An assessment of the feasibility of
introducing bus priority signalling in
Dublin
/
An appraisal of introducing bus priority
signaling in Dublin
/
…
Introduction Presentation to Thesis
2
Introduction Presentation to Thesis
Problem definition
• There is a growing demand for smarter
transport due to Congestion,
Environmental, Health reasons
• ITS are playing an increasing role in
transport
• Dublin is very dependent on Bus transport
• Yet the focus is still strongly towards the
car even though there are severe
limitations to Dublin’s bridges capacity
(6,000 cars during peak hours)
3
Influencing
Factors for
introducing
Bus Signal
Priority in
Dublin
Social
Political
Technical
Reliability
factors
• Travel time savings
• Cost of software
• Operational savings
Other reliability factors
• waiting
• travel time
• Total
• Access
• Egress
• comfort
• Why is it important to have PT
• Accessibility
• Social exclusion
• Paradigm shifts a growing
awareness of a variety of physical,
social, environmental and health
related effects
• Essentially politicians are scared to
introduce anything to radical...
Introduction Presentation to Thesis
4
• Scope
- I will focus on Dublins 16 QBC’s (Quality Bus Corridors) /and the LUAS lines
Introduction Presentation to Thesis
5
• Research Question
- Question: to determine to what extent priority signaling will be feasible in Dublin
• Sub Questions
- What social requirements does public transport need to fulfill? (and when is it
fulfilled)
- What is the political willingness for transit priority measures to be introduced?
- What are the technical requirements that are necessary for transit priority
measure to be introduced?
- Are transit priority measures the best way to increase public transport status?
Other reliability measures
- What will the effects on traffic be if such a system was implemented in Dublin?
Introduction Presentation to Thesis
6
Methodology
1. Writing of the first chapter (above information)
2. Research into society and political theory – why PT is important and why certain policies
are implemented
3. Test these theories through surveys of population and interviewing politicians
4. Research technical requirements to implementing priority signaling and determine which
method/model is best
• Give brief case study – Amsterdam, London and how its implemented there
5. Model the current bus and LUAS network + model the network using the new method /
model. Determine effects on PT, other road vehicles, pedestrains (crossings), cyclists
6. Evaluate other reliability measures against this answer
7. Conclusion, recommendations, discussion
Introduction Presentation to Thesis
7
• Social
- Determined types of travelers and
therefore identified the vulnerables ones
who need PT and the ones that could shift
over
- (dis)advantages of CBA and MCA when
determining accessibility
- Gini Index and Lorenz Curve
alternative determination
• Political
- Paradigm change from ‘predict and provide’ to ‘new
realism’
- Policy was focused towards the car, therefore spatial
planning followed – activities were located outside
town centres
- Politicians want visible results but invisible costs - e.g.
road pricing has visible cost but invisible benefits
- Quantify? – stated preference survey on different
policies they prefer under different attributes e.g.
operational costs, congestion reduction, emission
reduction, acceptability among inhabitants and
acceptability among retailers
- What I might add is to relate what they say to the
actual policy investment made in the past
Introduction Presentation to Thesis
8
• Technical
- Interacting components
- Detection
- Priority Request Generator/Server
- Priority Control Strategies
- TSP System Management
- Types of priority systems
- Passive / active
- Conditional / unconditional
- What does Dublin use?
- Case Study
- Amsterdam
- London
• Reliability
- Service, technical and price reliability
- Service reliability
- Length of variability of vehicle trip time
in practice
- instruments operator / authority apply
- instruments, design choices at strategic
and tactical level
- Priority signaling is an element in the
instruments used to help improve the
reliability of PT
- …
Introduction Presentation to Thesis

More Related Content

What's hot

Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...
Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...
Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...Stefanie De Puydt
 
SMART International Symposium for Next Generation Infrastructure: Strategic a...
SMART International Symposium for Next Generation Infrastructure: Strategic a...SMART International Symposium for Next Generation Infrastructure: Strategic a...
SMART International Symposium for Next Generation Infrastructure: Strategic a...SMART Infrastructure Facility
 
Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...
Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...
Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...Energy Cultures 2 Janet Stephenson
 
Public procurement as game changer in citylogistics
Public procurement as game changer in citylogisticsPublic procurement as game changer in citylogistics
Public procurement as game changer in citylogisticsWalther Ploos van Amstel
 
Robert Margolis | DOE Solar Analysis Agenda
Robert Margolis | DOE Solar Analysis AgendaRobert Margolis | DOE Solar Analysis Agenda
Robert Margolis | DOE Solar Analysis AgendaGW Solar Institute
 
Alice Dalton: Evaluating the sustainability of office locations: a study of t...
Alice Dalton: Evaluating the sustainability of office locations: a study of t...Alice Dalton: Evaluating the sustainability of office locations: a study of t...
Alice Dalton: Evaluating the sustainability of office locations: a study of t...AGI Geocommunity
 
Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01
Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01
Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01Marco Lisi
 
Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02
Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02
Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02Marco Lisi
 
Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Morten Meyer
 
Active modes and urban mobility: outcomes from the ALLEGRO project
Active modes and urban mobility: outcomes from the ALLEGRO projectActive modes and urban mobility: outcomes from the ALLEGRO project
Active modes and urban mobility: outcomes from the ALLEGRO projectSerge Hoogendoorn
 
Active transport workshop hoogendoorn
Active transport workshop hoogendoornActive transport workshop hoogendoorn
Active transport workshop hoogendoornSerge Hoogendoorn
 
BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...
BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...
BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...CLIC Innovation Ltd
 
Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...
Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...
Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...Barry Wellar
 
E-buses and Electric Roads in Sweden
E-buses and Electric Roads in SwedenE-buses and Electric Roads in Sweden
E-buses and Electric Roads in SwedenBjörn Hasselgren
 

What's hot (20)

Transport Thursday Niel van Oort
Transport Thursday Niel van OortTransport Thursday Niel van Oort
Transport Thursday Niel van Oort
 
Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...
Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...
Tom Voege: Legalise it: legal and regulatory issues in the context of shared ...
 
SMART International Symposium for Next Generation Infrastructure: Strategic a...
SMART International Symposium for Next Generation Infrastructure: Strategic a...SMART International Symposium for Next Generation Infrastructure: Strategic a...
SMART International Symposium for Next Generation Infrastructure: Strategic a...
 
Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...
Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...
Pascale Blyth “A Planning Framework for Self-Driving Mobility Transitions: A ...
 
Public procurement as game changer in citylogistics
Public procurement as game changer in citylogisticsPublic procurement as game changer in citylogistics
Public procurement as game changer in citylogistics
 
Masters Dissertation Posters 2017
Masters Dissertation Posters 2017Masters Dissertation Posters 2017
Masters Dissertation Posters 2017
 
Robert Margolis | DOE Solar Analysis Agenda
Robert Margolis | DOE Solar Analysis AgendaRobert Margolis | DOE Solar Analysis Agenda
Robert Margolis | DOE Solar Analysis Agenda
 
Alice Dalton: Evaluating the sustainability of office locations: a study of t...
Alice Dalton: Evaluating the sustainability of office locations: a study of t...Alice Dalton: Evaluating the sustainability of office locations: a study of t...
Alice Dalton: Evaluating the sustainability of office locations: a study of t...
 
LeMO project poster
LeMO project posterLeMO project poster
LeMO project poster
 
Private finance in the roads sector
Private finance in the roads sectorPrivate finance in the roads sector
Private finance in the roads sector
 
Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01
Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01
Throughlife integrated concurrent_engineering_skoltech_2016_lisi_v01
 
Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02
Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02
Throughlife integrated concurrent_engineering_master_gaudenzi_2016_lisi_v02
 
Efficiency and pm
Efficiency and pmEfficiency and pm
Efficiency and pm
 
Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010
 
Active modes and urban mobility: outcomes from the ALLEGRO project
Active modes and urban mobility: outcomes from the ALLEGRO projectActive modes and urban mobility: outcomes from the ALLEGRO project
Active modes and urban mobility: outcomes from the ALLEGRO project
 
Rail Passenger Demand Forecasting - a view from the industry
Rail Passenger Demand Forecasting - a view from the industryRail Passenger Demand Forecasting - a view from the industry
Rail Passenger Demand Forecasting - a view from the industry
 
Active transport workshop hoogendoorn
Active transport workshop hoogendoornActive transport workshop hoogendoorn
Active transport workshop hoogendoorn
 
BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...
BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...
BEST: (How) Can centralised waste and sanitation infrastructure be replaced w...
 
Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...
Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...
Strategies for Infrastructure Improvements in Urban Neighbourhoods: An Issue-...
 
E-buses and Electric Roads in Sweden
E-buses and Electric Roads in SwedenE-buses and Electric Roads in Sweden
E-buses and Electric Roads in Sweden
 

Similar to Assessing Bus Priority Signaling in Dublin

Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...KTN
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
Operation Moving Traffic
Operation Moving TrafficOperation Moving Traffic
Operation Moving TrafficJumpingJaq
 
Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...Institute for Transport Studies (ITS)
 
Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planningMuhammadNomanAslam3
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Toronto Public Consultation Unit
 
Strategic to Simulation - A Pedestrian Perspective
Strategic to Simulation - A Pedestrian PerspectiveStrategic to Simulation - A Pedestrian Perspective
Strategic to Simulation - A Pedestrian PerspectiveJumpingJaq
 
Overcoming islands of disability
Overcoming islands of disabilityOvercoming islands of disability
Overcoming islands of disabilityJumpingJaq
 
Transport and Travel Challenges for the NHS - Webinar
Transport and Travel Challenges for the NHS - WebinarTransport and Travel Challenges for the NHS - Webinar
Transport and Travel Challenges for the NHS - Webinar4 All of Us
 
Urban transport (MODAL SHIFT ANALYSIS)
Urban transport (MODAL SHIFT ANALYSIS)Urban transport (MODAL SHIFT ANALYSIS)
Urban transport (MODAL SHIFT ANALYSIS)syafiqahbahrin
 
LS2: Exploring the Complexity of Policy Design
LS2: Exploring the Complexity of Policy DesignLS2: Exploring the Complexity of Policy Design
LS2: Exploring the Complexity of Policy DesignBRTCoE
 
LS2: Exploring the complexity of policy design
LS2: Exploring the complexity of policy designLS2: Exploring the complexity of policy design
LS2: Exploring the complexity of policy designBRTCoE
 
Creating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptxCreating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptxaditimeena173
 
Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updatedpyoungkyova
 

Similar to Assessing Bus Priority Signaling in Dublin (20)

Cost-Benefit Analysis in Transport - Professor Peter Mackie
Cost-Benefit Analysis in Transport - Professor Peter MackieCost-Benefit Analysis in Transport - Professor Peter Mackie
Cost-Benefit Analysis in Transport - Professor Peter Mackie
 
Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...
 
dr. cal
dr. caldr. cal
dr. cal
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
Operation Moving Traffic
Operation Moving TrafficOperation Moving Traffic
Operation Moving Traffic
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...Transport policy, appraisal, and decision making – is the process at the cros...
Transport policy, appraisal, and decision making – is the process at the cros...
 
Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planning
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
2030 and 2035 Transportation Plans Review
2030 and 2035 Transportation Plans Review2030 and 2035 Transportation Plans Review
2030 and 2035 Transportation Plans Review
 
Strategic to Simulation - A Pedestrian Perspective
Strategic to Simulation - A Pedestrian PerspectiveStrategic to Simulation - A Pedestrian Perspective
Strategic to Simulation - A Pedestrian Perspective
 
Overcoming islands of disability
Overcoming islands of disabilityOvercoming islands of disability
Overcoming islands of disability
 
Transport and Travel Challenges for the NHS - Webinar
Transport and Travel Challenges for the NHS - WebinarTransport and Travel Challenges for the NHS - Webinar
Transport and Travel Challenges for the NHS - Webinar
 
Urban transport (MODAL SHIFT ANALYSIS)
Urban transport (MODAL SHIFT ANALYSIS)Urban transport (MODAL SHIFT ANALYSIS)
Urban transport (MODAL SHIFT ANALYSIS)
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
 
LS2: Exploring the Complexity of Policy Design
LS2: Exploring the Complexity of Policy DesignLS2: Exploring the Complexity of Policy Design
LS2: Exploring the Complexity of Policy Design
 
LS2: Exploring the complexity of policy design
LS2: Exploring the complexity of policy designLS2: Exploring the complexity of policy design
LS2: Exploring the complexity of policy design
 
Creating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptxCreating a Sustainable Transportation Platform.pptx
Creating a Sustainable Transportation Platform.pptx
 
Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updated
 

Recently uploaded

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 

Assessing Bus Priority Signaling in Dublin

  • 1. An assessment of the feasibility of introducing bus priority signalling in Dublin / An appraisal of introducing bus priority signaling in Dublin / … Introduction Presentation to Thesis
  • 2. 2 Introduction Presentation to Thesis Problem definition • There is a growing demand for smarter transport due to Congestion, Environmental, Health reasons • ITS are playing an increasing role in transport • Dublin is very dependent on Bus transport • Yet the focus is still strongly towards the car even though there are severe limitations to Dublin’s bridges capacity (6,000 cars during peak hours)
  • 3. 3 Influencing Factors for introducing Bus Signal Priority in Dublin Social Political Technical Reliability factors • Travel time savings • Cost of software • Operational savings Other reliability factors • waiting • travel time • Total • Access • Egress • comfort • Why is it important to have PT • Accessibility • Social exclusion • Paradigm shifts a growing awareness of a variety of physical, social, environmental and health related effects • Essentially politicians are scared to introduce anything to radical... Introduction Presentation to Thesis
  • 4. 4 • Scope - I will focus on Dublins 16 QBC’s (Quality Bus Corridors) /and the LUAS lines Introduction Presentation to Thesis
  • 5. 5 • Research Question - Question: to determine to what extent priority signaling will be feasible in Dublin • Sub Questions - What social requirements does public transport need to fulfill? (and when is it fulfilled) - What is the political willingness for transit priority measures to be introduced? - What are the technical requirements that are necessary for transit priority measure to be introduced? - Are transit priority measures the best way to increase public transport status? Other reliability measures - What will the effects on traffic be if such a system was implemented in Dublin? Introduction Presentation to Thesis
  • 6. 6 Methodology 1. Writing of the first chapter (above information) 2. Research into society and political theory – why PT is important and why certain policies are implemented 3. Test these theories through surveys of population and interviewing politicians 4. Research technical requirements to implementing priority signaling and determine which method/model is best • Give brief case study – Amsterdam, London and how its implemented there 5. Model the current bus and LUAS network + model the network using the new method / model. Determine effects on PT, other road vehicles, pedestrains (crossings), cyclists 6. Evaluate other reliability measures against this answer 7. Conclusion, recommendations, discussion Introduction Presentation to Thesis
  • 7. 7 • Social - Determined types of travelers and therefore identified the vulnerables ones who need PT and the ones that could shift over - (dis)advantages of CBA and MCA when determining accessibility - Gini Index and Lorenz Curve alternative determination • Political - Paradigm change from ‘predict and provide’ to ‘new realism’ - Policy was focused towards the car, therefore spatial planning followed – activities were located outside town centres - Politicians want visible results but invisible costs - e.g. road pricing has visible cost but invisible benefits - Quantify? – stated preference survey on different policies they prefer under different attributes e.g. operational costs, congestion reduction, emission reduction, acceptability among inhabitants and acceptability among retailers - What I might add is to relate what they say to the actual policy investment made in the past Introduction Presentation to Thesis
  • 8. 8 • Technical - Interacting components - Detection - Priority Request Generator/Server - Priority Control Strategies - TSP System Management - Types of priority systems - Passive / active - Conditional / unconditional - What does Dublin use? - Case Study - Amsterdam - London • Reliability - Service, technical and price reliability - Service reliability - Length of variability of vehicle trip time in practice - instruments operator / authority apply - instruments, design choices at strategic and tactical level - Priority signaling is an element in the instruments used to help improve the reliability of PT - … Introduction Presentation to Thesis