    Power Plant - Presentation Transcript

    1. POWER PLANT
      • COAL THERMAL PP
      • ANDY DESIGN: ANDYENGINE
      • 1/3 FUEL for SAME MW. Nor.Asp.
      • 1/3 CO2e , 2/3 CER
      • COAL FUEL 100 kg/MWh for 300 kg NOW
      • CO2e 233 kg for 699 kg / MWh NOW
      • COST 1 Mn$/MW
      • FUEL SAVED 200 kg/MWh ; $ 200 /T
      • COST 288,000 $/MW/Yr
    2. POWER PLANT
      • NOW DESIGN
      • CAPACITY 1000 MW
      • POWER 1.4 MnHP
      • Aspiration Normal
      • FUEL used 300 T/hr
      • COST 1000 Mn$
      • CO2e 700 T/hr
      • CO2e 5.04 MnT/Yr
      • ANDY DESIGN
      • CAPACITY 1000 MW
      • POWER 1.4 MnHP
      • Aspiration Normal
      • FUEL used 100 T/hr
      • COST 1000 Mn$
      • CO2e 233 T/hr
      • CO2e 1.68 MnT/Yr
      • CER 3.36 MnT/Yr
    3. ANDY ENGINE Nor.Asp
      • ALL FUEL- S. L . G
      • ROTARY ENGINE
      • COMBUSTION-INTERNAL/EXTERNAL
      • ROTARY ENGINE SIZE
      • . HP MW OD Thk
      • 1400 HP 1 MW 60 cm, 12 cm
      • 700,000 HP 500 MW 476 95
      • 1,400,000 HP 1000 MW 600 , 120
    4. POWER PLANT NEW
      • FUEL – COAL, LIGNITE, NAPHTHA, SULFER, ALL OIL, ALL GAS, NUCLEAR, Geo-Thermal,
      • RETROFIT for ENGINE ONLY 300,000 $
      • FLUE GAS ENGINE
      • NO BOILER, NO TURBINE
      • DIRECT ROTARY
      • 1000; 5000; 10,000; 100,000 MW
    5. PP INV. 200 Mn$
      • ANDY DESIGN
      • Vehicle Cost $ Prod # INV Prod $ Profit $
      • 500 MW 500 Mn 5 40 Mn 2500 Mn 150 Mn
      • 1000 MW 1000 Mn 3 40 Mn 3000 Mn 150 Mn
      • ENGINE 30K$ 5000 MW 20 Mn 150 Mn 20 Mn
      • LAND 400 a/c 50 MW 100 Mn$
      • 200 Mn$
      • RoI 320/200*100 = 160 %
      • M A APPAN, M E 45 Yrs EXPERT Mb.91 098404 63337
    SlideShare Zeitgeist 2009

    + andy appanandy appan Nominate

    custom

    66 views, 0 favs, 0 embeds more stats

    1/3 FUEL. 1/3 CO2e, 2/3 CER
    PPR$1/20KWH

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 66
      • 66 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 0
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories

    Tags