King Street Station Utilities Installation 2.20.11 slide show

  1. 1. Phase 2A<br />In this slide show: <br />Utilities Installation<br />February 22, 2011<br />
  2. 2. All HVAC duct ends are sealed before installation to maintain air sanitization according to LEED standards. <br />
  3. 3. HVAC ducts are first installed to the plaza open air mechanical vault. <br />
  4. 4. The network progressed southward to various locations. <br />
  5. 5. HVAC ducts shown here are connected to the nearly completed elevator. <br />
  6. 6. Other utilities network such as water and electricity are installed within a similar time frame. <br />
  7. 7. Large original windows on the east wall below the plaza are freshly restored and installed. <br />
  8. 8. Geothermal well pipes are installed to its mechanical network. This system will provide efficient heating and cooling for the entire building. <br />
  9. 9. The left side original terminal ceiling contrasts with the new plaza steel. <br />
  10. 10. Northeast corner of plaza still awaits structural beam and column. <br />
  11. 11. Open air mechanical vault shown from top of plaza. HVAC ducts are connected to this vault to extract clean air for the entire station. <br />
  12. 12. Concrete trench drains for the plaza were casted. The blankets shown help to insulate and cure the concrete. <br />
  13. 13. North side canopy trusses were also painted and restored.<br />

×