1. POWER PLANT
• COAL THERMAL PP
• ANDY DESIGN: ANDYENGINE
• 1/3 FUEL for SAME MW. Nor.Asp.
• 1/3 CO2e , 2/3 CER
• COAL FUEL 100 kg/MWh for 300 kg NOW
• CO2e 233 kg for 699 kg / MWh NOW
• COST 1 Mn$/MW
• FUEL SAVED 200 kg/MWh ; $ 200 /T
• COST 288,000 $/MW/Yr
2. POWER PLANT
• NOW DESIGN • ANDY DESIGN
• CAPACITY 1000 MW • CAPACITY 1000 MW
• POWER 1.4 MnHP • POWER 1.4 MnHP
• Aspiration Normal • Aspiration Normal
• FUEL used 300 T/hr • FUEL used 100 T/hr
• COST 1000 Mn$ • COST 1000 Mn$
• CO2e 700 T/hr • CO2e 233 T/hr
• CO2e 5.04 MnT/Yr • CO2e 1.68 MnT/Yr
• CER 3.36 MnT/Yr
3. ANDY ENGINE Nor.Asp
• ALL FUEL- S. L . G
• ROTARY ENGINE
• COMBUSTION-INTERNAL/EXTERNAL
• ROTARY ENGINE SIZE
• . HP MW OD Thk
• 1400 HP 1 MW 60 cm, 12 cm
• 700,000 HP 500 MW 476 95
• 1,400,000 HP 1000 MW 600 , 120
4. POWER PLANT NEW
• FUEL – COAL, LIGNITE, NAPHTHA,
SULFER, ALL OIL, ALL GAS, NUCLEAR,
Geo-Thermal,
• RETROFIT for ENGINE ONLY 300,000 $
• FLUE GAS ENGINE
• NO BOILER, NO TURBINE
• DIRECT ROTARY
• 1000; 5000; 10,000; 100,000 MW