Visual8 Corporation
WSC2013 – SIMUL8 User Group Presentation
2

Agenda



About Visual8 – Company Overview



Example Projects



Case Study – Automated Plywood Patching Line



Live Demonstration



Questions & Answers



Conclusion
3

Visual8 Overview
Company Profile

Background:
– Industrial Engineering & Operations Research Consultants
– Provide productivity improvements to companies through
simulation modeling, analysis and optimization

Business Focus:
– Simulation Consulting, Training & Support with SIMUL8
– Optimization, Planning & Scheduling
– Strategic, Tactical & Operational Level Decision Support
Industry Specialization:
–
–
–

General Manufacturing, Distribution & Supply Chain
Automotive, Food & Beverage, Plastics, Oil & Gas
Mining, Smelting, Metals Processing
4

Example Projects
Distribution Centre – Inventory Management

Objective:
 To identify whether the warehouse can conform to plan
 To determine the inventory sizing required for all products
 To allocate spacing and materials handling to all floors

Solution:
 Create a warehousing simulation of the entire DC and show inventory
movements, arrivals and shipments, inventory spacing, and labour
requirements.

Benefits:
 Capacity Planning tool for new products
 Correct sizing of inventory for product mix and replenishment
 Proven delivery capability to stores
5

Example Projects
Dairy Cooler – Process Improvement

Objective:
 Evaluate the impact of product layout and staff plans on labour picking
time
 Determine the impact of sequencing and batching of product on storage
requirements and order fulfillment

Solution:
 Created a component-based flexible simulator that can be used to
simulate the operation of all 15 Dairies

Benefits:
 Increased output with minimal capital changes

 Determine the capacity limits of the materials handling system
 Standardized Best-Practices Procedures across plants
6

Example Projects
Candy Manufacturer – Capacity Planning

Objective:
 Consolidation of external packaging plant within plant
 To identify WIP and Finished Goods space requirements
 To evaluate impact of smaller batches to directly feed packing

Solution:
 Create a plant-wide simulation of entire Candy operations and simulate
the impact of the new packaging lines

Benefits:
 Decrease in transportation and plant costs
 Correct inventory sizing prior to commissioning of line
 Identified a need for a tighter scheduling system
7

Example Projects
Automotive Bumper Line – Takt-Time Analysis

Objective:
 Demonstrate capability of planned assembly line to Customer
 To determine the correct number of assembly stations
 To allocate appropriate tasks and parts to stations

Solution:
 Create an assembly-line simulation of the Bumper line and show build
rates, line replenishment requirements, delivery rates, and labor
requirements

Benefits:
 Reduced commissioning time of the line to meet TAKT times
 Correct sizing of bins for product mix and replenishment
 Proven delivery capability to Customer
8

Case Study – Plywood Finishing
Background:
Major US plywood manufacturer wanted to update their current
manual defect patching process to an automated robotic line.
A number of different design configurations were proposed and
the company wanted a way to effectively evaluate them.

Project Objective:
Design and construct detailed simulation models of the various
proposed patch line designs
Conduct sensitivity analysis study to help determine the
configuration best suited to meet client requirements.
9

Case Study – Plywood Finishing
Project Steps:
1.
2.
3.

4.
5.

Coordination & Data Collection
Initial Simulation Model Development
Preliminary Analysis & Review
Model Refinement and In-Depth Analysis
Onsite Review and Discussion
10

Process Description - Current
Manual Plywood Inspection & Repair
•
•

•
•
•

Stacks of manufactured plywood delivered to the line
Plywood conveyed through a panel inspection/repair
area on rigid belt
Defects in panel manually processed by two workers
Routing to remove defects such as knots
Patching to fill holes left by router and other defects such
as cracks

Process Issues
•
•

•

Lack of quality control
High level of rework
Excessive use of Patching compound
11

Process Description - Planned
Automated Inspection & Repair
•
•

•

•
•

Stacks of manufactured plywood delivered to the line
Plywood conveyed through an imaging tool to identify
quantity, types, sizes and locations of defects
Product conveyed to Routing or combined Routing and
Patching equipment, indexed and locked into position
Routing operation to remove defects such as knots
Patching operation to fill holes left by router and other
defects such as cracks

Key considerations
•

•

Supply of plywood/movement of product through the
scanner and line not an issue
Need to achieve high throughput with good utilization of
equipment, Limited floor space available
12

Process Description - Planned
Panel Loading

Defect Scanning

Panel Exit

Panel Repair Stations
13

Model Inputs
14

Model Inputs
15

Model Inputs
16

Model Inputs
17

Design Layouts
Scenario 1a – Parallel Work Centers (Combined Route & Patch)
Key Design Factors:
1. Route & Patch operations
combined in same work
center (line)
2. Dedicated routing & patch
robots
3. Simple board conveyance
(even distribution to work
centers)
18

Design Layouts
Scenario 1b – Parallel Work Centers (Separate Route & Patch)
Key Design Factors:
1. Route & Patch operations
separate for each work
center (line)
2. Dedicated routing & patch
robots
3. Simple board conveyance
(even distribution to work
centers)
19

Design Layouts
Scenario 1c – Parallel Work Centers (Defect-based Board Routing)
Key Design Factors:
1. Route & Patch operations
combined in same work
center
2. Dedicated routing & patch
robots
3. Dual patch robots in one
work center
4. Defect-based board
conveyance (high defect
boards routed to dual robot
work centers)
20

Design Layouts
Scenario 1d – Parallel Work Centers (Shared Patch Robots)
Key Design Factors:
1. Route & Patch operations
separate in same work
center
2. Two patch robots shared
between to work centers
3. Simple board conveyance
(even distribution to work
centers)
21

Design Layouts
Scenario 1e – Parallel Work Centers (Shared Patch + Defect Routing)
Key Design Factors:
1. Route & Patch operations
separate in same work
center
2. Two patch robots shared
between to work centers
3. Dual patch robots in one
work center
4. Defect-based board
conveyance (high defect
boards routed to dual robot
work centers)
22

Design Layouts
Scenario 1f – Parallel Work Centers (Separate Route & Patch)
Key Design Factors:
1. Route & Patch operations
separate for each work
center (line)
2. Dedicated routing & patch
robots
3. Simple board conveyance
(even distribution to work
centers)
23

Design Layouts
Scenario 2a – Alternating Patch Robots (In/Out Conveyance)
Key Design Factors:
1. Route & Patch operations
combined in same work
center
2. Patch robots shared
between two work centers
3. Boards move into and out
of work centers from same
side
24

Design Layouts
Scenario 2b – Alternating Patch Robots (Flow-through Conveyance)
Key Design Factors:
1. Route & Patch operations
combined in same work
center
2. Patch robots shared
between two work centers
3. Boards flow through work
centers
25

Design Layouts
Layout 3 – Multiple Patch Robots per Board
Key Design Factors:
1. Single Work Center
resulting in lower space
utilization
2. Work on a single board
divided out to 4 robots
3. Boards flow through work
center
26

Design Layouts
Layout 4 – Combined Routing & Patch Robots
Key Design Factors:
1. Route & Patch operations
combined in same work
center
2. Routing and patch
operations are completed
by single robot
3. Boards flow through work
centers
27

Sensitivity Analysis Testing
Generated Data:
Simulation trials based on Panel data created using distributions
•

AC Grade / BC Grade / Siding Grade

Real Data:
Single runs utilizing actual Scanner data
•

AC Grade / BC Grade / Siding Grade

Breakdowns/Efficiency:
•
•

Randomized breakdowns
Scheduled stoppages
28

Results
Layout 1A

Layout 1B

Layout 1C

Layout 1D

Layout 1E

Layout 1F

Layout 2A

Layout 2B

Layout 3

Layout 4

Router 1: Utilization %

22.5

24.2

22.2

24.2

22.4

24.2

20.1

20.0

40.7

-

Router 2: Utilization %

22.4

24.3

22.2

24.4

22.5

24.0

19.8

19.8

32.6

-

Router 3: Utilization %

22.6

24.4

26.6

33.8

33.8

24.2

20.0

20.0

33.9

-

Router 4: Utilization %

-

-

-

-

-

24.5

20.1

20.0

26.3

-

Patching 1: Working %

70.7

76.3

69.7

76.2

89.9

76.4

79.2

86.2

18.0

81.8

Patching 2: Working %

70.6

76.4

69.7

76.3

95.3

76.2

84.6

77.3

17.6

81.9

Patching 3: Working %

70.6

76.3

37.8

48.1

48.2

76.1

79.6

86.3

-

81.8

Patching 4: Working %

-

-

45.7

57.9

57.9

76.4

84.3

77.1

-

81.6

4820

5207

5071

5881

5620

6938

5706

5751

3602

5518

Board Count

Key Findings:
•
•
•
•
•

Parallel Work Centers yield optimal throughput
Maximize Patch Robot Utilization by alternating workstations or combining Route/Patch
Minimize Routing & Patching overlap
Parallel Work Centers increase redundancy
Flow-though Work Centers at Patch if possible
29

Results
Highest throughput scenario Layout 1F:

Issues:
•
•
•

Unbalanced line yields underutilized Patch robots
Reconfiguring the line to balance line would mean exceeding floor space
limitations or require complex conveyor set up
Additional equipment & conveyance required – potential reliability impacts
30

Results
Final choice Layout 4:

Layout analysis:
• Throughput requirements met
• Machine utilization requirements achieved
• Floor space limitations not exceeded
• Conveyance simplicity maintained
31

Live Demonstration
Example Model, Q & A

 Presentation of Sample Model
 Questions & Answers

More Related Content

Viewers also liked

Social Media Case Study : Century Ply
Social Media Case Study : Century PlySocial Media Case Study : Century Ply
Social Media Case Study : Century PlySocial Samosa
 
Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...
Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...
Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...Katalyst Wealth
 
Century Ply India Ltd_SKP Securities Ltd
Century Ply India Ltd_SKP Securities LtdCentury Ply India Ltd_SKP Securities Ltd
Century Ply India Ltd_SKP Securities LtdAnik Das
 
Virtual manufacturing systems ppt
Virtual manufacturing systems pptVirtual manufacturing systems ppt
Virtual manufacturing systems pptAnusha Chethana
 
Western india plywood project
Western india plywood projectWestern india plywood project
Western india plywood projectNits Kedia
 
Bharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu SamantaBharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu SamantaDr. Asokendu Samanta
 
Plywood industry- A deep insight
Plywood industry- A deep insightPlywood industry- A deep insight
Plywood industry- A deep insightVikram Dahiya
 
Market Survey on Plywood
Market Survey on Plywood Market Survey on Plywood
Market Survey on Plywood Aakash Bareja
 
types of commercial Timber
types of commercial Timbertypes of commercial Timber
types of commercial TimberRohit Chandnani
 
Timber - A Construction Material
Timber - A Construction MaterialTimber - A Construction Material
Timber - A Construction MaterialAadîl Khåñ
 
Literature review in research
Literature review in researchLiterature review in research
Literature review in researchNursing Path
 
5. timber seasoning
5. timber seasoning5. timber seasoning
5. timber seasoningSt. Pat's
 

Viewers also liked (20)

Social Media Case Study : Century Ply
Social Media Case Study : Century PlySocial Media Case Study : Century Ply
Social Media Case Study : Century Ply
 
Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...
Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...
Century Plyboards Ltd (NSE Code - CENTURYPLY) - Aug'14 Katalyst Wealth Alpha ...
 
Century Ply India Ltd_SKP Securities Ltd
Century Ply India Ltd_SKP Securities LtdCentury Ply India Ltd_SKP Securities Ltd
Century Ply India Ltd_SKP Securities Ltd
 
ATS Company Reports: Greenply industries ltd.
ATS Company Reports: Greenply industries ltd.ATS Company Reports: Greenply industries ltd.
ATS Company Reports: Greenply industries ltd.
 
IMPORTANCE OF RETAIL VISIBILITY IN PLYWOOD CATEGORY
IMPORTANCE OF RETAIL VISIBILITY IN PLYWOOD CATEGORYIMPORTANCE OF RETAIL VISIBILITY IN PLYWOOD CATEGORY
IMPORTANCE OF RETAIL VISIBILITY IN PLYWOOD CATEGORY
 
Virtual manufacturing systems ppt
Virtual manufacturing systems pptVirtual manufacturing systems ppt
Virtual manufacturing systems ppt
 
Virtual Manufacturing
Virtual ManufacturingVirtual Manufacturing
Virtual Manufacturing
 
Virtual manufacturing
Virtual manufacturingVirtual manufacturing
Virtual manufacturing
 
Western india plywood project
Western india plywood projectWestern india plywood project
Western india plywood project
 
Bharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu SamantaBharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
 
Plywood industry- A deep insight
Plywood industry- A deep insightPlywood industry- A deep insight
Plywood industry- A deep insight
 
Market Survey on Plywood
Market Survey on Plywood Market Survey on Plywood
Market Survey on Plywood
 
PLYWOOD
PLYWOODPLYWOOD
PLYWOOD
 
types of commercial Timber
types of commercial Timbertypes of commercial Timber
types of commercial Timber
 
Greenply
GreenplyGreenply
Greenply
 
Timber ppt-1
Timber ppt-1Timber ppt-1
Timber ppt-1
 
Timber - A Construction Material
Timber - A Construction MaterialTimber - A Construction Material
Timber - A Construction Material
 
Literature review in research
Literature review in researchLiterature review in research
Literature review in research
 
Mba project report
Mba project reportMba project report
Mba project report
 
5. timber seasoning
5. timber seasoning5. timber seasoning
5. timber seasoning
 

Similar to Visual8 Corporation SIMUL8 User Group Presentation Case Study

IPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptxIPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptxShaownRahmanSaidur
 
Mba ii pmom_unit-2.3 facility layout a
Mba ii pmom_unit-2.3 facility layout aMba ii pmom_unit-2.3 facility layout a
Mba ii pmom_unit-2.3 facility layout aRai University
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
AutoML for user segmentation: how to match millions of users with hundreds of...
AutoML for user segmentation: how to match millions of users with hundreds of...AutoML for user segmentation: how to match millions of users with hundreds of...
AutoML for user segmentation: how to match millions of users with hundreds of...Institute of Contemporary Sciences
 
Chap08- Facility Layout.pptx
Chap08- Facility Layout.pptxChap08- Facility Layout.pptx
Chap08- Facility Layout.pptxKritikaRaj30
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.pptRenu Lamba
 
Process design layout
Process design layoutProcess design layout
Process design layoutAL Kindi
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET Journal
 
Process Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingProcess Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingDrGopiKrishnanPonnus
 

Similar to Visual8 Corporation SIMUL8 User Group Presentation Case Study (20)

IPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptxIPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptx
 
Mba ii pmom_unit-2.3 facility layout a
Mba ii pmom_unit-2.3 facility layout aMba ii pmom_unit-2.3 facility layout a
Mba ii pmom_unit-2.3 facility layout a
 
Anitha Vanga
Anitha VangaAnitha Vanga
Anitha Vanga
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
AutoML for user segmentation: how to match millions of users with hundreds of...
AutoML for user segmentation: how to match millions of users with hundreds of...AutoML for user segmentation: how to match millions of users with hundreds of...
AutoML for user segmentation: how to match millions of users with hundreds of...
 
Layout
LayoutLayout
Layout
 
layout.ppt
layout.pptlayout.ppt
layout.ppt
 
Chap08- Facility Layout.pptx
Chap08- Facility Layout.pptxChap08- Facility Layout.pptx
Chap08- Facility Layout.pptx
 
Facility+layout
Facility+layoutFacility+layout
Facility+layout
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
facility layout.ppt
facility layout.pptfacility layout.ppt
facility layout.ppt
 
Process design layout
Process design layoutProcess design layout
Process design layout
 
6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Process Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular ManufacturingProcess Planning & Cost Estimation - Cellular Manufacturing
Process Planning & Cost Estimation - Cellular Manufacturing
 
Apqp la
Apqp laApqp la
Apqp la
 

More from SIMUL8 Corporation

Testing the impact of policy decisions using simulation
Testing the impact of policy decisions using simulationTesting the impact of policy decisions using simulation
Testing the impact of policy decisions using simulationSIMUL8 Corporation
 
3 Simulation Case Studies from ABUHB
3 Simulation Case Studies from ABUHB3 Simulation Case Studies from ABUHB
3 Simulation Case Studies from ABUHBSIMUL8 Corporation
 
Using Simulation for Facility Planning in Healthcare
Using Simulation for Facility Planning in HealthcareUsing Simulation for Facility Planning in Healthcare
Using Simulation for Facility Planning in HealthcareSIMUL8 Corporation
 
Improving Laboratory Flow with Simulation
Improving Laboratory Flow with SimulationImproving Laboratory Flow with Simulation
Improving Laboratory Flow with SimulationSIMUL8 Corporation
 
Merging Cath Labs: Using simulation to design a solution and understand the i...
Merging Cath Labs: Using simulation to design a solution and understand the i...Merging Cath Labs: Using simulation to design a solution and understand the i...
Merging Cath Labs: Using simulation to design a solution and understand the i...SIMUL8 Corporation
 
Releasing ICU bed capacity using simulation
Releasing ICU bed capacity using simulationReleasing ICU bed capacity using simulation
Releasing ICU bed capacity using simulationSIMUL8 Corporation
 
Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...
Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...
Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...SIMUL8 Corporation
 
Bringing Data to Life with Simulation
Bringing Data to Life with SimulationBringing Data to Life with Simulation
Bringing Data to Life with SimulationSIMUL8 Corporation
 
Simulation modeling of pre/post bed needs for an Interventional Platform
Simulation modeling of pre/post bed needs for an Interventional PlatformSimulation modeling of pre/post bed needs for an Interventional Platform
Simulation modeling of pre/post bed needs for an Interventional PlatformSIMUL8 Corporation
 
Redefining the care team to meet Population Health objectives
Redefining the care team to meet Population Health objectivesRedefining the care team to meet Population Health objectives
Redefining the care team to meet Population Health objectivesSIMUL8 Corporation
 
Controlling your simulation from spreadsheets
Controlling your simulation from spreadsheetsControlling your simulation from spreadsheets
Controlling your simulation from spreadsheetsSIMUL8 Corporation
 
Adding more complexity to your simulation
Adding more complexity to your simulationAdding more complexity to your simulation
Adding more complexity to your simulationSIMUL8 Corporation
 
Improving Eye Care Outpatient Services with Simulation
Improving Eye Care Outpatient Services with SimulationImproving Eye Care Outpatient Services with Simulation
Improving Eye Care Outpatient Services with SimulationSIMUL8 Corporation
 
Getting Started with Simulation
Getting Started with SimulationGetting Started with Simulation
Getting Started with SimulationSIMUL8 Corporation
 
SIMTEGR8: Simulation To Evaluate Great Care
SIMTEGR8: Simulation To Evaluate Great CareSIMTEGR8: Simulation To Evaluate Great Care
SIMTEGR8: Simulation To Evaluate Great CareSIMUL8 Corporation
 
Using Simulation for Hospital Planning
Using Simulation for Hospital PlanningUsing Simulation for Hospital Planning
Using Simulation for Hospital PlanningSIMUL8 Corporation
 
CMS Measures Forum - Chronic Disease
CMS Measures Forum - Chronic DiseaseCMS Measures Forum - Chronic Disease
CMS Measures Forum - Chronic DiseaseSIMUL8 Corporation
 
Launch & Grow a Successful Simulation Program
Launch & Grow a Successful Simulation ProgramLaunch & Grow a Successful Simulation Program
Launch & Grow a Successful Simulation ProgramSIMUL8 Corporation
 
Population Health Planning for Chronic Disease
Population Health Planning for Chronic DiseasePopulation Health Planning for Chronic Disease
Population Health Planning for Chronic DiseaseSIMUL8 Corporation
 

More from SIMUL8 Corporation (20)

Basics1_07_2019
Basics1_07_2019Basics1_07_2019
Basics1_07_2019
 
Testing the impact of policy decisions using simulation
Testing the impact of policy decisions using simulationTesting the impact of policy decisions using simulation
Testing the impact of policy decisions using simulation
 
3 Simulation Case Studies from ABUHB
3 Simulation Case Studies from ABUHB3 Simulation Case Studies from ABUHB
3 Simulation Case Studies from ABUHB
 
Using Simulation for Facility Planning in Healthcare
Using Simulation for Facility Planning in HealthcareUsing Simulation for Facility Planning in Healthcare
Using Simulation for Facility Planning in Healthcare
 
Improving Laboratory Flow with Simulation
Improving Laboratory Flow with SimulationImproving Laboratory Flow with Simulation
Improving Laboratory Flow with Simulation
 
Merging Cath Labs: Using simulation to design a solution and understand the i...
Merging Cath Labs: Using simulation to design a solution and understand the i...Merging Cath Labs: Using simulation to design a solution and understand the i...
Merging Cath Labs: Using simulation to design a solution and understand the i...
 
Releasing ICU bed capacity using simulation
Releasing ICU bed capacity using simulationReleasing ICU bed capacity using simulation
Releasing ICU bed capacity using simulation
 
Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...
Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...
Vidant Duplin Hospital: Testing Emergency Department improvements with Simula...
 
Bringing Data to Life with Simulation
Bringing Data to Life with SimulationBringing Data to Life with Simulation
Bringing Data to Life with Simulation
 
Simulation modeling of pre/post bed needs for an Interventional Platform
Simulation modeling of pre/post bed needs for an Interventional PlatformSimulation modeling of pre/post bed needs for an Interventional Platform
Simulation modeling of pre/post bed needs for an Interventional Platform
 
Redefining the care team to meet Population Health objectives
Redefining the care team to meet Population Health objectivesRedefining the care team to meet Population Health objectives
Redefining the care team to meet Population Health objectives
 
Controlling your simulation from spreadsheets
Controlling your simulation from spreadsheetsControlling your simulation from spreadsheets
Controlling your simulation from spreadsheets
 
Adding more complexity to your simulation
Adding more complexity to your simulationAdding more complexity to your simulation
Adding more complexity to your simulation
 
Improving Eye Care Outpatient Services with Simulation
Improving Eye Care Outpatient Services with SimulationImproving Eye Care Outpatient Services with Simulation
Improving Eye Care Outpatient Services with Simulation
 
Getting Started with Simulation
Getting Started with SimulationGetting Started with Simulation
Getting Started with Simulation
 
SIMTEGR8: Simulation To Evaluate Great Care
SIMTEGR8: Simulation To Evaluate Great CareSIMTEGR8: Simulation To Evaluate Great Care
SIMTEGR8: Simulation To Evaluate Great Care
 
Using Simulation for Hospital Planning
Using Simulation for Hospital PlanningUsing Simulation for Hospital Planning
Using Simulation for Hospital Planning
 
CMS Measures Forum - Chronic Disease
CMS Measures Forum - Chronic DiseaseCMS Measures Forum - Chronic Disease
CMS Measures Forum - Chronic Disease
 
Launch & Grow a Successful Simulation Program
Launch & Grow a Successful Simulation ProgramLaunch & Grow a Successful Simulation Program
Launch & Grow a Successful Simulation Program
 
Population Health Planning for Chronic Disease
Population Health Planning for Chronic DiseasePopulation Health Planning for Chronic Disease
Population Health Planning for Chronic Disease
 

Recently uploaded

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 

Recently uploaded (20)

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 

Visual8 Corporation SIMUL8 User Group Presentation Case Study

  • 1. Visual8 Corporation WSC2013 – SIMUL8 User Group Presentation
  • 2. 2 Agenda  About Visual8 – Company Overview  Example Projects  Case Study – Automated Plywood Patching Line  Live Demonstration  Questions & Answers  Conclusion
  • 3. 3 Visual8 Overview Company Profile Background: – Industrial Engineering & Operations Research Consultants – Provide productivity improvements to companies through simulation modeling, analysis and optimization Business Focus: – Simulation Consulting, Training & Support with SIMUL8 – Optimization, Planning & Scheduling – Strategic, Tactical & Operational Level Decision Support Industry Specialization: – – – General Manufacturing, Distribution & Supply Chain Automotive, Food & Beverage, Plastics, Oil & Gas Mining, Smelting, Metals Processing
  • 4. 4 Example Projects Distribution Centre – Inventory Management Objective:  To identify whether the warehouse can conform to plan  To determine the inventory sizing required for all products  To allocate spacing and materials handling to all floors Solution:  Create a warehousing simulation of the entire DC and show inventory movements, arrivals and shipments, inventory spacing, and labour requirements. Benefits:  Capacity Planning tool for new products  Correct sizing of inventory for product mix and replenishment  Proven delivery capability to stores
  • 5. 5 Example Projects Dairy Cooler – Process Improvement Objective:  Evaluate the impact of product layout and staff plans on labour picking time  Determine the impact of sequencing and batching of product on storage requirements and order fulfillment Solution:  Created a component-based flexible simulator that can be used to simulate the operation of all 15 Dairies Benefits:  Increased output with minimal capital changes  Determine the capacity limits of the materials handling system  Standardized Best-Practices Procedures across plants
  • 6. 6 Example Projects Candy Manufacturer – Capacity Planning Objective:  Consolidation of external packaging plant within plant  To identify WIP and Finished Goods space requirements  To evaluate impact of smaller batches to directly feed packing Solution:  Create a plant-wide simulation of entire Candy operations and simulate the impact of the new packaging lines Benefits:  Decrease in transportation and plant costs  Correct inventory sizing prior to commissioning of line  Identified a need for a tighter scheduling system
  • 7. 7 Example Projects Automotive Bumper Line – Takt-Time Analysis Objective:  Demonstrate capability of planned assembly line to Customer  To determine the correct number of assembly stations  To allocate appropriate tasks and parts to stations Solution:  Create an assembly-line simulation of the Bumper line and show build rates, line replenishment requirements, delivery rates, and labor requirements Benefits:  Reduced commissioning time of the line to meet TAKT times  Correct sizing of bins for product mix and replenishment  Proven delivery capability to Customer
  • 8. 8 Case Study – Plywood Finishing Background: Major US plywood manufacturer wanted to update their current manual defect patching process to an automated robotic line. A number of different design configurations were proposed and the company wanted a way to effectively evaluate them. Project Objective: Design and construct detailed simulation models of the various proposed patch line designs Conduct sensitivity analysis study to help determine the configuration best suited to meet client requirements.
  • 9. 9 Case Study – Plywood Finishing Project Steps: 1. 2. 3. 4. 5. Coordination & Data Collection Initial Simulation Model Development Preliminary Analysis & Review Model Refinement and In-Depth Analysis Onsite Review and Discussion
  • 10. 10 Process Description - Current Manual Plywood Inspection & Repair • • • • • Stacks of manufactured plywood delivered to the line Plywood conveyed through a panel inspection/repair area on rigid belt Defects in panel manually processed by two workers Routing to remove defects such as knots Patching to fill holes left by router and other defects such as cracks Process Issues • • • Lack of quality control High level of rework Excessive use of Patching compound
  • 11. 11 Process Description - Planned Automated Inspection & Repair • • • • • Stacks of manufactured plywood delivered to the line Plywood conveyed through an imaging tool to identify quantity, types, sizes and locations of defects Product conveyed to Routing or combined Routing and Patching equipment, indexed and locked into position Routing operation to remove defects such as knots Patching operation to fill holes left by router and other defects such as cracks Key considerations • • Supply of plywood/movement of product through the scanner and line not an issue Need to achieve high throughput with good utilization of equipment, Limited floor space available
  • 12. 12 Process Description - Planned Panel Loading Defect Scanning Panel Exit Panel Repair Stations
  • 17. 17 Design Layouts Scenario 1a – Parallel Work Centers (Combined Route & Patch) Key Design Factors: 1. Route & Patch operations combined in same work center (line) 2. Dedicated routing & patch robots 3. Simple board conveyance (even distribution to work centers)
  • 18. 18 Design Layouts Scenario 1b – Parallel Work Centers (Separate Route & Patch) Key Design Factors: 1. Route & Patch operations separate for each work center (line) 2. Dedicated routing & patch robots 3. Simple board conveyance (even distribution to work centers)
  • 19. 19 Design Layouts Scenario 1c – Parallel Work Centers (Defect-based Board Routing) Key Design Factors: 1. Route & Patch operations combined in same work center 2. Dedicated routing & patch robots 3. Dual patch robots in one work center 4. Defect-based board conveyance (high defect boards routed to dual robot work centers)
  • 20. 20 Design Layouts Scenario 1d – Parallel Work Centers (Shared Patch Robots) Key Design Factors: 1. Route & Patch operations separate in same work center 2. Two patch robots shared between to work centers 3. Simple board conveyance (even distribution to work centers)
  • 21. 21 Design Layouts Scenario 1e – Parallel Work Centers (Shared Patch + Defect Routing) Key Design Factors: 1. Route & Patch operations separate in same work center 2. Two patch robots shared between to work centers 3. Dual patch robots in one work center 4. Defect-based board conveyance (high defect boards routed to dual robot work centers)
  • 22. 22 Design Layouts Scenario 1f – Parallel Work Centers (Separate Route & Patch) Key Design Factors: 1. Route & Patch operations separate for each work center (line) 2. Dedicated routing & patch robots 3. Simple board conveyance (even distribution to work centers)
  • 23. 23 Design Layouts Scenario 2a – Alternating Patch Robots (In/Out Conveyance) Key Design Factors: 1. Route & Patch operations combined in same work center 2. Patch robots shared between two work centers 3. Boards move into and out of work centers from same side
  • 24. 24 Design Layouts Scenario 2b – Alternating Patch Robots (Flow-through Conveyance) Key Design Factors: 1. Route & Patch operations combined in same work center 2. Patch robots shared between two work centers 3. Boards flow through work centers
  • 25. 25 Design Layouts Layout 3 – Multiple Patch Robots per Board Key Design Factors: 1. Single Work Center resulting in lower space utilization 2. Work on a single board divided out to 4 robots 3. Boards flow through work center
  • 26. 26 Design Layouts Layout 4 – Combined Routing & Patch Robots Key Design Factors: 1. Route & Patch operations combined in same work center 2. Routing and patch operations are completed by single robot 3. Boards flow through work centers
  • 27. 27 Sensitivity Analysis Testing Generated Data: Simulation trials based on Panel data created using distributions • AC Grade / BC Grade / Siding Grade Real Data: Single runs utilizing actual Scanner data • AC Grade / BC Grade / Siding Grade Breakdowns/Efficiency: • • Randomized breakdowns Scheduled stoppages
  • 28. 28 Results Layout 1A Layout 1B Layout 1C Layout 1D Layout 1E Layout 1F Layout 2A Layout 2B Layout 3 Layout 4 Router 1: Utilization % 22.5 24.2 22.2 24.2 22.4 24.2 20.1 20.0 40.7 - Router 2: Utilization % 22.4 24.3 22.2 24.4 22.5 24.0 19.8 19.8 32.6 - Router 3: Utilization % 22.6 24.4 26.6 33.8 33.8 24.2 20.0 20.0 33.9 - Router 4: Utilization % - - - - - 24.5 20.1 20.0 26.3 - Patching 1: Working % 70.7 76.3 69.7 76.2 89.9 76.4 79.2 86.2 18.0 81.8 Patching 2: Working % 70.6 76.4 69.7 76.3 95.3 76.2 84.6 77.3 17.6 81.9 Patching 3: Working % 70.6 76.3 37.8 48.1 48.2 76.1 79.6 86.3 - 81.8 Patching 4: Working % - - 45.7 57.9 57.9 76.4 84.3 77.1 - 81.6 4820 5207 5071 5881 5620 6938 5706 5751 3602 5518 Board Count Key Findings: • • • • • Parallel Work Centers yield optimal throughput Maximize Patch Robot Utilization by alternating workstations or combining Route/Patch Minimize Routing & Patching overlap Parallel Work Centers increase redundancy Flow-though Work Centers at Patch if possible
  • 29. 29 Results Highest throughput scenario Layout 1F: Issues: • • • Unbalanced line yields underutilized Patch robots Reconfiguring the line to balance line would mean exceeding floor space limitations or require complex conveyor set up Additional equipment & conveyance required – potential reliability impacts
  • 30. 30 Results Final choice Layout 4: Layout analysis: • Throughput requirements met • Machine utilization requirements achieved • Floor space limitations not exceeded • Conveyance simplicity maintained
  • 31. 31 Live Demonstration Example Model, Q & A  Presentation of Sample Model  Questions & Answers