Applying LEAN
TO NONMANUFACTURING
SUPPLY CHAIN
Purchase Order to Pay
Optimization
Elm Valle, Pride International, Process Improvement Lead
• Introduction
•
| Our World is Getting Deeper
Agenda
Company Overviews
PRIDE INTERNATIONAL
Headquartered in Houston, Texas, Pride International,
Inc. is one of the world's largest offshore drilling
contractors. Pride provides contract drilling and
related services to oil and gas companies
worldwide.
With approximately 4,000 employees, Pride offers a
multinational workforce with offices in the United
States, Angola, Brazil, and Saudi Arabia. We have
positioned our fleet in some of the world's largest
and most active exploration and production
basins. In 2010, Pride had $1.5 billion in
revenues.
Our fleet and operations currently consists of the
following:
5 Deepwater drillships
2 Deepwater drillships under construction
6 Deepwater Semisubmersible
6 Midwater Semisubmersible
7 Jackups
2 Managed deepwater units
UHY ADVISORS
Headquartered in Houston, Texas, Pride International,
Inc. is one of the world's largest offshore drilling
contractors. Pride provides contract drilling and
related services to oil and gas companies
worldwide.
With approximately 4,000 employees, Pride offers a
multinational workforce with offices in the United
States, Angola, Brazil, and Saudi Arabia. We have
positioned our fleet in some of the world's largest
and most active exploration and production
basins. In 2010, Pride had $1.5 billion in
revenues.
Our fleet and operations currently consists of the
following:
5 Deepwater drillships
2 Deepwater drillships under construction
6 Deepwater Semisubmersible
6 Midwater Semisubmersible
7 Jackups
2 Managed deepwater units
The Background (timeline)
Brought on as a Consultant for Pride International – to “Fix”
their Received Not Voucher backlog.
Hired on Full Time as the Process Improvement Lead
Myriad of Opportunities in the Procure to Pay Process
Enlisted Aid from UHY Advisors
Requested Full Blown Project to be initiated
The Challenge
Oil & Gas Company
Non Manufacturing
Vague or No Documentation of Processes / Procedures
Siloed Work
No Process Improvement Culture or Experience
Strategy Overview
PDCA
Plan
Do
Check
Act
DMAIC
Define
Measure
Analyze
Improve
Control
Control
ACTION
What is the
problem?
How are we
doing?
Fix It
Hold & Sustain
Gains
Project Mgmt
• Identify
Opportunities
• Scope Project
• Analyze the
Process
• Define Outcomes
• Prioritize
• Refine
• Implement
• Measure Outcomes
• Acknowledge
Plan, Do, Check, Act
Identify Problem Statement / Challenges
Benchmark against Industry & Best Practice
Acquire Support from Leadership
Validate and Continue Data Gathering
Define Current State & Metrics
Create Key Performance Indicators
Evangelize and Socialize at all levels
Create Future State
Document the Future State – Process Maps
Pilot and Validate
Implement the Future State
Activity
Requirements Gathering
Planning & Analysis
Design
Workshop
Develop Future State
Pilot
Implement & Monitor
2010
APRJAN FEB MAR
2011
JUL AUG SEP OCT NOV DEC
Note: Business Gathering was over a span of 1 year prior to Project
Timeline
Marketing Strategy
Understand Agree Document
Problem Statement - Cost
Pride International: $30/ Invoice
In 2009, Pride had an opportunity to save over $8MM in prompt pay discounts.
Actual Prompt Pay Discount Taken: $0.00
The 30% rework cost Pride additional $50 per invoice
In 2009, Pride’s First Pass Yield for Purchase Order to Pay transactions was 70%.
Category
Annualized 2010 Invoices
to be Processed
PSC 16,432
Brazil 67,627
Angola 9,830
All Others 41,455
TOTAL 144,070
15% of Purchase Orders are Cancelled
20% go through Change Order process
32% of PO Receipt fell into OS&D
20% of All Invoices Lost
Clearly Defined Process Map or Procedures did not exist
Lack of SOP’s or Desktop Procedures Transaction Oriented (Firefighting)
Problem Statement - Waste
Lacking Knowledge or Culture for Process Improvement / LEAN / Six Sigma
20% Re-Work Rate
Additional Costs
PO Mgmt
PO
Approval
Publish
PO
Receive
Material
Invoice
Receive
Voucher
PO
Pay
PO
Requisition
Queue
Understand Agree Document
Overall Cycle Time - Inefficiency
2 Days
Days a
Req sits.
Metrics are in “average” days.
7 Days
Conversion of
Req to PO
15 Days
Time to Approve & Publish 90 Days
Time Supplier
receives
approval to
Pride
receives
material at
K&N
24 Days
Supplier’s
Date of
Invoice vs.
Invoice
Received
Date logged
in E1
15 Days
Invoice
Received
Date vs. Date
Vouchered
7 Days
Lead Time for
Batching
Process &
Physical
Payment
Total Average Cycle Time = 160 Days
First Pass Yield = 70%
| Our World is Getting Deeper
Scope of Project
PO
Mgmt
PO
Approval
Publish
PO
Receive
Material
Invoice
Receive
Voucher
PO
Pay
PO
Level 1 Process Steps are denoted “LX.0”
L1.0 L2.0 L3.0 L4.0 L5.0 L6.0 L7.0
POMgmt
•Manual
•Auto
•Portal
•Change
•Cancel
•Blanket?
•Emergency?
POApproval
•Initial
•Changes
•AFE
•Non-Capital
AE
•Budget
Mgmt
PublishPO
•Manual
•Portal
•EDI
• Supplier
Acknowledge
ment
ReceiveMaterial
•K&N Process
•Pride
Process
•Recon
•PO
Status/Ship
InvoiceReceived
•Indexing
•Accruals
VoucherPO
•Voucher Log
•Normal
•3 Way Match
•No Match
•No Invoice
•No PO
PayPO
•Batching
•Approving
•Releasing
•Confirmation
• Direct Objectives:
Cycle Times – Reduce Cycle Times in the P2P process
First Pass Yield – Reduce rework or recycle of work (70%)
Streamline – Remove unnecessary steps or steps that can be
consolidated
• Indirect Objectives:
Reduced Costs (Rework of $300K)
Import Export Compliance
Increased Efficiencies (Lowest Credit Rating DnBi among
Competitors)
Meet Commercial Obligations (55% On Time Pay)
Improve Savings (2% Prompt Pay Discount $8MM)
Aligned with Internal Controls & Policies
| Our World is Getting Deeper
Project Objectives
| Our World is Getting Deeper
•Example Map
•Session Work
•Consolidation
Day 1-
Current
State
•Example VSM
•Session Work
•Consolidation
Days
2,3-
Value
Stream
• Session Work
• Internal Controls
• Consolidation
Days
4,5-
Future
State
Objectives
Understand Agree Document
SpiritTimeline
Off-Site Workshop
| Our World is Getting Deeper
Service Team Maturity Model
Characteristics of the business process at each maturation
level include:
1. Initial
 Initial learning phase for the team is determined.
 Formal documented processes may not exist.
2. Repeatable
 Informal, ad-hoc paths of communication are established.
 A certain level of repeatability is attained.
3. Defined
 Processes are well defined, documented, and standardized.
 Repeatability and consistency is more commonplace.
4. Predictable
 Integrated service management is present (e.g. quality controls,
audit controls, preventive measures).
 Focus is on measuring and communicating processes at the
business level.
5. OPTIMIZING (targeted goal for a service department)
 Departmental efficiencies are gained through refined
processes.
 Errors are almost non-existent.
Initial
Repeatable
Defined
Predictable
Optimizing
| Our World is Getting Deeper
Identify Value/Waste
Using the
Current State
Map. Identify
activities within
the process that
can be
“improved”.
Level 1
Level 2
Level 3
| Our World is Getting Deeper
Current State Result Mapping
Current State Mapping & Analysis
Value Stream Analysis Results
Minimize
Non-Value Add
RequiredActivity
Eliminate
Improve
Monitor
Value Add
Non-Required
Activity
AUTOMATE
 Required as checks due to number of exceptions
 Required due to immature processes
 Required due to lack of closed processes
 Required due to lack of communication
 Required due to lack of policy enforcement
Total Activities Identified - 120
 Required/Value Add 42%
 Non Required/Value Add 0%
 Required/Non Value Add 53%
 Non Required/Non Value Add 6%
Total of 173 Improvements were identified to support our Process Maps and
Future State.
Shared Ownership with split responsibilities for Voucher Log and Received
Not Vouchered.
Training! Training! Training! Lack of knowledge/ enforcement on Policies
and Procedures has caused delays in the process or rework.
Poke Yoke – Error Proofing on front end rather than mid-stream checks and
reviews.
Close the Loop – Understand and own the process.
Ongoing Project Discovery
Policy Requirements – Integration into new SOP
Desktop Manual – Complete End to End
Process Maps – 23 New Process Maps
Sarbanes-Oxley 404 – New Controls & Integration
Training Requirements – Process / Technology
Pride Platform – Training Guides
The Test Pilot
Three Buyers / 2 Expeditors / 2 Accounts Payables
Random population of Purchase Orders
Track them against old metrics
Period of One Month
KPI Improvements
Comparison to YTD 2010 vs. 2011 YTD Running JAN FEB
P2P Metric % Improvement % Improvement
REQ to PO Time (Days) 30% 15%
Approval Time (Days) 67% 57%
Supplier Shipment Time (Days) 51% 47%
Invoice Date vs. Received Invoice Date (Days) 79% 79%
Received Invoice Date to Voucher (Days) 80% 80%
Total Cycle Time % Improvement % Improvement
First Pass Yield [No Change PO, No Voucher Log] 37% 36%
Received Not Vouchered (in Millions) 60% 56%
Voucher Log (in Millions) 50% 67%
KPI Description % Improvement % Improvement
Line Items on Purchase Order that has uses a GIM number 2% 1%
Items in GIM that has classification data required for Export 39% 42%
Total Average Days Passed % Improvement % Improvement
NO Touch PO [Auto PO] 100% 100%
PO's with 3 Bids - exclud. Auto PO 60% 43%
| Our World is Getting Deeper
Instill the Culture
Current State
Future State
Q1 - Work Plan
&
Implementation
Q2 - Work Plan
&
Implementation
Q3 - Work Plan
&
Implementation

More Related Content

What's hot

Value Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) PosterValue Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) Poster
Operational Excellence Consulting
 
Improving On Time Delivery
Improving On Time DeliveryImproving On Time Delivery
Improving On Time Delivery
Thomas Cantin
 

What's hot (20)

Innovative Practices in Software Quality Facilitation
Innovative Practices in Software Quality FacilitationInnovative Practices in Software Quality Facilitation
Innovative Practices in Software Quality Facilitation
 
Black Belt Project Storyboard Template Example
Black Belt Project Storyboard Template ExampleBlack Belt Project Storyboard Template Example
Black Belt Project Storyboard Template Example
 
Metrics based Management
Metrics based ManagementMetrics based Management
Metrics based Management
 
Value Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) PosterValue Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) Poster
 
Pernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global OffshoringPernille Fabricius, Global CFO at Damco - Global Offshoring
Pernille Fabricius, Global CFO at Damco - Global Offshoring
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15ISO 9001 2015 DIS 9.0 performance 1-04-15
ISO 9001 2015 DIS 9.0 performance 1-04-15
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
ISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues WebinarISO 9001:2015 Transition Key Changes and Issues Webinar
ISO 9001:2015 Transition Key Changes and Issues Webinar
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniques
 
Improving On Time Delivery
Improving On Time DeliveryImproving On Time Delivery
Improving On Time Delivery
 
Lean Six Sigma overview Julian Kalac
Lean  Six Sigma overview Julian KalacLean  Six Sigma overview Julian Kalac
Lean Six Sigma overview Julian Kalac
 
Mapping the End to End Process
Mapping the End to End ProcessMapping the End to End Process
Mapping the End to End Process
 
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
 
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
 
ISO 9001:2015 Reshaping the role of the auditor - updated version
ISO 9001:2015 Reshaping the role of the auditor - updated versionISO 9001:2015 Reshaping the role of the auditor - updated version
ISO 9001:2015 Reshaping the role of the auditor - updated version
 
ISO 9001 2015 | Join-The-Dots
ISO 9001 2015 | Join-The-DotsISO 9001 2015 | Join-The-Dots
ISO 9001 2015 | Join-The-Dots
 
Agile transformation by Gnanasambandham anbazhagan
Agile transformation   by Gnanasambandham anbazhaganAgile transformation   by Gnanasambandham anbazhagan
Agile transformation by Gnanasambandham anbazhagan
 
Quality improvement
Quality improvementQuality improvement
Quality improvement
 

Viewers also liked

Saner Tanju Atis_ Strategic Procurement
Saner Tanju Atis_ Strategic ProcurementSaner Tanju Atis_ Strategic Procurement
Saner Tanju Atis_ Strategic Procurement
saneratis
 

Viewers also liked (14)

From Subcontracting to Vertical Value Chains
From Subcontracting to Vertical Value ChainsFrom Subcontracting to Vertical Value Chains
From Subcontracting to Vertical Value Chains
 
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION 046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
 
Saner Tanju Atis_ Strategic Procurement
Saner Tanju Atis_ Strategic ProcurementSaner Tanju Atis_ Strategic Procurement
Saner Tanju Atis_ Strategic Procurement
 
GOTO Night with Mirko Kleiner & Joe Justice
GOTO Night with Mirko Kleiner & Joe JusticeGOTO Night with Mirko Kleiner & Joe Justice
GOTO Night with Mirko Kleiner & Joe Justice
 
050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction 050 Intergrating Constructability with Lean Construction
050 Intergrating Constructability with Lean Construction
 
Michigan is Going Digital - Social Media Strategy Presentation for Walsh College
Michigan is Going Digital - Social Media Strategy Presentation for Walsh CollegeMichigan is Going Digital - Social Media Strategy Presentation for Walsh College
Michigan is Going Digital - Social Media Strategy Presentation for Walsh College
 
Formation lean supply chain - Lean Logistics
Formation lean supply chain - Lean LogisticsFormation lean supply chain - Lean Logistics
Formation lean supply chain - Lean Logistics
 
LEAN Construction
LEAN ConstructionLEAN Construction
LEAN Construction
 
Lean Supply Chain Systems Engineering
Lean Supply Chain Systems EngineeringLean Supply Chain Systems Engineering
Lean Supply Chain Systems Engineering
 
Introduction to Lean Construction
Introduction to Lean ConstructionIntroduction to Lean Construction
Introduction to Lean Construction
 
Lean construction
Lean constructionLean construction
Lean construction
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction Webinar
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introduction
 
Agile and Lean for Construction
Agile and Lean for ConstructionAgile and Lean for Construction
Agile and Lean for Construction
 

Similar to Pride Procurement Lean

T keynote 1020_de_lost wylie
T keynote 1020_de_lost wylieT keynote 1020_de_lost wylie
T keynote 1020_de_lost wylie
robgirvan
 
Doug Groves Shell S O A Symposium
Doug  Groves    Shell  S O A  SymposiumDoug  Groves    Shell  S O A  Symposium
Doug Groves Shell S O A Symposium
SOA Symposium
 
Where BPM and Change Management Meet
Where BPM and Change Management MeetWhere BPM and Change Management Meet
Where BPM and Change Management Meet
BPM Link
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
Omnex Inc.
 
Quality Assurance Plan White Paper
Quality Assurance Plan White PaperQuality Assurance Plan White Paper
Quality Assurance Plan White Paper
Geert Appeltans
 

Similar to Pride Procurement Lean (20)

4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation4 Steps to Drive Process Innovation
4 Steps to Drive Process Innovation
 
Lean Event 2013
Lean Event 2013Lean Event 2013
Lean Event 2013
 
T keynote 1020_de_lost wylie
T keynote 1020_de_lost wylieT keynote 1020_de_lost wylie
T keynote 1020_de_lost wylie
 
Logistics Case Study
Logistics Case StudyLogistics Case Study
Logistics Case Study
 
1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
 
build-for-speed-brochure
build-for-speed-brochurebuild-for-speed-brochure
build-for-speed-brochure
 
Loughridge Transformations' Webinar: Process Model - Begin with Basics
Loughridge Transformations' Webinar: Process Model - Begin with BasicsLoughridge Transformations' Webinar: Process Model - Begin with Basics
Loughridge Transformations' Webinar: Process Model - Begin with Basics
 
Doug Groves Shell S O A Symposium
Doug  Groves    Shell  S O A  SymposiumDoug  Groves    Shell  S O A  Symposium
Doug Groves Shell S O A Symposium
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Agile Lean Process Improvement
Agile Lean Process ImprovementAgile Lean Process Improvement
Agile Lean Process Improvement
 
Lean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & BradstreetLean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & Bradstreet
 
Where BPM and Change Management Meet
Where BPM and Change Management MeetWhere BPM and Change Management Meet
Where BPM and Change Management Meet
 
Project initiation
Project initiationProject initiation
Project initiation
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
 
Course 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptxCourse 1 Requirements Definition Overview.pptx
Course 1 Requirements Definition Overview.pptx
 
Transforming to an agile devops ecommerce
Transforming to an agile devops ecommerceTransforming to an agile devops ecommerce
Transforming to an agile devops ecommerce
 
BIP communication
BIP communicationBIP communication
BIP communication
 
Quality Assurance Plan White Paper
Quality Assurance Plan White PaperQuality Assurance Plan White Paper
Quality Assurance Plan White Paper
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
Business Analysis.pdf
Business Analysis.pdfBusiness Analysis.pdf
Business Analysis.pdf
 

Pride Procurement Lean

  • 1. Applying LEAN TO NONMANUFACTURING SUPPLY CHAIN Purchase Order to Pay Optimization Elm Valle, Pride International, Process Improvement Lead
  • 2. • Introduction • | Our World is Getting Deeper Agenda
  • 3. Company Overviews PRIDE INTERNATIONAL Headquartered in Houston, Texas, Pride International, Inc. is one of the world's largest offshore drilling contractors. Pride provides contract drilling and related services to oil and gas companies worldwide. With approximately 4,000 employees, Pride offers a multinational workforce with offices in the United States, Angola, Brazil, and Saudi Arabia. We have positioned our fleet in some of the world's largest and most active exploration and production basins. In 2010, Pride had $1.5 billion in revenues. Our fleet and operations currently consists of the following: 5 Deepwater drillships 2 Deepwater drillships under construction 6 Deepwater Semisubmersible 6 Midwater Semisubmersible 7 Jackups 2 Managed deepwater units UHY ADVISORS Headquartered in Houston, Texas, Pride International, Inc. is one of the world's largest offshore drilling contractors. Pride provides contract drilling and related services to oil and gas companies worldwide. With approximately 4,000 employees, Pride offers a multinational workforce with offices in the United States, Angola, Brazil, and Saudi Arabia. We have positioned our fleet in some of the world's largest and most active exploration and production basins. In 2010, Pride had $1.5 billion in revenues. Our fleet and operations currently consists of the following: 5 Deepwater drillships 2 Deepwater drillships under construction 6 Deepwater Semisubmersible 6 Midwater Semisubmersible 7 Jackups 2 Managed deepwater units
  • 4. The Background (timeline) Brought on as a Consultant for Pride International – to “Fix” their Received Not Voucher backlog. Hired on Full Time as the Process Improvement Lead Myriad of Opportunities in the Procure to Pay Process Enlisted Aid from UHY Advisors Requested Full Blown Project to be initiated
  • 5. The Challenge Oil & Gas Company Non Manufacturing Vague or No Documentation of Processes / Procedures Siloed Work No Process Improvement Culture or Experience
  • 6. Strategy Overview PDCA Plan Do Check Act DMAIC Define Measure Analyze Improve Control Control ACTION What is the problem? How are we doing? Fix It Hold & Sustain Gains Project Mgmt • Identify Opportunities • Scope Project • Analyze the Process • Define Outcomes • Prioritize • Refine • Implement • Measure Outcomes • Acknowledge
  • 7. Plan, Do, Check, Act Identify Problem Statement / Challenges Benchmark against Industry & Best Practice Acquire Support from Leadership Validate and Continue Data Gathering Define Current State & Metrics Create Key Performance Indicators Evangelize and Socialize at all levels Create Future State Document the Future State – Process Maps Pilot and Validate Implement the Future State
  • 8. Activity Requirements Gathering Planning & Analysis Design Workshop Develop Future State Pilot Implement & Monitor 2010 APRJAN FEB MAR 2011 JUL AUG SEP OCT NOV DEC Note: Business Gathering was over a span of 1 year prior to Project Timeline
  • 10. Problem Statement - Cost Pride International: $30/ Invoice In 2009, Pride had an opportunity to save over $8MM in prompt pay discounts. Actual Prompt Pay Discount Taken: $0.00 The 30% rework cost Pride additional $50 per invoice In 2009, Pride’s First Pass Yield for Purchase Order to Pay transactions was 70%. Category Annualized 2010 Invoices to be Processed PSC 16,432 Brazil 67,627 Angola 9,830 All Others 41,455 TOTAL 144,070
  • 11. 15% of Purchase Orders are Cancelled 20% go through Change Order process 32% of PO Receipt fell into OS&D 20% of All Invoices Lost Clearly Defined Process Map or Procedures did not exist Lack of SOP’s or Desktop Procedures Transaction Oriented (Firefighting) Problem Statement - Waste Lacking Knowledge or Culture for Process Improvement / LEAN / Six Sigma 20% Re-Work Rate Additional Costs
  • 12. PO Mgmt PO Approval Publish PO Receive Material Invoice Receive Voucher PO Pay PO Requisition Queue Understand Agree Document Overall Cycle Time - Inefficiency 2 Days Days a Req sits. Metrics are in “average” days. 7 Days Conversion of Req to PO 15 Days Time to Approve & Publish 90 Days Time Supplier receives approval to Pride receives material at K&N 24 Days Supplier’s Date of Invoice vs. Invoice Received Date logged in E1 15 Days Invoice Received Date vs. Date Vouchered 7 Days Lead Time for Batching Process & Physical Payment Total Average Cycle Time = 160 Days First Pass Yield = 70%
  • 13. | Our World is Getting Deeper Scope of Project PO Mgmt PO Approval Publish PO Receive Material Invoice Receive Voucher PO Pay PO Level 1 Process Steps are denoted “LX.0” L1.0 L2.0 L3.0 L4.0 L5.0 L6.0 L7.0 POMgmt •Manual •Auto •Portal •Change •Cancel •Blanket? •Emergency? POApproval •Initial •Changes •AFE •Non-Capital AE •Budget Mgmt PublishPO •Manual •Portal •EDI • Supplier Acknowledge ment ReceiveMaterial •K&N Process •Pride Process •Recon •PO Status/Ship InvoiceReceived •Indexing •Accruals VoucherPO •Voucher Log •Normal •3 Way Match •No Match •No Invoice •No PO PayPO •Batching •Approving •Releasing •Confirmation
  • 14. • Direct Objectives: Cycle Times – Reduce Cycle Times in the P2P process First Pass Yield – Reduce rework or recycle of work (70%) Streamline – Remove unnecessary steps or steps that can be consolidated • Indirect Objectives: Reduced Costs (Rework of $300K) Import Export Compliance Increased Efficiencies (Lowest Credit Rating DnBi among Competitors) Meet Commercial Obligations (55% On Time Pay) Improve Savings (2% Prompt Pay Discount $8MM) Aligned with Internal Controls & Policies | Our World is Getting Deeper Project Objectives
  • 15. | Our World is Getting Deeper •Example Map •Session Work •Consolidation Day 1- Current State •Example VSM •Session Work •Consolidation Days 2,3- Value Stream • Session Work • Internal Controls • Consolidation Days 4,5- Future State Objectives Understand Agree Document SpiritTimeline Off-Site Workshop
  • 16.
  • 17. | Our World is Getting Deeper Service Team Maturity Model Characteristics of the business process at each maturation level include: 1. Initial  Initial learning phase for the team is determined.  Formal documented processes may not exist. 2. Repeatable  Informal, ad-hoc paths of communication are established.  A certain level of repeatability is attained. 3. Defined  Processes are well defined, documented, and standardized.  Repeatability and consistency is more commonplace. 4. Predictable  Integrated service management is present (e.g. quality controls, audit controls, preventive measures).  Focus is on measuring and communicating processes at the business level. 5. OPTIMIZING (targeted goal for a service department)  Departmental efficiencies are gained through refined processes.  Errors are almost non-existent. Initial Repeatable Defined Predictable Optimizing
  • 18. | Our World is Getting Deeper Identify Value/Waste Using the Current State Map. Identify activities within the process that can be “improved”. Level 1 Level 2 Level 3
  • 19.
  • 20. | Our World is Getting Deeper Current State Result Mapping Current State Mapping & Analysis
  • 21. Value Stream Analysis Results Minimize Non-Value Add RequiredActivity Eliminate Improve Monitor Value Add Non-Required Activity AUTOMATE  Required as checks due to number of exceptions  Required due to immature processes  Required due to lack of closed processes  Required due to lack of communication  Required due to lack of policy enforcement Total Activities Identified - 120  Required/Value Add 42%  Non Required/Value Add 0%  Required/Non Value Add 53%  Non Required/Non Value Add 6%
  • 22. Total of 173 Improvements were identified to support our Process Maps and Future State. Shared Ownership with split responsibilities for Voucher Log and Received Not Vouchered. Training! Training! Training! Lack of knowledge/ enforcement on Policies and Procedures has caused delays in the process or rework. Poke Yoke – Error Proofing on front end rather than mid-stream checks and reviews. Close the Loop – Understand and own the process.
  • 23. Ongoing Project Discovery Policy Requirements – Integration into new SOP Desktop Manual – Complete End to End Process Maps – 23 New Process Maps Sarbanes-Oxley 404 – New Controls & Integration Training Requirements – Process / Technology
  • 24. Pride Platform – Training Guides
  • 25. The Test Pilot Three Buyers / 2 Expeditors / 2 Accounts Payables Random population of Purchase Orders Track them against old metrics Period of One Month
  • 26. KPI Improvements Comparison to YTD 2010 vs. 2011 YTD Running JAN FEB P2P Metric % Improvement % Improvement REQ to PO Time (Days) 30% 15% Approval Time (Days) 67% 57% Supplier Shipment Time (Days) 51% 47% Invoice Date vs. Received Invoice Date (Days) 79% 79% Received Invoice Date to Voucher (Days) 80% 80% Total Cycle Time % Improvement % Improvement First Pass Yield [No Change PO, No Voucher Log] 37% 36% Received Not Vouchered (in Millions) 60% 56% Voucher Log (in Millions) 50% 67% KPI Description % Improvement % Improvement Line Items on Purchase Order that has uses a GIM number 2% 1% Items in GIM that has classification data required for Export 39% 42% Total Average Days Passed % Improvement % Improvement NO Touch PO [Auto PO] 100% 100% PO's with 3 Bids - exclud. Auto PO 60% 43%
  • 27. | Our World is Getting Deeper Instill the Culture Current State Future State Q1 - Work Plan & Implementation Q2 - Work Plan & Implementation Q3 - Work Plan & Implementation