SlideShare a Scribd company logo
1 of 28
Project Management Plan
                                                        <Project Name>
                                                                   Document ID:
                                                                     Version:
                                                                   Release Date:




                                                                 www.simplilearn.com




                                                                   Copyright Simplilearn

This document is the property of Simplilearn, and its contents are confidential to Simplilearn Reproduction of the materials contained herein, in part or full
                                        in any form by anyone, without the permission of Simplilearn is prohibited.
Project Management Plan



                                      Document Information

 Author

 Reviewer

 Approver



                                         Revision History

      Date              Version   Section Changed        Change Description          Author




Strictly Confidential                          Version 1.0                    Page 2 of 28
Project Management Plan


                                                                 Index
                                                       Table of Contents

1 Purpose..........................................................................................................................6

2 Scope.............................................................................................................................6

3 Audience .......................................................................................................................7

4 References.....................................................................................................................7

5 Glossary ........................................................................................................................7

5.1 Acronyms...................................................................................................................7
5.1.1 Definitions ..........................................................................................................................7

6 Process..........................................................................................................................7

7 Open Issues – While Writing Document Only..........................................................8

8 Project Introduction......................................................................................................8

8.1 Project Overview........................................................................................................8
8.2 Project Description, Scope & Objectives...................................................................9
8.2.1 Project Description..............................................................................................................9
8.2.2 Project Scope...................................................................................................................10
8.2.3 Project Objectives.............................................................................................................10
8.3 Project Environment................................................................................................10
8.3.1 Development Environment................................................................................................10
8.3.2 Maintenance Environment................................................................................................10
8.4 Target Implementation Environment.......................................................................10
8.5 Project Deliverables.................................................................................................11
8.6 Client Contact Details..............................................................................................11
8.7 Reference Material..................................................................................................11
8.8 Project Terminology, Acronyms and Definitions......................................................12
8.9 Referred Project Database & Library......................................................................12

9 Project Organization...................................................................................................13

9.1 Organizational Structure .........................................................................................13
9.2      Organizational Structure.........................................................................................13
9.3 Problems faced in the Current System ...................................................................14
Strictly Confidential                                              Version 1.0                                       Page 3 of 28
Project Management Plan

10 Project Control..........................................................................................................14

10.1 Project Management Goals...................................................................................14
10.2 Assumptions, Dependencies & Constraints .........................................................14
10.2.1 Assumptions ..................................................................................................................14
10.2.2 Dependencies.................................................................................................................15
10.2.3 Constraints......................................................................................................................15
10.3 Information Gathering & Project reporting.............................................................15
10.3.1 Reporting Mechanisms...................................................................................................15
10.3.2 Monitoring & Tracking.....................................................................................................16
10.3.3 Meetings.........................................................................................................................16
10.4 External Communication and Communication Protocol........................................17
10.5 Update of Project Plan...........................................................................................17
10.6 Risk Management Plan.........................................................................................17
10.7 Configuration Management...................................................................................18
10.7.1 Project Configuration Items and SCM Schedule.............................................................18
10.7.2 Naming Conventions.......................................................................................................19
10.7.3 Version Number Scheme................................................................................................19
10.7.4 Controlled Software libraries...........................................................................................19
10.7.5 Library backup strategy...................................................................................................20
10.7.6 Procedure for the storage of documents and magnetic media........................................20
10.7.7 Procedure for retrieval and reproduction of controlled items from the library..................20
10.8 Change Management Procedure..........................................................................20
10.9 Configuration Status reporting...............................................................................21
10.10 Project Audit Schedule........................................................................................21

11 Resource Plan...........................................................................................................23

11.1 Person Power........................................................................................................23
11.2 Training..................................................................................................................23
11.3 Hardware...............................................................................................................23
11.4 Software.................................................................................................................24
11.5 Other resources.....................................................................................................24
11.6 Budget....................................................................................................................24

12 Simplilearn Obligations............................................................................................24

12.1 Simplilearn Activities..............................................................................................24
12.2 Simplilearn Supplied product handling..................................................................25

Strictly Confidential                                             Version 1.0                                     Page 4 of 28
Project Management Plan

13 Verification & Validation..........................................................................................25

13.1 Review Plan...........................................................................................................25
13.1.1 Artifact Review Strategy..................................................................................................25
13.1.2 Artifact Approval Strategy...............................................................................................26
13.1.3 Artifact Approval Criteria.................................................................................................26
13.2 Software Quality Assurance Plan..........................................................................26
13.2.1 Test Approval Strategy...................................................................................................26
13.3 Test Strategy Overview.........................................................................................27

14 Quality Recording Handling....................................................................................27

14.1 Review Record storage & Handling......................................................................27
15 Document reviews and approvals..........................................................................27

15.1 Document Reviewers.............................................................................................27
15.2 Additional recipients of the document ..................................................................28
15.3 Document Approvers.............................................................................................28




Strictly Confidential                                          Version 1.0                                   Page 5 of 28
Project Management Plan



1 Purpose
<IMPORTANT: The comments in ORANGE colour and in ITALICS are meant for author’s
attention. Please delete all the comments, including this, before releasing the document.>
 •    What purpose does the document serve?
 •    Why is the document useful to people who will read it?
 •    Describe in this section the aims the author had in writing the document
 •    Are there any objectives specific to the project / document that need to be made clear to
      facilitate the success of the project?
 •    It may be beneficial to take a look at the list below and add / delete objectives, as appropriate…
e.g. The objective of this document are to establish and identify:
•    A complete plan for managing the project
•    all tasks required to successfully complete the project
•    project reporting mechanisms
•    responsibilities
•    risks
•    etc etc
Prior to obtaining the approval of this document a formal review should take place to ensure the
completeness and correctness of the plan.
If, following approval of this document and the base-lining of requirements, amendments to the plan
are deemed necessary, changes may be introduced via the change management process.
An updated version of the document must be created to reflect the changes introduced.
 •    How will this document be used?
 •    Who uses it and how?
e.g. The document will be used for the following purposes:
•    The Project Manager will use it in the plan, control and monitor later phases of the project
•    The Simplilearn Project Manager will use it to identify his responsibilities
•    The Simplilearn Users will use it to identify their involvement and responsibilities
•    Simplilearn board will use it to understand the scope of the project and to monitor progress
     against the plans
•    The Project Office will use it to create a project plan



2 Scope
 •    What is the scope of the document?
 •    Are there any reasons to believe that not specifying something may cause confusion, or lead to
      claims that it was “so obvious” that it need not be stated?

•    Have there been any problems with the client, or areas of contention or confusion, that mean a
     clear statement on the exclusions from the project or requirements should also be stated here?
Strictly Confidential                                 Version 1.0                           Page 6 of 28
Project Management Plan

•     Ambiguities can be avoided by stating the scope here!
•     Are there any similar requirements that are not part of this project, but which the user might think
      are?
e.g. The scope of this document is the overall scope of the project Project Name, Project Code
1234.



3 Audience

 •     Include the likely audience of the Requirements [add to or delete from the following list, as
       appropriate
          The intended audience of this document is:
•     Simplilearn Program Manager
•     Simplilearn CEO
•     Simplilearn Project Manager
•     Project Office



4 References
< References>

5 Glossary

5.1     Acronyms

              Acronym                                                Description



5.1.1     Definitions

                Term                                                  Definition




6 Process
 •     What is the agreed process for developing this document and obtaining its approval?
 •     What are the steps if change is required?
    1. The Project Manager drafts this document.

    2. Draft versions (numbered incrementally from version 0.1) will be written for informal review and
       circulated to participants in the requirements analysis phase.


Strictly Confidential                                 Version 1.0                            Page 7 of 28
Project Management Plan

    3. A formal review will be made of version 1.0D1 of the document. “D1” will indicate that it is the
       first draft of the final version. If amendments are made before approval, then the number must
       incremented for version control purposes.

    4. When all parties agree that all necessary and relevant information is recorded in the document,
       version 1.0 will be distributed for approval by the Simplilearn Program Manager, Project
       Manager. This version will represent the baseline project plan.

    5. Changes to plan will result in the document being updated, given an incremental version
       number (e.g. version 1.1) and approved once again. Changes to the document must be clearly
       marked in the margin and summarized in the document history.

    6. The document, once approved, will be stored in an appropriately named project folder.
•     All contributors are working towards the success of the project




7 Open Issues – While Writing Document Only

 •     This is an author aid whilst writing the document
 •     Are there any points that still need to be cleared up?
 •     Is there any information that is outstanding, which needs to be provided?
 •     A more complete open issue log with status, due completion date, name of person assigned to
       resolve the issue may be kept elsewhere, if deemed appropriate.

The following open issues must be clarified prior to the requirements being deemed complete:

ISSUE ID     RAISED BY         DATE               DESCRIPTION OF OPEN ISSUE




8 Project Introduction

8.1     Project Overview

•     Fill in the table below, so that the gaps (the white boxes) are completed
•     Enter an “x” into the relevant “Project Type” and “Commercial Terms” boxes
•     Do not leave blanks
The table below provides an overview of the project:




Strictly Confidential                                 Version 1.0                           Page 8 of 28
Project Management Plan

PROJECT ID
PROJECT NAME
CLIENT ORGANIZATION (NAME & ADDRESS)
CLIENT CONTACT (NAME & ADDRESS)
PROJECT TYPE                                         [   ] Full Development
                                                     [   ] Part Development
                                                     [   ] Migration
                                                     [   ] Enhancement
                                                     [   ] Maintenance/ Support
                                                     [   ] Any Other ________________
APPLICATION AREA DESCRIPTION
(E.G., INDUSTRY AND FUNCTIONAL AREAS)
PLATFORM/ TECHNOLOGY DESCRIPTION
(OPERATING SYSTEM, DATABASE, LANGUAGE, FRONT-
END, ETC.)
COMMERCIAL TERMS                                     [ ] Time & Material
                                                     [ ] Turn Key
                                                     [ ] Internally sponsored
START DATE
END DATE
TOTAL ESTIMATED CALENDAR DAYS                        % VARIANCE THRESHOLD
TOTAL ESTIMATED SIZE                                 % VARIANCE THRESHOLD
TOTAL ESTIMATED EFFORT                               % VARIANCE THRESHOLD
TOTAL BUDGET                                         % VARIANCE THRESHOLD

Explicit corrective actions will be identified and tracked once the thresholds are crossed.


8.2     Project Description, Scope & Objectives

 •    Briefly describe the project and what it is, in terms of type of project (e.g. full development or
      migration)
 •    What is the nature of the work being undertaken?
 •    Provide a reference to the proposal and contract
 •    What are the objectives of the project?
 •    What are the characteristics of the project?
 •    What is the scope of the project?

•     What is excluded from scope?
•     Where can further details be found?
This section provides a summary over of the project in text:



8.2.1    Project Description

Add text here….
e.g. This project is a full development project to develop a set of processes and guidelines for
software development by Simplilearn.




Strictly Confidential                                    Version 1.0                          Page 9 of 28
Project Management Plan

8.2.2    Project Scope

Add text here….
e.g. The scope of this project to develop the processes and support documentation that will be used
by Simplilearn when developing software.

The scope does not include documentation for any of the potential software development
methodologies other than the waterfall method.

The proposal and contract for this project may be referred to for additional detail (see above,
Reference Documents).

The service levels being worked to in this project are described in the document XYZ.


8.2.3    Project Objectives
Add text here….
e.g. This objective of this project is to deliver a fully documented set of processes for the development
lifecycle, plus support documentation, in a clearly comprehensible format and style.



8.3     Project Environment

 •    Describe the development environment (in terms of hardware configuration, operating systems
      and other software systems)
 •    Describe the maintenance environment (in terms of hardware configuration, operating systems
      and other software systems)
This section describes the environment, in terms of combination of hardware, software and operating
system


8.3.1    Development Environment
Add text here….
e.g. The x system will be running on a x hardware with an x v1.0 operating system.


8.3.2    Maintenance Environment

Add text here….
e.g. The x system will be running on a x hardware with an x v1.0 operating system


8.4     Target Implementation Environment

 •    Describe the environment where the system will be finally installed and operated
 •    Which hardware will be used?
 •    Which Operating System (with version numbers)?
 •    Which other software systems will be run concurrently?
Strictly Confidential                               Version 1.0                           Page 10 of 28
Project Management Plan

 •       Add a diagram of the environment if it is likely to add value and clarity
Add text / diagrams here…
e.g. The software to be developed will be implemented in an environment running on x hardware with
an x v1.0 operating system, and will be running concurrently with x.


8.5       Project Deliverables

 •       Under deliverable specify the items to be delivered as part of the project (typical deliverables
         are Requirements Analysis document, High-Level Design document, Source-code, User and
         Operations Manual, etc.). All artifacts to be delivered in the project must be listed here.
 •       How and to where will they be delivered? (Media and Location)
 •       How many will be delivered?
 •       When will they be delivered? (see committed date)
The following table shows a complete list of deliverable to delivered as part of this project:

     #       DELIVERABLE               MEDIA & LOCATION                         QTY     PLAN     ACTUAL
                                                                                        DATE     DATE




8.6       Client Contact Details

 •       Provide the:
 •       Client name
 •       contact persons for this project and their roles
 •       the address, phone, fax and e-mails to contact them
The client for this project is <Client Name>.

The key single point of contact for this project at <Client> is:
PROJECT MANAGER
LOCATION
TELEPHONE NUMBER
MOBILE TELEPHONE NUMBER
FAX NUMBER
E-MAIL ADDRESS

If the Simplilearn SPOC cannot be reached the contact person is:
DEPUTY PROJECT MANAGER
LOCATION
TELEPHONE NUMBER
MOBILE TELEPHONE NUMBER
FAX NUMBER
E-MAIL ADDRESS


8.7       Reference Material


Strictly Confidential                                     Version 1.0                          Page 11 of 28
Project Management Plan

    •   List all documents and other information sources referenced in this plan (state version number
        and location)
    •   Examples of documents referred to are; Project CM Plan, Requirements Analysis document,
        User and Operations Manual, Contract, Proposals, Project's Defined Process.
    •   What is the title?
    •   Where is it located?
    •   Who is the author?
    •   Is it just for information?
    •   If it is referenced later in the document what reference ID will it have?
    •   Enter them into the table below.
The table below references all information sources used in establishing this Project Management
Plan:

REF_ID         TITLE                  AUTHOR                 LOCATION
1              The Title              ABD                    Folder




8.8      Project Terminology, Acronyms and Definitions

    •   What terms have you used in writing this document that may not be immediately
        understandable to all of the intended readers?
    •   Have you used technical terms that may need to be explained (defined) to other people?
    •   Are there any acronyms that need to be written in full, to ensure they are understood?
    •   It is easier to include any terms that you feel may need to be explained pro-actively than to wait
        for somebody to ask – or worse; to have the project fail because there was a misunderstanding
        over the terms used!
    •   Add all such terms in the table below


The following table includes all acronyms and terminology to be used in the project, along with an
explanation in non-technical terms:

TERM                               EXPLANATION
PM                                 Project Manager
SPOC                               Single Point of Contact




8.9      Referred Project Database & Library

    •   List the documents and data used from the Project Database and Library.
    •   Fill out the table below
The following table includes all items referenced from the project database and library, along with a
description of how it was used:


Strictly Confidential                                            Version 1.0                 Page 12 of 28
Project Management Plan

     #       PROJECT AND DOCUMENT REFERENCED FROM THE PROJECT              HOW THE DOCUMENT WAS USEFUL IN PROJECT
             DATABASE AND LIBRARY                                          PLANNING




9 Project Organization

9.1       Organizational Structure

This section outlines the organization of the project.
 •       Describe the project organization structure
 •       Describe the internal management structure
 •       What are the organizational boundaries?
 •       What are the communication interfaces
 •       Describe / show reporting relationships
 •       Define individual responsibilities for the various project elements
 •       If the project has a maintenance component, also specify the maintenance team composition
         and organization for the maintenance activities.
 •       Describes the roles and responsibilities for each team member
 •       Add a org-diagram for clarity, if possible
Add text here…eg:
The organizational structure of the project is…
The internal management structure is…
Simplilearn team members will report only to the Simplilearn Project Manager. <Client> team
members will report only to the <Client> Project Manager.
The single point of contact between Simplilearn and <Client> is over the Project Managers.


9.2         Organizational Structure

 •       Identify the person fulfilling a particular role.
 •       Typical roles are project manager, analysts/ designers, programmers, configuration controller,
         PQE, etc.
The following table identifies all the roles required for the project and the individuals who are
responsible for the role and activities.




Strictly Confidential                                        Version 1.0                             Page 13 of 28
Project Management Plan

ROLE                              RESPONSIBLE PERSON                   BACK-UP PERSON




9.3     Problems faced in the Current System

 •     Describe the administrative and managerial boundaries between the project and external
       entities.
 •     Examples of external entities are client, the Quality Group, Business Development Group, etc.?
 •     Fill out the table below
The table below describes the administrative and managerial boundaries between the project and
external entities:

EXTERNAL ENTITY                   RELATIONSHIP/ RESPONSIBILITIES FOR PROJECT




10 Project Control

10.1 Project Management Goals

 •     Describe the goals and relative priorities among quality, schedules, requirements, and budget
       for the project
 •     Typical goals are completion within time and cost, and meeting required quality.
Add text…
e.g. The project must be completed in time and cost, while meeting the required quality.
The quality of the project will be measured by x.



10.2 Assumptions, Dependencies & Constraints

 •     State the assumptions on which the project is based
 •     State the external events the project is dependent on (e.g. specify major events like acquisition
       of required software/ hardware, recruitment etc., which are critical to the success of the project )
 •     State the constraints under which the project is to be executed.



10.2.1 Assumptions

The project is based on the following assumptions:

Strictly Confidential                                   Version 1.0                          Page 14 of 28
Project Management Plan

#    DESCRIPTION OF ASSUMPTION                          VALIDATION PHASE      IMPACT OF POSSIBLE
                                                                              VIOLATION




10.2.2 Dependencies

The project has the following dependencies:

#         Item to be               Provided    Provided       Acceptance         Planned      Actual
          provided                 By          To             Criteria           Date         Date




DEPENDENCY ID                    DESCRIPTION OF DEPENDENCY




10.2.3 Constraints

The following constraints exist:

#    DESCRIPTION OF CONSTRAINT                          VALIDATION PHASE      IMPACT OF POSSIBLE
                                                                              VIOLATION




10.3 Information Gathering & Project reporting

 •   Identify the implications on security of the required changes
 •   Outline and describe the required level of security
 •   If appropriate, describe any specific tools that need to be present in order to achieve the desired
     level of security. These can include firewalls, proxy servers, or monitoring devices
 •   What would be the potential impact of a security breakdown?
 •   What are examples of typical misuse?
Add text here…


10.3.1 Reporting Mechanisms

 •   Describe the reporting mechanism and report formats for the Project Manager to gather
     information from project team members.
 •   Define the reporting to be done by the Project Manager to the Group Manager and the client.
Strictly Confidential                                Version 1.0                          Page 15 of 28
Project Management Plan

 •   Include/ refer to reporting to be done for configuration management and quality assurance
     activities.
 •   For each reporting requirement define:
 •   Who has to generate the report
 •   The recipients of the report
 •   Format and contents of the report
 •   Frequency of the reporting
 •   Mode of reporting (on-line/ hardcopy).
 •   Define how the Project Manager shall use the information to update the project status – this
     may be on a Gantt chart/ spreadsheet, or table or using a project management software
     package, etc
 •   Describe how the Project Manager will use the updated project information to understand the
     current status and re-plan the project.
Add text here…

The following reports will be created during the course of the project:
REPORT TYPE     GENERATED BY GIVEN TO            FORMAT &           METHOD          FREQUENCY
                                                 CONTENT
Weekly          PM                <Client>       Predefined PPT Online              Weekly
Status Report                                    Format
                                                 • Project
                                                     Status
                                                 • Key
                                                     Activities
                                                 • Next Steps




10.3.2 Monitoring & Tracking

 •   Include the reporting required for monitoring and tracking maintenance activities.
 •   This can include meetings and the use of client call reports, change request status and time
     sheets as input.


10.3.3 Meetings

 •   Define the meetings that shall be held as part of project management. For each meeting, define:
 •   Attendees
 •   Coordinator
 •   Typical topics to be discussed
 •   Frequency
 •   Location
The following regular meetings will be held as part of the project:


Strictly Confidential                               Version 1.0                           Page 16 of 28
Project Management Plan

MEETING TYPE     ATTENDEES         CO-ORDINATOR      TOPICS TO        FREQUENCY         LOCATION
                                                     DISCUSS
Weekly           All               PM                Progress         Weekly            Simplilearn
Progress         Simplilearn                         Problems
/Team            Team                                Issues
Meeting          members                             Next Steps




10.4 External Communication and Communication Protocol

 •   List all Communication between Simplilearn and <Client>, plus the responsible people
The following table lists all agreed communication between Simplilearn and <Client> and the
responsible people:
e.g.:
TYPE OF COMMUNICATION                SIMPLILEARN PERSON RESPONSIBLE  <CLIENT> PERSON RESPONSIBLE
Regular project status
Technical clarifications
User requirements clarifications
Commercial issues
Escalated issues
…..
.....


10.5 Update of Project Plan

 •   Define the process to be used to review the updated plan, and any authorization for a new plan.
 •   For cases where the changed plan involves a slippage in cost or schedule, define the process
     used to obtain management approval and document it.
E.g. The process to review an update of the project plan is as follows:
1. X
2. Y
3. Z
The authorization process of a new version of the project plan is as follows:
1. X
2. Y
3. Z

If slippage to the project timeline or cost escalation is involved due to a change in the plan then this
must be reported to X and Y in the form of X & Y, stating the reasons why and why it is unavoidable.


10.6 Risk Management Plan

 •   Identify and assess risk factors (such as contractual risk, technological risk, risk due to size and
     complexity of the project, risk in recruitment, training and risks in achieving client acceptance of
     the project)
 •   For all the risks that are identified and being planned for tabulate the risks, their probability,
     severity, possible actions to mitigate the risk, the priority, etc.


Strictly Confidential                                 Version 1.0                             Page 17 of 28
Project Management Plan

 •     Define the frequency for monitoring the risks and performing fresh risk analysis. Define the
       threshold for initiating contingency action, and for escalation to senior management and client
 •     Create a link to the Risk Management Plan spreadsheet
The following risks have been identified and logged, along with contingency plans:


10.7 Configuration Management


10.7.1 Project Configuration Items and SCM Schedule

 •     List by phase the items that will be produced in the project
 •     Under Baseline state the version number that will be taken as the baseline
 •     Under Configuration items list all items to be produced as critical to the project success
 •     Phase – list the project phase wherein the item is produced
 •     Under acceptance criteria list what needs to be done to accept the item (e.g. review, review and
       approval)
 •     Under approval authority list who approves
 •     Under planned and actual date, list the dates the items are planned and then produced
 The following items are required to be produced in this project:
BASELINE         CONFIGRATION ITEM    PHASE         ACCEPTANCE        APPROVAL       PLANNED        ACTUAL
                                                    CRITERIA          AUTHORITY      DATE           DATE
CUSTOMER SUPPLIED ITEMS
V1.0             • Business User Planning           Review            PM
                    Requirements
                 • Functional
                    Requirements
                 • Technical
                    Requirements


PROJECT SPECIFIC ITEMS
V1.0              Functional design    Pre-Project    Approval        Client
                  Specifications,                     (Not for LLD
                  LLD                                 Specification
                  Specifications,                     s)
                  Prototype
V1.0              Code                 Planning       Fully Tested    PM/QM
                                                      Code

V1.0             Functional design     Design         Approval        Client
                 Specifications,                      (Not for LLD
                 LLD                                  Specification
                 Specifications,                      s)
                 Prototype
V1.0             Code                  Developmen Fully Tested        PM/QM
                                       t          Code




Strictly Confidential                                 Version 1.0                              Page 18 of 28
Project Management Plan

BASELINE         CONFIGRATION ITEM     PHASE             ACCEPTANCE    APPROVAL     PLANNED         ACTUAL
                                                         CRITERIA      AUTHORITY    DATE            DATE
V1.0             SIT Test Plan         Testing
                 ST Test Plan
                 Acceptance Test
                 Plan
V1.0                                   Handover
V1.0             Project Closure       Project
                 Report                Closure


10.7.2 Naming Conventions

 •     Specify the naming conventions to be applied for all documents in the project
 •     Specify the naming convention to be applied for all technical items to be produced in the project
The following naming conventions have been adopted:
CONFIGURATION ITEM                              NAMING CONVENTION




10.7.3 Version Number Scheme

 •     Specify the numbering conventions to be applied for all documents in the project
 •     Specify the numbering conventions to be applied for all technical items to be produced in the
       project
The following numbering conventions for configuration items have been adopted:
• Version Number of configured items will start from 1.0
• Each change to a component of a CI increases Version Number by 10%, i.e. 0.1
• When Version Number of the component exceeds 0.9 then the version increases to next higher,
   i.e. 2.0
• Within each CI if the components change by over 50% then the CI Version Number changes by
   1.0.
• Work in progress version is 0.1.


10.7.4 Controlled Software libraries

 •     Specify the software libraries required for project success
 •     To identify the purpose of each of the libraries
 •     To define the location of each of the libraries
 •     To specify the restrictions (i.e. Create, Read, Update, Delete) of each of the libraries
The following numbering conventions for configuration items have been adopted:

#      Name             Type          Purpose            Location           Access                Person
                                                                            Restriction           Responsible
1.     Dynamic          Dynamic       code, items         Promon          Read/Write for        SCM
                                      under              Database.          all
                                      development
2.     Control          Controlled    Item Under          Promon          Read All, Write       QM

Strictly Confidential                                    Version 1.0                          Page 19 of 28
Project Management Plan

                                    Review          Database             PSM, QM,SCM
3.   Static             Static      Final Product    Promon            Read All,          SCM
                                                    Database             Write
                                                                         SCM,PSM


10.7.5 Library backup strategy

 •   Specify Library and how it will be backed up (under Back-up Nature)
 •   State the Frequency of the Back-up
 •   State the Back-up media
 •   State the location of the Backed-up media
 •   State how long it will be retained (under retention period)
 The following library back-up conventions have been defined:
LIBRARY             BACKUP         BACKUP        BACKUP      BACKUP LOCATION         RETENTION PERIOD
                    NATURE         FREQUENCY     MEDIA
ssb-kkj-vseg1: Complete         Daily         Tape                                15 days
                    Volume




Details of actual backups taken for the project will be recorded in the Backup Register.


10.7.6 Procedure for the storage of documents and magnetic media

 •   What magnetic media will be used?
 •   Why will they be used (e.g., what will be stored on them?)
 •   How will storage take place?
 •   Where will they be stored?
The following storage of documents and magnetic media has been identified as being necessary:


10.7.7 Procedure for retrieval and reproduction of controlled items from the library

 •   Who has access to the libraries?
 •   What needs to be done to take a document out of the library? (list the steps involved)
The following process has been identified for the retrieval and reproduction of items from the library:


10.8 Change Management Procedure

 •   What is the Change Management Procedure?
 •   What steps are involved in getting a change through from a request to rejection or
     implementation?
 •   What categories of change request exist?
Strictly Confidential                               Version 1.0                            Page 20 of 28
Project Management Plan

The process for assessing and implementing changes to the baselined plan is as follows:

     1. The desired change must be entered into PBN as a “Change Request”

     2. The Simplilearn PM will allocate the change request to a project team member for
        assessment.

     3. The change request plus impact analysis will be presented to the Simplilearn PM, CCB

     4. A decision will be taken as to whether the change can be accepted or not.

     5. The project scope will be amended as appropriate and the changes tracked in this document.


The following Change Request categories exist:
   • Nice to Have (the lowest priority category)

     •   Medium

     •   Vital (the highest priority category)


The response time to assessing change is as follows:
CATEGORY OF CHANGE                                RESPONSE TIME
Nice to Have                                      > 8 hours
Medium                                            > 4 hours < 8 hours
Vital                                             < 4 hours


10.9 Configuration Status reporting

 •   List the Configuration Reports that will be produced
 •   List who will provide them under “From”
 •   List who will receive them under “To”
 •   How frequently are they produced?
 •   In what format are they produced?
 •   What procedure will they be produced in?
The Configuration Status Reporting for the Project is as follows:

 REPORT                              FROM        TO           FREQUENCY    FORMAT    PROCEDURE
 Configuration Status Report         SCM         PSM/SPM      Monthly
 Configuration Audit Report          QM          PSM          Monthly




10.10Project Audit Schedule

 •   When will the project be audited?
 •   Enter how many audits are planned in the first column
The internal audit schedule for the project is as follows:


Strictly Confidential                                 Version 1.0                       Page 21 of 28
Project Management Plan

   #      PLANNED DATE   ACTUAL DATE             NO OF NON-CONFORMANCE(S)
  1.
  2.
  3.




Strictly Confidential              Version 1.0                  Page 22 of 28
Project Management Plan




       11 Resource Plan

       11.1 Person Power

        •   Specify the number of and type of personnel required for project execution
        •   Specify activity, start date, duration of needs, and the methods for obtaining, retaining and phasing
            out of personnel
        •   Ensure that these are included in the Work-breakdown, Estimates and Schedules
       The following personnel are required to execute the project:

   Phase                   Period           Planned                           Actual
                                            PSM    TL        TM    Total      PSM      TL      TM      Total
   Planning                                 1      8+1       29    39         1        8+1     29      39
   Design                                   1      8+1       29    39         1        8+1     29      39
   Development                              1      8+1       29    39         1        8+1     29      39
   Testing
   Acceptance
   Handover
   Project Close
   Out


       11.2 Training

        •   Describe the training requirements
        •   What is the training schedule for the project specific training
        •   The HR Group will need to be involved for this part of the plan
        •   Ensure that these are included in the Work-breakdown, Estimates and Schedules.
       The following training requirements have been identified:
NAME                   SKILLS                 SKILLS         TRAINING         TRAINING       PLANNED       ACTUAL
                       REQUIRED               REQUIRED       REQUIRED         MODE           DATE          DATE
                                              DATE




       11.3 Hardware

        •   Specify the hardware platform and the quantities to be used for development and for final
            installation.
        •   Specify the source for the hardware – this could be purchase, client supplied hardware, hardware
            from other projects, etc.
        •   Identify the critical hardware resources (if any).
        •   Ensure that these are included in the Work-breakdown, Estimates and Schedules.

       Strictly Confidential                                Version 1.0                             Page 23 of 28
Project Management Plan

The following hardware requirements have been identified:

Add text here…


11.4 Software

 •   Specify the software platform and the quantities to be used for development and for final
     installation. (This should include compilers, operating systems, editors, utilities, RDBMS, project
     management tools, configuration management tools, project quality assurance tools, testing tools,
     coding standards checkers, etc.)
 •   Specify the source for the software– this could be purchase, client supplied software, available
     software from other projects, etc.
 •   Ensure that these are included in the Work-breakdown, Estimates and Schedules.
 •   Identify the critical software resources (if any).
The following software resource requirements have been identified:

Add text here…


11.5 Other resources

 •   Specify other resources that will be required for the project (These could include expert consultants,
     books, magazines, cell-phones, pagers, manuals, etc.)
 •   Ensure that these are included in the Work-breakdown, Estimates and Schedules.
The following resource requirements have been identified:

Add text here…


11.6 Budget

 •   Specify the itemized budget for the project in money terms
 •   In addition to the manpower effort, training, hardware and software, include the cost related to items
     like travel, communication, etc
 •   Specify the budget by phase of the project
The following monetary resource requirements have been identified:

Add text here…




12 Simplilearn Obligations

12.1 Simplilearn Activities

 •   Specify the activities that the client is obliged to perform as per the contract or later agreements, the
     basis for identifying such action, the manner of monitoring these and the way of coordinating with
     the client to ensure these.
Strictly Confidential                                 Version 1.0                           Page 24 of 28
Project Management Plan

        •   Specify how a delay by the client will be handled (due escalation to Group Manager and equivalent
            levels from the client organization, etc.), especially where a delay by the client impacts the cost/
            schedule/ quality.
        •   Specify the responsibility for managing the activities related to coordinating client obligations,
            follow-up and record-keeping, escalation, etc.
        •   Ensure that these are included in the Work-breakdown, Estimates and Schedules.
       The following actions are required from <Client> for the successful execution of the project:
       • X
       • Y
       • Z


       12.2 Simplilearn Supplied product handling

        •   Provide the list of client supplied artifacts and involvements in the project, and how it will be
            ensured that:
        •   The artifacts are available as per schedule
        •   The artifacts received are of the required quality and perform the intended function, and if not, the
            client is informed and suitable corrective action taken
        •   The artifacts are maintained separately and are traceable
        •   The artifacts are handled as per contractual requirement at the end of the project.
        •   Specify the version control mechanism to be used, and the specific responsibility for these
            products.
        •   Ensure that these are included in the Work-breakdown, Estimates and Schedules.
       The following artifacts have been identified as requiring <Client> action:....
       Add text here




       13 Verification & Validation


       13.1 Review Plan


       13.1.1 Artifact Review Strategy

       •    Identify the artifacts needing to be reviewed
       •    Identify the review type required (formal, informal)
       •    When and how will the review take place
       •    Who will be involved in the review?
       The following reviews of artifacts have been identified during the course of the project:
ARTIFACT NAME        REVIEW TYPE                PLANNED REVIEW ACTUAL REVIEW          REVIEWER(S)
                                                DATE              DATE




       Strictly Confidential                                Version 1.0                             Page 25 of 28
Project Management Plan

ARTIFACT NAME         REVIEW TYPE               PLANNED REVIEW    ACTUAL REVIEW         REVIEWER(S)
                                                DATE              DATE




       13.1.2 Artifact Approval Strategy

        •   Identify the artifacts needing to be approved
        •   Identify the approval type required (e.g. sign-off)
        •   When and how will the review take place
        •   Who will be involved in the review?
       The following approval of artifacts have been identified during the course of the project:
ARTIFACT NAME        APPROVAL TYPE              PLANNED           ACTUAL APPROVAL APPROVER(S)
                                                APPROVAL DATE     DATE




       13.1.3 Artifact Approval Criteria

        •   Identify the artifacts the will be approved
        •   Identify the factors by which their acceptability can be measured, under approval criteria
      The following approval criteria have been identified for each of the artifacts:
      ARTIFACT NAME                     APPROVAL CRITERIA




       13.2 Software Quality Assurance Plan


       13.2.1 Test Approval Strategy

        •   Identify the Test Phases in the project
        •   Identify the Critical Success Factors
        •   When should the Test Phase come to an end
        •   When did it come to an end?
        •   Who approves the test phase as complete?
      The following test strategy will be in place for the project:
TEST PHASE NAME     CRITICAL SUCCESS            PLANNED             ACTUAL              APPROVER(S)
                    FACTORS                     APPROVAL DATE       APPROVAL DATE



       Strictly Confidential                                Version 1.0                               Page 26 of 28
Project Management Plan

TEST PHASE NAME       CRITICAL SUCCESS             PLANNED             ACTUAL               APPROVER(S)
                      FACTORS                      APPROVAL DATE       APPROVAL DATE




      13.3 Test Strategy Overview

       •     Test
       •     Include the strategy for various types of testing (such as unit, integration, system and acceptance).
       •     Also specify how different aspects like load, stress, usability, maintainability will be tested.
       •     Who will perform the testing
       •     When will the testing take place
      Refer to the Test Plan for additional details.




      14 Quality Recording Handling

      14.1 Review Record storage & Handling

       •     Specify how the review records generated during the reviews will be stored and retrieved
       •     How will the data be analyzed for feedback to the project?
       •     Specify the frequency of review record analysis
       •     Who is (the person(s)) responsible for it?
       •     What tools and techniques to be used?
       •     Specify how the feedback obtained by such analysis will be used back within the project and the
             responsibility for this.



      15 Document reviews and approvals

      15.1 Document Reviewers

      •    Who has received a copy of the document for review and why?

      NAME                    ROLE               DATE         REASON
      Krishna Kumar           Program                         Review for accuracy & completeness with a view to
                              Manager                         approval
                              Simplilearn
                              Project Manager
                              <Client> Project
                              Manager




      Strictly Confidential                                  Version 1.0                                  Page 27 of 28
Project Management Plan




15.2 Additional recipients of the document


•   Apart from the reviewers, who has received a copy of the document and why?


NAME                    ROLE         DATE           REASON




15.3 Document Approvers



•   Who has received a copy of the document for approval? Did they review it first?
Signing-off the document approves the Project Management Plan as being complete and accurate.
By signing below I acknowledge that I have read the entire contents of this document and accept the
document in this form as reasonably representing all issues, goals, and tasks intended for the scope of
this project. Optionally I may attach modifications to the document and only apply my initials to indicate
that this document needs revisions before it will represent final delivery.

NAME                    ROLE         DATE           SIGNATURE OF APPROVAL




Strictly Confidential                               Version 1.0                            Page 28 of 28

More Related Content

What's hot

Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
Theodore Van Patten, Jr.
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides
SlideTeam
 

What's hot (20)

Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
PROJECT CHARTER
PROJECT CHARTERPROJECT CHARTER
PROJECT CHARTER
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
 
Project Task Powerpoint Presentation Slides
Project Task Powerpoint Presentation SlidesProject Task Powerpoint Presentation Slides
Project Task Powerpoint Presentation Slides
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
Project Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation SlidesProject Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation Slides
 
Governance Structure Powerpoint Presentation Slides
Governance Structure Powerpoint Presentation SlidesGovernance Structure Powerpoint Presentation Slides
Governance Structure Powerpoint Presentation Slides
 
Governance Deck PowerPoint Presentation Slides
Governance Deck PowerPoint Presentation SlidesGovernance Deck PowerPoint Presentation Slides
Governance Deck PowerPoint Presentation Slides
 
Template kick off-meeting
Template kick off-meeting Template kick off-meeting
Template kick off-meeting
 
Project Status Report Presentation Visuals
Project Status Report Presentation VisualsProject Status Report Presentation Visuals
Project Status Report Presentation Visuals
 
Project Governance Framework Powerpoint Presentation Slides
Project Governance Framework Powerpoint Presentation SlidesProject Governance Framework Powerpoint Presentation Slides
Project Governance Framework Powerpoint Presentation Slides
 
PMP - Risk Management plan & template
PMP - Risk Management plan & templatePMP - Risk Management plan & template
PMP - Risk Management plan & template
 
Introduction to project, program & portfolio management
Introduction to project, program & portfolio managementIntroduction to project, program & portfolio management
Introduction to project, program & portfolio management
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides
 
Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides
 
Software Project Management Plan
Software Project Management PlanSoftware Project Management Plan
Software Project Management Plan
 
Project governance
Project governanceProject governance
Project governance
 

Viewers also liked

Documentation Plan Example
Documentation Plan ExampleDocumentation Plan Example
Documentation Plan Example
Greg Turnbull
 
Поетапний план роботи над проектом
Поетапний план роботи над проектомПоетапний план роботи над проектом
Поетапний план роботи над проектом
Svitlana Ivashnova
 
Scope proposal-ecommerce-website
Scope proposal-ecommerce-websiteScope proposal-ecommerce-website
Scope proposal-ecommerce-website
maxtra
 
E commerce businnes plan
E  commerce businnes planE  commerce businnes plan
E commerce businnes plan
tobybear30
 
Ecommerce website proposal
Ecommerce website proposalEcommerce website proposal
Ecommerce website proposal
Sudhir Raj
 

Viewers also liked (18)

Documentation Plan Example
Documentation Plan ExampleDocumentation Plan Example
Documentation Plan Example
 
"Управление изменениями: Какие инструменты помогут диагностировать проблемы и...
"Управление изменениями: Какие инструменты помогут диагностировать проблемы и..."Управление изменениями: Какие инструменты помогут диагностировать проблемы и...
"Управление изменениями: Какие инструменты помогут диагностировать проблемы и...
 
Поетапний план роботи над проектом
Поетапний план роботи над проектомПоетапний план роботи над проектом
Поетапний план роботи над проектом
 
Планирование и реализация проекта
Планирование и реализация проектаПланирование и реализация проекта
Планирование и реализация проекта
 
План управления проектом
План управления проектомПлан управления проектом
План управления проектом
 
Управление изменениями - методология и процесс ADKAR
Управление изменениями - методология и процесс ADKARУправление изменениями - методология и процесс ADKAR
Управление изменениями - методология и процесс ADKAR
 
Online shopping portal: Software Project Plan
Online shopping portal: Software Project PlanOnline shopping portal: Software Project Plan
Online shopping portal: Software Project Plan
 
E-commerce Berlin Expo 2017 - Strategies to improve your SEO and get even mor...
E-commerce Berlin Expo 2017 - Strategies to improve your SEO and get even mor...E-commerce Berlin Expo 2017 - Strategies to improve your SEO and get even mor...
E-commerce Berlin Expo 2017 - Strategies to improve your SEO and get even mor...
 
Document Management Regulations Ii Payment Processing
Document Management Regulations Ii   Payment ProcessingDocument Management Regulations Ii   Payment Processing
Document Management Regulations Ii Payment Processing
 
MMS Payment Portal
MMS Payment PortalMMS Payment Portal
MMS Payment Portal
 
E Commerce Proposal
E Commerce ProposalE Commerce Proposal
E Commerce Proposal
 
Scope proposal-ecommerce-website
Scope proposal-ecommerce-websiteScope proposal-ecommerce-website
Scope proposal-ecommerce-website
 
E commerce businnes plan
E  commerce businnes planE  commerce businnes plan
E commerce businnes plan
 
план навчального проекту
план навчального проектуплан навчального проекту
план навчального проекту
 
Sample Ecommerce Business plan
Sample Ecommerce Business planSample Ecommerce Business plan
Sample Ecommerce Business plan
 
Ecommerce website proposal
Ecommerce website proposalEcommerce website proposal
Ecommerce website proposal
 
Online shopping report-6 month project
Online shopping report-6 month projectOnline shopping report-6 month project
Online shopping report-6 month project
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 

Similar to Project Management Plan Template

Software Requirement Specification Master Template
Software Requirement Specification Master TemplateSoftware Requirement Specification Master Template
Software Requirement Specification Master Template
Wayne Chen
 
Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112
magik570
 
Srs template
Srs templateSrs template
Srs template
muqeet19
 
Systems Analysis And Design Methodology And Supporting Processes
Systems Analysis And Design Methodology And Supporting ProcessesSystems Analysis And Design Methodology And Supporting Processes
Systems Analysis And Design Methodology And Supporting Processes
Alan McSweeney
 
Oracle Web Conferencing - Release 2.0.4
Oracle Web Conferencing - Release 2.0.4Oracle Web Conferencing - Release 2.0.4
Oracle Web Conferencing - Release 2.0.4
Mehul Sanghavi
 
IO_Report_Template (Readonly)
IO_Report_Template (Readonly)IO_Report_Template (Readonly)
IO_Report_Template (Readonly)
guestf8327e
 

Similar to Project Management Plan Template (20)

Mbg spmp project_management
Mbg spmp project_managementMbg spmp project_management
Mbg spmp project_management
 
IT Project Planning Standards V 1.2
IT Project Planning Standards V 1.2IT Project Planning Standards V 1.2
IT Project Planning Standards V 1.2
 
Software Requirement Specification Master Template
Software Requirement Specification Master TemplateSoftware Requirement Specification Master Template
Software Requirement Specification Master Template
 
Chat Application [Full Documentation]
Chat Application [Full Documentation]Chat Application [Full Documentation]
Chat Application [Full Documentation]
 
ProcessGuide
ProcessGuideProcessGuide
ProcessGuide
 
Open Source adobe lightroom like
Open Source adobe lightroom likeOpen Source adobe lightroom like
Open Source adobe lightroom like
 
Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112
 
Application Of Microsoft Project To Manage Successful Project
Application Of Microsoft Project To Manage Successful ProjectApplication Of Microsoft Project To Manage Successful Project
Application Of Microsoft Project To Manage Successful Project
 
Ps training mannual power users
Ps training mannual   power usersPs training mannual   power users
Ps training mannual power users
 
Project Handover Document Template
Project Handover Document TemplateProject Handover Document Template
Project Handover Document Template
 
Primavera Release Notes 8.1
Primavera Release Notes 8.1Primavera Release Notes 8.1
Primavera Release Notes 8.1
 
CS4099Report
CS4099ReportCS4099Report
CS4099Report
 
Srs template
Srs templateSrs template
Srs template
 
My "Grain Motion Detection" Project
My "Grain Motion Detection" ProjectMy "Grain Motion Detection" Project
My "Grain Motion Detection" Project
 
Systems Analysis And Design Methodology And Supporting Processes
Systems Analysis And Design Methodology And Supporting ProcessesSystems Analysis And Design Methodology And Supporting Processes
Systems Analysis And Design Methodology And Supporting Processes
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
 
Oracle Web Conferencing - Release 2.0.4
Oracle Web Conferencing - Release 2.0.4Oracle Web Conferencing - Release 2.0.4
Oracle Web Conferencing - Release 2.0.4
 
User manual for Well Plotter 1.0
User manual for Well Plotter 1.0User manual for Well Plotter 1.0
User manual for Well Plotter 1.0
 
IO_Report_Template (Readonly)
IO_Report_Template (Readonly)IO_Report_Template (Readonly)
IO_Report_Template (Readonly)
 
Ensuring Distributed Accountability in the Cloud
Ensuring Distributed Accountability in the CloudEnsuring Distributed Accountability in the Cloud
Ensuring Distributed Accountability in the Cloud
 

More from Simplilearn

What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...
What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...
What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...
Simplilearn
 
Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...
Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...
Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...
Simplilearn
 
React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...
React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...
React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...
Simplilearn
 
Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...
Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...
Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...
Simplilearn
 
How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...
How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...
How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...
Simplilearn
 
Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...
Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...
Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...
Simplilearn
 
Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...
Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...
Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...
Simplilearn
 
Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...
Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...
Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...
Simplilearn
 
React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...
React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...
React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...
Simplilearn
 
What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...
What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...
What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...
Simplilearn
 
How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...
How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...
How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...
Simplilearn
 
WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...
WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...
WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...
Simplilearn
 
Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...
Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...
Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...
Simplilearn
 
How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...
How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...
How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...
Simplilearn
 
How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...
How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...
How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...
Simplilearn
 

More from Simplilearn (20)

ChatGPT in Cybersecurity
ChatGPT in CybersecurityChatGPT in Cybersecurity
ChatGPT in Cybersecurity
 
Whatis SQL Injection.pptx
Whatis SQL Injection.pptxWhatis SQL Injection.pptx
Whatis SQL Injection.pptx
 
Top 5 High Paying Cloud Computing Jobs in 2023
 Top 5 High Paying Cloud Computing Jobs in 2023  Top 5 High Paying Cloud Computing Jobs in 2023
Top 5 High Paying Cloud Computing Jobs in 2023
 
Types Of Cloud Jobs In 2024
Types Of Cloud Jobs In 2024Types Of Cloud Jobs In 2024
Types Of Cloud Jobs In 2024
 
Top 12 AI Technologies To Learn 2024 | Top AI Technologies in 2024 | AI Trend...
Top 12 AI Technologies To Learn 2024 | Top AI Technologies in 2024 | AI Trend...Top 12 AI Technologies To Learn 2024 | Top AI Technologies in 2024 | AI Trend...
Top 12 AI Technologies To Learn 2024 | Top AI Technologies in 2024 | AI Trend...
 
What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...
What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...
What is LSTM ?| Long Short Term Memory Explained with Example | Deep Learning...
 
Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...
Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...
Top 10 Chat GPT Use Cases | ChatGPT Applications | ChatGPT Tutorial For Begin...
 
React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...
React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...
React JS Vs Next JS - What's The Difference | Next JS Tutorial For Beginners ...
 
Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...
Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...
Backpropagation in Neural Networks | Back Propagation Algorithm with Examples...
 
How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...
How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...
How to Become a Business Analyst ?| Roadmap to Become Business Analyst | Simp...
 
Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...
Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...
Career Opportunities In Artificial Intelligence 2023 | AI Job Opportunities |...
 
Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...
Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...
Programming for Beginners | How to Start Coding in 2023? | Introduction to Pr...
 
Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...
Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...
Best IDE for Programming in 2023 | Top 8 Programming IDE You Should Know | Si...
 
React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...
React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...
React 18 Overview | React 18 New Features and Changes | React 18 Tutorial 202...
 
What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...
What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...
What Is Next JS ? | Introduction to Next JS | Basics of Next JS | Next JS Tut...
 
How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...
How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...
How To Become an SEO Expert In 2023 | SEO Expert Tutorial | SEO For Beginners...
 
WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...
WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...
WordPress Tutorial for Beginners 2023 | What Is WordPress and How Does It Wor...
 
Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...
Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...
Blogging For Beginners 2023 | How To Create A Blog | Blogging Tutorial | Simp...
 
How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...
How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...
How To Start A Blog In 2023 | Pros And Cons Of Blogging | Blogging Tutorial |...
 
How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...
How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...
How to Increase Website Traffic ? | 10 Ways To Increase Website Traffic in 20...
 

Recently uploaded

Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 

Project Management Plan Template

  • 1. Project Management Plan <Project Name> Document ID: Version: Release Date: www.simplilearn.com Copyright Simplilearn This document is the property of Simplilearn, and its contents are confidential to Simplilearn Reproduction of the materials contained herein, in part or full in any form by anyone, without the permission of Simplilearn is prohibited.
  • 2. Project Management Plan Document Information Author Reviewer Approver Revision History Date Version Section Changed Change Description Author Strictly Confidential Version 1.0 Page 2 of 28
  • 3. Project Management Plan Index Table of Contents 1 Purpose..........................................................................................................................6 2 Scope.............................................................................................................................6 3 Audience .......................................................................................................................7 4 References.....................................................................................................................7 5 Glossary ........................................................................................................................7 5.1 Acronyms...................................................................................................................7 5.1.1 Definitions ..........................................................................................................................7 6 Process..........................................................................................................................7 7 Open Issues – While Writing Document Only..........................................................8 8 Project Introduction......................................................................................................8 8.1 Project Overview........................................................................................................8 8.2 Project Description, Scope & Objectives...................................................................9 8.2.1 Project Description..............................................................................................................9 8.2.2 Project Scope...................................................................................................................10 8.2.3 Project Objectives.............................................................................................................10 8.3 Project Environment................................................................................................10 8.3.1 Development Environment................................................................................................10 8.3.2 Maintenance Environment................................................................................................10 8.4 Target Implementation Environment.......................................................................10 8.5 Project Deliverables.................................................................................................11 8.6 Client Contact Details..............................................................................................11 8.7 Reference Material..................................................................................................11 8.8 Project Terminology, Acronyms and Definitions......................................................12 8.9 Referred Project Database & Library......................................................................12 9 Project Organization...................................................................................................13 9.1 Organizational Structure .........................................................................................13 9.2 Organizational Structure.........................................................................................13 9.3 Problems faced in the Current System ...................................................................14 Strictly Confidential Version 1.0 Page 3 of 28
  • 4. Project Management Plan 10 Project Control..........................................................................................................14 10.1 Project Management Goals...................................................................................14 10.2 Assumptions, Dependencies & Constraints .........................................................14 10.2.1 Assumptions ..................................................................................................................14 10.2.2 Dependencies.................................................................................................................15 10.2.3 Constraints......................................................................................................................15 10.3 Information Gathering & Project reporting.............................................................15 10.3.1 Reporting Mechanisms...................................................................................................15 10.3.2 Monitoring & Tracking.....................................................................................................16 10.3.3 Meetings.........................................................................................................................16 10.4 External Communication and Communication Protocol........................................17 10.5 Update of Project Plan...........................................................................................17 10.6 Risk Management Plan.........................................................................................17 10.7 Configuration Management...................................................................................18 10.7.1 Project Configuration Items and SCM Schedule.............................................................18 10.7.2 Naming Conventions.......................................................................................................19 10.7.3 Version Number Scheme................................................................................................19 10.7.4 Controlled Software libraries...........................................................................................19 10.7.5 Library backup strategy...................................................................................................20 10.7.6 Procedure for the storage of documents and magnetic media........................................20 10.7.7 Procedure for retrieval and reproduction of controlled items from the library..................20 10.8 Change Management Procedure..........................................................................20 10.9 Configuration Status reporting...............................................................................21 10.10 Project Audit Schedule........................................................................................21 11 Resource Plan...........................................................................................................23 11.1 Person Power........................................................................................................23 11.2 Training..................................................................................................................23 11.3 Hardware...............................................................................................................23 11.4 Software.................................................................................................................24 11.5 Other resources.....................................................................................................24 11.6 Budget....................................................................................................................24 12 Simplilearn Obligations............................................................................................24 12.1 Simplilearn Activities..............................................................................................24 12.2 Simplilearn Supplied product handling..................................................................25 Strictly Confidential Version 1.0 Page 4 of 28
  • 5. Project Management Plan 13 Verification & Validation..........................................................................................25 13.1 Review Plan...........................................................................................................25 13.1.1 Artifact Review Strategy..................................................................................................25 13.1.2 Artifact Approval Strategy...............................................................................................26 13.1.3 Artifact Approval Criteria.................................................................................................26 13.2 Software Quality Assurance Plan..........................................................................26 13.2.1 Test Approval Strategy...................................................................................................26 13.3 Test Strategy Overview.........................................................................................27 14 Quality Recording Handling....................................................................................27 14.1 Review Record storage & Handling......................................................................27 15 Document reviews and approvals..........................................................................27 15.1 Document Reviewers.............................................................................................27 15.2 Additional recipients of the document ..................................................................28 15.3 Document Approvers.............................................................................................28 Strictly Confidential Version 1.0 Page 5 of 28
  • 6. Project Management Plan 1 Purpose <IMPORTANT: The comments in ORANGE colour and in ITALICS are meant for author’s attention. Please delete all the comments, including this, before releasing the document.> • What purpose does the document serve? • Why is the document useful to people who will read it? • Describe in this section the aims the author had in writing the document • Are there any objectives specific to the project / document that need to be made clear to facilitate the success of the project? • It may be beneficial to take a look at the list below and add / delete objectives, as appropriate… e.g. The objective of this document are to establish and identify: • A complete plan for managing the project • all tasks required to successfully complete the project • project reporting mechanisms • responsibilities • risks • etc etc Prior to obtaining the approval of this document a formal review should take place to ensure the completeness and correctness of the plan. If, following approval of this document and the base-lining of requirements, amendments to the plan are deemed necessary, changes may be introduced via the change management process. An updated version of the document must be created to reflect the changes introduced. • How will this document be used? • Who uses it and how? e.g. The document will be used for the following purposes: • The Project Manager will use it in the plan, control and monitor later phases of the project • The Simplilearn Project Manager will use it to identify his responsibilities • The Simplilearn Users will use it to identify their involvement and responsibilities • Simplilearn board will use it to understand the scope of the project and to monitor progress against the plans • The Project Office will use it to create a project plan 2 Scope • What is the scope of the document? • Are there any reasons to believe that not specifying something may cause confusion, or lead to claims that it was “so obvious” that it need not be stated? • Have there been any problems with the client, or areas of contention or confusion, that mean a clear statement on the exclusions from the project or requirements should also be stated here? Strictly Confidential Version 1.0 Page 6 of 28
  • 7. Project Management Plan • Ambiguities can be avoided by stating the scope here! • Are there any similar requirements that are not part of this project, but which the user might think are? e.g. The scope of this document is the overall scope of the project Project Name, Project Code 1234. 3 Audience • Include the likely audience of the Requirements [add to or delete from the following list, as appropriate The intended audience of this document is: • Simplilearn Program Manager • Simplilearn CEO • Simplilearn Project Manager • Project Office 4 References < References> 5 Glossary 5.1 Acronyms Acronym Description 5.1.1 Definitions Term Definition 6 Process • What is the agreed process for developing this document and obtaining its approval? • What are the steps if change is required? 1. The Project Manager drafts this document. 2. Draft versions (numbered incrementally from version 0.1) will be written for informal review and circulated to participants in the requirements analysis phase. Strictly Confidential Version 1.0 Page 7 of 28
  • 8. Project Management Plan 3. A formal review will be made of version 1.0D1 of the document. “D1” will indicate that it is the first draft of the final version. If amendments are made before approval, then the number must incremented for version control purposes. 4. When all parties agree that all necessary and relevant information is recorded in the document, version 1.0 will be distributed for approval by the Simplilearn Program Manager, Project Manager. This version will represent the baseline project plan. 5. Changes to plan will result in the document being updated, given an incremental version number (e.g. version 1.1) and approved once again. Changes to the document must be clearly marked in the margin and summarized in the document history. 6. The document, once approved, will be stored in an appropriately named project folder. • All contributors are working towards the success of the project 7 Open Issues – While Writing Document Only • This is an author aid whilst writing the document • Are there any points that still need to be cleared up? • Is there any information that is outstanding, which needs to be provided? • A more complete open issue log with status, due completion date, name of person assigned to resolve the issue may be kept elsewhere, if deemed appropriate. The following open issues must be clarified prior to the requirements being deemed complete: ISSUE ID RAISED BY DATE DESCRIPTION OF OPEN ISSUE 8 Project Introduction 8.1 Project Overview • Fill in the table below, so that the gaps (the white boxes) are completed • Enter an “x” into the relevant “Project Type” and “Commercial Terms” boxes • Do not leave blanks The table below provides an overview of the project: Strictly Confidential Version 1.0 Page 8 of 28
  • 9. Project Management Plan PROJECT ID PROJECT NAME CLIENT ORGANIZATION (NAME & ADDRESS) CLIENT CONTACT (NAME & ADDRESS) PROJECT TYPE [ ] Full Development [ ] Part Development [ ] Migration [ ] Enhancement [ ] Maintenance/ Support [ ] Any Other ________________ APPLICATION AREA DESCRIPTION (E.G., INDUSTRY AND FUNCTIONAL AREAS) PLATFORM/ TECHNOLOGY DESCRIPTION (OPERATING SYSTEM, DATABASE, LANGUAGE, FRONT- END, ETC.) COMMERCIAL TERMS [ ] Time & Material [ ] Turn Key [ ] Internally sponsored START DATE END DATE TOTAL ESTIMATED CALENDAR DAYS % VARIANCE THRESHOLD TOTAL ESTIMATED SIZE % VARIANCE THRESHOLD TOTAL ESTIMATED EFFORT % VARIANCE THRESHOLD TOTAL BUDGET % VARIANCE THRESHOLD Explicit corrective actions will be identified and tracked once the thresholds are crossed. 8.2 Project Description, Scope & Objectives • Briefly describe the project and what it is, in terms of type of project (e.g. full development or migration) • What is the nature of the work being undertaken? • Provide a reference to the proposal and contract • What are the objectives of the project? • What are the characteristics of the project? • What is the scope of the project? • What is excluded from scope? • Where can further details be found? This section provides a summary over of the project in text: 8.2.1 Project Description Add text here…. e.g. This project is a full development project to develop a set of processes and guidelines for software development by Simplilearn. Strictly Confidential Version 1.0 Page 9 of 28
  • 10. Project Management Plan 8.2.2 Project Scope Add text here…. e.g. The scope of this project to develop the processes and support documentation that will be used by Simplilearn when developing software. The scope does not include documentation for any of the potential software development methodologies other than the waterfall method. The proposal and contract for this project may be referred to for additional detail (see above, Reference Documents). The service levels being worked to in this project are described in the document XYZ. 8.2.3 Project Objectives Add text here…. e.g. This objective of this project is to deliver a fully documented set of processes for the development lifecycle, plus support documentation, in a clearly comprehensible format and style. 8.3 Project Environment • Describe the development environment (in terms of hardware configuration, operating systems and other software systems) • Describe the maintenance environment (in terms of hardware configuration, operating systems and other software systems) This section describes the environment, in terms of combination of hardware, software and operating system 8.3.1 Development Environment Add text here…. e.g. The x system will be running on a x hardware with an x v1.0 operating system. 8.3.2 Maintenance Environment Add text here…. e.g. The x system will be running on a x hardware with an x v1.0 operating system 8.4 Target Implementation Environment • Describe the environment where the system will be finally installed and operated • Which hardware will be used? • Which Operating System (with version numbers)? • Which other software systems will be run concurrently? Strictly Confidential Version 1.0 Page 10 of 28
  • 11. Project Management Plan • Add a diagram of the environment if it is likely to add value and clarity Add text / diagrams here… e.g. The software to be developed will be implemented in an environment running on x hardware with an x v1.0 operating system, and will be running concurrently with x. 8.5 Project Deliverables • Under deliverable specify the items to be delivered as part of the project (typical deliverables are Requirements Analysis document, High-Level Design document, Source-code, User and Operations Manual, etc.). All artifacts to be delivered in the project must be listed here. • How and to where will they be delivered? (Media and Location) • How many will be delivered? • When will they be delivered? (see committed date) The following table shows a complete list of deliverable to delivered as part of this project: # DELIVERABLE MEDIA & LOCATION QTY PLAN ACTUAL DATE DATE 8.6 Client Contact Details • Provide the: • Client name • contact persons for this project and their roles • the address, phone, fax and e-mails to contact them The client for this project is <Client Name>. The key single point of contact for this project at <Client> is: PROJECT MANAGER LOCATION TELEPHONE NUMBER MOBILE TELEPHONE NUMBER FAX NUMBER E-MAIL ADDRESS If the Simplilearn SPOC cannot be reached the contact person is: DEPUTY PROJECT MANAGER LOCATION TELEPHONE NUMBER MOBILE TELEPHONE NUMBER FAX NUMBER E-MAIL ADDRESS 8.7 Reference Material Strictly Confidential Version 1.0 Page 11 of 28
  • 12. Project Management Plan • List all documents and other information sources referenced in this plan (state version number and location) • Examples of documents referred to are; Project CM Plan, Requirements Analysis document, User and Operations Manual, Contract, Proposals, Project's Defined Process. • What is the title? • Where is it located? • Who is the author? • Is it just for information? • If it is referenced later in the document what reference ID will it have? • Enter them into the table below. The table below references all information sources used in establishing this Project Management Plan: REF_ID TITLE AUTHOR LOCATION 1 The Title ABD Folder 8.8 Project Terminology, Acronyms and Definitions • What terms have you used in writing this document that may not be immediately understandable to all of the intended readers? • Have you used technical terms that may need to be explained (defined) to other people? • Are there any acronyms that need to be written in full, to ensure they are understood? • It is easier to include any terms that you feel may need to be explained pro-actively than to wait for somebody to ask – or worse; to have the project fail because there was a misunderstanding over the terms used! • Add all such terms in the table below The following table includes all acronyms and terminology to be used in the project, along with an explanation in non-technical terms: TERM EXPLANATION PM Project Manager SPOC Single Point of Contact 8.9 Referred Project Database & Library • List the documents and data used from the Project Database and Library. • Fill out the table below The following table includes all items referenced from the project database and library, along with a description of how it was used: Strictly Confidential Version 1.0 Page 12 of 28
  • 13. Project Management Plan # PROJECT AND DOCUMENT REFERENCED FROM THE PROJECT HOW THE DOCUMENT WAS USEFUL IN PROJECT DATABASE AND LIBRARY PLANNING 9 Project Organization 9.1 Organizational Structure This section outlines the organization of the project. • Describe the project organization structure • Describe the internal management structure • What are the organizational boundaries? • What are the communication interfaces • Describe / show reporting relationships • Define individual responsibilities for the various project elements • If the project has a maintenance component, also specify the maintenance team composition and organization for the maintenance activities. • Describes the roles and responsibilities for each team member • Add a org-diagram for clarity, if possible Add text here…eg: The organizational structure of the project is… The internal management structure is… Simplilearn team members will report only to the Simplilearn Project Manager. <Client> team members will report only to the <Client> Project Manager. The single point of contact between Simplilearn and <Client> is over the Project Managers. 9.2 Organizational Structure • Identify the person fulfilling a particular role. • Typical roles are project manager, analysts/ designers, programmers, configuration controller, PQE, etc. The following table identifies all the roles required for the project and the individuals who are responsible for the role and activities. Strictly Confidential Version 1.0 Page 13 of 28
  • 14. Project Management Plan ROLE RESPONSIBLE PERSON BACK-UP PERSON 9.3 Problems faced in the Current System • Describe the administrative and managerial boundaries between the project and external entities. • Examples of external entities are client, the Quality Group, Business Development Group, etc.? • Fill out the table below The table below describes the administrative and managerial boundaries between the project and external entities: EXTERNAL ENTITY RELATIONSHIP/ RESPONSIBILITIES FOR PROJECT 10 Project Control 10.1 Project Management Goals • Describe the goals and relative priorities among quality, schedules, requirements, and budget for the project • Typical goals are completion within time and cost, and meeting required quality. Add text… e.g. The project must be completed in time and cost, while meeting the required quality. The quality of the project will be measured by x. 10.2 Assumptions, Dependencies & Constraints • State the assumptions on which the project is based • State the external events the project is dependent on (e.g. specify major events like acquisition of required software/ hardware, recruitment etc., which are critical to the success of the project ) • State the constraints under which the project is to be executed. 10.2.1 Assumptions The project is based on the following assumptions: Strictly Confidential Version 1.0 Page 14 of 28
  • 15. Project Management Plan # DESCRIPTION OF ASSUMPTION VALIDATION PHASE IMPACT OF POSSIBLE VIOLATION 10.2.2 Dependencies The project has the following dependencies: # Item to be Provided Provided Acceptance Planned Actual provided By To Criteria Date Date DEPENDENCY ID DESCRIPTION OF DEPENDENCY 10.2.3 Constraints The following constraints exist: # DESCRIPTION OF CONSTRAINT VALIDATION PHASE IMPACT OF POSSIBLE VIOLATION 10.3 Information Gathering & Project reporting • Identify the implications on security of the required changes • Outline and describe the required level of security • If appropriate, describe any specific tools that need to be present in order to achieve the desired level of security. These can include firewalls, proxy servers, or monitoring devices • What would be the potential impact of a security breakdown? • What are examples of typical misuse? Add text here… 10.3.1 Reporting Mechanisms • Describe the reporting mechanism and report formats for the Project Manager to gather information from project team members. • Define the reporting to be done by the Project Manager to the Group Manager and the client. Strictly Confidential Version 1.0 Page 15 of 28
  • 16. Project Management Plan • Include/ refer to reporting to be done for configuration management and quality assurance activities. • For each reporting requirement define: • Who has to generate the report • The recipients of the report • Format and contents of the report • Frequency of the reporting • Mode of reporting (on-line/ hardcopy). • Define how the Project Manager shall use the information to update the project status – this may be on a Gantt chart/ spreadsheet, or table or using a project management software package, etc • Describe how the Project Manager will use the updated project information to understand the current status and re-plan the project. Add text here… The following reports will be created during the course of the project: REPORT TYPE GENERATED BY GIVEN TO FORMAT & METHOD FREQUENCY CONTENT Weekly PM <Client> Predefined PPT Online Weekly Status Report Format • Project Status • Key Activities • Next Steps 10.3.2 Monitoring & Tracking • Include the reporting required for monitoring and tracking maintenance activities. • This can include meetings and the use of client call reports, change request status and time sheets as input. 10.3.3 Meetings • Define the meetings that shall be held as part of project management. For each meeting, define: • Attendees • Coordinator • Typical topics to be discussed • Frequency • Location The following regular meetings will be held as part of the project: Strictly Confidential Version 1.0 Page 16 of 28
  • 17. Project Management Plan MEETING TYPE ATTENDEES CO-ORDINATOR TOPICS TO FREQUENCY LOCATION DISCUSS Weekly All PM Progress Weekly Simplilearn Progress Simplilearn Problems /Team Team Issues Meeting members Next Steps 10.4 External Communication and Communication Protocol • List all Communication between Simplilearn and <Client>, plus the responsible people The following table lists all agreed communication between Simplilearn and <Client> and the responsible people: e.g.: TYPE OF COMMUNICATION SIMPLILEARN PERSON RESPONSIBLE <CLIENT> PERSON RESPONSIBLE Regular project status Technical clarifications User requirements clarifications Commercial issues Escalated issues ….. ..... 10.5 Update of Project Plan • Define the process to be used to review the updated plan, and any authorization for a new plan. • For cases where the changed plan involves a slippage in cost or schedule, define the process used to obtain management approval and document it. E.g. The process to review an update of the project plan is as follows: 1. X 2. Y 3. Z The authorization process of a new version of the project plan is as follows: 1. X 2. Y 3. Z If slippage to the project timeline or cost escalation is involved due to a change in the plan then this must be reported to X and Y in the form of X & Y, stating the reasons why and why it is unavoidable. 10.6 Risk Management Plan • Identify and assess risk factors (such as contractual risk, technological risk, risk due to size and complexity of the project, risk in recruitment, training and risks in achieving client acceptance of the project) • For all the risks that are identified and being planned for tabulate the risks, their probability, severity, possible actions to mitigate the risk, the priority, etc. Strictly Confidential Version 1.0 Page 17 of 28
  • 18. Project Management Plan • Define the frequency for monitoring the risks and performing fresh risk analysis. Define the threshold for initiating contingency action, and for escalation to senior management and client • Create a link to the Risk Management Plan spreadsheet The following risks have been identified and logged, along with contingency plans: 10.7 Configuration Management 10.7.1 Project Configuration Items and SCM Schedule • List by phase the items that will be produced in the project • Under Baseline state the version number that will be taken as the baseline • Under Configuration items list all items to be produced as critical to the project success • Phase – list the project phase wherein the item is produced • Under acceptance criteria list what needs to be done to accept the item (e.g. review, review and approval) • Under approval authority list who approves • Under planned and actual date, list the dates the items are planned and then produced The following items are required to be produced in this project: BASELINE CONFIGRATION ITEM PHASE ACCEPTANCE APPROVAL PLANNED ACTUAL CRITERIA AUTHORITY DATE DATE CUSTOMER SUPPLIED ITEMS V1.0 • Business User Planning Review PM Requirements • Functional Requirements • Technical Requirements PROJECT SPECIFIC ITEMS V1.0 Functional design Pre-Project Approval Client Specifications, (Not for LLD LLD Specification Specifications, s) Prototype V1.0 Code Planning Fully Tested PM/QM Code V1.0 Functional design Design Approval Client Specifications, (Not for LLD LLD Specification Specifications, s) Prototype V1.0 Code Developmen Fully Tested PM/QM t Code Strictly Confidential Version 1.0 Page 18 of 28
  • 19. Project Management Plan BASELINE CONFIGRATION ITEM PHASE ACCEPTANCE APPROVAL PLANNED ACTUAL CRITERIA AUTHORITY DATE DATE V1.0 SIT Test Plan Testing ST Test Plan Acceptance Test Plan V1.0 Handover V1.0 Project Closure Project Report Closure 10.7.2 Naming Conventions • Specify the naming conventions to be applied for all documents in the project • Specify the naming convention to be applied for all technical items to be produced in the project The following naming conventions have been adopted: CONFIGURATION ITEM NAMING CONVENTION 10.7.3 Version Number Scheme • Specify the numbering conventions to be applied for all documents in the project • Specify the numbering conventions to be applied for all technical items to be produced in the project The following numbering conventions for configuration items have been adopted: • Version Number of configured items will start from 1.0 • Each change to a component of a CI increases Version Number by 10%, i.e. 0.1 • When Version Number of the component exceeds 0.9 then the version increases to next higher, i.e. 2.0 • Within each CI if the components change by over 50% then the CI Version Number changes by 1.0. • Work in progress version is 0.1. 10.7.4 Controlled Software libraries • Specify the software libraries required for project success • To identify the purpose of each of the libraries • To define the location of each of the libraries • To specify the restrictions (i.e. Create, Read, Update, Delete) of each of the libraries The following numbering conventions for configuration items have been adopted: # Name Type Purpose Location Access Person Restriction Responsible 1. Dynamic Dynamic code, items Promon Read/Write for SCM under Database. all development 2. Control Controlled Item Under Promon Read All, Write QM Strictly Confidential Version 1.0 Page 19 of 28
  • 20. Project Management Plan Review Database PSM, QM,SCM 3. Static Static Final Product Promon Read All, SCM Database Write SCM,PSM 10.7.5 Library backup strategy • Specify Library and how it will be backed up (under Back-up Nature) • State the Frequency of the Back-up • State the Back-up media • State the location of the Backed-up media • State how long it will be retained (under retention period) The following library back-up conventions have been defined: LIBRARY BACKUP BACKUP BACKUP BACKUP LOCATION RETENTION PERIOD NATURE FREQUENCY MEDIA ssb-kkj-vseg1: Complete Daily Tape 15 days Volume Details of actual backups taken for the project will be recorded in the Backup Register. 10.7.6 Procedure for the storage of documents and magnetic media • What magnetic media will be used? • Why will they be used (e.g., what will be stored on them?) • How will storage take place? • Where will they be stored? The following storage of documents and magnetic media has been identified as being necessary: 10.7.7 Procedure for retrieval and reproduction of controlled items from the library • Who has access to the libraries? • What needs to be done to take a document out of the library? (list the steps involved) The following process has been identified for the retrieval and reproduction of items from the library: 10.8 Change Management Procedure • What is the Change Management Procedure? • What steps are involved in getting a change through from a request to rejection or implementation? • What categories of change request exist? Strictly Confidential Version 1.0 Page 20 of 28
  • 21. Project Management Plan The process for assessing and implementing changes to the baselined plan is as follows: 1. The desired change must be entered into PBN as a “Change Request” 2. The Simplilearn PM will allocate the change request to a project team member for assessment. 3. The change request plus impact analysis will be presented to the Simplilearn PM, CCB 4. A decision will be taken as to whether the change can be accepted or not. 5. The project scope will be amended as appropriate and the changes tracked in this document. The following Change Request categories exist: • Nice to Have (the lowest priority category) • Medium • Vital (the highest priority category) The response time to assessing change is as follows: CATEGORY OF CHANGE RESPONSE TIME Nice to Have > 8 hours Medium > 4 hours < 8 hours Vital < 4 hours 10.9 Configuration Status reporting • List the Configuration Reports that will be produced • List who will provide them under “From” • List who will receive them under “To” • How frequently are they produced? • In what format are they produced? • What procedure will they be produced in? The Configuration Status Reporting for the Project is as follows: REPORT FROM TO FREQUENCY FORMAT PROCEDURE Configuration Status Report SCM PSM/SPM Monthly Configuration Audit Report QM PSM Monthly 10.10Project Audit Schedule • When will the project be audited? • Enter how many audits are planned in the first column The internal audit schedule for the project is as follows: Strictly Confidential Version 1.0 Page 21 of 28
  • 22. Project Management Plan # PLANNED DATE ACTUAL DATE NO OF NON-CONFORMANCE(S) 1. 2. 3. Strictly Confidential Version 1.0 Page 22 of 28
  • 23. Project Management Plan 11 Resource Plan 11.1 Person Power • Specify the number of and type of personnel required for project execution • Specify activity, start date, duration of needs, and the methods for obtaining, retaining and phasing out of personnel • Ensure that these are included in the Work-breakdown, Estimates and Schedules The following personnel are required to execute the project: Phase Period Planned Actual PSM TL TM Total PSM TL TM Total Planning 1 8+1 29 39 1 8+1 29 39 Design 1 8+1 29 39 1 8+1 29 39 Development 1 8+1 29 39 1 8+1 29 39 Testing Acceptance Handover Project Close Out 11.2 Training • Describe the training requirements • What is the training schedule for the project specific training • The HR Group will need to be involved for this part of the plan • Ensure that these are included in the Work-breakdown, Estimates and Schedules. The following training requirements have been identified: NAME SKILLS SKILLS TRAINING TRAINING PLANNED ACTUAL REQUIRED REQUIRED REQUIRED MODE DATE DATE DATE 11.3 Hardware • Specify the hardware platform and the quantities to be used for development and for final installation. • Specify the source for the hardware – this could be purchase, client supplied hardware, hardware from other projects, etc. • Identify the critical hardware resources (if any). • Ensure that these are included in the Work-breakdown, Estimates and Schedules. Strictly Confidential Version 1.0 Page 23 of 28
  • 24. Project Management Plan The following hardware requirements have been identified: Add text here… 11.4 Software • Specify the software platform and the quantities to be used for development and for final installation. (This should include compilers, operating systems, editors, utilities, RDBMS, project management tools, configuration management tools, project quality assurance tools, testing tools, coding standards checkers, etc.) • Specify the source for the software– this could be purchase, client supplied software, available software from other projects, etc. • Ensure that these are included in the Work-breakdown, Estimates and Schedules. • Identify the critical software resources (if any). The following software resource requirements have been identified: Add text here… 11.5 Other resources • Specify other resources that will be required for the project (These could include expert consultants, books, magazines, cell-phones, pagers, manuals, etc.) • Ensure that these are included in the Work-breakdown, Estimates and Schedules. The following resource requirements have been identified: Add text here… 11.6 Budget • Specify the itemized budget for the project in money terms • In addition to the manpower effort, training, hardware and software, include the cost related to items like travel, communication, etc • Specify the budget by phase of the project The following monetary resource requirements have been identified: Add text here… 12 Simplilearn Obligations 12.1 Simplilearn Activities • Specify the activities that the client is obliged to perform as per the contract or later agreements, the basis for identifying such action, the manner of monitoring these and the way of coordinating with the client to ensure these. Strictly Confidential Version 1.0 Page 24 of 28
  • 25. Project Management Plan • Specify how a delay by the client will be handled (due escalation to Group Manager and equivalent levels from the client organization, etc.), especially where a delay by the client impacts the cost/ schedule/ quality. • Specify the responsibility for managing the activities related to coordinating client obligations, follow-up and record-keeping, escalation, etc. • Ensure that these are included in the Work-breakdown, Estimates and Schedules. The following actions are required from <Client> for the successful execution of the project: • X • Y • Z 12.2 Simplilearn Supplied product handling • Provide the list of client supplied artifacts and involvements in the project, and how it will be ensured that: • The artifacts are available as per schedule • The artifacts received are of the required quality and perform the intended function, and if not, the client is informed and suitable corrective action taken • The artifacts are maintained separately and are traceable • The artifacts are handled as per contractual requirement at the end of the project. • Specify the version control mechanism to be used, and the specific responsibility for these products. • Ensure that these are included in the Work-breakdown, Estimates and Schedules. The following artifacts have been identified as requiring <Client> action:.... Add text here 13 Verification & Validation 13.1 Review Plan 13.1.1 Artifact Review Strategy • Identify the artifacts needing to be reviewed • Identify the review type required (formal, informal) • When and how will the review take place • Who will be involved in the review? The following reviews of artifacts have been identified during the course of the project: ARTIFACT NAME REVIEW TYPE PLANNED REVIEW ACTUAL REVIEW REVIEWER(S) DATE DATE Strictly Confidential Version 1.0 Page 25 of 28
  • 26. Project Management Plan ARTIFACT NAME REVIEW TYPE PLANNED REVIEW ACTUAL REVIEW REVIEWER(S) DATE DATE 13.1.2 Artifact Approval Strategy • Identify the artifacts needing to be approved • Identify the approval type required (e.g. sign-off) • When and how will the review take place • Who will be involved in the review? The following approval of artifacts have been identified during the course of the project: ARTIFACT NAME APPROVAL TYPE PLANNED ACTUAL APPROVAL APPROVER(S) APPROVAL DATE DATE 13.1.3 Artifact Approval Criteria • Identify the artifacts the will be approved • Identify the factors by which their acceptability can be measured, under approval criteria The following approval criteria have been identified for each of the artifacts: ARTIFACT NAME APPROVAL CRITERIA 13.2 Software Quality Assurance Plan 13.2.1 Test Approval Strategy • Identify the Test Phases in the project • Identify the Critical Success Factors • When should the Test Phase come to an end • When did it come to an end? • Who approves the test phase as complete? The following test strategy will be in place for the project: TEST PHASE NAME CRITICAL SUCCESS PLANNED ACTUAL APPROVER(S) FACTORS APPROVAL DATE APPROVAL DATE Strictly Confidential Version 1.0 Page 26 of 28
  • 27. Project Management Plan TEST PHASE NAME CRITICAL SUCCESS PLANNED ACTUAL APPROVER(S) FACTORS APPROVAL DATE APPROVAL DATE 13.3 Test Strategy Overview • Test • Include the strategy for various types of testing (such as unit, integration, system and acceptance). • Also specify how different aspects like load, stress, usability, maintainability will be tested. • Who will perform the testing • When will the testing take place Refer to the Test Plan for additional details. 14 Quality Recording Handling 14.1 Review Record storage & Handling • Specify how the review records generated during the reviews will be stored and retrieved • How will the data be analyzed for feedback to the project? • Specify the frequency of review record analysis • Who is (the person(s)) responsible for it? • What tools and techniques to be used? • Specify how the feedback obtained by such analysis will be used back within the project and the responsibility for this. 15 Document reviews and approvals 15.1 Document Reviewers • Who has received a copy of the document for review and why? NAME ROLE DATE REASON Krishna Kumar Program Review for accuracy & completeness with a view to Manager approval Simplilearn Project Manager <Client> Project Manager Strictly Confidential Version 1.0 Page 27 of 28
  • 28. Project Management Plan 15.2 Additional recipients of the document • Apart from the reviewers, who has received a copy of the document and why? NAME ROLE DATE REASON 15.3 Document Approvers • Who has received a copy of the document for approval? Did they review it first? Signing-off the document approves the Project Management Plan as being complete and accurate. By signing below I acknowledge that I have read the entire contents of this document and accept the document in this form as reasonably representing all issues, goals, and tasks intended for the scope of this project. Optionally I may attach modifications to the document and only apply my initials to indicate that this document needs revisions before it will represent final delivery. NAME ROLE DATE SIGNATURE OF APPROVAL Strictly Confidential Version 1.0 Page 28 of 28