071611 slideshow phase2a

5,945 views

Published on

King Street Station Restoration Project

Phase 2A
Geothermal wells and first floor mezzanine

Published in: Business, Technology
  • Be the first to comment

  • Be the first to like this

071611 slideshow phase2a

  1. 1. Phase 2A<br />In this slide show: <br />Geothermal wells and first floor mezzanine<br />July 16, 2011<br />
  2. 2. The additional geothermal wells on the west side installed and connected with the rest of the geothermal network under the plaza. <br />
  3. 3. The west side street repaved and painted with new Amtrak bus queuing boundaries.<br />
  4. 4. The new turn around system will improve Amtrak bus access. <br />
  5. 5. Original under-plaza geothermal wells on the left. New west side wells on the right. Both are now connected for operation. <br />
  6. 6. Grand stair terrazzo treads and rails mobilized onsite for installation. <br />
  7. 7. The new terrazzo treads are beautiful and match the original . <br />
  8. 8. Half the terrazzo treads installed at top of the stair. <br />
  9. 9. Original brass rails installed on the sides of the stairway. <br />
  10. 10. Ticketing desks are being installed. <br />
  11. 11. New ticketing counters match the original appearance. <br />
  12. 12. A view of the drawers behind the ticketing counters. <br />
  13. 13. Additional counters are also being installed behind the ticketing desks. <br />
  14. 14. The mezzanine stairs and lift are fully installed connecting the first floor Amtrak offices to additional space above. <br />
  15. 15. Carpet and lighting are in place for the mezzanine level. <br />
  16. 16. A skilled technician working with the ceiling in the mezzanine. <br />
  17. 17. Carpet installation for Amtrak break room. <br />
  18. 18. Dedicated restrooms for all Amtrak employees. <br />
  19. 19. A ceiling will be installed to cover these mechanicals under the plaza. <br />

×