Joint Traffic Management Center Parking Structure
Location: Honolulu, Hawaii
Submitted by: Baldridge & Associates Structural Engineering (BASE)
Owner: City & County of Honolulu, Department of Transportation Services
Architect(s): Anbe, Aruga & Ishizu, Architects, Inc.
Engineer(s): Baldridge & Associates Structural Engineering, Inc. (BASE)
Contractor: Hawaiian Dredging Construction Company, Inc.
PT Supplier: CMC Cable (Supplier)
Other Contributors: Associated Steel Workers (PT Installer)
Joint Traffic Management Center Parking Structure
Project Highlights:
โ€ข Exemplifies the cost-effectiveness of PT, with the cast-in-place
post-tensioned design being selected over a precast, prestressed
alternate.
โ€ข Using BIM, the design/construction team was able to reduce the
structure size and, as a result, seismic loading, yet maximize the
parking stall count.
โ€ข Use of cast-in-place post-tensioned concrete enabled the
designers to round off two corners to meet the aesthetic
requirements of the owner.
โ€ข Efficient design resulted in a savings of materials while increasing
the number of vehicles that could be accommodated, enabling
the structure to attain a LEED Gold rating.
Joint Traffic Management Center Parking Structure
Project Overview:
In March 2010, the city and county of Honolulu released a competitive
design-build request for proposal (RFP) to design and construct a multi-
storied, access-controlled parking structure sufficient to accommodate a
minimum of 380 cars in addition to providing parking space for 16 buses
and two travel lanes at grade. The RFP included structural documentation
for a 128 ft wide by 249 ft long trapezoidal-shaped parking structure but
allowed the contractors to submit an Alternate Technical concept.
The RFP included two structural scenarios. The first was a precast
prestressed structure using double tees, inverted L-beam girders, and
precast perimeter girders. The second was a cast-in-place system using
37 in. deep post-tensioned beams spaced at 18 ft on center.
Joint Traffic Management Center Parking Structure
Project Overview Continued:
The contractor, architect, and structural engineer worked together
collaboratively to develop an alternate post-tensioned concrete scheme
based on a revised column grid optimized for the site dimensions,
parking layout, and reuse of the forming system. The final grid system
was based on a 24 by 60 ft module that fit equally in to eight bays of the
ramping portion of the garage. The layout resulted in a more efficient but
slightly smaller 122 ft wide by 247 ft long trapezoidal typical floor that
reduced the mass of the building while saving material use for the
construction of the parking deck.
The revised column grid also reduced the maximum span of the typical
girders without losing any functionality in the garage. This shorter span
also allowed the structural depth of the system to be reduced. Through
coordination within the team using a project building information
modeling (BIM) model, they were able to reduce the floor-to-floor height
by 6 in. The final layout included a 6 in.
thick post-tensioned slab supported by 31 in. deep post-tensioned
girders.
Joint Traffic Management Center Parking Structure
Project Overview Continued:
The Joint Traffic Management Center Parking Structure was completed in
January 2012. Through the use of post-tensioning, along with the hard
work and innovation of the architect, the structural engineer, and the
contractor, the city and county of Honolulu now has a parking structure
that meets its functional requirements, is an attractive addition to the
Hawaii Capital Special District, and is LEED Gold certified.
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking Structure

More Related Content

What's hot

Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
Crosstown TO
ย 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
guest2d44ee
ย 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
Josia Tannos, EIT
ย 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
Crosstown TO
ย 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
Crosstown TO
ย 
Nj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizioNj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizio
New Jersey Future
ย 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
Crosstown TO
ย 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
awweiss
ย 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation Projects
City of College Station
ย 

What's hot (19)

Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
ย 
Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting Presentation
ย 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
ย 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
ย 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
ย 
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
AH CCM 04.09.18 Item #4   1001Townsend - CambridgeAH CCM 04.09.18 Item #4   1001Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
ย 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
ย 
2009 CNU New England Urbanism Awards
2009 CNU New England Urbanism Awards2009 CNU New England Urbanism Awards
2009 CNU New England Urbanism Awards
ย 
Presentation Master
Presentation MasterPresentation Master
Presentation Master
ย 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
ย 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
ย 
Nj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizioNj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizio
ย 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
ย 
North link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 finalNorth link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 final
ย 
+
++
+
ย 
West district library presentation
West district library presentationWest district library presentation
West district library presentation
ย 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
ย 
City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
ย 
Rock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation ProjectsRock Prairie Road Corridor Transportation Projects
Rock Prairie Road Corridor Transportation Projects
ย 

Viewers also liked

Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
Luan Truong Van
ย 

Viewers also liked (19)

Veterans' Glass City Skyway Bridge
Veterans' Glass City Skyway BridgeVeterans' Glass City Skyway Bridge
Veterans' Glass City Skyway Bridge
ย 
Fallingwater Residence
Fallingwater ResidenceFallingwater Residence
Fallingwater Residence
ย 
Edward Rice House
Edward Rice HouseEdward Rice House
Edward Rice House
ย 
San Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission HeadquartersSan Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission Headquarters
ย 
2201 Westlake/Enso
2201 Westlake/Enso2201 Westlake/Enso
2201 Westlake/Enso
ย 
Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
 Rehabilitation of a Parking Garage in Downtown Milwaukee, WI Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
Rehabilitation of a Parking Garage in Downtown Milwaukee, WI
ย 
Reinforcement of Driscoll Bridge
Reinforcement of Driscoll BridgeReinforcement of Driscoll Bridge
Reinforcement of Driscoll Bridge
ย 
The Trump International Hotel & Tower
The Trump International Hotel & TowerThe Trump International Hotel & Tower
The Trump International Hotel & Tower
ย 
Glacier Skywalk
Glacier SkywalkGlacier Skywalk
Glacier Skywalk
ย 
Vidalta Bridge
Vidalta BridgeVidalta Bridge
Vidalta Bridge
ย 
San-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: SkywaySan-Francisco-Oakland Bay Bridge New East Span: Skyway
San-Francisco-Oakland Bay Bridge New East Span: Skyway
ย 
I-64 Kanawha River Bridge
I-64 Kanawha River BridgeI-64 Kanawha River Bridge
I-64 Kanawha River Bridge
ย 
The Memorial Wall at Ground Zero
The Memorial Wall at Ground ZeroThe Memorial Wall at Ground Zero
The Memorial Wall at Ground Zero
ย 
Wacker Drive Viaduct Reconstruction
Wacker Drive Viaduct ReconstructionWacker Drive Viaduct Reconstruction
Wacker Drive Viaduct Reconstruction
ย 
Sky View Parc
Sky View ParcSky View Parc
Sky View Parc
ย 
Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)Emergency Vehicle Operator Course (EVOC)
Emergency Vehicle Operator Course (EVOC)
ย 
Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
ย 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
ย 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
ย 

Similar to Joint Traffic Management Center Parking Structure

Enogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyEnogex Bentley Award Full Case Study
Enogex Bentley Award Full Case Study
Kevin Fust
ย 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptx
PrabhuGurusamy2
ย 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
aiahouston
ย 
Final_Capstone_2016
Final_Capstone_2016Final_Capstone_2016
Final_Capstone_2016
Julia Mateusiak
ย 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdf
RavenousSolos
ย 

Similar to Joint Traffic Management Center Parking Structure (20)

Transportation Systems Design Project
Transportation Systems Design ProjectTransportation Systems Design Project
Transportation Systems Design Project
ย 
Enogex Bentley Award Full Case Study
Enogex Bentley Award Full Case StudyEnogex Bentley Award Full Case Study
Enogex Bentley Award Full Case Study
ย 
2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions 2016 AEC Excellence - Infrastructure Submissions
2016 AEC Excellence - Infrastructure Submissions
ย 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptx
ย 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
ย 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
ย 
Final_Capstone_2016
Final_Capstone_2016Final_Capstone_2016
Final_Capstone_2016
ย 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdf
ย 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptx
ย 
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
3ds Max, AutoCAD, badminton court, bus parking, ETABS, Lumion, multi-function...
ย 
A-insinoorit
A-insinooritA-insinoorit
A-insinoorit
ย 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
ย 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
ย 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
ย 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM
ย 
Sujal Mamadgi Work Samples
Sujal Mamadgi Work SamplesSujal Mamadgi Work Samples
Sujal Mamadgi Work Samples
ย 
A BIM-enabled collaborative platform in practice #COMIT2016
A BIM-enabled collaborative platform in practice #COMIT2016A BIM-enabled collaborative platform in practice #COMIT2016
A BIM-enabled collaborative platform in practice #COMIT2016
ย 
Sujal Mamadgi Work Samples
Sujal Mamadgi Work SamplesSujal Mamadgi Work Samples
Sujal Mamadgi Work Samples
ย 
Resume 2018
Resume 2018Resume 2018
Resume 2018
ย 
Sujal Mamadgi - Work Samples
Sujal Mamadgi - Work SamplesSujal Mamadgi - Work Samples
Sujal Mamadgi - Work Samples
ย 

Recently uploaded

Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
amitlee9823
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
ย 

Recently uploaded (20)

Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 

Joint Traffic Management Center Parking Structure

  • 1. Joint Traffic Management Center Parking Structure
  • 2. Location: Honolulu, Hawaii Submitted by: Baldridge & Associates Structural Engineering (BASE) Owner: City & County of Honolulu, Department of Transportation Services Architect(s): Anbe, Aruga & Ishizu, Architects, Inc. Engineer(s): Baldridge & Associates Structural Engineering, Inc. (BASE) Contractor: Hawaiian Dredging Construction Company, Inc. PT Supplier: CMC Cable (Supplier) Other Contributors: Associated Steel Workers (PT Installer) Joint Traffic Management Center Parking Structure
  • 3. Project Highlights: โ€ข Exemplifies the cost-effectiveness of PT, with the cast-in-place post-tensioned design being selected over a precast, prestressed alternate. โ€ข Using BIM, the design/construction team was able to reduce the structure size and, as a result, seismic loading, yet maximize the parking stall count. โ€ข Use of cast-in-place post-tensioned concrete enabled the designers to round off two corners to meet the aesthetic requirements of the owner. โ€ข Efficient design resulted in a savings of materials while increasing the number of vehicles that could be accommodated, enabling the structure to attain a LEED Gold rating. Joint Traffic Management Center Parking Structure
  • 4. Project Overview: In March 2010, the city and county of Honolulu released a competitive design-build request for proposal (RFP) to design and construct a multi- storied, access-controlled parking structure sufficient to accommodate a minimum of 380 cars in addition to providing parking space for 16 buses and two travel lanes at grade. The RFP included structural documentation for a 128 ft wide by 249 ft long trapezoidal-shaped parking structure but allowed the contractors to submit an Alternate Technical concept. The RFP included two structural scenarios. The first was a precast prestressed structure using double tees, inverted L-beam girders, and precast perimeter girders. The second was a cast-in-place system using 37 in. deep post-tensioned beams spaced at 18 ft on center. Joint Traffic Management Center Parking Structure
  • 5. Project Overview Continued: The contractor, architect, and structural engineer worked together collaboratively to develop an alternate post-tensioned concrete scheme based on a revised column grid optimized for the site dimensions, parking layout, and reuse of the forming system. The final grid system was based on a 24 by 60 ft module that fit equally in to eight bays of the ramping portion of the garage. The layout resulted in a more efficient but slightly smaller 122 ft wide by 247 ft long trapezoidal typical floor that reduced the mass of the building while saving material use for the construction of the parking deck. The revised column grid also reduced the maximum span of the typical girders without losing any functionality in the garage. This shorter span also allowed the structural depth of the system to be reduced. Through coordination within the team using a project building information modeling (BIM) model, they were able to reduce the floor-to-floor height by 6 in. The final layout included a 6 in. thick post-tensioned slab supported by 31 in. deep post-tensioned girders. Joint Traffic Management Center Parking Structure
  • 6. Project Overview Continued: The Joint Traffic Management Center Parking Structure was completed in January 2012. Through the use of post-tensioning, along with the hard work and innovation of the architect, the structural engineer, and the contractor, the city and county of Honolulu now has a parking structure that meets its functional requirements, is an attractive addition to the Hawaii Capital Special District, and is LEED Gold certified. Joint Traffic Management Center Parking Structure