Group memberGROUP NO. 06
2011-TE-08
2011-TE-27
2011-TE-44
2011-TE-48
2011-TE-59
2011-TE-66
ADIL SOHAIL
FAKHAR IMAM
AQSA RIAZ
HIBA ARSHAD
MUHAMMAD ADNAN
JHANGEER IHSAN
Allama iqbal internation airport
Project Proposal
ā€¢ Walton airport was the main airport of lahore but
its handling capacity is less however, Walton was
unable to handle the large aircraft
ā€¢ Over the course of the next 25 years the demand
for air travel rose
ā€¢ government decided to build a new world class
airport to meet the growing needs for the future
and improve the facilities for passengers named
as Allama Iqbal International
Flights
ā€¢ All flights will be switched to the new airport
and the old airport will be passed onto the
military. However, during the Hajj period, the
old airport will be used as the Hajj Terminal by
the national carrier, PIA.
Project Description:
ā€¢ Site Location
ā€¢ It is located in Lahore, Punjab, Pakistan. The
airport currently has three terminals; the
Allama Iqbal terminal, the Hajj terminal, and a
cargo terminal. The airport is located about 15
kilometres from the centre of the city.
ā€¢ Its coordinates are 31į“¼31ā€™17ā€N, 74į“¼24ā€™09ā€E.
Project Management
ā€¢ Client
Client of Allama Iqbal International airport is
Civil Aviation Authority Pakistan
ā€¢ Cost of the project
estimated to be in the region of $200m
ā€¢ Consultant
NESPAK + Nayyar Ali Dada + Other Architects
ā€¢ Contractor
Allama Iqbal International Airport
facilities
ā€¢ Flights
ā€¢ Terminals
ā€¢ Bridges
ā€¢ Passengerā€™s Facilities
ā€¢ Passenger terminal
complex
Airport maintenance
facilities
ā€¢ Passenger
Accomondation
ā€¢ Runways
ā€¢ Commercial Important
Person Lounge
ā€¢ Lahore air cargo and
transport
Proposed development
Walkways
Passenger drop off
Primary check in
Ticket counter
Secondary security
check in
Departure lounge
Airline lounge
Arrivals route
Baggage claim hall
Customs
Parking
Screening
ā€¢ Pakistan environmental protection authority
(PEPA), require an Environmental Impact
Assessment (EIA), for every major project in
Pakistan having Physical, Biological, social and
economical impacts
Scooping
ā€¢ Land environment impacts
ā€¢ Water environmental impacts
ā€¢ Air environmental impact
ā€¢ Noise environmental impact
ā€¢ Biological environmental impact
ā€¢ Socio-Economic environmental impact
ā€¢ Solid waste
Land environment impacts
Activity
ā€¢ Earth work construction
ā€¢ Fuel storage and handling:
Impacts
ā€¢ Loss of vegetation
ā€¢ Change in elevation of the
area
ā€¢ Drainage Patterns
ā€¢ Land and air pollution
Water environmental impacts
Activity
ā€¢ Aircraft and vehicle washing
ā€¢ Toilets, laundries, cleaning
fluids
Impacts
ā€¢ Water pollution
ā€¢ Land pollution
ā€¢ Cause health problems
Air environmental impact
Activity
ā€¢ Aircraft emissions
ā€¢ Emissions from surface
vehicles
Impacts
ā€¢ The maximum incremental
Ground Level
Concentrations (GLCs) due
to the airport project for
PM, SO2, NOx, CO and HC
ā€¢ Pm, SO2, NOx, CO, HC
emissions to air, which
cause health hazards
Noise environmental impacts
Activity
ā€¢ Construction noise
ā€¢ Aircraft noise & Ground
noise
Impacts
ā€¢ Noise pollution
ā€¢ Effects hearing and nerves
system
ā€¢ Noise pollution
ā€¢ Effects hearing and nerves
system
Waste management impacts
Activity
In-flight
wastes
Scrap wastes
Catering
wastes
Aircraft
maintenance
wastes
Impacts
Water
pollution
Land
pollution
Land
pollution
by hard
metals
Water
pollution
Socio-Economic environmental
impacts
Activity
ā€¢ Development project
ā€¢ Vehicle emission
Impacts
ā€¢ loss of cultural heritage ,
economic and commercial
value of its surrounding
land
ā€¢ Ambient air
Mitigation measure
ā€¢ Land Environment
ā€¢ containment of any surface spillage monitored
ā€¢ Aircraft maintenance, sensitivity of the location
where activities are undertaken, and control of
runoff of potential contaminants, chemicals etc.
are to be properly implemented and reported.
ā€¢ Proper drainage systems
ā€¢ emergency containment in the event of a major
spill during monsoon season etc. are to be
provided.
Water environment
ā€¢ Storm water drains are to be built for
discharging storm water from the air-field to
avoid flooding /water logging in project area
during monsoon season / cloud bursts
Air Environment
ā€¢ Continuous Descent Approach and low power- low drop
techniques,
ā€¢ Design the airports to minimize aircraft holding and taxiing
times
ā€¢ Avoid Aircraft line up on the ground,
ā€¢ Avoiding unnecessary use of aircraft secondary power
units,
ā€¢ Taxiing management (e.g. towing and single engine taxi),
ā€¢ Increasing the use of public transport,
ā€¢ The use of electric vehicles or less polluting fuels
Noise Environment
ā€¢ The noise preferential routes which the aircraft
overfly the least populated areas after takeoff
and before landing are to be suggested.
ā€¢ Night flying policy to limit the number of flights
and amount of noise generated during this most
sensitive time is to be formulated
ā€¢ Mitigation measures could also include
introduction of higher landing fees for noisy
aircraft and for night landing in threshold cases
could be considered.
Waste Management
ā€¢ The wastes have to be managed after
segregation and identifying the method of
management. Recycling of wastes such as
paper, glass carried out.
ā€¢
Socio-Economic Environment
ā€¢ Air pollution control measures are to be
adopted. Noise control measures such as
noise absorbing building material in closed
buildings, noise barriers in Ground run bays,
are to be insured
ā€¢ Health camps both for employees and local
populations are to be conducted.
EIA repot for Airport
EIA repot for Airport
EIA repot for Airport

More Related Content

What's hot

Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams
Sodiq Rasaq
Ā 

What's hot (20)

Nirvana hills project-Case Study
Nirvana hills project-Case StudyNirvana hills project-Case Study
Nirvana hills project-Case Study
Ā 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
Ā 
Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
Ā 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
Ā 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
Ā 
Eia methodogies
Eia methodogiesEia methodogies
Eia methodogies
Ā 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
Ā 
Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams
Ā 
EIA Process
EIA ProcessEIA Process
EIA Process
Ā 
EIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOREIA OF DAM: DURGAWATI RESERVIOR
EIA OF DAM: DURGAWATI RESERVIOR
Ā 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
Ā 
EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
Ā 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
Ā 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
Ā 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
Ā 
Eia for railway project
Eia for railway projectEia for railway project
Eia for railway project
Ā 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
Ā 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
Ā 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment study
Ā 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
Ā 

Viewers also liked

Mitigation of environmental issues of Aviation
Mitigation of environmental issues of AviationMitigation of environmental issues of Aviation
Mitigation of environmental issues of Aviation
Akanksha Singh
Ā 
Airport master plan
Airport master planAirport master plan
Airport master plan
Aravind Raj
Ā 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airport
Vivekanand Prasad Moril
Ā 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Shubhranshu Upadhyay
Ā 
Presentation On Aviation
Presentation On AviationPresentation On Aviation
Presentation On Aviation
way2sharif
Ā 

Viewers also liked (12)

Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
Ā 
Floating airport
Floating airportFloating airport
Floating airport
Ā 
Mitigation of environmental issues of Aviation
Mitigation of environmental issues of AviationMitigation of environmental issues of Aviation
Mitigation of environmental issues of Aviation
Ā 
Airport master plan
Airport master planAirport master plan
Airport master plan
Ā 
Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (Nmia
Ā 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airport
Ā 
Risk Management for Airlines ā€“ Financial Risks
Risk Management for Airlines ā€“ Financial RisksRisk Management for Airlines ā€“ Financial Risks
Risk Management for Airlines ā€“ Financial Risks
Ā 
Airport lighting
Airport lightingAirport lighting
Airport lighting
Ā 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
Ā 
Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)
Ā 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Ā 
Presentation On Aviation
Presentation On AviationPresentation On Aviation
Presentation On Aviation
Ā 

Similar to EIA repot for Airport

AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
Anujyadav514462
Ā 
airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptx
cuhp21rdtt12
Ā 
literaturestudy-190217161742.pdf
literaturestudy-190217161742.pdfliteraturestudy-190217161742.pdf
literaturestudy-190217161742.pdf
BurkaDinka
Ā 

Similar to EIA repot for Airport (20)

Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Ā 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
Ā 
Airport
AirportAirport
Airport
Ā 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
Ā 
Sustainability OF AIR Transportation
Sustainability OF AIR Transportation Sustainability OF AIR Transportation
Sustainability OF AIR Transportation
Ā 
airports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxairports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptx
Ā 
airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptx
Ā 
Airports
AirportsAirports
Airports
Ā 
1.introduction
1.introduction1.introduction
1.introduction
Ā 
Incheon international airport
Incheon international airportIncheon international airport
Incheon international airport
Ā 
Compartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportCompartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliport
Ā 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
Ā 
literaturestudy-190217161742.pdf
literaturestudy-190217161742.pdfliteraturestudy-190217161742.pdf
literaturestudy-190217161742.pdf
Ā 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
Ā 
Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4
Ā 
Final Presentation STL UAM.pptx
Final Presentation STL UAM.pptxFinal Presentation STL UAM.pptx
Final Presentation STL UAM.pptx
Ā 
Airport engineering
Airport engineering Airport engineering
Airport engineering
Ā 
Airport engg.pptx
Airport  engg.pptxAirport  engg.pptx
Airport engg.pptx
Ā 
Airport Planning and Design
Airport Planning and Design Airport Planning and Design
Airport Planning and Design
Ā 
Aviation (2)1
Aviation (2)1Aviation (2)1
Aviation (2)1
Ā 

Recently uploaded

Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
amitlee9823
Ā 
Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...
lizamodels9
Ā 
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
lizamodels9
Ā 
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚EscortCall Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
dlhescort
Ā 
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
Ā 
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
lizamodels9
Ā 
Call Girls In Noida 959961āŠ¹3876 Independent Escort Service Noida
Call Girls In Noida 959961āŠ¹3876 Independent Escort Service NoidaCall Girls In Noida 959961āŠ¹3876 Independent Escort Service Noida
Call Girls In Noida 959961āŠ¹3876 Independent Escort Service Noida
dlhescort
Ā 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
Ā 
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
amitlee9823
Ā 

Recently uploaded (20)

Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Ā 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
Ā 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
Ā 
Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabadā¤ļø8448577510 āŠ¹Best Escorts Servi...
Ā 
Malegaon Call Girls Service ā˜Ž ļø82500ā€“77686 ā˜Žļø Enjoy 24/7 EscortĀ Service
Malegaon Call Girls Service ā˜Ž ļø82500ā€“77686 ā˜Žļø Enjoy 24/7 EscortĀ ServiceMalegaon Call Girls Service ā˜Ž ļø82500ā€“77686 ā˜Žļø Enjoy 24/7 EscortĀ Service
Malegaon Call Girls Service ā˜Ž ļø82500ā€“77686 ā˜Žļø Enjoy 24/7 EscortĀ Service
Ā 
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Ā 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
Ā 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
Ā 
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚EscortCall Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Call Girls In Nangloi Rly Metro ź§‚ā€¦ā€¦.95996 ā€¦ 13876 Enjoy ź§‚Escort
Ā 
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service šŸ“ž8868886958šŸ“ž JustšŸ“² Call Nihal Chandigarh Call Girl...
Ā 
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Ā 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
Ā 
Call Girls In Noida 959961āŠ¹3876 Independent Escort Service Noida
Call Girls In Noida 959961āŠ¹3876 Independent Escort Service NoidaCall Girls In Noida 959961āŠ¹3876 Independent Escort Service Noida
Call Girls In Noida 959961āŠ¹3876 Independent Escort Service Noida
Ā 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
Ā 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Ā 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
Ā 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
Ā 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Ā 
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Ā 
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
Ā 

EIA repot for Airport

  • 1.
  • 2. Group memberGROUP NO. 06 2011-TE-08 2011-TE-27 2011-TE-44 2011-TE-48 2011-TE-59 2011-TE-66 ADIL SOHAIL FAKHAR IMAM AQSA RIAZ HIBA ARSHAD MUHAMMAD ADNAN JHANGEER IHSAN
  • 4. Project Proposal ā€¢ Walton airport was the main airport of lahore but its handling capacity is less however, Walton was unable to handle the large aircraft ā€¢ Over the course of the next 25 years the demand for air travel rose ā€¢ government decided to build a new world class airport to meet the growing needs for the future and improve the facilities for passengers named as Allama Iqbal International
  • 5. Flights ā€¢ All flights will be switched to the new airport and the old airport will be passed onto the military. However, during the Hajj period, the old airport will be used as the Hajj Terminal by the national carrier, PIA.
  • 6. Project Description: ā€¢ Site Location ā€¢ It is located in Lahore, Punjab, Pakistan. The airport currently has three terminals; the Allama Iqbal terminal, the Hajj terminal, and a cargo terminal. The airport is located about 15 kilometres from the centre of the city. ā€¢ Its coordinates are 31į“¼31ā€™17ā€N, 74į“¼24ā€™09ā€E.
  • 7.
  • 8. Project Management ā€¢ Client Client of Allama Iqbal International airport is Civil Aviation Authority Pakistan ā€¢ Cost of the project estimated to be in the region of $200m ā€¢ Consultant NESPAK + Nayyar Ali Dada + Other Architects ā€¢ Contractor
  • 9. Allama Iqbal International Airport facilities ā€¢ Flights ā€¢ Terminals ā€¢ Bridges ā€¢ Passengerā€™s Facilities ā€¢ Passenger terminal complex Airport maintenance facilities ā€¢ Passenger Accomondation ā€¢ Runways ā€¢ Commercial Important Person Lounge ā€¢ Lahore air cargo and transport
  • 10. Proposed development Walkways Passenger drop off Primary check in Ticket counter Secondary security check in Departure lounge Airline lounge Arrivals route Baggage claim hall Customs Parking
  • 11. Screening ā€¢ Pakistan environmental protection authority (PEPA), require an Environmental Impact Assessment (EIA), for every major project in Pakistan having Physical, Biological, social and economical impacts
  • 12. Scooping ā€¢ Land environment impacts ā€¢ Water environmental impacts ā€¢ Air environmental impact ā€¢ Noise environmental impact ā€¢ Biological environmental impact ā€¢ Socio-Economic environmental impact ā€¢ Solid waste
  • 13. Land environment impacts Activity ā€¢ Earth work construction ā€¢ Fuel storage and handling: Impacts ā€¢ Loss of vegetation ā€¢ Change in elevation of the area ā€¢ Drainage Patterns ā€¢ Land and air pollution
  • 14. Water environmental impacts Activity ā€¢ Aircraft and vehicle washing ā€¢ Toilets, laundries, cleaning fluids Impacts ā€¢ Water pollution ā€¢ Land pollution ā€¢ Cause health problems
  • 15. Air environmental impact Activity ā€¢ Aircraft emissions ā€¢ Emissions from surface vehicles Impacts ā€¢ The maximum incremental Ground Level Concentrations (GLCs) due to the airport project for PM, SO2, NOx, CO and HC ā€¢ Pm, SO2, NOx, CO, HC emissions to air, which cause health hazards
  • 16. Noise environmental impacts Activity ā€¢ Construction noise ā€¢ Aircraft noise & Ground noise Impacts ā€¢ Noise pollution ā€¢ Effects hearing and nerves system ā€¢ Noise pollution ā€¢ Effects hearing and nerves system
  • 17. Waste management impacts Activity In-flight wastes Scrap wastes Catering wastes Aircraft maintenance wastes Impacts Water pollution Land pollution Land pollution by hard metals Water pollution
  • 18. Socio-Economic environmental impacts Activity ā€¢ Development project ā€¢ Vehicle emission Impacts ā€¢ loss of cultural heritage , economic and commercial value of its surrounding land ā€¢ Ambient air
  • 19. Mitigation measure ā€¢ Land Environment ā€¢ containment of any surface spillage monitored ā€¢ Aircraft maintenance, sensitivity of the location where activities are undertaken, and control of runoff of potential contaminants, chemicals etc. are to be properly implemented and reported. ā€¢ Proper drainage systems ā€¢ emergency containment in the event of a major spill during monsoon season etc. are to be provided.
  • 20.
  • 21. Water environment ā€¢ Storm water drains are to be built for discharging storm water from the air-field to avoid flooding /water logging in project area during monsoon season / cloud bursts
  • 22. Air Environment ā€¢ Continuous Descent Approach and low power- low drop techniques, ā€¢ Design the airports to minimize aircraft holding and taxiing times ā€¢ Avoid Aircraft line up on the ground, ā€¢ Avoiding unnecessary use of aircraft secondary power units, ā€¢ Taxiing management (e.g. towing and single engine taxi), ā€¢ Increasing the use of public transport, ā€¢ The use of electric vehicles or less polluting fuels
  • 23.
  • 24. Noise Environment ā€¢ The noise preferential routes which the aircraft overfly the least populated areas after takeoff and before landing are to be suggested. ā€¢ Night flying policy to limit the number of flights and amount of noise generated during this most sensitive time is to be formulated ā€¢ Mitigation measures could also include introduction of higher landing fees for noisy aircraft and for night landing in threshold cases could be considered.
  • 25.
  • 26. Waste Management ā€¢ The wastes have to be managed after segregation and identifying the method of management. Recycling of wastes such as paper, glass carried out. ā€¢
  • 27. Socio-Economic Environment ā€¢ Air pollution control measures are to be adopted. Noise control measures such as noise absorbing building material in closed buildings, noise barriers in Ground run bays, are to be insured ā€¢ Health camps both for employees and local populations are to be conducted.