1. ANDY TECHNOLOGY
NO CARBON
TRANSPORT, POWER PLANT
M/s AMARAPPAN TRANSPORTS ‘P’ Ltd
10 Alayamman 2nd Street, Madipakam,
Chennai-600091. INDIA
Mobile :+919840463337
No Carbon Transport
Automotive, Rail, Ship.
Electric drive, Air Motor are no
carbon power for automotive, rail.
Electric is usual drive but andy
bearing fit to it makes it to run at
2. double speed in auto,triple speed in
rail for same ton-hp.
Air motor is run on isothermally
compressed air by electric motor.
Air is compressed upto 3.21kg/sqcm
and stored in a tank.Andy engine is
the air motor. Road side recharge.
Air motor is economical than EV.
Compare ‘t-kmph/cost of energy/h’
Comparison Bike 300 kg, 60 kmph
vehicle HP cost of
energy/hr efficiency cost
1 bike 8 1 $ petrol 18 1000$
2 andy 4 1/6 $ petrol 108 900$
3 ev 2w 8 2.3 $ electricity 7.8 750$
4 air motor 4 1.5 $ electricity 12. 750$
ITEMS 2,4 run at 4hp for same ton-speed by bearing
3. NUCLEAR SHIPPING
Nuke power plant can be used for
Shipping 50,000GRT/330knt 1000MW
No propeller, no rudder.
Cost 7200 mn$
Nuke power plant can be used for
Sub-Marine Shipping. Hollow nose
30,000 GRT/ 330 knt 1000 MW
No propeller, no rudder. 4 D action
Cost 7500 mn$
N0 Carbon Power Plants
CSP,CPV,Nuke,Geothermal are inline.
No Boiler. No Turbine. Andy engine
Tapping wind energy is dangerous.
Air collects heat from hot source,
stored, fed to andy engine to spin gen
4. Concentration is a factor for CSP,
CPV Solar. Andy CF is 2-10,000 which
means 40 0 C can be concentrated to
80-400,000 0 C. Now CF is only 16 to
concentrate to 640 0 C
Cost 4 Mn$ / MW
CSP, CPV Solar Combination
CPV is better than PV by higher
electricity by PV panel. CPV can be on
with CSP concentrator. Air takesup
heat from sun rays,leaving cold rays
pass through transparent air coloumn,
to hit CPV panel. Cost 6 mn$ /MW
NUKE,Geothermal POWER PLANT
Air collects heat from hot
source, stored, fed to andy engine to
spin generator as in power plant
No Boiler. No Turbine
Cost 7 mn$/MW
5. SHIPPING
Nuke power plant can be used for
Shipping 50,000GRT/330knt 1000MW
No propeller, no rudder.
Cost 7200 mn$
Nuke power plant can be used for
Sub-Marine Shipping. Hollow nose
30,000 GRT/ 330 knt 1000 MW
No propeller, no rudder. 4 D action
Cost 7500 mn$
No Carbon Transport, Power Plant
COST OF TRIAL
ELECTRIC, AIR MOTOR TRANSPORT
ENGINE+BEARING
1.Bike 300 kg 120 kmph 2 no 15,000$
2.Car 2 T 200 kmph, 2 no 150,000$
3.Truck 15 T 200 kmph, 2 no 300,000$
4.Rail 1000 T 300 kmph, 2 no 30.0 mn$
6. NO CARBON POWER PLANT
5 CSP SOLAR /MW 5 mn$
6 CSP+CPV /MW 7 mn$
Land,shed,power,w/s machine etc 10 mn$
Help,consumables etc for 2 yrs 2.5 mn$
Total 55 mn$ 3 yrs