SlideShare a Scribd company logo
1 of 15
MODERN CHAIRS
A Total Quality Management/Kaizen – Failure
By Jonathan Baker.
INTRODUCTION
 A Total Quality Management training video that a final year class
at the University of Edinburgh made in the style of Charlie
Chaplin's Modern Times. The intention was to teach teamwork,
production line processes, process optimisation, defects, quality,
and continual improvement 'Kaizen'.
Click <https://youtu.be/L--Oyw6V8gI> or google “YouTube Modern Chairs”
NON TQM: 30 CHAIRS STACKED IN 120 SECONDS
 Customer Specification: Create 6 Stacks of 5 Chairs per
Stack
 Simple Manufacturing Process: Chair Stacking; non-TQM
method
 6 People successfully move 30 chairs from one side of a
room to another; the chairs are stacked already in piles of
5, and chairs can only be moved one at a time.
 Each person grabs a chair and moves one across the room
to create a pile of 5; no planning; no measurement of
waste; no Total Quality Management (TQM)
 Completed Pile: Left hand Stack has 6 chairs
Top Right: Start
Lower Right: Finish
APPLYING TQM PRINCIPLES STAGE: 1
 Chain Gang Production Line Configuration, one
person at the end stacking chairs into piles of 5 (Top
Left)
 One can see that Work In Process is waiting to be
moved to the final stage of stacking (Top Middle)
creating a waste or resources and time.
 Completed Process (Top Right) 10 seconds faster,
but still with defects in meeting the customer’s
specification.
30 CHAIRS STACKED IN 110 SECONDS
RELATIONSHIP BETWEEN QUALITY AND CYCLE TIME
“Apparently”, as Cycle Time increases, Quality reduces
APPLYING TQM PRINCIPLES STAGE: 2
 As the below formation takes place, the theme tune to ‘The
Apprentice’ kicks in to suggest a revelation in using the Toyota
Production System to eliminate waste, over processing, over
production and waiting
OPTIMISATION – LEAN MANUFACTURING
30 CHAIRS STACKED
IN 90 SECONDS!
IF YOU WATCHED THE ENTIRE VIDEO ON YOUTUBE; YOU WILL HAVE NOTICED THAT
THEY HAVE ALREADY ENCOUNTERED DEFECTS AND IMPLEMENTED QUALITY
CONTROL. DO YOU REMEMBER THE CUSTOMER SPECIFICATION?
CREATE 6 STACKS OF “5” CHAIRS PER STACK
CONTINUAL IMPROVEMENT
BUT COULD WE REDUCE A PROJECT BY 90% OR HIGHER?
Well there we have it!! From 120 seconds down to 65 seconds with the magic of TPS utilising TQM
and the philosophies of Continual Improvement. An improvement of 45.83%
Is this enough to meet the Governments ambitions for Construction of a 50% reduction in duration
of projects as outlined in the Construction 2025 Report?
Well; no…. But its pretty damn close right?
Watching this video though, it just doesn’t shock me, open my eyes to the power of TPS and Lean
Thinking. Lets actually analyse the customer requirement and processes properly:
 Simple Analysis of the figures show that if all people collecting a chair each, and then moving it to its
final location achieves 30 chairs stacked in 120 seconds, we therefore have:
𝟏𝟐𝟎
𝟑𝟎
= 𝟒 𝒔𝒆𝒄𝒐𝒏𝒅𝒔 𝒑𝒆𝒓 𝒄𝒉𝒂𝒊𝒓
This is taken from the very first video.
A single cycle of moving a chair from point 1, and depositing at point 2 before returning to point 3
takes 4 seconds in total for 1 person.
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
We have 6 people involved in the process.
Therefore if all 6 people followed the 1,2,3
cycle at the same time – we would have successfully
moved 6 chairs in 4 seconds.
We only have to repeat this process 5 times.
𝟓 × 𝟒 𝒔𝒆𝒄𝒐𝒏𝒅𝒔 = 𝟐𝟎 𝒔𝒆𝒄𝒐𝒏𝒅𝒔
If each person knows and counts out 5 iterations
of this cycle and only deposits in their own area
then we also reduce the all too erroneous issues of
6 chairs in some piles.
Lean Management can really be that easy and
effective. Poor consultants and educational sources
leave many construction professionals with a foul taste
when they hear the term ‘Lean’.
The only goal of Lean; is to DELIVER VALUE for the customer; in this instance, 6 stacks of 5 chairs is
what the customer values, whilst eliminating waste and applying continual improvement/lean
principles. Eliminating all motion, and copying a production line which operates in a sequence of
processes as closely as possible, is not the application of Lean or the Toyota Production System
(TPS); particularly when it means poorer performance and poorer quality.
20 SECONDS = REDUCTION BY 83.3%
 The above improvements of 83.3% really don’t even apply any lean techniques. It is just a
simple work/motion study of the original inefficient system and applying some common
mathematical judgement.
 Managing the Supply Chain
(Where, how and what kind of chairs are originally stored, can they be changed?)
 Delivering the Chairs on a wheeled pallet would mean that a stack of 5 chairs could be moved
in 4 seconds. With 6 people the entire process could be delivered in:
 Can any quality control or standardisation be applied to the chairs before being supplied?
4 seconds = 96.67% improvement
And that’s just 2 minutes of thinking laterally and innovatively, the same processes can and does
apply in construction; even more so than manufacturing.
‘quod erat demonstrandum’
Decent Homes Programme: Current Contractor Improvement of 575% on Handovers within 4
weeks (2013)
Decent Homes Programme: 195% improvement over any week in the prior contractors 15 year
contract (2013)
28 day refurbishment programme, reduced to 2 days saving £125,000 per day on critical path
costs; that’s £3.25m [92.85%] (2014)
Q.E.D; Used to convey that a fact or situation demonstrates the truth of one’s theory or claim, especially to mark the conclusion of
formal proof. www.oxforddictionaries.com
Thank-you

More Related Content

What's hot

Product Quality
Product QualityProduct Quality
Product QualitySajith91
 
Organizational Structure and Culture
Organizational Structure and CultureOrganizational Structure and Culture
Organizational Structure and CultureGamze Saba
 
Operation management intro
Operation management  introOperation management  intro
Operation management introStudsPlanet.com
 
Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...
Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...
Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...nenoliruzu
 
Cost Behavior Analysis
Cost Behavior AnalysisCost Behavior Analysis
Cost Behavior AnalysisJhOnie JhOan
 
Quality management gurus
Quality management  gurus  Quality management  gurus
Quality management gurus abh123sek
 
Good governance and social responsibility
Good governance and social responsibilityGood governance and social responsibility
Good governance and social responsibilityCrisDeLeon6
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesNên Trần Ngọc
 
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...Ali Salah
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selectionSujan Oli
 
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanBarriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanMuhammad Haseeb Sultan
 
Managerial Accounting Garrison Noreen Brewer Chapter 06
Managerial Accounting Garrison Noreen Brewer Chapter 06Managerial Accounting Garrison Noreen Brewer Chapter 06
Managerial Accounting Garrison Noreen Brewer Chapter 06Asif Hasan
 
Tvm review lecture
Tvm review lectureTvm review lecture
Tvm review lectureAhmed Said
 
The Total Quality Approach To Quality Management
The Total Quality Approach To Quality ManagementThe Total Quality Approach To Quality Management
The Total Quality Approach To Quality Managementambedkarpanchasheel
 
Sanbeda Presentation
Sanbeda PresentationSanbeda Presentation
Sanbeda Presentationesambale
 
Total quality management tools and techniques
Total quality management tools and techniquesTotal quality management tools and techniques
Total quality management tools and techniquesbhushan8233
 

What's hot (20)

Chapter 1 - TQM Evolution
Chapter 1 - TQM EvolutionChapter 1 - TQM Evolution
Chapter 1 - TQM Evolution
 
Product Quality
Product QualityProduct Quality
Product Quality
 
Organizational Structure and Culture
Organizational Structure and CultureOrganizational Structure and Culture
Organizational Structure and Culture
 
Quality Management Philosophies
Quality Management PhilosophiesQuality Management Philosophies
Quality Management Philosophies
 
Operation management intro
Operation management  introOperation management  intro
Operation management intro
 
Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...
Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...
Managerial Accounting Tools for Business Decision Making 6th Edition Weygandt...
 
Cost Behavior Analysis
Cost Behavior AnalysisCost Behavior Analysis
Cost Behavior Analysis
 
Quality management gurus
Quality management  gurus  Quality management  gurus
Quality management gurus
 
Good governance and social responsibility
Good governance and social responsibilityGood governance and social responsibility
Good governance and social responsibility
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_services
 
Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...Evaluation of-total-quality-management-implementation-as-engineering-practice...
Evaluation of-total-quality-management-implementation-as-engineering-practice...
 
Product design and process selection
Product design and process selectionProduct design and process selection
Product design and process selection
 
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb SultanBarriers to total quality management implementation By Mahr M.Haseeb Sultan
Barriers to total quality management implementation By Mahr M.Haseeb Sultan
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Managerial Accounting Garrison Noreen Brewer Chapter 06
Managerial Accounting Garrison Noreen Brewer Chapter 06Managerial Accounting Garrison Noreen Brewer Chapter 06
Managerial Accounting Garrison Noreen Brewer Chapter 06
 
Tvm review lecture
Tvm review lectureTvm review lecture
Tvm review lecture
 
The Total Quality Approach To Quality Management
The Total Quality Approach To Quality ManagementThe Total Quality Approach To Quality Management
The Total Quality Approach To Quality Management
 
Sanbeda Presentation
Sanbeda PresentationSanbeda Presentation
Sanbeda Presentation
 
QFD For Pizza
QFD For PizzaQFD For Pizza
QFD For Pizza
 
Total quality management tools and techniques
Total quality management tools and techniquesTotal quality management tools and techniques
Total quality management tools and techniques
 

Viewers also liked

Production Management Introduction
Production Management IntroductionProduction Management Introduction
Production Management IntroductionDr. Gururaj Phatak
 
Employe Engagement Research Update by BlessingWhite
Employe Engagement Research Update by BlessingWhiteEmploye Engagement Research Update by BlessingWhite
Employe Engagement Research Update by BlessingWhiteElizabeth Lupfer
 
Production Management
Production ManagementProduction Management
Production ManagementHiten Patel
 
Knowledge sharing and continious improvement strategies for the offshore wind...
Knowledge sharing and continious improvement strategies for the offshore wind...Knowledge sharing and continious improvement strategies for the offshore wind...
Knowledge sharing and continious improvement strategies for the offshore wind...Stavros Thomas
 
A modern office chair dissertation
A modern office chair dissertationA modern office chair dissertation
A modern office chair dissertationamidalka
 
Eight principle of tqm
Eight principle of tqmEight principle of tqm
Eight principle of tqmAman Kumar
 
Cost of quality concept and advantages
Cost of quality   concept and advantagesCost of quality   concept and advantages
Cost of quality concept and advantagesImran Jamil
 
Gallup Q12's Employee Engagement Findings
Gallup Q12's Employee Engagement FindingsGallup Q12's Employee Engagement Findings
Gallup Q12's Employee Engagement FindingsPaul Sohn
 

Viewers also liked (11)

Lean construction
Lean constructionLean construction
Lean construction
 
Production Management Introduction
Production Management IntroductionProduction Management Introduction
Production Management Introduction
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Employe Engagement Research Update by BlessingWhite
Employe Engagement Research Update by BlessingWhiteEmploye Engagement Research Update by BlessingWhite
Employe Engagement Research Update by BlessingWhite
 
Production Management
Production ManagementProduction Management
Production Management
 
Knowledge sharing and continious improvement strategies for the offshore wind...
Knowledge sharing and continious improvement strategies for the offshore wind...Knowledge sharing and continious improvement strategies for the offshore wind...
Knowledge sharing and continious improvement strategies for the offshore wind...
 
A modern office chair dissertation
A modern office chair dissertationA modern office chair dissertation
A modern office chair dissertation
 
Eight principle of tqm
Eight principle of tqmEight principle of tqm
Eight principle of tqm
 
Tqm
TqmTqm
Tqm
 
Cost of quality concept and advantages
Cost of quality   concept and advantagesCost of quality   concept and advantages
Cost of quality concept and advantages
 
Gallup Q12's Employee Engagement Findings
Gallup Q12's Employee Engagement FindingsGallup Q12's Employee Engagement Findings
Gallup Q12's Employee Engagement Findings
 

Similar to Modern chairs

Allied Quality Concept by Rahim Khoja
Allied Quality Concept by  Rahim KhojaAllied Quality Concept by  Rahim Khoja
Allied Quality Concept by Rahim KhojaRahim Khoja
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality ManagementSameer Omles
 
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLYPRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLYDIPRANJAN GUPTA
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingTimothy Wooi
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1vedzen1234
 
Mistake proofing for web
Mistake proofing for webMistake proofing for web
Mistake proofing for webvedzen1234
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1vedzen1234
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1vedzen1234
 
Toyota kata and beyond
Toyota kata and beyondToyota kata and beyond
Toyota kata and beyondWilliam Judd
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesDK Sharma
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systemsAyman Aljahdali
 

Similar to Modern chairs (20)

Allied Quality Concept by Rahim Khoja
Allied Quality Concept by  Rahim KhojaAllied Quality Concept by  Rahim Khoja
Allied Quality Concept by Rahim Khoja
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Kaizen.ppt
Kaizen.pptKaizen.ppt
Kaizen.ppt
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality Management
 
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLYPRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON  ENGINE COOLING ASSEMBLY
PRODUCTIVITY IMPROVEMENT THROUGH LEAN TOOLS ON ENGINE COOLING ASSEMBLY
 
Understand SPC Fundamentals
Understand SPC FundamentalsUnderstand SPC Fundamentals
Understand SPC Fundamentals
 
SMED overview
SMED overviewSMED overview
SMED overview
 
Kaizen bcic
Kaizen bcicKaizen bcic
Kaizen bcic
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Scrum overview
Scrum overviewScrum overview
Scrum overview
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & Manufacturing
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
Lss overview
Lss   overviewLss   overview
Lss overview
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
Mistake proofing for web
Mistake proofing for webMistake proofing for web
Mistake proofing for web
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
Toyota kata and beyond
Toyota kata and beyondToyota kata and beyond
Toyota kata and beyond
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management Principles
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 

Recently uploaded

Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 

Recently uploaded (20)

Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 

Modern chairs

  • 1. MODERN CHAIRS A Total Quality Management/Kaizen – Failure By Jonathan Baker.
  • 2. INTRODUCTION  A Total Quality Management training video that a final year class at the University of Edinburgh made in the style of Charlie Chaplin's Modern Times. The intention was to teach teamwork, production line processes, process optimisation, defects, quality, and continual improvement 'Kaizen'. Click <https://youtu.be/L--Oyw6V8gI> or google “YouTube Modern Chairs”
  • 3. NON TQM: 30 CHAIRS STACKED IN 120 SECONDS  Customer Specification: Create 6 Stacks of 5 Chairs per Stack  Simple Manufacturing Process: Chair Stacking; non-TQM method  6 People successfully move 30 chairs from one side of a room to another; the chairs are stacked already in piles of 5, and chairs can only be moved one at a time.  Each person grabs a chair and moves one across the room to create a pile of 5; no planning; no measurement of waste; no Total Quality Management (TQM)  Completed Pile: Left hand Stack has 6 chairs Top Right: Start Lower Right: Finish
  • 4. APPLYING TQM PRINCIPLES STAGE: 1  Chain Gang Production Line Configuration, one person at the end stacking chairs into piles of 5 (Top Left)  One can see that Work In Process is waiting to be moved to the final stage of stacking (Top Middle) creating a waste or resources and time.  Completed Process (Top Right) 10 seconds faster, but still with defects in meeting the customer’s specification. 30 CHAIRS STACKED IN 110 SECONDS
  • 5. RELATIONSHIP BETWEEN QUALITY AND CYCLE TIME “Apparently”, as Cycle Time increases, Quality reduces
  • 6. APPLYING TQM PRINCIPLES STAGE: 2  As the below formation takes place, the theme tune to ‘The Apprentice’ kicks in to suggest a revelation in using the Toyota Production System to eliminate waste, over processing, over production and waiting OPTIMISATION – LEAN MANUFACTURING 30 CHAIRS STACKED IN 90 SECONDS!
  • 7. IF YOU WATCHED THE ENTIRE VIDEO ON YOUTUBE; YOU WILL HAVE NOTICED THAT THEY HAVE ALREADY ENCOUNTERED DEFECTS AND IMPLEMENTED QUALITY CONTROL. DO YOU REMEMBER THE CUSTOMER SPECIFICATION? CREATE 6 STACKS OF “5” CHAIRS PER STACK
  • 9. BUT COULD WE REDUCE A PROJECT BY 90% OR HIGHER? Well there we have it!! From 120 seconds down to 65 seconds with the magic of TPS utilising TQM and the philosophies of Continual Improvement. An improvement of 45.83% Is this enough to meet the Governments ambitions for Construction of a 50% reduction in duration of projects as outlined in the Construction 2025 Report? Well; no…. But its pretty damn close right? Watching this video though, it just doesn’t shock me, open my eyes to the power of TPS and Lean Thinking. Lets actually analyse the customer requirement and processes properly:
  • 10.  Simple Analysis of the figures show that if all people collecting a chair each, and then moving it to its final location achieves 30 chairs stacked in 120 seconds, we therefore have: 𝟏𝟐𝟎 𝟑𝟎 = 𝟒 𝒔𝒆𝒄𝒐𝒏𝒅𝒔 𝒑𝒆𝒓 𝒄𝒉𝒂𝒊𝒓 This is taken from the very first video. A single cycle of moving a chair from point 1, and depositing at point 2 before returning to point 3 takes 4 seconds in total for 1 person. 1 2 3
  • 11. 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 We have 6 people involved in the process. Therefore if all 6 people followed the 1,2,3 cycle at the same time – we would have successfully moved 6 chairs in 4 seconds. We only have to repeat this process 5 times. 𝟓 × 𝟒 𝒔𝒆𝒄𝒐𝒏𝒅𝒔 = 𝟐𝟎 𝒔𝒆𝒄𝒐𝒏𝒅𝒔 If each person knows and counts out 5 iterations of this cycle and only deposits in their own area then we also reduce the all too erroneous issues of 6 chairs in some piles. Lean Management can really be that easy and effective. Poor consultants and educational sources leave many construction professionals with a foul taste when they hear the term ‘Lean’.
  • 12. The only goal of Lean; is to DELIVER VALUE for the customer; in this instance, 6 stacks of 5 chairs is what the customer values, whilst eliminating waste and applying continual improvement/lean principles. Eliminating all motion, and copying a production line which operates in a sequence of processes as closely as possible, is not the application of Lean or the Toyota Production System (TPS); particularly when it means poorer performance and poorer quality. 20 SECONDS = REDUCTION BY 83.3%
  • 13.  The above improvements of 83.3% really don’t even apply any lean techniques. It is just a simple work/motion study of the original inefficient system and applying some common mathematical judgement.  Managing the Supply Chain (Where, how and what kind of chairs are originally stored, can they be changed?)  Delivering the Chairs on a wheeled pallet would mean that a stack of 5 chairs could be moved in 4 seconds. With 6 people the entire process could be delivered in:  Can any quality control or standardisation be applied to the chairs before being supplied? 4 seconds = 96.67% improvement And that’s just 2 minutes of thinking laterally and innovatively, the same processes can and does apply in construction; even more so than manufacturing.
  • 14. ‘quod erat demonstrandum’ Decent Homes Programme: Current Contractor Improvement of 575% on Handovers within 4 weeks (2013) Decent Homes Programme: 195% improvement over any week in the prior contractors 15 year contract (2013) 28 day refurbishment programme, reduced to 2 days saving £125,000 per day on critical path costs; that’s £3.25m [92.85%] (2014) Q.E.D; Used to convey that a fact or situation demonstrates the truth of one’s theory or claim, especially to mark the conclusion of formal proof. www.oxforddictionaries.com