  1. 1. Phase 2A<br />In this slide show: <br />12th Floor Tower Lighting<br />July 28, 2011<br />
  2. 2. New lighting has been installed to improve illumination of the glass pyramid at the top of the tower. <br />
  3. 3. Another interior view of the glass pyramid. <br />
  4. 4. These reels raised and lowered the fluorescent lights that were used to illuminate the space before the new lighting replacement. <br />
  5. 5. These fixtures can be individually adjusted for the best angle of illumination. <br />
  6. 6. A view looking up the top of the tower shows the glass pyramid evenly lit. <br />
  7. 7.
  8. 8. New ticketing area <br />
  9. 9. A close-up view of the new ticket counter. <br />
  10. 10. Cabinets behind the ticketing counters are still under installation. <br />
  11. 11. Mezzanine break room for Amtrak employees <br />
  12. 12. New mezzanine restroom for Amtrak employees<br />
  13. 13. These refurbished windows provide natural lighting for both the station level and the new mezzanine level.<br />
  14. 14. Man lift for Amtrak’s new operations area<br />
  15. 15. A view inside the man lift. <br />
  16. 16. West side driveway repaved after the completion of geothermal wells installation. <br />
  17. 17. A view of the new bus/taxi queuing route from the station’s 12th floor balcony. <br />
  18. 18. Installation of new terrazzo treads for the Grand Stairs is almost complete. <br />
  19. 19. The New Jackson Plaza beautifully blend in with the city landscape. <br />

×