Finnish organizations are conducting a feasibility study to demonstrate improved indoor air quality (IAQ) technologies in Beijing schools. The study aims to identify market potential and appropriate business models for Finnish IAQ companies. A "Dream Team" of Finnish technology providers will work with GreenStream Network, who has experience implementing energy efficiency projects in China using an energy management company model. The feasibility study will involve visiting schools to assess IAQ issues and determine which Finnish solutions could be piloted to develop a showcase project and references for companies. The goal is to combine Finnish IAQ and educational expertise to develop a comprehensive offering for China.
2. Gateway to environmentally
friendly learning environment
• Finland is a forerunner in learning environments
as well as in air quality research
• Previously air quality expertise and educational
know-how have been exported separately
• During the spring of 2016 Finpro, GreenStream
Network and VTT decided to build a
comprehensive offering to China, combining
Finnish robust expertise in technologies in the
fields of both IAQ and education
”The Finnish approach
is to build a fun and
enjoyable learning
environment for the
students, where they
are interested to learn
new things.”
Chinese Teacher, Shanghai,
Helsingin Sanomat 29.8.2015
3. • In May 2016 the final project plan was ready and in late June
Tekes approved our application for the financial support for the
feasibility study phase
• During June-December 2016 a feasibility study will be done to
identify market potential for Finnish IAQ technology companies
and experts in Chinese schools
• Business models
• Appropriate financing models
• Potential pilot school for demonstration project
Feasibility Study:
HVAC demonstration in Beijing Schools
8. 8
• Introduce the project to Finnish companies
• Travel to China to introduce the project and
its participating companies to Beijing
Schools
• To utilise Finpro’s network and high-level
relationships to get connected with the local
schools in Beijing
• Beijing has about 30 school with ice hockey
team
• Helsinki-Beijing sister city relationships
• During the Moi Helsinki –event in May,
already 2 schools were visited
First steps of the project
9. • School environments vary a lot in
Beijing
• Not all schools have cantines
Lunch served in classrooms
• No possibility to air the
classrooms
• Only about 5 % of the schools
have mechanical ventilation
system
First observations
10. Ventilation should provide 6 litres of fresh air
every second for each student in the classroom
Finland’s Ministry of Social Affairs and Health, regulation 545/2015
12. Report by
Finnish National Instutute for Health and Welfare, 2.8.2016:
”In classrooms where indoor air ventilation met the required levels,
pupils’ ability to solve mathematical problems was approximately 4 %
higher compared to the classrooms with poor indoor air quality.”
15. Companies
Project manager
Financing models
Business Models
Local networks
Beautiful Beijing
Programme
IAQ expertise
Identification of
technologies to match
pilot school’s needs
IAQ expertise
Technology solutions
Dream Team
17. Successcase:Savings for Henglian Guanghua Paper Mill
Equipment from Finnish high-tech companies, European Energy Savings Technologies (Shanghai) Ltd
as turnkey supplier, local design and construction
The Switch Oy / Vacon Oy
Henglian Shandong
Guanghua Paper Group
European Energy Savings
Technologies (Shanghai) Ltd
”EEST”
Runtech Systems Oy
TM Systems Oy
• Ecopump Turbo and other main equipment
• Design and installation supervision
• Training of the customer
• Maintenance for the whole contract period
• Drop separation tank
• Operation of the paper mill
• Part of construction work
• Payments to EEST according to achieved
energy savings
• Main equipment delivery and scheduled
maintenance, and financing of the project,
using EMC model
• Owner of the project during contract
period
• Revenues from energy savings
• Detailed design • Installation & construction
• Supply of certain ancillary materials
(pipes and cables
• Frequency converter
Weifang Hengrui
Machinery Installation
Co. Ltd
Shandong Light
Industry Design
Institute
PPTA Digi
• Monitoring
19. VTT’stest system in Beijing:
Ambassador’s Residence
Building in China
References
HelsinkiSchoolexample:
HVAC renovation in Ressu
high school
Examplecase:
Apartment withroom air
cleaners
Indoorairmeasurement
system was installedin an air
handling unit
(AHU)in the residenceof the
FinnishEmbassyinOctober
2014
HVACrenovationinRessuhigh
schoolimprovedschool’ssupplyair
filtrationefficiencyremarkablyand
enabledhighqualityofindoorair
LowindoorparticleconcentrationandI/O
(indoor/outdoor)ratios
Incasethereisnosupplyair
filtration,indoorairparticle
concertationcanbereducedwith
recirculatingstandaloneroomair
cleaners
23. Next steps
• Feasibility study takes
approximately 6-8 months
• In September the first
schools will be visited
• In early October the first
meeting of the Dream
Team
23
24. The cooperation and business concept established in this project can
be expanded to several new fields to boost Finnish exports