McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina.

McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
44
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Success is in the Details McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina. THE CHALLENGE The project had a very aggressive schedule coupled with extensive scope in a small area making the jobsite congested with both personnel and materials. At times, the workforce on the project exceeded 200 people. THE SOLUTION McKenney’s utilized Building Information ­Modeling (BIM)—along with prefabricating nearly all of the steel piping mains—to minimize on-site congestion and optimize installation efficiency. Pipe deliveries were sequenced just-in-time and set in place upon arrival, reducing on-site storage. To ensure an on-time installation of the chiller plant, the construction team created a detailed installa-tion schedule utilizing heavy BIM coordination, numerous trips to the factory and major collaboration with all trades. THE RESULTS With the exception of the chiller plant installation which took two rather than the scheduled four weeks—on-site pipe-fitting crew size was kept under 10. PROJECT NAME žž Colocation Data Centers PROJECT LOCATION žž Durham, North Carolina PROJECT TEAM žž Owner: Data Centers žž General Contractor: Holder Construction žž Architect: O’Brien/Atkins Associates, PA žž Engineer: DLB Associates Consulting Engineers, P.C. žž Contractor: McKenney’s, Inc. SPECIALIZATIONS Building Information Modeling Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS žž Mission Critical www.mckenneys.com © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. The content of this document is not intended as an endorsement. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214

×