Your SlideShare is downloading. ×
King Street Station Update 4.27.11
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

King Street Station Update 4.27.11

1,529
views

Published on

Published in: Art & Photos, Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,529
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Phase 2A
    In this slide show:
    New Terrazzo Floor
    &
    Jackson Plaza Aerial Views
    April 27, 2011
  • 2. Future ticketing area gets new terrazzo floor.
  • 3. A Sellen worker moping out the dust to prep for the floor clear coat.
  • 4. The new terrazzo floor has a beautiful pattern.
  • 5. Marble walls installation progressed throughout the rest of the area under Jackson Plaza.
  • 6. An aerial view of the new Jackson Plaza. Photo by John Stamets.
  • 7. An eastward view of Jackson Plaza from King Street Center roof.
  • 8. The 12th floor clock tower balcony also provides an excellent view of Jackson Plaza.
  • 9. The cherry trees have beautiful blossoms each spring. The new trees bloom in planters on the soon to open Jackson Plaza.
  • 10. Wooden benches with stainless steel supporting trusses are installed around the perimeter of each planter to serve pedestrians.
  • 11. The large planter around the mechanical vault also has benches around its perimeter.
  • 12. A close-up view of the benches.
  • 13. A view of the western side of the station still under construction. Additional geothermal wells are being installed.
  • 14. The west side painted canopy awaits new roofing to match the rest of the station.
  • 15. Large red tanks on top of the new elevator on the 3rd floor help relieve air gaps in the geothermal well network.
  • 16. Crews drill more geothermal wells on the west side of the station.