SlideShare a Scribd company logo
1 of 28
4WEB
RTS
ADR
DAS
APS
OTM
PILOT
Queryser
BI
MESSAGING
DASHBOARD
VW - VISUAL WAREHOUSE
4WEB – Internet Acces
MES - Manufacturing Execution System
WMS – Warehouse Management System
TMS – Transport Management System
YMS – Yard Management System
TOS
QGUAR APS – one of many solutions in SCE software portfolio
APS – Advanced Planning & Scheduling
QGUAR APS – Advanced Planning & Scheduling
 Production to order
 Processes which require frequent and not
predictable changes in the production schedule
 Products which require many components or
complicated manufacturing processes
 Production by using many, different resources
 Manufacturing many different products in one
factory.
Lowering of costs and optimisation of production and
related processes time :
APS (Advanced Planning & Scheduling) –
IT solutions class, which allows for composing and optimisation of complex production
plans.
Qguar APS:
APS class solution, supporting management and planner in sophisticated production scheduling and optimisation
APS
WMS WMS
TRANSPORT
TMS
MES
WAREHOUSING
raw materials
components
packaging
PLANT’S ENVIRONMENT PLANT’S ENVIRONMENT PLANT’S ENVIRONMENT
YMS
WAREHOUSING
finished goods
PRODUCTION
planning
execution
Company as element in the supply chain and main Quantum’s solutions
Import of production operations
Preparation of schedule
Scheduling
Evaluation of schedule
System configuration
Schedule conversion Calculation of KPI for schedule
Definition of callendar Definition of resources
Choice of scheduling criterion
Definition of KPI - indicatiors of schedule
evaluation
General QGUAR APS flow-chart (split into main processes)
XML file with data from host system (MES, ERP)
Comparison of schedule on the basis of calculated KPIs
Confirmation of schedule Rating and confirmation of schedule
Export of production operations XML file with data for host system (MES, ERP)
QGUAR APS – functional scope
APS
Visualisation of schedule
Creation of production
schedule
(including dates of completion)
Parallel management of many
production plans
(with simulation of plans on the daily
weekly or monthly basis)
Production planing
for many production facilities,
branches, departments and stations
Number of KPIs
enabling evaluation of particular
scenarios and choosing optimal
production plan
Integration with external
solution MES and ERP solutions
factory, branch, production
departments, technological
installation
Data structure in Qguar APS allows for adaptation of the solution to production
organisation scheme in the company.
Data architecture
ENVIRONMENT
SESSION
1
SESSION
n
Schedule 1
Schedule 2
Schedule n
Schedule 1
Schedule 2
Schedule n
set of fixed data about orders to be
scheduled
SESSION
Schedule – versions of order
completion within the framework of
schedule session
Schedule
ENVIRONMENT
Qguar APS data
 Production orders
 Technology of production
(including resources to be used for orders
completion)
 Information about order’s progress (MES)
(from location – to location)
Data from external solutions
 Masterdata (callendars, resources)
 Set up times scheets
 Schedule’s configuration (indicators)
 Orders for completion of single works
Qguar APS internal configuration data
Callendars – daily chart
 Unlimited number
 Identification of days off and
holidays
 Definition of name and scope of
validity
 Each day can have different hours
structure
Features
 Production capacity
limited/unlimited, daily/weekly
 Resources
alternative/subordinate
 Optimal load
 Efficiency
 Work callendar
Features
Basic resources
 Machinesy
 Workers
 Cooperating
resources
Types of basic resource
 Warehouse, storage location
 Form / matrix
 Tool
 Accessories
 Transportation / route
Subordinate
Subordinate resources
 Production capacity
limited/unllimited, daily/weekly
 Resources
altenative/subordinate
 Optimal load
 Efficiency
 Work callendar
Features
Subordinate resources have assigned callendar, which together with callendar of main
resource create a grid for schedule definition
Gantt diagram - Resources
Gantt diagram for resources is the
basic application chart presenting plan
of completion of orders assigned to
resources in time
Gantt diagram
Gantt diagram – basic features
 Manual planing of operations
 Intuitive navigation between operations
 Detailed presentation of objects introduced
on the diagram
 Dynamic changes of timescale or using one
of predefined ranges
 Graphic presentation of operation status,
delays, set up times, characteristics of operations
Basic features
Charakteristics
Definition of characteristics for
operations/products used for
identification of set up times in case of
operations with different features
Input resources
Operations done by using input resources can be done simultanously
Gantt chart for prodution orders is auxiliary diagram for Wykres Gantta dla zleceń jest
diagramem pomocniczym obrazującym visualisation of order processinf in time
 Definable, graphic marking of operation status
 Transparent overview of order processing
 Dynamic changes of time scale, or employment of
one of predefined time interwals
 Autmatic, configurable information including
details of any object presented on the chart.
Gantt diagram – production orders
Scheduling in QGUAR APS - cryteria
Minimizing of waiting time
Maximizing resource load
Maximizing revenue in the time period
Minimizing delays
Minimizing the greatest delays
Minimizing of deviation from the terms of delivery
Maximizing the implementation of orders priorities
Minimizing set up times
Optimization in QGUAR APS - cryteria
Optimization algorythm depends on the user having
the ability to determine weight of each criterion of
optimization
Results obtained on the optimization process can be
traced by analyzing changes in key indicators
list of scheduled operations on particular resources.
Activities to be carried out on a workplace in a line with the production plan
OPERATIONS BY RESOURCES
Reports
list of operations in different orders . Activties to be done in order to carry out given production order.
OPERATIONS BY ORDER
list of operations for particular recepients.
Activities to be done in order to carry out orders for given recepient.
OPERATIONS BY RECEPIENTS
Information about utilization of secondary resources in the created plan.
SUBORDINATE RESOURCE
Information on implementation of work in the batch resource
DETAILS OF THE BATCH CYCLE
List of production operations planned for particullar resources.
List of all production operations occuring in the production plan.
DETAILS OF SCHEDULING
Report - example
Reports - example
Reports - example
Interface - dataexchange
Architecture
QGUAR APS
QGUAR APS MONITOR
MES/ERP
XML/DB
 System delivering technology and data about
machines (Qguar MES or ERP)
Technical conditions
Interfaces – dataexchange: strickt integration with ERP
Scada/HMI
APS
MESERP
• Delays (acceleration)
of production plan
• Confirmation of order completion
Production plan
/plan correction/changes
Trade order
Confirmation of
plan fulfillment
• BOMs/recipes
technologies/articles
Specifications
Production accounting
Interfaces – details of dataexchange
DATAEXCHANGE INTERFACE
ENVIRONMENT SESSION SCHEDULE
ERP
Production orders
Production orders
Indicators
Configuration of indicators
Transition tables
Propoertys
Capacity changes
Downtimes
Callendars
ResourcesResources
Callendars
Downtimes
Capacity changes
Propoertys
Transition table
Configuration of indicators
Resources
Callendars
Downtimes
Capacity changes
Propertys
Transition tables
Configuration of indicators
Production orders
Manual production
orders
Progress of works
Production orders
Operations started
 Open interface enabling
integration with other solutions
 Qguar APS is integrated with
Qguar MES
 Integration with ERP solutions
Chosen KPIs in the field of production scheduling
 Idle time and downtime
 The average delay in days
 Prodution time
 Cooperation time
 Degree of implementation of priorities
 Ahead of the average delivery dates
 Accelerated order
Possible indicators enabling definition of the schedule’s quality with
respect to the assumed value:
Advantages of using the QGUAR APS
 Optimization of production scenarios
 Reaction to production changes
 Definition of critical path, which illustrates the
shortest possible time of order completion
 Identification of processes which in case of delay
can cause delay of whole order completion.
 Definition of bottle necks in production
 Controll over meeting the delivery deadlines
 Reduction of set up time
Thank you for your time

More Related Content

What's hot

Duties & responsibility
Duties & responsibilityDuties & responsibility
Duties & responsibility
Zaw Min
 

What's hot (20)

SAP - Transportation Module Study material
SAP - Transportation Module Study materialSAP - Transportation Module Study material
SAP - Transportation Module Study material
 
Production Supply with SAP EWM
Production Supply with SAP EWMProduction Supply with SAP EWM
Production Supply with SAP EWM
 
SAP EWM Training
SAP EWM TrainingSAP EWM Training
SAP EWM Training
 
Ewm howtoleverage sap
Ewm howtoleverage sapEwm howtoleverage sap
Ewm howtoleverage sap
 
SCM EWM Solution
SCM EWM SolutionSCM EWM Solution
SCM EWM Solution
 
SAP EWM BATCH MANAGEMENT
SAP EWM BATCH MANAGEMENTSAP EWM BATCH MANAGEMENT
SAP EWM BATCH MANAGEMENT
 
09 shop floor control
09 shop floor control09 shop floor control
09 shop floor control
 
EWM - I
EWM - IEWM - I
EWM - I
 
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...
 
Syntelic Outbound Warehouse Solutions
Syntelic Outbound Warehouse SolutionsSyntelic Outbound Warehouse Solutions
Syntelic Outbound Warehouse Solutions
 
Le tra sap
Le tra sapLe tra sap
Le tra sap
 
Sap ewm detailed presentation
Sap ewm detailed presentationSap ewm detailed presentation
Sap ewm detailed presentation
 
Ch16 mrp
Ch16 mrpCh16 mrp
Ch16 mrp
 
Aviation Fuel Distribution Simulation
Aviation Fuel Distribution SimulationAviation Fuel Distribution Simulation
Aviation Fuel Distribution Simulation
 
3t systems overview 2011
3t systems overview 20113t systems overview 2011
3t systems overview 2011
 
Sameers LE Shipping & Transportation
Sameers LE Shipping & TransportationSameers LE Shipping & Transportation
Sameers LE Shipping & Transportation
 
Duties & responsibility
Duties & responsibilityDuties & responsibility
Duties & responsibility
 
Transportation in sap
Transportation in sapTransportation in sap
Transportation in sap
 
Advanced Inventory Planning - Valogix
Advanced Inventory Planning - ValogixAdvanced Inventory Planning - Valogix
Advanced Inventory Planning - Valogix
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 

Similar to Qguar APS - ENGLISH

Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017
Ted Thorne
 

Similar to Qguar APS - ENGLISH (20)

Oracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP SolutionOracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP Solution
 
CIM unit-2
CIM unit-2CIM unit-2
CIM unit-2
 
Production module
Production moduleProduction module
Production module
 
Unit 2
Unit 2Unit 2
Unit 2
 
Demand Driven Production Management
Demand Driven Production ManagementDemand Driven Production Management
Demand Driven Production Management
 
Unit 2 cim
Unit 2 cimUnit 2 cim
Unit 2 cim
 
Demand Driven Production Management from Ecoservity
Demand Driven Production Management from EcoservityDemand Driven Production Management from Ecoservity
Demand Driven Production Management from Ecoservity
 
M-2_CAPP.pptx
M-2_CAPP.pptxM-2_CAPP.pptx
M-2_CAPP.pptx
 
xdoc.pl_meb.pdf
xdoc.pl_meb.pdfxdoc.pl_meb.pdf
xdoc.pl_meb.pdf
 
Demand Driven Production Management
Demand Driven Production ManagementDemand Driven Production Management
Demand Driven Production Management
 
00- PP Overview.ppt
00- PP Overview.ppt00- PP Overview.ppt
00- PP Overview.ppt
 
Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017
 
Win tool presentation-en-pmg
Win tool presentation-en-pmgWin tool presentation-en-pmg
Win tool presentation-en-pmg
 
90_Minds_Presentation_Feb_2015_revised.
90_Minds_Presentation_Feb_2015_revised.90_Minds_Presentation_Feb_2015_revised.
90_Minds_Presentation_Feb_2015_revised.
 
Out-of-the-box MES \ MOM solution
Out-of-the-box MES \ MOM solutionOut-of-the-box MES \ MOM solution
Out-of-the-box MES \ MOM solution
 
Manufacturing Production Planning AI - ERP system
Manufacturing Production Planning AI -  ERP systemManufacturing Production Planning AI -  ERP system
Manufacturing Production Planning AI - ERP system
 
Manufacturing Execution System
Manufacturing Execution SystemManufacturing Execution System
Manufacturing Execution System
 
Sap overview
Sap overviewSap overview
Sap overview
 
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITYDESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
 
Unit ii Process Planning
Unit ii Process PlanningUnit ii Process Planning
Unit ii Process Planning
 

More from Quantum software

More from Quantum software (20)

Qguar saas PL
Qguar saas PLQguar saas PL
Qguar saas PL
 
Qguar DS - GERMAN
Qguar DS - GERMANQguar DS - GERMAN
Qguar DS - GERMAN
 
Qguar DS - RUSSIAN
Qguar DS - RUSSIANQguar DS - RUSSIAN
Qguar DS - RUSSIAN
 
Qguar DS - POLISH
Qguar DS - POLISHQguar DS - POLISH
Qguar DS - POLISH
 
Qguar YMS - GERMAN
Qguar YMS - GERMANQguar YMS - GERMAN
Qguar YMS - GERMAN
 
Qguar MES - GERMAN
Qguar MES - GERMANQguar MES - GERMAN
Qguar MES - GERMAN
 
Qguar TMS - GERMAN
Qguar TMS - GERMANQguar TMS - GERMAN
Qguar TMS - GERMAN
 
Qguar WMS - GERMAN
Qguar WMS - GERMANQguar WMS - GERMAN
Qguar WMS - GERMAN
 
Qguar APS - GERMAN
Qguar APS - GERMANQguar APS - GERMAN
Qguar APS - GERMAN
 
Qguar YMS - RUSSIAN
Qguar YMS - RUSSIANQguar YMS - RUSSIAN
Qguar YMS - RUSSIAN
 
Qguar YMS - POLISH
Qguar YMS - POLISHQguar YMS - POLISH
Qguar YMS - POLISH
 
Qguar TMS - RUSSIAN
Qguar TMS - RUSSIANQguar TMS - RUSSIAN
Qguar TMS - RUSSIAN
 
Qguar TMS - ENGLISH
Qguar TMS - ENGLISHQguar TMS - ENGLISH
Qguar TMS - ENGLISH
 
Qguar TMS - POLISH
Qguar TMS - POLISHQguar TMS - POLISH
Qguar TMS - POLISH
 
Qguar WMS - RUSSIAN
Qguar WMS - RUSSIANQguar WMS - RUSSIAN
Qguar WMS - RUSSIAN
 
Qguar WMS - POLISH
Qguar WMS - POLISHQguar WMS - POLISH
Qguar WMS - POLISH
 
Qguar APS - RUSSIAN
Qguar APS - RUSSIANQguar APS - RUSSIAN
Qguar APS - RUSSIAN
 
Qguar APS - POLISH
Qguar APS - POLISHQguar APS - POLISH
Qguar APS - POLISH
 
Qguar MES - RUSSIAN
Qguar MES - RUSSIANQguar MES - RUSSIAN
Qguar MES - RUSSIAN
 
Qguar MES - POLISH
Qguar MES - POLISHQguar MES - POLISH
Qguar MES - POLISH
 

Recently uploaded

%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
masabamasaba
 
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Medical / Health Care (+971588192166) Mifepristone and Misoprostol tablets 200mg
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Health
 
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Medical / Health Care (+971588192166) Mifepristone and Misoprostol tablets 200mg
 
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
masabamasaba
 
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
chiefasafspells
 

Recently uploaded (20)

Architecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the pastArchitecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the past
 
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
 
AI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplateAI & Machine Learning Presentation Template
AI & Machine Learning Presentation Template
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
 
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital TransformationWSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
 
tonesoftg
tonesoftgtonesoftg
tonesoftg
 
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto
 
%in Benoni+277-882-255-28 abortion pills for sale in Benoni
%in Benoni+277-882-255-28 abortion pills for sale in Benoni%in Benoni+277-882-255-28 abortion pills for sale in Benoni
%in Benoni+277-882-255-28 abortion pills for sale in Benoni
 
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
 
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
%+27788225528 love spells in Huntington Beach Psychic Readings, Attraction sp...
 
Artyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxArtyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptx
 
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
 
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
 
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
 
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
 

Qguar APS - ENGLISH

  • 1.
  • 2. 4WEB RTS ADR DAS APS OTM PILOT Queryser BI MESSAGING DASHBOARD VW - VISUAL WAREHOUSE 4WEB – Internet Acces MES - Manufacturing Execution System WMS – Warehouse Management System TMS – Transport Management System YMS – Yard Management System TOS QGUAR APS – one of many solutions in SCE software portfolio APS – Advanced Planning & Scheduling
  • 3. QGUAR APS – Advanced Planning & Scheduling  Production to order  Processes which require frequent and not predictable changes in the production schedule  Products which require many components or complicated manufacturing processes  Production by using many, different resources  Manufacturing many different products in one factory. Lowering of costs and optimisation of production and related processes time : APS (Advanced Planning & Scheduling) – IT solutions class, which allows for composing and optimisation of complex production plans. Qguar APS: APS class solution, supporting management and planner in sophisticated production scheduling and optimisation
  • 4. APS WMS WMS TRANSPORT TMS MES WAREHOUSING raw materials components packaging PLANT’S ENVIRONMENT PLANT’S ENVIRONMENT PLANT’S ENVIRONMENT YMS WAREHOUSING finished goods PRODUCTION planning execution Company as element in the supply chain and main Quantum’s solutions
  • 5. Import of production operations Preparation of schedule Scheduling Evaluation of schedule System configuration Schedule conversion Calculation of KPI for schedule Definition of callendar Definition of resources Choice of scheduling criterion Definition of KPI - indicatiors of schedule evaluation General QGUAR APS flow-chart (split into main processes) XML file with data from host system (MES, ERP) Comparison of schedule on the basis of calculated KPIs Confirmation of schedule Rating and confirmation of schedule Export of production operations XML file with data for host system (MES, ERP)
  • 6. QGUAR APS – functional scope APS Visualisation of schedule Creation of production schedule (including dates of completion) Parallel management of many production plans (with simulation of plans on the daily weekly or monthly basis) Production planing for many production facilities, branches, departments and stations Number of KPIs enabling evaluation of particular scenarios and choosing optimal production plan Integration with external solution MES and ERP solutions
  • 7. factory, branch, production departments, technological installation Data structure in Qguar APS allows for adaptation of the solution to production organisation scheme in the company. Data architecture ENVIRONMENT SESSION 1 SESSION n Schedule 1 Schedule 2 Schedule n Schedule 1 Schedule 2 Schedule n set of fixed data about orders to be scheduled SESSION Schedule – versions of order completion within the framework of schedule session Schedule ENVIRONMENT
  • 8. Qguar APS data  Production orders  Technology of production (including resources to be used for orders completion)  Information about order’s progress (MES) (from location – to location) Data from external solutions  Masterdata (callendars, resources)  Set up times scheets  Schedule’s configuration (indicators)  Orders for completion of single works Qguar APS internal configuration data
  • 9. Callendars – daily chart  Unlimited number  Identification of days off and holidays  Definition of name and scope of validity  Each day can have different hours structure Features
  • 10.  Production capacity limited/unlimited, daily/weekly  Resources alternative/subordinate  Optimal load  Efficiency  Work callendar Features Basic resources  Machinesy  Workers  Cooperating resources Types of basic resource
  • 11.  Warehouse, storage location  Form / matrix  Tool  Accessories  Transportation / route Subordinate Subordinate resources  Production capacity limited/unllimited, daily/weekly  Resources altenative/subordinate  Optimal load  Efficiency  Work callendar Features Subordinate resources have assigned callendar, which together with callendar of main resource create a grid for schedule definition
  • 12. Gantt diagram - Resources Gantt diagram for resources is the basic application chart presenting plan of completion of orders assigned to resources in time Gantt diagram
  • 13. Gantt diagram – basic features  Manual planing of operations  Intuitive navigation between operations  Detailed presentation of objects introduced on the diagram  Dynamic changes of timescale or using one of predefined ranges  Graphic presentation of operation status, delays, set up times, characteristics of operations Basic features
  • 14. Charakteristics Definition of characteristics for operations/products used for identification of set up times in case of operations with different features
  • 15. Input resources Operations done by using input resources can be done simultanously
  • 16. Gantt chart for prodution orders is auxiliary diagram for Wykres Gantta dla zleceń jest diagramem pomocniczym obrazującym visualisation of order processinf in time  Definable, graphic marking of operation status  Transparent overview of order processing  Dynamic changes of time scale, or employment of one of predefined time interwals  Autmatic, configurable information including details of any object presented on the chart. Gantt diagram – production orders
  • 17. Scheduling in QGUAR APS - cryteria Minimizing of waiting time Maximizing resource load Maximizing revenue in the time period Minimizing delays Minimizing the greatest delays Minimizing of deviation from the terms of delivery Maximizing the implementation of orders priorities Minimizing set up times
  • 18. Optimization in QGUAR APS - cryteria Optimization algorythm depends on the user having the ability to determine weight of each criterion of optimization Results obtained on the optimization process can be traced by analyzing changes in key indicators
  • 19. list of scheduled operations on particular resources. Activities to be carried out on a workplace in a line with the production plan OPERATIONS BY RESOURCES Reports list of operations in different orders . Activties to be done in order to carry out given production order. OPERATIONS BY ORDER list of operations for particular recepients. Activities to be done in order to carry out orders for given recepient. OPERATIONS BY RECEPIENTS Information about utilization of secondary resources in the created plan. SUBORDINATE RESOURCE Information on implementation of work in the batch resource DETAILS OF THE BATCH CYCLE List of production operations planned for particullar resources. List of all production operations occuring in the production plan. DETAILS OF SCHEDULING
  • 23. Interface - dataexchange Architecture QGUAR APS QGUAR APS MONITOR MES/ERP XML/DB  System delivering technology and data about machines (Qguar MES or ERP) Technical conditions
  • 24. Interfaces – dataexchange: strickt integration with ERP Scada/HMI APS MESERP • Delays (acceleration) of production plan • Confirmation of order completion Production plan /plan correction/changes Trade order Confirmation of plan fulfillment • BOMs/recipes technologies/articles Specifications Production accounting
  • 25. Interfaces – details of dataexchange DATAEXCHANGE INTERFACE ENVIRONMENT SESSION SCHEDULE ERP Production orders Production orders Indicators Configuration of indicators Transition tables Propoertys Capacity changes Downtimes Callendars ResourcesResources Callendars Downtimes Capacity changes Propoertys Transition table Configuration of indicators Resources Callendars Downtimes Capacity changes Propertys Transition tables Configuration of indicators Production orders Manual production orders Progress of works Production orders Operations started  Open interface enabling integration with other solutions  Qguar APS is integrated with Qguar MES  Integration with ERP solutions
  • 26. Chosen KPIs in the field of production scheduling  Idle time and downtime  The average delay in days  Prodution time  Cooperation time  Degree of implementation of priorities  Ahead of the average delivery dates  Accelerated order Possible indicators enabling definition of the schedule’s quality with respect to the assumed value:
  • 27. Advantages of using the QGUAR APS  Optimization of production scenarios  Reaction to production changes  Definition of critical path, which illustrates the shortest possible time of order completion  Identification of processes which in case of delay can cause delay of whole order completion.  Definition of bottle necks in production  Controll over meeting the delivery deadlines  Reduction of set up time
  • 28. Thank you for your time