Life Cycle Cost analysis for manage the uncertainty in the taking decision process for a project. This study includes in the financial analysis outcomes for unavailability and number expected of failures (RAM and Risk Analysis) All the variables have been treated as probabilistic. Finally the NPV model is a forecast expressed in probabilistic manner.