SlideShare a Scribd company logo
1 of 63
Supply Chain Risk Management Minimising Risk Exposure in Supply Chain Anand Subramaniam
[object Object],[object Object]
Highlights ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Supply Chain Today… Challenges
Supply Chain Today..
Supply Chain Today.. Riskier !!  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Exposure – SC Network Design Top Pressures Driving Supply Risk Management 82% 79% 78% 77% 73% 70% 69% 59% 58% SC Disruption within past 24 mos Longer lead times Pressure from executives Customer pressures Global sourcing Lean/JIT initiatives Supply assurance outweighs cost  Supply base reduction Regulatory pressures Transportation constraints 73% 20% 12% 10% 8% Supply Chain  Price Fluctuations Labor Issues IT Systems Mgt Malfeasance  8% #1 Threat Factor To Revenue Source: Managing Business Risk 2006 & Beyond, FM Global & Harris / USA Today, 2006 Survey 602 Global CFOs / Financial Executives
AMR Research 2008 on Risk Change in level of risk from 1 year ago
Supply Chain disruption would mean.. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
AMR Research 2008 - SC Risk Mitigation 44% 33% 31% 29% 27% 42% 27% 10% 4% 10% 12% 5% 14% 10% Performance-based contracts with suppliers or service providers Increase in IT investment for better visibility across the supply chain Closer collaborative relations with trading partners Utilising modeling tools (optimisation, simulation) to be proactive about risk by conducting what-if analysis Outsourcing logistics function Dual/multi sourcing strategies and using redundant suppliers Outsourcing manufacturing function Top 10 methods used to mitigate risk Most successful method used to mitigate risk
Supply Chain & Risk - Realities
SCM Components.. Ideal World !!  Store In-Stock Channel Design Network Rationalisation Flow of Merchandise Distribution Operations/ Transportation Planning, Buying, Allocation Supporting Infrastructure Right goods, right place, right time, right cost The optimum combination of facilities and  transportation modes that achieve service targets The cost effective Distribution Channels  at the lowest cost Synchronised flow of merchandise to optimise inventories and meet customer demand The most appropriate operational linkage between client and vendors  Functions and processes consistent with vendor operating strengths and needs The most appropriate information systems  and support areas  to plan and manage the flow of goods strategy
Industry Challenges ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],2 6 7 4 3 9 8 1 10 5 High Low Relative Cost Manage Business Impact 11 High 12 13 14 15 16 17 18 19 21 20 24 22 23 25
Risks Impact - Strategy / Initiatives Shareholder Benefits Asset Utilisation Plant Specialisation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Profit /  Revenue Growth Cost/ Productivity Improvement Capital Asset Evaluation Selling/Pricing Selectivity New Product Development Market/ Customer Segmentation Infrastructure Optimisation Acquisition Divestiture Inventory Management Shipping Efficiency Error Elimination Manufacturing Efficiency Strategy Initiatives Risk / Opportunity
Risks – Managing Stakeholder … Supplier SC Disruption  Capacity  / Quality Supplier Performance Supplier Environment  Financial Distress Product / Process innovation Relationship Regulatory Disaster Customer Environmental  Volume / Product mix Brand / Reputation Data Sharing  Product Liability  Legal Liability Market Mix Disasters Quality Internal Environmental  Legal / Financial  Technical / Operational Staff Turnover /OH&S SC disruption history Capacity / Sourcing  Quality / Delivery Spend Leverage Innovation
Risk Management Realities… Insurance Not Purchased Political Risk  Environmental  Advertiser’s Liability  Professional Liability E-Commerce Liability Certain lines of Products Patent Infringement Product recall Non-Owned Terrorism Liability Insurance Not Available War / Strike Reputational  Terrorism Biological Nuclear / Radiation Regulatory Fines & Penalties Poor Business Judgment Supply Chain Interruption Loss of Market Share Breach of Contract Global Pandemic Fraud
Internal & External Drivers
Exposure – External & Internal Drivers Environment Supply Demand Process Governance / Controls Risk Response / Contingency Exposure External Internal External Internal
Risks - External Factors ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risks - Internal Factors ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Response / Contingency ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Exposure in Managing…..
Risks -Managing Shareholder Value
Risks - Managing Competitive Pressures  Requires  a change in  Business Model Serving localised customer with complex supply lines  Demanding customers Changing market boundaries and new channels Aggressive global competition Industry consolidation and alliances Environmental and risk issues  Stakeholder pressures Speed of technology change Shortening product life cycles Pressure on margins, growth, cost Supply & Demand Co-ordination Hyper – competition & Globalisation Compliance Green SCM Catastrophic events
Risks - Managing End to End Networks Supply Chain Redesign New Materials Cooperative Development New Relationships New Processing Product Adaptation Integrated Solutions Key Process Improvement New Products Supply Chain Responsiveness Alternative Channels Cost to Serve New Sales Sales Leadership Strategies New Business Systems Suppliers Manufacturing Distribution Retailer Consumer Flow of information, products, services and financials Capture Buying  Habits Product Development Distribution Efficiency Product Replenishment Order Fulfillment Marketing Strategy Business Development
Risks - Managing SCM Performance Sell Product recall, service and quality issues can impact brand image High turnover coupled with poor training can result in serious customer service issues Plan Poorly designed products can result in future recalls Product complexity can create downstream execution issues Missed or lagging trends Design flaws & cycle time Source Globalisation & sourcing from emerging markets leads to product safety, quality, supply disruptions &  monitoring issues, which  Can impact customer perceptions Single / sole-sourcing creates failure points Deliver Consolidation of distribution and fulfillment creates risks -  product theft, labour shortages /  stoppages.  Less resilient local  hauling lanes create significant exposures within the last few miles of the delivery process Make Realigning and consolidating facilities creates risks – product rationalisation, labor disputes,  stoppages etc. Outsourcing can create vulnerabilities that extend beyond the immediate business Service Fall in service levels (after Sales ), process returns, lack of spares etc can  influence future buying behaviors brand image Lack of visibility across reverse logistics can impact top & bottom line Warranty failure can impact loyalty / image. Suppliers Manufacturing Distribution Retailer Consumer
Risks - Managing Product / Information Flow Postponement Vendor managed inventory Cross docking Continuous replenishment Flexible automation  Modularisation Mass customisation Quick response  Efficient consumer response End to End Supply Chain Time-based logistics  Extended warehouse Visibility Integrated business planning / Sales & Operations Planning Cloud based services: Managed Services, On-Demand, SaaS Sustainability & Green Supply Chain  Closed-loop Supply Chain Execution & Supply Chain Planning Demand Driven Lean Supply Chain Transportation Management & Global Trade Management Convergence Continuous Monitoring & Control of Risks
Risks - Managing SC Change Initiatives Supplier Rationalisation Flexible Manufacturing Strategies Cross- docking Activity- Based Costing CPFR Salesforce Planning  Production Scheduling Inventory Planning Distribution Scheduling Integrated- Micro Marketing Customer-Focused Planning Vendors Inbound  Logistics Manufacturing Transportation Warehousing Delivery Retailer Consumer Quick Response  Forecasting EDI Category Management, Continuous Replenishment Net Landed Cost Palletisation, Bar Coding Vendor Managed Inventory Supply Chain Systems Selection and Implementation Promotion Planning Information, Finance & Product flows
Risks – Managing Inventory ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Key Success Metrics Risks Preventing Success ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Product Design Supply Chain / Procurement Manufacturing & MRO Sales & Marketing Core Business Process
Risk Exposure - Managing Suppliers
Supplier - Risk Sources ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Managing Supplier ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Supplier Profiles & Risk Assessment Supplier Audits & Certification Non-conformance /  Corrective & Preventive Actions Product Sampling & Test Results Performance Monitoring & Reporting
Root Cause Analysis Supplier Supply Chain  Involuntary (bankruptcy)  Voluntary (exit market)  Business Exit  Supplier Business Continuity  Sole / Single Source  Environmental Control  Security  Natural Disaster  Building Contamination Inventory Handling & Managment  Warehousing  Poor RM Quality  RM Out of Spec  Contamination  Inadequate Documentation  Compliance  Systems  Process  Procurement  Raw Material Supply
Risk Planning -  Integration  (People, Process & Systems)
Risk Planning – Competency & Performance ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Planning – C & P (Contd.)  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Planning – C & P (Contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Planning – C & P (Contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Planning – C & P (Contd.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk Framework
Strategic Approach – Resilient SC Resilient Supply Chain Supply Chain (Re)Engineering Supply Chain Design Supply Chain Understanding Supply Base Strategy Supply Chain Collaboration Collaborative Planning Supply Chain Intelligence SC Risk Mngt Culture Agility Visibility Velocity Supply Chain Continuity Teams Board level responsibility Risk in decision making
Risk Framework Strategy Execution Tactical Iterate & Improve
Risk - Strategy ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk - Tactical ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk - Execution ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Knowledge - Iteration & Improvement Lessons Learnt  Capture Communicate Collaborate Continuously  Improve
Stakeholder / Change - Management ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Risk – Tools, Techniques, Checklists
Risk Categories Relationship Relationship Supply Chain Disruption Human Resources Performance Supply Chain Performance Financial Health Environment SC Risk Category Quality, Delivery, Capability, Service Influence, Alignment, Information, Sharing Turnover, Union issues, Pay Position Market Power, Information Visibility, Concentration, Disruption Potential Size, Asset Utilisation, Capitalisation, Profitability 1 2 3 4 5 6 Market Dynamics, Mergers, Regulatory, Disasters, Transportation
Questionnaire on SC Risk Issues
Supply Chain Risk Barriers
Supply Chain Description
Risks - Demand, Supply, Control Etc.
Risk  - Scoring Results
Risk – Scoring System Consequences 1.  No direct effect on operating service level 2.  Minor deterioration in operating service level 3.  Definite reduction in operating service level 4.  Serious deterioration in operating service level 5.  Operating service level approaches zero Likelihood of occurrence E.  Probability of once in many years D.  Probability of once in many operating months C.  Probability of once in some operating weeks B.  Probability of weekly occurrence A.  Probability of daily occurrence Likelihood of detection A.  Detectability is very high B.  C onsiderable warning of failure before occurrence C.  Some warning of failure before occurrence D.  Little warning of failure before occurrence E.  Detectability is effectively zero
Risk -  Quantification / Qualification Valuation (factors to consider) Quantitative factors Revenue value Asset value Cash flow value Qualitative factors Brand Compliance Strategy Uninsurable Risks ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Insurable Risks ,[object Object],[object Object],[object Object],[object Object],[object Object]
Risk – Prioritised Consequence Likelihood 0 Tolerate Terminate Treat Transfer
Risk Classification
Cause & Effect Analysis Failure to  Deliver on  Time No Stock Available Lead-Time Too Short Carrier Performance Quality Problems Capacity Constraint Inflexible Systems Inadequate Communications Poor Scheduling Inadequate Supplier Management Materials  Supply Problem Failure to Achieve Plan Forecasting Problems Poor Process Control
Risk Control Matrix Key Process Number Process Risk Number Risk  Control  Objective Control Number Control Description Control Owner Process Narrative Control Category  Control  Type Primary/ Secondary Control Frequency Design Assessment
Example – Contingency Risks  How Long Can You Do Without? Impact of Doing Without? Vulnerabilities? Contingency in case of a disaster? Equipment (IT only) 5 days After five days no way to schedule production or track orders No UPS/generator, MD hardware, SPOF SME Use paper reports for 5 days then go manual for as many members as possible Facility 0 days No production, potential for bankruptcy, IT non-existent Metal building, flood zone, poor maintenance, no perimeter security, door lock broken Look for warehouse space, attempt to salvage equipment and restart operation, file bankruptcy Personnel 0 days Degraded operations, low service levels Too many SPOF Best effort shifting of available staff, temps Raw Materials 30 days before new deliveries None until on hand exhausted Single supplier relationship Search for alternative supplier Transportation System 30 days in 2 days out No supplies No deliveries Location, design of entrance None Utilities 0 hours/power 0 hours/water Extrusion shuts down, lines cleaned, waste collected and prepared for grinder, IT non-existent Single power feed, no generator or backup water supply None Vendors  (Sourcing) 4 hours No call center Mercy of vendor Bring in-house
[object Object],[object Object]
[object Object],[object Object]

More Related Content

What's hot

Supply chain management
Supply chain managementSupply chain management
Supply chain management
Aniket Verma
 
Integrated logistics management
Integrated logistics managementIntegrated logistics management
Integrated logistics management
Uyot Olpindo
 
Effective Supplier Relationship Management
Effective Supplier Relationship ManagementEffective Supplier Relationship Management
Effective Supplier Relationship Management
Tejari
 

What's hot (20)

Supply chain management ppt
Supply chain management pptSupply chain management ppt
Supply chain management ppt
 
Supply chain lecture
Supply chain lectureSupply chain lecture
Supply chain lecture
 
Risk Management in Supply chain management
Risk Management in Supply chain managementRisk Management in Supply chain management
Risk Management in Supply chain management
 
Introduction to Supply Chain Management
Introduction to Supply Chain ManagementIntroduction to Supply Chain Management
Introduction to Supply Chain Management
 
LOGISTICS AND SUPPLY CHAIN CHALLENGES FOR THE FUTURE
LOGISTICS AND SUPPLY CHAIN CHALLENGES FOR THE FUTURELOGISTICS AND SUPPLY CHAIN CHALLENGES FOR THE FUTURE
LOGISTICS AND SUPPLY CHAIN CHALLENGES FOR THE FUTURE
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Bullwhip effect ppt
Bullwhip effect pptBullwhip effect ppt
Bullwhip effect ppt
 
Supplier management
Supplier managementSupplier management
Supplier management
 
Integrated logistics management
Integrated logistics managementIntegrated logistics management
Integrated logistics management
 
Transportation in supply chain
Transportation in supply chain Transportation in supply chain
Transportation in supply chain
 
Preventing and Managing Supply Chain Disruptions
Preventing and Managing Supply Chain DisruptionsPreventing and Managing Supply Chain Disruptions
Preventing and Managing Supply Chain Disruptions
 
Vendor Management
Vendor ManagementVendor Management
Vendor Management
 
Supply Chain Risk Management
Supply Chain Risk ManagementSupply Chain Risk Management
Supply Chain Risk Management
 
The "Bullwhip" Effect
The "Bullwhip" EffectThe "Bullwhip" Effect
The "Bullwhip" Effect
 
Supply Chain Process Improvement
Supply Chain Process ImprovementSupply Chain Process Improvement
Supply Chain Process Improvement
 
Supplier Relationship Management
Supplier Relationship ManagementSupplier Relationship Management
Supplier Relationship Management
 
Global supply chain management
Global supply chain managementGlobal supply chain management
Global supply chain management
 
INTEGRATED LOGISTICS
INTEGRATED LOGISTICSINTEGRATED LOGISTICS
INTEGRATED LOGISTICS
 
Effective Supplier Relationship Management
Effective Supplier Relationship ManagementEffective Supplier Relationship Management
Effective Supplier Relationship Management
 
Basics of Supply Chain Managment
Basics of Supply Chain ManagmentBasics of Supply Chain Managment
Basics of Supply Chain Managment
 

Viewers also liked

2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars brief2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars brief
Madu Obiora
 
Mapping Global Value Chains: International Input-Output Table
Mapping Global Value Chains: International Input-Output TableMapping Global Value Chains: International Input-Output Table
Mapping Global Value Chains: International Input-Output Table
comexcr
 
Gereffi Gary Global Value Chains as a driver for upgrading and innovation CGGC
Gereffi Gary Global Value Chains as a driver for upgrading and innovation CGGCGereffi Gary Global Value Chains as a driver for upgrading and innovation CGGC
Gereffi Gary Global Value Chains as a driver for upgrading and innovation CGGC
FOMINDEL
 
Como hacer una buena presentación en power point
Como hacer una buena presentación en power pointComo hacer una buena presentación en power point
Como hacer una buena presentación en power point
carsanlosmejores
 

Viewers also liked (20)

2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars brief2012 logistics & supply chain seminars brief
2012 logistics & supply chain seminars brief
 
Supply Chain Strategy Assessment
Supply Chain Strategy AssessmentSupply Chain Strategy Assessment
Supply Chain Strategy Assessment
 
Mapping Global Value Chains: International Input-Output Table
Mapping Global Value Chains: International Input-Output TableMapping Global Value Chains: International Input-Output Table
Mapping Global Value Chains: International Input-Output Table
 
ValueMagics - a road map from cost to value
ValueMagics - a road map from cost to valueValueMagics - a road map from cost to value
ValueMagics - a road map from cost to value
 
Apnec10 electronics kong jeong_ok
Apnec10 electronics kong jeong_okApnec10 electronics kong jeong_ok
Apnec10 electronics kong jeong_ok
 
Shaping Commercial Diplomacy of the Future
Shaping Commercial Diplomacy of the FutureShaping Commercial Diplomacy of the Future
Shaping Commercial Diplomacy of the Future
 
Trends & Challenges of Operation Management by Asikur Rahman (Operation manag...
Trends & Challenges of Operation Management by Asikur Rahman (Operation manag...Trends & Challenges of Operation Management by Asikur Rahman (Operation manag...
Trends & Challenges of Operation Management by Asikur Rahman (Operation manag...
 
Supplier Risk Assessment
Supplier Risk AssessmentSupplier Risk Assessment
Supplier Risk Assessment
 
Know your suppliers? How can you manage supplier risk?
Know your suppliers? How can you manage supplier risk?Know your suppliers? How can you manage supplier risk?
Know your suppliers? How can you manage supplier risk?
 
What Every Procurement Professional Should Know About Supplier Risk Managemen...
What Every Procurement Professional Should Know About Supplier Risk Managemen...What Every Procurement Professional Should Know About Supplier Risk Managemen...
What Every Procurement Professional Should Know About Supplier Risk Managemen...
 
fidic-contracts
fidic-contractsfidic-contracts
fidic-contracts
 
Gereffi Gary Global Value Chains as a driver for upgrading and innovation CGGC
Gereffi Gary Global Value Chains as a driver for upgrading and innovation CGGCGereffi Gary Global Value Chains as a driver for upgrading and innovation CGGC
Gereffi Gary Global Value Chains as a driver for upgrading and innovation CGGC
 
E2E - Entenda os modelos de negócio End To End (E2E)
E2E - Entenda os modelos de negócio End To End (E2E)E2E - Entenda os modelos de negócio End To End (E2E)
E2E - Entenda os modelos de negócio End To End (E2E)
 
Como hacer una buena presentación en power point
Como hacer una buena presentación en power pointComo hacer una buena presentación en power point
Como hacer una buena presentación en power point
 
Fidic
FidicFidic
Fidic
 
Vice president supply chain - 90 day plan
Vice president supply chain - 90 day planVice president supply chain - 90 day plan
Vice president supply chain - 90 day plan
 
Impact Sourcing Conference Summary
Impact Sourcing Conference SummaryImpact Sourcing Conference Summary
Impact Sourcing Conference Summary
 
Public and private actions for shifting towards sustainable production of bee...
Public and private actions for shifting towards sustainable production of bee...Public and private actions for shifting towards sustainable production of bee...
Public and private actions for shifting towards sustainable production of bee...
 
Action on zero deforestation pledges the challenge of aligning public and pri...
Action on zero deforestation pledges the challenge of aligning public and pri...Action on zero deforestation pledges the challenge of aligning public and pri...
Action on zero deforestation pledges the challenge of aligning public and pri...
 
How business can tackle deforestation London 2015 conference
How business can tackle deforestation London 2015 conferenceHow business can tackle deforestation London 2015 conference
How business can tackle deforestation London 2015 conference
 

Similar to Supply Chain Risk Management

Vendor risk management 2013
Vendor risk management 2013Vendor risk management 2013
Vendor risk management 2013
Nidhi Gupta
 

Similar to Supply Chain Risk Management (20)

Innovation Global Supply Chain
Innovation Global Supply ChainInnovation Global Supply Chain
Innovation Global Supply Chain
 
Managing Today’s Supply Chain
Managing Today’s Supply ChainManaging Today’s Supply Chain
Managing Today’s Supply Chain
 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle Management
 
La gestión de la cadena de suministro en un entorno económico cambiante
La gestión de la cadena de suministro en un entorno económico cambianteLa gestión de la cadena de suministro en un entorno económico cambiante
La gestión de la cadena de suministro en un entorno económico cambiante
 
Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E Procurement
 
Creating a secure supply chain
Creating a secure supply  chainCreating a secure supply  chain
Creating a secure supply chain
 
Supply chain management ppt @ bec doms
Supply chain management ppt @ bec domsSupply chain management ppt @ bec doms
Supply chain management ppt @ bec doms
 
Supply Chain optimization & risks factors
Supply Chain optimization & risks factorsSupply Chain optimization & risks factors
Supply Chain optimization & risks factors
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Reverse Logistics
Reverse LogisticsReverse Logistics
Reverse Logistics
 
Succeeding in Tough Economic Times with Smart Manufacturing Solutions
Succeeding in Tough Economic Times with Smart Manufacturing SolutionsSucceeding in Tough Economic Times with Smart Manufacturing Solutions
Succeeding in Tough Economic Times with Smart Manufacturing Solutions
 
Chap02
Chap02Chap02
Chap02
 
Vendor risk management 2013
Vendor risk management 2013Vendor risk management 2013
Vendor risk management 2013
 
Vendor risk management 2013
Vendor risk management 2013Vendor risk management 2013
Vendor risk management 2013
 
Vendor risk management 2013
Vendor risk management 2013Vendor risk management 2013
Vendor risk management 2013
 
Vendor risk management 2013
Vendor risk management 2013Vendor risk management 2013
Vendor risk management 2013
 
Supplier Management- HICX Solutions
Supplier Management- HICX SolutionsSupplier Management- HICX Solutions
Supplier Management- HICX Solutions
 
Supply_sample
Supply_sampleSupply_sample
Supply_sample
 
Supply Sample
Supply SampleSupply Sample
Supply Sample
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)
 

More from Anand Subramaniam

More from Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 

Supply Chain Risk Management

  • 1. Supply Chain Risk Management Minimising Risk Exposure in Supply Chain Anand Subramaniam
  • 2.
  • 3.
  • 6.
  • 7. Risk Exposure – SC Network Design Top Pressures Driving Supply Risk Management 82% 79% 78% 77% 73% 70% 69% 59% 58% SC Disruption within past 24 mos Longer lead times Pressure from executives Customer pressures Global sourcing Lean/JIT initiatives Supply assurance outweighs cost Supply base reduction Regulatory pressures Transportation constraints 73% 20% 12% 10% 8% Supply Chain Price Fluctuations Labor Issues IT Systems Mgt Malfeasance 8% #1 Threat Factor To Revenue Source: Managing Business Risk 2006 & Beyond, FM Global & Harris / USA Today, 2006 Survey 602 Global CFOs / Financial Executives
  • 8. AMR Research 2008 on Risk Change in level of risk from 1 year ago
  • 9.
  • 10. AMR Research 2008 - SC Risk Mitigation 44% 33% 31% 29% 27% 42% 27% 10% 4% 10% 12% 5% 14% 10% Performance-based contracts with suppliers or service providers Increase in IT investment for better visibility across the supply chain Closer collaborative relations with trading partners Utilising modeling tools (optimisation, simulation) to be proactive about risk by conducting what-if analysis Outsourcing logistics function Dual/multi sourcing strategies and using redundant suppliers Outsourcing manufacturing function Top 10 methods used to mitigate risk Most successful method used to mitigate risk
  • 11. Supply Chain & Risk - Realities
  • 12. SCM Components.. Ideal World !! Store In-Stock Channel Design Network Rationalisation Flow of Merchandise Distribution Operations/ Transportation Planning, Buying, Allocation Supporting Infrastructure Right goods, right place, right time, right cost The optimum combination of facilities and transportation modes that achieve service targets The cost effective Distribution Channels at the lowest cost Synchronised flow of merchandise to optimise inventories and meet customer demand The most appropriate operational linkage between client and vendors Functions and processes consistent with vendor operating strengths and needs The most appropriate information systems and support areas to plan and manage the flow of goods strategy
  • 13.
  • 14.
  • 15. Risks – Managing Stakeholder … Supplier SC Disruption Capacity / Quality Supplier Performance Supplier Environment Financial Distress Product / Process innovation Relationship Regulatory Disaster Customer Environmental Volume / Product mix Brand / Reputation Data Sharing Product Liability Legal Liability Market Mix Disasters Quality Internal Environmental Legal / Financial Technical / Operational Staff Turnover /OH&S SC disruption history Capacity / Sourcing Quality / Delivery Spend Leverage Innovation
  • 16. Risk Management Realities… Insurance Not Purchased Political Risk Environmental Advertiser’s Liability Professional Liability E-Commerce Liability Certain lines of Products Patent Infringement Product recall Non-Owned Terrorism Liability Insurance Not Available War / Strike Reputational Terrorism Biological Nuclear / Radiation Regulatory Fines & Penalties Poor Business Judgment Supply Chain Interruption Loss of Market Share Breach of Contract Global Pandemic Fraud
  • 18. Exposure – External & Internal Drivers Environment Supply Demand Process Governance / Controls Risk Response / Contingency Exposure External Internal External Internal
  • 19.
  • 20.
  • 21.
  • 22. Risk Exposure in Managing…..
  • 24. Risks - Managing Competitive Pressures Requires a change in Business Model Serving localised customer with complex supply lines Demanding customers Changing market boundaries and new channels Aggressive global competition Industry consolidation and alliances Environmental and risk issues Stakeholder pressures Speed of technology change Shortening product life cycles Pressure on margins, growth, cost Supply & Demand Co-ordination Hyper – competition & Globalisation Compliance Green SCM Catastrophic events
  • 25. Risks - Managing End to End Networks Supply Chain Redesign New Materials Cooperative Development New Relationships New Processing Product Adaptation Integrated Solutions Key Process Improvement New Products Supply Chain Responsiveness Alternative Channels Cost to Serve New Sales Sales Leadership Strategies New Business Systems Suppliers Manufacturing Distribution Retailer Consumer Flow of information, products, services and financials Capture Buying Habits Product Development Distribution Efficiency Product Replenishment Order Fulfillment Marketing Strategy Business Development
  • 26. Risks - Managing SCM Performance Sell Product recall, service and quality issues can impact brand image High turnover coupled with poor training can result in serious customer service issues Plan Poorly designed products can result in future recalls Product complexity can create downstream execution issues Missed or lagging trends Design flaws & cycle time Source Globalisation & sourcing from emerging markets leads to product safety, quality, supply disruptions & monitoring issues, which Can impact customer perceptions Single / sole-sourcing creates failure points Deliver Consolidation of distribution and fulfillment creates risks - product theft, labour shortages / stoppages. Less resilient local hauling lanes create significant exposures within the last few miles of the delivery process Make Realigning and consolidating facilities creates risks – product rationalisation, labor disputes, stoppages etc. Outsourcing can create vulnerabilities that extend beyond the immediate business Service Fall in service levels (after Sales ), process returns, lack of spares etc can influence future buying behaviors brand image Lack of visibility across reverse logistics can impact top & bottom line Warranty failure can impact loyalty / image. Suppliers Manufacturing Distribution Retailer Consumer
  • 27. Risks - Managing Product / Information Flow Postponement Vendor managed inventory Cross docking Continuous replenishment Flexible automation Modularisation Mass customisation Quick response Efficient consumer response End to End Supply Chain Time-based logistics Extended warehouse Visibility Integrated business planning / Sales & Operations Planning Cloud based services: Managed Services, On-Demand, SaaS Sustainability & Green Supply Chain Closed-loop Supply Chain Execution & Supply Chain Planning Demand Driven Lean Supply Chain Transportation Management & Global Trade Management Convergence Continuous Monitoring & Control of Risks
  • 28. Risks - Managing SC Change Initiatives Supplier Rationalisation Flexible Manufacturing Strategies Cross- docking Activity- Based Costing CPFR Salesforce Planning Production Scheduling Inventory Planning Distribution Scheduling Integrated- Micro Marketing Customer-Focused Planning Vendors Inbound Logistics Manufacturing Transportation Warehousing Delivery Retailer Consumer Quick Response Forecasting EDI Category Management, Continuous Replenishment Net Landed Cost Palletisation, Bar Coding Vendor Managed Inventory Supply Chain Systems Selection and Implementation Promotion Planning Information, Finance & Product flows
  • 29.
  • 30. Risk Exposure - Managing Suppliers
  • 31.
  • 32.
  • 33. Root Cause Analysis Supplier Supply Chain Involuntary (bankruptcy) Voluntary (exit market) Business Exit Supplier Business Continuity Sole / Single Source Environmental Control Security Natural Disaster Building Contamination Inventory Handling & Managment Warehousing Poor RM Quality RM Out of Spec Contamination Inadequate Documentation Compliance Systems Process Procurement Raw Material Supply
  • 34. Risk Planning - Integration (People, Process & Systems)
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 41. Strategic Approach – Resilient SC Resilient Supply Chain Supply Chain (Re)Engineering Supply Chain Design Supply Chain Understanding Supply Base Strategy Supply Chain Collaboration Collaborative Planning Supply Chain Intelligence SC Risk Mngt Culture Agility Visibility Velocity Supply Chain Continuity Teams Board level responsibility Risk in decision making
  • 42. Risk Framework Strategy Execution Tactical Iterate & Improve
  • 43.
  • 44.
  • 45.
  • 46. Knowledge - Iteration & Improvement Lessons Learnt Capture Communicate Collaborate Continuously Improve
  • 47.
  • 48. Risk – Tools, Techniques, Checklists
  • 49. Risk Categories Relationship Relationship Supply Chain Disruption Human Resources Performance Supply Chain Performance Financial Health Environment SC Risk Category Quality, Delivery, Capability, Service Influence, Alignment, Information, Sharing Turnover, Union issues, Pay Position Market Power, Information Visibility, Concentration, Disruption Potential Size, Asset Utilisation, Capitalisation, Profitability 1 2 3 4 5 6 Market Dynamics, Mergers, Regulatory, Disasters, Transportation
  • 50. Questionnaire on SC Risk Issues
  • 51. Supply Chain Risk Barriers
  • 53. Risks - Demand, Supply, Control Etc.
  • 54. Risk - Scoring Results
  • 55. Risk – Scoring System Consequences 1. No direct effect on operating service level 2. Minor deterioration in operating service level 3. Definite reduction in operating service level 4. Serious deterioration in operating service level 5. Operating service level approaches zero Likelihood of occurrence E. Probability of once in many years D. Probability of once in many operating months C. Probability of once in some operating weeks B. Probability of weekly occurrence A. Probability of daily occurrence Likelihood of detection A. Detectability is very high B. C onsiderable warning of failure before occurrence C. Some warning of failure before occurrence D. Little warning of failure before occurrence E. Detectability is effectively zero
  • 56.
  • 57. Risk – Prioritised Consequence Likelihood 0 Tolerate Terminate Treat Transfer
  • 59. Cause & Effect Analysis Failure to Deliver on Time No Stock Available Lead-Time Too Short Carrier Performance Quality Problems Capacity Constraint Inflexible Systems Inadequate Communications Poor Scheduling Inadequate Supplier Management Materials Supply Problem Failure to Achieve Plan Forecasting Problems Poor Process Control
  • 60. Risk Control Matrix Key Process Number Process Risk Number Risk Control Objective Control Number Control Description Control Owner Process Narrative Control Category Control Type Primary/ Secondary Control Frequency Design Assessment
  • 61. Example – Contingency Risks How Long Can You Do Without? Impact of Doing Without? Vulnerabilities? Contingency in case of a disaster? Equipment (IT only) 5 days After five days no way to schedule production or track orders No UPS/generator, MD hardware, SPOF SME Use paper reports for 5 days then go manual for as many members as possible Facility 0 days No production, potential for bankruptcy, IT non-existent Metal building, flood zone, poor maintenance, no perimeter security, door lock broken Look for warehouse space, attempt to salvage equipment and restart operation, file bankruptcy Personnel 0 days Degraded operations, low service levels Too many SPOF Best effort shifting of available staff, temps Raw Materials 30 days before new deliveries None until on hand exhausted Single supplier relationship Search for alternative supplier Transportation System 30 days in 2 days out No supplies No deliveries Location, design of entrance None Utilities 0 hours/power 0 hours/water Extrusion shuts down, lines cleaned, waste collected and prepared for grinder, IT non-existent Single power feed, no generator or backup water supply None Vendors (Sourcing) 4 hours No call center Mercy of vendor Bring in-house
  • 62.
  • 63.