King Street Station 7.27.10 update

  1. 1. King Street Station Rehabilitation Project Phase 2<br />July 27, 2010 Update<br />
  2. 2. Jackson plaza Rehabilitation on the left. <br />West side canopy being painted on to right. <br />
  3. 3. Alternate angle of Jackson Plaza. Asphalt top coat has been removed in preparation for demolition.<br />
  4. 4.
  5. 5. Jackson Plaza will be transformed from a parking lot into a pedestrian plaza. Future station access will also be available via the Grand staircase from Jackson Plaza. <br />
  6. 6.
  7. 7. Bird’s eye view from the tower.<br />
  8. 8. Steel brace frame installation<br />
  9. 9.
  10. 10. Column attached to Jackson Plaza supporting wall from below. <br />
  11. 11. Jackson Plaza supporting wall at center. <br />
  12. 12. Tunnel entrance below plaza<br />
  13. 13. 2nd floor original baggage area under demolition. <br />
  14. 14. Note the barrel vaulted walls. This type of construction is also found on the ceilings of upper station floors and clock tower.<br />
  15. 15. New joint utilities support column<br />
  16. 16. New temporally general contractor office area. <br />
  17. 17. Aside from the new glass window to view the terminal from above, much of the walls, truss and column are still original. <br />
  18. 18.
  19. 19. Drop ceiling removedfrom public waiting room to reveal original ornamental plaster ceiling.<br />
  20. 20. Second floor quarter round balcony is also revealed. <br />
  21. 21.
  22. 22. 2nd floor windows provide additional natural light for the station waiting area.<br />
  23. 23. 2nd Floor<br />
  24. 24. Original connecting stairs between 2nd and 3rd floors. <br />
  25. 25.
  26. 26.
  27. 27. 3rd floor <br />
  28. 28. 3rd floor new stairway <br />
  29. 29. Future elevator shaft on the left and stairway on the right. <br />

×