recycle & ReUse of Waste Water.
Recycle & ReUse of Waste Water.Recycle & ReUse of Waste Water.
Recycle & ReUse of Waste Water.
ย 
Reduce recycle reuse
Reduce recycle reuseReduce recycle reuse
Reduce recycle reuse
ย 
Save our Environment
Save our EnvironmentSave our Environment
Save our Environment
ย 
recycle reduce reuse
recycle reduce reuserecycle reduce reuse
recycle reduce reuse
ย 
Coca Cola CSR
Coca Cola CSR Coca Cola CSR
Coca Cola CSR
ย 
Reduce, Reuse and Recycle (3R)
Reduce, Reuse and Recycle (3R)Reduce, Reuse and Recycle (3R)
Reduce, Reuse and Recycle (3R)
ย 

Similar to Save Laguna Lake! No to Expressway Dike Project!

Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...Iwl Pcu
ย 
2018 Ottawa County Parks Annual Report
2018 Ottawa County Parks Annual Report2018 Ottawa County Parks Annual Report
2018 Ottawa County Parks Annual ReportJessica VanGinhoven
ย 
The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...
The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...
The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...Michael Birch
ย 
Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...
Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...
Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...JOHN W. GICHUKI (PhD)
ย 
Kenya; Rainwater Harvesting For Increased Agricultural Production In Kenya
Kenya;  Rainwater Harvesting For Increased Agricultural Production In KenyaKenya;  Rainwater Harvesting For Increased Agricultural Production In Kenya
Kenya; Rainwater Harvesting For Increased Agricultural Production In KenyaV9X
ย 
Coburg a new paradigm for water supply
Coburg   a new paradigm for water supplyCoburg   a new paradigm for water supply
Coburg a new paradigm for water supplyNEXTDC
ย 
National workshop on community based water management in rajasthan
National workshop on community based water management in rajasthanNational workshop on community based water management in rajasthan
National workshop on community based water management in rajasthanSubhash Jain
ย 
Water pollution
Water pollutionWater pollution
Water pollutionFelix Bunagan
ย 
Introduction to cGanga - Namami Gange
Introduction to cGanga - Namami GangeIntroduction to cGanga - Namami Gange
Introduction to cGanga - Namami Gangecmmindia2017
ย 
Lower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration PlanLower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration PlanMichael Hewitt, GISP
ย 
Guatemala Water Fund: Partnering with the Private Sector for Biodiversity Co...
Guatemala Water Fund:  Partnering with the Private Sector for Biodiversity Co...Guatemala Water Fund:  Partnering with the Private Sector for Biodiversity Co...
Guatemala Water Fund: Partnering with the Private Sector for Biodiversity Co...Iwl Pcu
ย 
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...Iwl Pcu
ย 
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...Iwl Pcu
ย 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of damsnibeditachakraborty
ย 
Rainwater Harvesting Systems - Case Studies
Rainwater Harvesting Systems - Case StudiesRainwater Harvesting Systems - Case Studies
Rainwater Harvesting Systems - Case StudiesD4Z
ย 
OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT U.S. Water Alliance
ย 
Aquatic Ecosystem Restoration in Massachusetts
Aquatic Ecosystem Restoration in MassachusettsAquatic Ecosystem Restoration in Massachusetts
Aquatic Ecosystem Restoration in MassachusettsBuzzards Bay Coalition
ย 
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...Kevin Perry
ย 
Doing more with less - Brian Hales, Waterproofing the south
Doing more with less - Brian Hales, Waterproofing the southDoing more with less - Brian Hales, Waterproofing the south
Doing more with less - Brian Hales, Waterproofing the southWater Industry Alliance
ย 

Similar to Save Laguna Lake! No to Expressway Dike Project! (20)

Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
Strategic Action Program for the Bermejo River Binational Basin: Argentina- B...
ย 
2018 Ottawa County Parks Annual Report
2018 Ottawa County Parks Annual Report2018 Ottawa County Parks Annual Report
2018 Ottawa County Parks Annual Report
ย 
Coastal_Urban_Conservation_Yasiel_Figueroa_Sanchez_2022.07.18.pptx
Coastal_Urban_Conservation_Yasiel_Figueroa_Sanchez_2022.07.18.pptxCoastal_Urban_Conservation_Yasiel_Figueroa_Sanchez_2022.07.18.pptx
Coastal_Urban_Conservation_Yasiel_Figueroa_Sanchez_2022.07.18.pptx
ย 
The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...
The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...
The Ruamฤhanga Whaitua processโ€ฆWater storage and resilience issues for the Wa...
ย 
Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...
Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...
Big Valley Rancheria - Adoption of Demand Side Management for Water Conservat...
ย 
Kenya; Rainwater Harvesting For Increased Agricultural Production In Kenya
Kenya;  Rainwater Harvesting For Increased Agricultural Production In KenyaKenya;  Rainwater Harvesting For Increased Agricultural Production In Kenya
Kenya; Rainwater Harvesting For Increased Agricultural Production In Kenya
ย 
Coburg a new paradigm for water supply
Coburg   a new paradigm for water supplyCoburg   a new paradigm for water supply
Coburg a new paradigm for water supply
ย 
National workshop on community based water management in rajasthan
National workshop on community based water management in rajasthanNational workshop on community based water management in rajasthan
National workshop on community based water management in rajasthan
ย 
Water pollution
Water pollutionWater pollution
Water pollution
ย 
Introduction to cGanga - Namami Gange
Introduction to cGanga - Namami GangeIntroduction to cGanga - Namami Gange
Introduction to cGanga - Namami Gange
ย 
Lower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration PlanLower Lackawanna Watershed Assessment and Restoration Plan
Lower Lackawanna Watershed Assessment and Restoration Plan
ย 
Guatemala Water Fund: Partnering with the Private Sector for Biodiversity Co...
Guatemala Water Fund:  Partnering with the Private Sector for Biodiversity Co...Guatemala Water Fund:  Partnering with the Private Sector for Biodiversity Co...
Guatemala Water Fund: Partnering with the Private Sector for Biodiversity Co...
ย 
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...
ย 
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...GUATEMALA WATER FUND:  Partnering with the Private Sector for Biodiversity Co...
GUATEMALA WATER FUND: Partnering with the Private Sector for Biodiversity Co...
ย 
Water resource management and role of dams
Water resource management and role of damsWater resource management and role of dams
Water resource management and role of dams
ย 
Rainwater Harvesting Systems - Case Studies
Rainwater Harvesting Systems - Case StudiesRainwater Harvesting Systems - Case Studies
Rainwater Harvesting Systems - Case Studies
ย 
OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT
ย 
Aquatic Ecosystem Restoration in Massachusetts
Aquatic Ecosystem Restoration in MassachusettsAquatic Ecosystem Restoration in Massachusetts
Aquatic Ecosystem Restoration in Massachusetts
ย 
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
Kathryn Buckner, Council of Great Lakes Industries, The Great Lakes, Midwest ...
ย 
Doing more with less - Brian Hales, Waterproofing the south
Doing more with less - Brian Hales, Waterproofing the southDoing more with less - Brian Hales, Waterproofing the south
Doing more with less - Brian Hales, Waterproofing the south
ย 

Recently uploaded

Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxhossanmdjobayer103
ย 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
ย 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...tanu pandey
ย 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programsitadmin50
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
ย 

Recently uploaded (20)

Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
ย 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
ย 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
ย 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
ย 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
ย 
Climate Change
Climate ChangeClimate Change
Climate Change
ย 

Save Laguna Lake! No to Expressway Dike Project!

  • 1. NO To Megadike PPP; Save Laguna Lake Now! Rep. Carlos Isagani T. Zarate 25 May 2015 Plenary Hall, House of Representatives Batasang Pambansa Complex, Quezon City
  • 2. SPECIFICATIONS โ€ข 47 km flood-control dike โ€ข Six-lane causeway-expressway with seven interchanges: โ€ข Sucat, Paranaque โ€ข Alabang, Muntinlupa โ€ข San Pedro, Laguna โ€ข Santa Rosa, Laguna โ€ข Cabuyao, Laguna (2 exits) โ€ข Calamba, Laguna (SLEx connector) โ€ข Los Banos, Laguna (going to Bay) โ€ข 700 hectares of reclaimed land โ€ข 7 islands of 100 sq.m. each โ€ข Intended for mixed-use real estate development (Hotels, Office Bldgs, Condominiums, Shopping Malls)
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. โ€ข Construction of Public Infrastructure is often: โ€ข Time-Consuming โ€“ often takes years to accomplish โ€ข Capital Intensive โ€“ costs money and labor โ€ข Intended for long-term or permanent use โ€ข Planning for Public Infrastructure should always: โ€ข Absolutely Necessary โ€“ if viable alternatives exist, then building structures should only be the last resort โ€ข Minimally Invasive โ€“ it should not disrupt biodiversity and ecological balance, especially in critical habitats โ€ข Cost-effective โ€“ the benefits should greatly outweigh the drawbacks (maximum gains for minimum cost) โ€ข Involve consultations with concerned sectors to ensure that their welfare will be given the utmost priority โ€ข Conform to pre-existing laws
  • 8. San Pedro River Binan River Cabuyao River Pagsanjan River Santa Cruz River Morong River Tanay River
  • 9. โ€ข Pagsanjan โ€ข Santa Cruz โ€ข Mangangate โ€ข Sapang Baho โ€ข San Cristobal โ€ข San Juan โ€ข San Pedro โ€ข Cabuyao โ€ข Balanak โ€ข Tunasan โ€ข Maitem โ€ข Molawin โ€ข Calo โ€ข Bay โ€ข Pele โ€ข Tanay โ€ข Siniloan โ€ข Morong โ€ข Dampalit โ€ข Pangil โ€ข Marikina (Manggahan) Laguna de Bay is fed by waters from 21 tributaries: And has only ONE outlet to the sea: Pasig River.
  • 10. โ€ข Coca-Cola FEMSA Bottlers (Sta. Rosa) โ€ข Mitsubishi Motors Philippines (Sta. Rosa) โ€ข Toyota Motors Philippines (Sta. Rosa) โ€ข Nissan Automotive Motors (Sta. Rosa) โ€ข Monde Nissin Corporation (Sta. Rosa) โ€ข Nestle Philippines (Cabuyao) โ€ข Tanduay La Tondeรฑa Distillers (Cabuyao) โ€ข Asia Brewery Incorporated (Cabuyao) โ€ข Procter & Gamble Philippines (Cabuyao) โ€ข Unilever Philippines (Cabuyao) โ€ข Wyeth Philippines (Cabuyao) โ€ข San Miguel Corporation (Cabuyao) โ€ข Gardenia Bakeries Philippines (Biรฑan) โ€ข United Laboratories โ€“ Amherst (Biรฑan) โ€ข Universal Robina Corporation (Biรฑan) โ€ข Toshiba Information Equipment (Biรฑan)
  • 11. Mt. Gonzales โ€œSungayโ€ (2326 ft.) Mt. Makiling (3580 ft.) Mt. Banahaw (7120 ft.) Mt. San Cristobal (4820 ft.)Mt. Batulao (2667 ft) Mt. Sembrano (2444 ft.) Mt. Tagapo โ€œSusong Dalagaโ€ (2444 ft.) Mt. Daraitan (2359 ft.) Mt. Kasilungan (2251 ft.) Mt. Manabu (2493 ft.) Areas shaded ORANGE denote largely deforested areas of the Laguna de Bay watershed.
  • 12. Maximum Depth: 20 m Average Depth: 2.7 m The deepest parts of the Lake (Deep Blue) are slowly filled up with silt and sediment, drastically decreasing itโ€™s carrying capacity RED denotes the mean water level while GREEN indicates a critical overflow level The western shoreline of the lake is the area most susceptible to flooding, as it is lower than the eastern shoreline (bounded by the Sierra Madre Mountain Range) NAPINDAN CHANNEL is the only outlet of the Laguna de Bay to the Sea.
  • 13. Shaded in Red are parts of the Laguna de Bay watershed which were submerged in water during Typhoon Ondoy (Ketsana) Notice that Metro Manila received the worst flood. Other than being the most densely populated, it is the only part which is lower than the mean water level of Laguna de Bay during storms.
  • 14. โ€ข Reopen the Napindan Hydraulic Control Structure in Taguig to allow the natural ebb and flow of brackish estuarine water from Manila Bay to the lake through the Pasig River โ€ข Utilize the Tapayan, Labasan & Taguig pumping stations to control the volume of discharged water from the Lake โ€ข Conduct regular periodic dredging of the lake bed to remove accumulated silt and sediment, increasing the lakeโ€™s carrying capacity โ€ข Rehabilitate the Laguna de Bay watershed through discipline and proper conservation procedures (reforestation, proper waste disposal, wastewater treatment, removal of large fish pens, population control of invasive species) WHAT IS THE BEST SOLUTION?
  • 15. In reality, the Laguna Lake Expressway Dike PPP does not solve anything at all. Rather, it further aggravates the problem it aims to solve, while it creates more and more problems in the process. And it costs PhP 124.91 billion. (Expressway dike P64.91B + Reclamation P57.89B + Right-of-Way- P2.1B)
  • 16. San Pedro River Binan River Cabuyao River Pagsanjan River Santa Cruz River Morong River Tanay River PAPAANO KUNG LUMINDOL? PAPAANO KUNG BUMIGAY ANG DIKE SA DAMI NG NAIIPONG TUBIG?
  • 17. TUTULAN ANG LAGUNA LAKESHORE EXPRESSWAY DIKE! โ€ขBilang isang Public-Private Partnership, Hindi ito pabor sa mamamayan โ€ขTinantanggalan nito ng kabuhayan ang mga mangingisda at mag-iitik โ€ขSinisira nito ang kalikasan ng Lawa โ€ขMaaring magdulot ito ng malaking sakuna
  • 18. SAVE LAGUNA LAKE! SAVE OUR FUTURE!