1. SAMPLE INSULATION DETAILS FOR TEE ELBOW AND VALVE
SCALE 1:5
3D VIEW
SCALE 1:5
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
CLIENT
CONTRACTOR
REVISIONS TABLE
SYM. DESCRIPTION DATE APPROVED
GENERAL NOTES
US ARMY CORPS OF ENGINEER AIR FORCE
AL UDEID AIR BASE QATAR
DRAWING NAME DRAWING NO.
SCALE.
SIZE.
A 3
CONSTR. CONTR. NO.
DESIGNED BY:
REV.
CHECKED BY
WAFIK R. ZAKHARY
1
SHEET DATE
MIDDLE EAST DISTRICT
INSULATION SYSTEM
(ELBOW - TEE - VALVE) MS1002
1 OF 1
AS SHOWN
MAR
2014
TACTICAL RAMP & VEHICLE
MAINTENANCE FACILITY
WZ
ELBOW INSULATION DETAIL
INSULATION TO BE CUT AT A 45 DEGREE ANGLE.
THE JOINT TO BE COVERED WITH THE FSK VAPOUR BARRIER.
45
45.0
45.0
TEE INSULATION DETAIL
VALVE INSULATION DETAIL
AN OPENING TO BE MADE TO ALLOW
ONLY THE VALVE STEM TO GO OUT.
KIMMCO RIGID PIPE INSULATION
WITH FSK FACING
83
33
83
33
42
NOTES:
1- INSULATION SECTIONS TO BE CUT UNIFROMALY
WITH SHARP TOOL IN ORDER TO INSURE PROPER
MATING BET. THE 2 SECTIONS MINIMIZING THE AIR
GAPS.
2- LOW VOC WATER AND HEAT RESISTANT CR
BASED DUCT LINER & INSULATION ADHESIVE. TO BE
APPLIED ON THE PIPES AND FITTINGS.
3- JOINTS TO BE FULLY COVERED WITH FSK TAPE
(VAPOUR BARRIER).