GSLV MARK
III
ABSTRACT
GSLV MARK-III
GSLV mark-3 is a significant step for India’s space ambitions as it is the first step
towards India’s ambition to send Indian astronauts into space. It is also significant from
perspective of ISRO’s own cryogenic engine. It proved ISRO’s maturity in reentry technology,
its ability to develop braking techniques, deceleration technology and thermal protection system
for crew module. The new launch vehicle named the LVM-3 or Geostationary Satellite Launch
Vehicle Mk. 3 is the most capable rocket ever developed by India. It can carry up to 10 metric
tons, or about 22,000 pounds, of cargo into low Earth orbit and up to 4 metric tons 8,800 pounds
into geostationary transfer orbit once it is operational, a milestone Indian officials hope to
achieve within about two years.
To achieve low cost access to space, ISRO has chalked down a plan to develop a new
breed of reusable launch system called AVATAR to substantially cut down the launch costs. ).
AVATAR will be a Single Stage To Orbit (SSTO) launch system that will attempt to reuse
maximum sub-systems and will use turbojet and dual mode ramjet-scramjet propulsion. SSTO
launch system will take a long time to develope. Accordingly, ISRO has decided to first develop
a Two Stage to Orbit (TSTO) reusable launch system for the immediate future by utilizing its
current capabilities and target development of AVATAR in the long term.
INDEX
Sl.no Topic Page no
1 History 3
2 GSLV MK-III 7
3 Stages 11
4 CARE 13
5 Future 15
6 Conclusion 20
7 Reference 21
HISTORY OF LAUNCH VEHICLES:
During the 1960s and 1970s, India initiated its own launch vehicle programme owing to
geopolitical and economic considerations. In the 1960s–1970s, the country successfully
developed a sounding rockets programme, and by the 1980s, research had yielded the Satellite
Launch Vehicle-3 and the more advanced Augmented Satellite Launch Vehicle (ASLV),
complete with operational supporting infrastructure. ISRO further applied its energies to the
advancement of launch vehicle technology resulting in the creation of PSLV and GSLV
technologies.
Satellite Launch Vehicle (SLV)
The Satellite Launch Vehicle, usually known by its abbreviation SLV or SLV-3 was a 4-
stage solid-propellant light launcher. It was intended to reach a height of 500 km and carry a
payload of 40 kg. Its first launch took place in 1979 with 2 more in each subsequent year,
and the final launch in 1983. Only two of its four test flights were successful.
Augmented Satellite Launch Vehicle (ASLV)
The Augmented Satellite Launch Vehicle, usually known by its abbreviation ASLV was
a 5-stage solid propellant rocket with the capability of placing a 150 kg satellite into Low
Earth Orbit. This project was started by the ISRO during the early 1980s to develop
technologies needed for a payload to be placed into a geostationary orbit. Its design was
based on Satellite Launch Vehicle. The first launch test was held in 1987, and after that 3
others followed in 1988, 1992 and 1994, out of which only 2 were successful, before it was
decommissioned.
Polar Satellite Launch Vehicle (PSLV)
The Polar Satellite Launch Vehicle, usually known by its abbreviation PSLV, is
an expendable launch system developed to allow India to launch its Indian Remote Sensing
(IRS) satellites into Sun synchronous orbits, a service that was, until the advent of the PSLV,
commercially viable only from Russia. PSLV can also launch small satellites
intogeostationary transfer orbit (GTO). The reliability and versatility of the PSLV is proven
by the fact that it has launched, as of 2014, 71 satellites/spacecraft (31 Indian and 40 foreign)
into a variety of orbits. The maximum number of satellites launched by the PSLV in a single
launch is 10, in the PSLV-C9 launch on 28 April 2008 (690 kg CARTOSAT-2A, 83 kg
Indian Mini Satellite, and 8 nano-satellites, launched by PSLV's "core-alone" version).
Geosynchronous Satellite Launch Vehicle (GSLV)
The Geosynchronous Satellite Launch Vehicle, usually known by its abbreviation GSLV,
is an expendable launch system developed to enable India to launch its INSAT-type satellites
into geostationary orbit and to make India less dependent on foreign rockets. At present, it is
ISRO's second-heaviest satellite launch vehicle and is capable of putting a total payload of
up to 5 tons to Low Earth Orbit. The vehicle is built by India with the cryogenic engine
purchased from Russia while the ISRO develops its own engine programme.
In a setback for ISRO, the attempt to launch the GSLV, GSLV-F07 carrying GSAT-5P,
failed on 25 December 2010. The initial evaluation implies that loss of control for the strap-
on boosters caused the rocket to veer from its intended flight path, forcing a programmed
detonation. Sixty-four seconds into the first stage of flight, the rocket began to break up due
to the acute angle of attack. The body housing the 3rd stage, the cryogenic stage, incurred
structural damage, forcing the range safety team to initiate a programmed detonation of the
rocket.
On 5 January 2014, GSLV-D5 successfully launched GSAT-14 into intended orbit. This
also marked first successful flight using indigenous cryogenic engine, making India the sixth
country in the world to have this technology.
Geosynchronous Satellite Launch Vehicle Mark-III (GSLV III)
GSLV-Mk III can launch four tonne satellite into geosynchronous transfer orbit. It is a
three-stage vehicle with a 110 tonne core liquid propellant stage (L-110) and a strap-on stage
with two solid propellant motors, each with 200 tonne propellant (S-200). The upper stage
will be cryogenic with a propellant loading of 25 tonne (C-25). It has a lift-off mass of about
640 tonnes, and is 43.43 meters tall. The payload fairing has a diameter of 5 meters and a
payload volume of 100 cubic meters. It will allow India to become less dependent on foreign
rockets for heavy lifting.
On 18 December 2014, ISRO successfully conducted an experimental test-flight of
GSLV MK III carrying a crew module, to be used in future human space missions. This
suborbital test flight demonstrated the performance of GSLV Mk III in the atmosphere.
ISRO’s NEW MONSTER ROCKET
Indian engineers are counting down to a test flight Thursday of a next-generation
launcher to verify the performance of two powerful solid rocket motors, a twin-engine core
booster and a prototype capsule designed for India’s nascent human spaceflight program.
The flight is set to take off at 0400 GMT Thursday (11 p.m. EST Wednesday) from the
Satish Dhawan Space Center, India’s spaceport on Sriharikota Island along the country’s east
coast about 50 miles north of the Indian city of Chennai.
The 24-and-a-half hour countdown started on time, and filling of the rocket with liquid
propellants was underway Wednesday.
The stubby 139-foot-tall rocket will not reach the velocity necessary to enter orbit, but
the demonstration launch will reach a top speed of 5.3 kilometers per second nearly 12,000 mph
and a peak altitude of 126 kilometers, or 78 miles.
The new launch vehicle named the LVM-3 or Geostationary Satellite Launch Vehicle
Mk. 3 is the most capable rocket ever developed by India. It can carry up to 10 metric tons, or
about 22,000 pounds, of cargo into low Earth orbit and up to 4 metric tons 8,800 pounds into
geostationary transfer orbit once it is operational, a milestone Indian officials hope to achieve
within about two years.
Started in 2002, the GSLV Mk. 3 program is projected to cost approximately $400
million by the time development is finished, Indian news outlets reported. Thursday’s flight
alone cost about $24 million, according to India’s NDTV television news network.
Thursday’s test launch will check the performance of the GSLV Mk. 3’s first stage and
strap-on boosters, which will carry the rocket out of the atmosphere beyond the boundary of
space. The launcher’s cryogenic upper stage, which will be active and fueled by liquid hydrogen
on future missions, will be dormant on Thursday’s flight.
“The primary objective of this experimental flight is to validate the complex atmospheric
ascent regime of this all new launcher, especially the aerodynamic and control features that
cannot be conclusively tested on ground,” the Indian Space Research Organization wrote in a
post on its official Facebook page.
Each of the GSLV Mk. 3’s two S200 solid boosters will generate 1.1 million pounds of
thrust, making them the second-most powerful solid-fueled rocket motors currently in service
after the strap-on rockets used by Europe’s Ariane 5 launcher, ISRO says on its website.
Burning a pre-packed mix of fuel, oxidizer and binding agent, the 10.5-foot-wide, 72-
foot-long boosters will fire for more than two minutes alongside the GSLV Mk. 3’s core stage.
The rocket’s first stage is powered by two hydrazine-fueled Vikas engines, the same type
of engines flying on India’s Polar Satellite Launch Vehicle and smaller versions of the GSLV.
The twin-engine liquid-fueled L110 first stage will ignite when the rocket is already in
the air, firing for more than three minutes and ramping up to peak power of 360,000 pounds of
thrust.
Stage 1 – solid boosters:
The GSLV-III uses S200 solid motors. Each booster has a diameter of 3.2 metres, a
length of 25 metres, and carries 207 tonnes of propellant. These boosters burn for 130 seconds
and produce a peak thrust of about 5,150 kilonewtons (525 tf) each.
A separate facility has been established at Sriharikota to make the S200 boosters. Another
major feature is that the S200’s large nozzle has been equipped with a ‘flex seal.’ The nozzle can
therefore be gimballed when the rocket’s orientation needs correction.
In flight, as the thrust from the S200 boosters begins to tail off, the decline in acceleration
is sensed by the rocket’s onboard sensors and the twin Vikas engines on the ‘L110’ liquid
propellant core stage are then ignited. Before the S200s separate and fall away from the rocket,
the solid boosters as well as the Vikas engines operate together for a short period of time.
Stage 2 – liquid motor
The core stage, designated L110, is a 4-meter-diameter liquid-fueled stage carrying 110
tonnes of UDMH and N2O4. It is the first Indian liquid-engine cluster design, and uses two
improved Vikas engines, each producing about 700 kilonewtons (70 tf). The improved Vikas
engine uses regenerative cooling, providing improved weight and specific impulse, compared to
earlier rockets. The L110 core stage ignites 113 seconds after liftoff and burns for about 200
seconds.
Stage 3 – cryogenic upper stage
The cryogenic upper stage is designated the C25 and will be powered by the Indian-
developed CE-20 engine burning LOX and LH2, producing 186 kilonewtons (19.0 tf) of thrust.
The C-25 will be 4 metres (13 ft) in diameter and 13.5 metres (44 ft) long, and contain 27 tonnes
of propellant.
This engine is slated for completion and testing by 2015, it will then be integrated with
the C25 stage and be put through a series of tests. The first C25 stage will be used on the GSLV-
III D-1 mission in early 2017. This mission will put in orbit the GSAT-19E communication
satellite. Work on the C25 stage and CE-20 engine for GSLV Mk-III upper stage was initiated in
2003, the project has been subject to many delays due to problems with ISRO's smaller
cryogenic engine, the CE-7.5 for GSLV MK-II upper stage.
K. Radhakrishnan, ISRO’s chairman, described the rocket as “a totally new
configuration” for India, according to the Hindu newspaper, an Indian English-language
newspaper.
“So if there are issues with respect to the configuration and we need to take care of that, it
is better to take care of [them] early,” he said in a report published on the Hindu’s website.
After the rocket’s propulsion shuts down, a gumdrop-shaped capsule will separate from
the GSLV Mk. 3’s dummy upper segment about five-and-a-half minutes after liftoff, according
to the Times of India, another English-language paper in India.
The capsule weighs about 8,000 pounds — about 3.6 metric tons. Indian engineers
from Hindustan Aeronautics Ltd. fabricated the car-sized module, and ISRO added sensors,
strain gauges, a guidance and control system and a heat shield for the suborbital flight, which is
called the Crew Module Atmospheric Re-entry Experiment, or CARE.
CARE separated from the passive C25 cryogenic upper stage of GSLV Mk-III 330.8
seconds after lift-off and began its guided descent for atmospheric re-entry. After the successful
re-entry phase, CARE module’s parachutes opened, following which it gently landed over
Andaman Sea about 1600 km from Sriharikota, there by successfully concluding the GSLV Mk-
III X/CARE mission. While the rocket cost Indian Space Research Organisation Rs 140 crore,
the crew module has taken another Rs 15 crore.
“This was a very significant day in the history of Indian space programme,”
ISRO Chairman K S Radhakrishnan said from mission control, as fellow scientists clapped and
broke into a round of cheers. President Pranab Mukherjee and Prime Minister Narendra Modi
were among other leaders who congratulated the ISRO scientists for the feat that will help carry
heavier communication satellites.
The 2.7 metre tall cupcake-shaped crew module CARE with a diameter of 3.1 metre
features aluminium alloy internal structure with composite panels and ablative thermal protection
systems and can carry two to three astronauts.
Though it would take at least 10 years for India to send humans into space, this
experiment has helped the space agency to test the module for safe return of humans from space,
according to ISRO.
Future: One of the Space Visions of ISRO is to enable low cost access to space, which is not
possible with the present expendable launch systems. The present launch cost of expendable
systems, is roughly 10,000 US $/ kg for LEO orbit and around 20,000 US $/ kg for GSO orbit.
ISRO is aiming to bring down this cost by half in the short term by the use of its new LVM3
(GSLV Mk3) and ULV expendable systems. But to make the harnessing of space resources more
affordable, it is imperative that the cost of access to space must be substantially brought down by
an order of magnitude.
To achieve low cost access to space, ISRO has chalked down a plan to develop a new
breed of reusable launch system called AVATAR to substantially cut down the launch
costs (vehicle hardware contributes 70% of the total cost of the launch vehicle that is presently
expended after one launch). AVATAR will be a Single Stage To Orbit (SSTO) launch system
that will attempt to reuse maximum sub-systems and will use turbojet and dual mode ramjet-
scramjet propulsion. The use of air-breathing ramjet-scramjet engines will preclude need for
carrying all the propellants , particularly oxidizer, that will enable cutting the system cost.
Avatar is an ambitious program and with the kind of engine and material technologies
required, such SSTO launch system will take a long time to develope. Accordingly, ISRO has
decided to first develop a Two Stage to Orbit (TSTO) reusable launch system for the immediate
future by utilizing its current capabilities and target development of AVATAR in the long term.
Targeted TSTO Features:
1. 10 Ton to LEO and GTO payload capability.
2. Vertical take off.
3. Semi-cryogenic booster stage with avg. Isp of 330 seconds and cryogenic orbiter stage
with avg. Isp of 400 seconds.
4. Total lift off weight < 700 tons.
Winged body booster that will boost the orbiter to Mach 10 at an altitude of 80-100 km
then separate and return to launch site and land conventionally on an air-strip.
1. Orbiter will deploy the payloads in the intended orbits and then deboost, re-enter and
land on airbags or vertically on legs.
2. Vehicle structure designed for 100 flights and engines for 50 flights.
3. Turn around time should be 30 days.
4. Payload fraction = 2%.
5. Cost effectiveness < 1000 US $/ kg for LEO payload.
Possible TSTO mission profiles:
To realize the TSTO and associated new technologies, ISRO has been working on the
development of a RLV technology demonstrator (RLV-TD) and is setting
up necessary technology development infrastructure.
CONCLUSION
India successfully launched its biggest ever rocket on Thursday, including an unmanned
capsule which could one day send astronauts into space, as the country ramps up its ambitious
space programme.
The crew module separated from the rocket at an altitude of 126km and then re-entered
into the earth’s atmosphere at 80km. It then followed an uncontrollable trajectory into the Bay of
Bengal about 180km off the Andaman Nicobar Islands.
The crew module weighing 3.73 tonnes separated from the rocket about 325seconds (five
min) after the lift off from the launch pad.
One of the space visions of ISRO is to enable low cost access to space, which is not
possible with the present expendable launch systems. The present launch cost of expendable
launch systems is roughly 10,000 US $/kg for LEO orbit and around 20,000US $/kg for GSO
orbit. ISRO is aiming to bring down this cost by half in the short term by the use of its new LVM
3 and ULV expendable systems.
References:
http://antariksh-space.blogspot.in/2013/01/isro-reusable-launch-vehicle-program.html
http://spaceflightnow.com/2014/12/17/powerful-new-indian-rocket-poised-for-suborbital-test-
launch/
http://www.pragyan.org/blog/2014/12/another-leap-into-space/
http://en.wikipedia.org/wiki/Geosynchronous_Satellite_Launch_Vehicle_Mk_III

More Related Content

What's hot

BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONMasudul Robin
 
Role of computer in cemnet industry
Role of computer in cemnet industryRole of computer in cemnet industry
Role of computer in cemnet industryHannanAfzal1
 
Design and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDesign and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDevesh Chaurasia
 
Seminar report-3rd sem.pdf
Seminar report-3rd sem.pdfSeminar report-3rd sem.pdf
Seminar report-3rd sem.pdframbhuvansonkar1
 
Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]
Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]
Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]Muhammad Irfan
 
Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2IAEME Publication
 
PAVEMENT DESIGN BY USING GEOTEXTILE
 PAVEMENT DESIGN BY USING GEOTEXTILE  PAVEMENT DESIGN BY USING GEOTEXTILE
PAVEMENT DESIGN BY USING GEOTEXTILE IAEME Publication
 
Deep compaction techniques
Deep compaction techniquesDeep compaction techniques
Deep compaction techniquesJNTUK
 
Use of geo synthetic clay liners in waste
Use of geo synthetic clay liners in wasteUse of geo synthetic clay liners in waste
Use of geo synthetic clay liners in wastesrujanishrawne
 
Strengthening and Widening of road (P.W.D)(Summer Training)
Strengthening and Widening of road (P.W.D)(Summer Training)Strengthening and Widening of road (P.W.D)(Summer Training)
Strengthening and Widening of road (P.W.D)(Summer Training)Arif Siddiqui
 
SpaceX Falcon9 Reusable Launch Vehicle
SpaceX Falcon9 Reusable Launch VehicleSpaceX Falcon9 Reusable Launch Vehicle
SpaceX Falcon9 Reusable Launch VehicleAkash Redekar
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training reportAnshul Shakya
 
Mars orbiter mission (Mangalyaan)
Mars orbiter mission (Mangalyaan)Mars orbiter mission (Mangalyaan)
Mars orbiter mission (Mangalyaan)Amit Raikar
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmerANKIT SHARMA
 
IRJET- Analysis and Design of Segmental Box Girder Bridge
IRJET- Analysis and Design of Segmental Box Girder BridgeIRJET- Analysis and Design of Segmental Box Girder Bridge
IRJET- Analysis and Design of Segmental Box Girder BridgeIRJET Journal
 
Internship report on rcc road
Internship report on rcc roadInternship report on rcc road
Internship report on rcc roaddeepak athwal
 

What's hot (20)

BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 
Role of computer in cemnet industry
Role of computer in cemnet industryRole of computer in cemnet industry
Role of computer in cemnet industry
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Design and analysis of flexible pavemeT
Design and analysis of flexible pavemeTDesign and analysis of flexible pavemeT
Design and analysis of flexible pavemeT
 
Seminar report-3rd sem.pdf
Seminar report-3rd sem.pdfSeminar report-3rd sem.pdf
Seminar report-3rd sem.pdf
 
Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]
Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]
Geotechnical Engineering-I [Lec #20: Consolidation Settlement Computation]
 
Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2
 
PAVEMENT DESIGN BY USING GEOTEXTILE
 PAVEMENT DESIGN BY USING GEOTEXTILE  PAVEMENT DESIGN BY USING GEOTEXTILE
PAVEMENT DESIGN BY USING GEOTEXTILE
 
Gslv
GslvGslv
Gslv
 
Irc 37-2018
Irc 37-2018Irc 37-2018
Irc 37-2018
 
Deep compaction techniques
Deep compaction techniquesDeep compaction techniques
Deep compaction techniques
 
Use of geo synthetic clay liners in waste
Use of geo synthetic clay liners in wasteUse of geo synthetic clay liners in waste
Use of geo synthetic clay liners in waste
 
Strengthening and Widening of road (P.W.D)(Summer Training)
Strengthening and Widening of road (P.W.D)(Summer Training)Strengthening and Widening of road (P.W.D)(Summer Training)
Strengthening and Widening of road (P.W.D)(Summer Training)
 
SpaceX Falcon9 Reusable Launch Vehicle
SpaceX Falcon9 Reusable Launch VehicleSpaceX Falcon9 Reusable Launch Vehicle
SpaceX Falcon9 Reusable Launch Vehicle
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2
 
Mars orbiter mission (Mangalyaan)
Mars orbiter mission (Mangalyaan)Mars orbiter mission (Mangalyaan)
Mars orbiter mission (Mangalyaan)
 
Indian railway ajmer
Indian railway ajmerIndian railway ajmer
Indian railway ajmer
 
IRJET- Analysis and Design of Segmental Box Girder Bridge
IRJET- Analysis and Design of Segmental Box Girder BridgeIRJET- Analysis and Design of Segmental Box Girder Bridge
IRJET- Analysis and Design of Segmental Box Girder Bridge
 
Internship report on rcc road
Internship report on rcc roadInternship report on rcc road
Internship report on rcc road
 

Viewers also liked

Viewers also liked (20)

Human Resource Management in a Sugar Factory.
Human Resource Management in a Sugar Factory.Human Resource Management in a Sugar Factory.
Human Resource Management in a Sugar Factory.
 
Martin timetable
Martin timetableMartin timetable
Martin timetable
 
Ferdigheter for en nav veileder
Ferdigheter for en nav  veilederFerdigheter for en nav  veileder
Ferdigheter for en nav veileder
 
Presentation janice s. dionisio
Presentation   janice s. dionisioPresentation   janice s. dionisio
Presentation janice s. dionisio
 
One stop english
One stop englishOne stop english
One stop english
 
Scala Days 2014: Pitching Typesafe
Scala Days 2014: Pitching TypesafeScala Days 2014: Pitching Typesafe
Scala Days 2014: Pitching Typesafe
 
Vinnco Indonesia
Vinnco Indonesia Vinnco Indonesia
Vinnco Indonesia
 
service marketing
service marketingservice marketing
service marketing
 
Condição humana e literatura
Condição humana e literaturaCondição humana e literatura
Condição humana e literatura
 
Run-Away-Bear (1984)
Run-Away-Bear (1984)Run-Away-Bear (1984)
Run-Away-Bear (1984)
 
Caleb clark's journal
Caleb clark's journalCaleb clark's journal
Caleb clark's journal
 
Corporate intro presentation
Corporate intro presentationCorporate intro presentation
Corporate intro presentation
 
Select Fair Sponsorship Deck Frieze Week 2014
Select Fair Sponsorship Deck Frieze Week 2014Select Fair Sponsorship Deck Frieze Week 2014
Select Fair Sponsorship Deck Frieze Week 2014
 
Hereglegdehuun 110509203617-phpapp01
Hereglegdehuun 110509203617-phpapp01Hereglegdehuun 110509203617-phpapp01
Hereglegdehuun 110509203617-phpapp01
 
COMPOSTING MACHINE
COMPOSTING MACHINECOMPOSTING MACHINE
COMPOSTING MACHINE
 
orientamento Liceo Elio Vittorini Gela 2014_ 2015
orientamento Liceo Elio Vittorini Gela 2014_ 2015orientamento Liceo Elio Vittorini Gela 2014_ 2015
orientamento Liceo Elio Vittorini Gela 2014_ 2015
 
Elektriskie lādiņi
Elektriskie lādiņiElektriskie lādiņi
Elektriskie lādiņi
 
¿POR QUÉ?
¿POR QUÉ?¿POR QUÉ?
¿POR QUÉ?
 
BoyleBT9g
BoyleBT9gBoyleBT9g
BoyleBT9g
 
Diez años del descubrimiento de las células iPS
Diez años del descubrimiento de las células iPSDiez años del descubrimiento de las células iPS
Diez años del descubrimiento de las células iPS
 

Similar to Gslv mk3 report

India’s launch vehicles
India’s launch vehiclesIndia’s launch vehicles
India’s launch vehiclesAman Dhanda
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptxNabeelMohd3
 
Indian space launch vehicle
Indian space launch vehicleIndian space launch vehicle
Indian space launch vehicleDinesh Babu
 
ISRO PSLV C-37 The pride of INDIA.
ISRO PSLV C-37 The pride of INDIA.ISRO PSLV C-37 The pride of INDIA.
ISRO PSLV C-37 The pride of INDIA.pinumalla sumanth
 
Mars orbital mission
Mars orbital missionMars orbital mission
Mars orbital missionanoop kp
 
LVM-3 Satellite Launch Vehicle chandrayaan 3.pptx
LVM-3 Satellite Launch Vehicle chandrayaan 3.pptxLVM-3 Satellite Launch Vehicle chandrayaan 3.pptx
LVM-3 Satellite Launch Vehicle chandrayaan 3.pptxdaymasarthak2
 
Mangalyaan - wiki
Mangalyaan - wikiMangalyaan - wiki
Mangalyaan - wikibsmukunth
 
PSLV Rocket and PSLV-C53
PSLV Rocket and PSLV-C53PSLV Rocket and PSLV-C53
PSLV Rocket and PSLV-C53PiyushMakhija10
 
space technology's in india
space technology's in indiaspace technology's in india
space technology's in indiakalyansks
 
Isro successfully launches its heaviest ever rocket, geosynchronous satellite...
Isro successfully launches its heaviest ever rocket, geosynchronous satellite...Isro successfully launches its heaviest ever rocket, geosynchronous satellite...
Isro successfully launches its heaviest ever rocket, geosynchronous satellite...Er. Rahul Jain
 
Indian Space Research Organisation
Indian Space Research OrganisationIndian Space Research Organisation
Indian Space Research OrganisationGajendra Choudhary
 
Indian space research organisation
Indian space research organisationIndian space research organisation
Indian space research organisationGodwin Reju
 

Similar to Gslv mk3 report (20)

India’s launch vehicles
India’s launch vehiclesIndia’s launch vehicles
India’s launch vehicles
 
Indian satellite lunch vehicles
Indian satellite lunch vehiclesIndian satellite lunch vehicles
Indian satellite lunch vehicles
 
Presentation.pptx
Presentation.pptxPresentation.pptx
Presentation.pptx
 
Indian space launch vehicle
Indian space launch vehicleIndian space launch vehicle
Indian space launch vehicle
 
ISRO PSLV C-37 The pride of INDIA.
ISRO PSLV C-37 The pride of INDIA.ISRO PSLV C-37 The pride of INDIA.
ISRO PSLV C-37 The pride of INDIA.
 
International Goals in Space, Indian Space Program
International Goals in Space, Indian Space ProgramInternational Goals in Space, Indian Space Program
International Goals in Space, Indian Space Program
 
PSLV C-23
PSLV C-23PSLV C-23
PSLV C-23
 
GSLV MKIII
GSLV MKIIIGSLV MKIII
GSLV MKIII
 
Mars orbital mission
Mars orbital missionMars orbital mission
Mars orbital mission
 
LVM-3 Satellite Launch Vehicle chandrayaan 3.pptx
LVM-3 Satellite Launch Vehicle chandrayaan 3.pptxLVM-3 Satellite Launch Vehicle chandrayaan 3.pptx
LVM-3 Satellite Launch Vehicle chandrayaan 3.pptx
 
Hj sci tech
Hj sci techHj sci tech
Hj sci tech
 
Mangalyaan - wiki
Mangalyaan - wikiMangalyaan - wiki
Mangalyaan - wiki
 
Space final
Space finalSpace final
Space final
 
PSLV Rocket and PSLV-C53
PSLV Rocket and PSLV-C53PSLV Rocket and PSLV-C53
PSLV Rocket and PSLV-C53
 
space technology's in india
space technology's in indiaspace technology's in india
space technology's in india
 
Isro successfully launches its heaviest ever rocket, geosynchronous satellite...
Isro successfully launches its heaviest ever rocket, geosynchronous satellite...Isro successfully launches its heaviest ever rocket, geosynchronous satellite...
Isro successfully launches its heaviest ever rocket, geosynchronous satellite...
 
Recent space achievements of india
Recent space achievements of indiaRecent space achievements of india
Recent space achievements of india
 
Indian Space Research Organisation
Indian Space Research OrganisationIndian Space Research Organisation
Indian Space Research Organisation
 
Chandrayaan II
Chandrayaan IIChandrayaan II
Chandrayaan II
 
Indian space research organisation
Indian space research organisationIndian space research organisation
Indian space research organisation
 

Recently uploaded

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 

Recently uploaded (20)

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 

Gslv mk3 report

  • 2. ABSTRACT GSLV MARK-III GSLV mark-3 is a significant step for India’s space ambitions as it is the first step towards India’s ambition to send Indian astronauts into space. It is also significant from perspective of ISRO’s own cryogenic engine. It proved ISRO’s maturity in reentry technology, its ability to develop braking techniques, deceleration technology and thermal protection system for crew module. The new launch vehicle named the LVM-3 or Geostationary Satellite Launch Vehicle Mk. 3 is the most capable rocket ever developed by India. It can carry up to 10 metric tons, or about 22,000 pounds, of cargo into low Earth orbit and up to 4 metric tons 8,800 pounds into geostationary transfer orbit once it is operational, a milestone Indian officials hope to achieve within about two years. To achieve low cost access to space, ISRO has chalked down a plan to develop a new breed of reusable launch system called AVATAR to substantially cut down the launch costs. ). AVATAR will be a Single Stage To Orbit (SSTO) launch system that will attempt to reuse maximum sub-systems and will use turbojet and dual mode ramjet-scramjet propulsion. SSTO launch system will take a long time to develope. Accordingly, ISRO has decided to first develop a Two Stage to Orbit (TSTO) reusable launch system for the immediate future by utilizing its current capabilities and target development of AVATAR in the long term.
  • 3. INDEX Sl.no Topic Page no 1 History 3 2 GSLV MK-III 7 3 Stages 11 4 CARE 13 5 Future 15 6 Conclusion 20 7 Reference 21
  • 4. HISTORY OF LAUNCH VEHICLES: During the 1960s and 1970s, India initiated its own launch vehicle programme owing to geopolitical and economic considerations. In the 1960s–1970s, the country successfully developed a sounding rockets programme, and by the 1980s, research had yielded the Satellite Launch Vehicle-3 and the more advanced Augmented Satellite Launch Vehicle (ASLV), complete with operational supporting infrastructure. ISRO further applied its energies to the advancement of launch vehicle technology resulting in the creation of PSLV and GSLV technologies. Satellite Launch Vehicle (SLV) The Satellite Launch Vehicle, usually known by its abbreviation SLV or SLV-3 was a 4- stage solid-propellant light launcher. It was intended to reach a height of 500 km and carry a
  • 5. payload of 40 kg. Its first launch took place in 1979 with 2 more in each subsequent year, and the final launch in 1983. Only two of its four test flights were successful. Augmented Satellite Launch Vehicle (ASLV) The Augmented Satellite Launch Vehicle, usually known by its abbreviation ASLV was a 5-stage solid propellant rocket with the capability of placing a 150 kg satellite into Low Earth Orbit. This project was started by the ISRO during the early 1980s to develop technologies needed for a payload to be placed into a geostationary orbit. Its design was based on Satellite Launch Vehicle. The first launch test was held in 1987, and after that 3 others followed in 1988, 1992 and 1994, out of which only 2 were successful, before it was decommissioned. Polar Satellite Launch Vehicle (PSLV) The Polar Satellite Launch Vehicle, usually known by its abbreviation PSLV, is an expendable launch system developed to allow India to launch its Indian Remote Sensing (IRS) satellites into Sun synchronous orbits, a service that was, until the advent of the PSLV, commercially viable only from Russia. PSLV can also launch small satellites intogeostationary transfer orbit (GTO). The reliability and versatility of the PSLV is proven by the fact that it has launched, as of 2014, 71 satellites/spacecraft (31 Indian and 40 foreign)
  • 6. into a variety of orbits. The maximum number of satellites launched by the PSLV in a single launch is 10, in the PSLV-C9 launch on 28 April 2008 (690 kg CARTOSAT-2A, 83 kg Indian Mini Satellite, and 8 nano-satellites, launched by PSLV's "core-alone" version). Geosynchronous Satellite Launch Vehicle (GSLV) The Geosynchronous Satellite Launch Vehicle, usually known by its abbreviation GSLV, is an expendable launch system developed to enable India to launch its INSAT-type satellites into geostationary orbit and to make India less dependent on foreign rockets. At present, it is ISRO's second-heaviest satellite launch vehicle and is capable of putting a total payload of up to 5 tons to Low Earth Orbit. The vehicle is built by India with the cryogenic engine purchased from Russia while the ISRO develops its own engine programme. In a setback for ISRO, the attempt to launch the GSLV, GSLV-F07 carrying GSAT-5P, failed on 25 December 2010. The initial evaluation implies that loss of control for the strap- on boosters caused the rocket to veer from its intended flight path, forcing a programmed detonation. Sixty-four seconds into the first stage of flight, the rocket began to break up due to the acute angle of attack. The body housing the 3rd stage, the cryogenic stage, incurred structural damage, forcing the range safety team to initiate a programmed detonation of the rocket. On 5 January 2014, GSLV-D5 successfully launched GSAT-14 into intended orbit. This also marked first successful flight using indigenous cryogenic engine, making India the sixth country in the world to have this technology.
  • 7. Geosynchronous Satellite Launch Vehicle Mark-III (GSLV III) GSLV-Mk III can launch four tonne satellite into geosynchronous transfer orbit. It is a three-stage vehicle with a 110 tonne core liquid propellant stage (L-110) and a strap-on stage with two solid propellant motors, each with 200 tonne propellant (S-200). The upper stage will be cryogenic with a propellant loading of 25 tonne (C-25). It has a lift-off mass of about 640 tonnes, and is 43.43 meters tall. The payload fairing has a diameter of 5 meters and a payload volume of 100 cubic meters. It will allow India to become less dependent on foreign rockets for heavy lifting. On 18 December 2014, ISRO successfully conducted an experimental test-flight of GSLV MK III carrying a crew module, to be used in future human space missions. This suborbital test flight demonstrated the performance of GSLV Mk III in the atmosphere.
  • 8. ISRO’s NEW MONSTER ROCKET Indian engineers are counting down to a test flight Thursday of a next-generation launcher to verify the performance of two powerful solid rocket motors, a twin-engine core booster and a prototype capsule designed for India’s nascent human spaceflight program. The flight is set to take off at 0400 GMT Thursday (11 p.m. EST Wednesday) from the Satish Dhawan Space Center, India’s spaceport on Sriharikota Island along the country’s east coast about 50 miles north of the Indian city of Chennai. The 24-and-a-half hour countdown started on time, and filling of the rocket with liquid propellants was underway Wednesday. The stubby 139-foot-tall rocket will not reach the velocity necessary to enter orbit, but the demonstration launch will reach a top speed of 5.3 kilometers per second nearly 12,000 mph and a peak altitude of 126 kilometers, or 78 miles. The new launch vehicle named the LVM-3 or Geostationary Satellite Launch Vehicle Mk. 3 is the most capable rocket ever developed by India. It can carry up to 10 metric tons, or about 22,000 pounds, of cargo into low Earth orbit and up to 4 metric tons 8,800 pounds into
  • 9. geostationary transfer orbit once it is operational, a milestone Indian officials hope to achieve within about two years. Started in 2002, the GSLV Mk. 3 program is projected to cost approximately $400 million by the time development is finished, Indian news outlets reported. Thursday’s flight alone cost about $24 million, according to India’s NDTV television news network. Thursday’s test launch will check the performance of the GSLV Mk. 3’s first stage and strap-on boosters, which will carry the rocket out of the atmosphere beyond the boundary of space. The launcher’s cryogenic upper stage, which will be active and fueled by liquid hydrogen on future missions, will be dormant on Thursday’s flight. “The primary objective of this experimental flight is to validate the complex atmospheric ascent regime of this all new launcher, especially the aerodynamic and control features that cannot be conclusively tested on ground,” the Indian Space Research Organization wrote in a post on its official Facebook page. Each of the GSLV Mk. 3’s two S200 solid boosters will generate 1.1 million pounds of thrust, making them the second-most powerful solid-fueled rocket motors currently in service after the strap-on rockets used by Europe’s Ariane 5 launcher, ISRO says on its website. Burning a pre-packed mix of fuel, oxidizer and binding agent, the 10.5-foot-wide, 72- foot-long boosters will fire for more than two minutes alongside the GSLV Mk. 3’s core stage.
  • 10. The rocket’s first stage is powered by two hydrazine-fueled Vikas engines, the same type of engines flying on India’s Polar Satellite Launch Vehicle and smaller versions of the GSLV. The twin-engine liquid-fueled L110 first stage will ignite when the rocket is already in the air, firing for more than three minutes and ramping up to peak power of 360,000 pounds of thrust.
  • 11. Stage 1 – solid boosters: The GSLV-III uses S200 solid motors. Each booster has a diameter of 3.2 metres, a length of 25 metres, and carries 207 tonnes of propellant. These boosters burn for 130 seconds and produce a peak thrust of about 5,150 kilonewtons (525 tf) each. A separate facility has been established at Sriharikota to make the S200 boosters. Another major feature is that the S200’s large nozzle has been equipped with a ‘flex seal.’ The nozzle can therefore be gimballed when the rocket’s orientation needs correction. In flight, as the thrust from the S200 boosters begins to tail off, the decline in acceleration is sensed by the rocket’s onboard sensors and the twin Vikas engines on the ‘L110’ liquid propellant core stage are then ignited. Before the S200s separate and fall away from the rocket, the solid boosters as well as the Vikas engines operate together for a short period of time.
  • 12. Stage 2 – liquid motor The core stage, designated L110, is a 4-meter-diameter liquid-fueled stage carrying 110 tonnes of UDMH and N2O4. It is the first Indian liquid-engine cluster design, and uses two improved Vikas engines, each producing about 700 kilonewtons (70 tf). The improved Vikas engine uses regenerative cooling, providing improved weight and specific impulse, compared to earlier rockets. The L110 core stage ignites 113 seconds after liftoff and burns for about 200 seconds. Stage 3 – cryogenic upper stage The cryogenic upper stage is designated the C25 and will be powered by the Indian- developed CE-20 engine burning LOX and LH2, producing 186 kilonewtons (19.0 tf) of thrust. The C-25 will be 4 metres (13 ft) in diameter and 13.5 metres (44 ft) long, and contain 27 tonnes of propellant. This engine is slated for completion and testing by 2015, it will then be integrated with the C25 stage and be put through a series of tests. The first C25 stage will be used on the GSLV- III D-1 mission in early 2017. This mission will put in orbit the GSAT-19E communication satellite. Work on the C25 stage and CE-20 engine for GSLV Mk-III upper stage was initiated in 2003, the project has been subject to many delays due to problems with ISRO's smaller cryogenic engine, the CE-7.5 for GSLV MK-II upper stage.
  • 13. K. Radhakrishnan, ISRO’s chairman, described the rocket as “a totally new configuration” for India, according to the Hindu newspaper, an Indian English-language newspaper. “So if there are issues with respect to the configuration and we need to take care of that, it is better to take care of [them] early,” he said in a report published on the Hindu’s website. After the rocket’s propulsion shuts down, a gumdrop-shaped capsule will separate from the GSLV Mk. 3’s dummy upper segment about five-and-a-half minutes after liftoff, according to the Times of India, another English-language paper in India. The capsule weighs about 8,000 pounds — about 3.6 metric tons. Indian engineers from Hindustan Aeronautics Ltd. fabricated the car-sized module, and ISRO added sensors, strain gauges, a guidance and control system and a heat shield for the suborbital flight, which is called the Crew Module Atmospheric Re-entry Experiment, or CARE.
  • 14. CARE separated from the passive C25 cryogenic upper stage of GSLV Mk-III 330.8 seconds after lift-off and began its guided descent for atmospheric re-entry. After the successful re-entry phase, CARE module’s parachutes opened, following which it gently landed over Andaman Sea about 1600 km from Sriharikota, there by successfully concluding the GSLV Mk- III X/CARE mission. While the rocket cost Indian Space Research Organisation Rs 140 crore, the crew module has taken another Rs 15 crore. “This was a very significant day in the history of Indian space programme,” ISRO Chairman K S Radhakrishnan said from mission control, as fellow scientists clapped and broke into a round of cheers. President Pranab Mukherjee and Prime Minister Narendra Modi were among other leaders who congratulated the ISRO scientists for the feat that will help carry heavier communication satellites. The 2.7 metre tall cupcake-shaped crew module CARE with a diameter of 3.1 metre features aluminium alloy internal structure with composite panels and ablative thermal protection systems and can carry two to three astronauts.
  • 15. Though it would take at least 10 years for India to send humans into space, this experiment has helped the space agency to test the module for safe return of humans from space, according to ISRO. Future: One of the Space Visions of ISRO is to enable low cost access to space, which is not possible with the present expendable launch systems. The present launch cost of expendable systems, is roughly 10,000 US $/ kg for LEO orbit and around 20,000 US $/ kg for GSO orbit. ISRO is aiming to bring down this cost by half in the short term by the use of its new LVM3 (GSLV Mk3) and ULV expendable systems. But to make the harnessing of space resources more affordable, it is imperative that the cost of access to space must be substantially brought down by an order of magnitude.
  • 16. To achieve low cost access to space, ISRO has chalked down a plan to develop a new breed of reusable launch system called AVATAR to substantially cut down the launch costs (vehicle hardware contributes 70% of the total cost of the launch vehicle that is presently expended after one launch). AVATAR will be a Single Stage To Orbit (SSTO) launch system that will attempt to reuse maximum sub-systems and will use turbojet and dual mode ramjet- scramjet propulsion. The use of air-breathing ramjet-scramjet engines will preclude need for carrying all the propellants , particularly oxidizer, that will enable cutting the system cost.
  • 17. Avatar is an ambitious program and with the kind of engine and material technologies required, such SSTO launch system will take a long time to develope. Accordingly, ISRO has decided to first develop a Two Stage to Orbit (TSTO) reusable launch system for the immediate future by utilizing its current capabilities and target development of AVATAR in the long term.
  • 18. Targeted TSTO Features: 1. 10 Ton to LEO and GTO payload capability. 2. Vertical take off. 3. Semi-cryogenic booster stage with avg. Isp of 330 seconds and cryogenic orbiter stage with avg. Isp of 400 seconds. 4. Total lift off weight < 700 tons. Winged body booster that will boost the orbiter to Mach 10 at an altitude of 80-100 km then separate and return to launch site and land conventionally on an air-strip. 1. Orbiter will deploy the payloads in the intended orbits and then deboost, re-enter and land on airbags or vertically on legs. 2. Vehicle structure designed for 100 flights and engines for 50 flights. 3. Turn around time should be 30 days. 4. Payload fraction = 2%. 5. Cost effectiveness < 1000 US $/ kg for LEO payload.
  • 20. To realize the TSTO and associated new technologies, ISRO has been working on the development of a RLV technology demonstrator (RLV-TD) and is setting up necessary technology development infrastructure.
  • 21. CONCLUSION India successfully launched its biggest ever rocket on Thursday, including an unmanned capsule which could one day send astronauts into space, as the country ramps up its ambitious space programme. The crew module separated from the rocket at an altitude of 126km and then re-entered into the earth’s atmosphere at 80km. It then followed an uncontrollable trajectory into the Bay of Bengal about 180km off the Andaman Nicobar Islands. The crew module weighing 3.73 tonnes separated from the rocket about 325seconds (five min) after the lift off from the launch pad. One of the space visions of ISRO is to enable low cost access to space, which is not possible with the present expendable launch systems. The present launch cost of expendable launch systems is roughly 10,000 US $/kg for LEO orbit and around 20,000US $/kg for GSO orbit. ISRO is aiming to bring down this cost by half in the short term by the use of its new LVM 3 and ULV expendable systems.