1. This is one of
our graphics
projects
COI and Olympic The work
For this high-visibility project, we considered
Delivery Authority durability, value for money and sustainability
Hoarding graphics for when considering a production technique. In
the Olympic Park the end, we opted to print directly onto 3mm
thick hoarding-grade aluminium composite
Designed by The Team and Bell Design
using our Durst 800 UV flat bed printer.
To deter unwelcome attention, each panel
The brief was then laminated with a polyester anti-
Following a tender managed by The graffiti seal.
Central Office of Information, we were
appointed to supply graphics for the The finished panels measure 3m high x 1.5m
structural hoardings surrounding the 2012 wide. We successfully installed almost 3,400
Olympic Park, East London. of them to make up the full 5km length.
The results
This great-looking installation provides a
perfect opportunity to bring to life the 2012
Olympic story. The local community and the
general public now have an exciting and
vibrant way to learn what’s happening
over the coming years, as the Olympic Park
takes shape.
If you would like to know how
we could help you why not call
our sales department on 020 7231 6070
McKenzie Clark
Unit 1, Glengall Business Centre
43 Glengall Road
London SE15 6NJ
2. McKenzie Clark Client Project Design
COI and Olympic Hoarding graphics for The Team and Bell Design
Delivery Authority the Olympic Park