SlideShare a Scribd company logo
1 of 17
DPR
«Development. Projects. Realization»
Modular Enrichment Plants
Technogenic fields
Activities of Mining-and-Metallurgical Industry (MMI)
lead to formation of waste – gigantic technogenic fields,
which contain a valuable concentrate:
- chrome
- manganese
- nickel
- iron
- copper
- coal
- rare-earth metals
The highly-profitable possibilities
The natural resources are exhausted while quantity of
the technogenic fields is increasing.
Modern enrichment* complexes allow to extract a
valuable concentrate with a prime cost from $4 for ton.
For example:
With a market value of ferrochrome from $1000,
the profitable of mining is 4800%
Concentrate
World-market value
for ton
Prime cost of
enrichment for ton
Enrichment`s
profitability
Coal $50 - 150 $12- 15 576%
Ferrochrome $1097 - 3600 $40 - 50 4800%
Ferromanganese $1300 - 2700 $45-55 4000%
Iron ore from $130 $4 - 6 2600%
*Ore enrichment is a set of methods of separation of metals and minerals
from each other with a difference in their physical and/or chemical
properties
Total investment to build the plant is about $ 2,5 million
The payback period is 2 months
Extra resource
these piles cover huge areas and cause serious ecological threat
by:
• Disengaging harmful and poisonous substances permeating
ground waters;
• Frequent occurrence of fires*.
* A single burning pile disengages an average of 10 t carbon oxide, 1.5 t sulfurous
anhydride and a considerable amount of other admixing gases.
The investor can get financing and administrative support because
High-profitable Business
1. Original material:
- % of valuable concentrate
- quality of concentrate
(physical and chemical properties)
- volume of concentrate stocks
- concentrate market cost
2. Enrichment technology:
- % of concentrate extraction
- extraction prime cost
(electricity, water, work and other)
- complex productivity
3. Logistics:
- site location (transport infrastructure)
- communications
- effinciency of equipment exploitation (loaders, dump-
trucks)
4. Manufacturing organization:
- administrative support
- personal training
- continuity of work
- terms of building
- distribution system
The following related factors influence on general profitability of business:
Stages of realization complex solution
1. Exploration
- stock evaluation
- concentrate analysis
- locality rating
2. Technology engineering
- technology choice
- productivity calculation
3. Enterprise projection
- production
- infrastructure
- logistics
- communications
4. Building
- paperwork
- equipment production
- construction
5. Starting- adjustment
- personal training
- complex adjustment
- optimization of equipment work
6. Commissioning
- service organization
- project completion
DPR enrichment plants
The DPR designs modular enrichment plants and performs a complete the whole cycle of works at
all project implementation stages:
• Object survey: sampling, determining an
enrichment technique;
• Calculation of economical efficiency;
• Providing for attraction of investments;
• Complete set of development works;
• Construction of plant;
• Personnel preparing and training;
• Logistics system establishment;
• Commissioning;
• Product distribution system establishment;
• Establishment of service and maintenance
department;
Enrichment by gravitational jigging
The available experience shows that enrichment by gravitational jigging may be efficient for
the following raw materials:
• Coal
• Coal gob piles
• Piles from metallurgical works
• Manganese ore
• Chromium ore
• Piles of ferromanganese and ferrochrome
• Vermiculite
• Placer deposits (gold, titanic ores, etc.)
• Iron ore
• Diamonds
The objects of Modular Enrichment Plants
DPR plant characteristics
1. High economic efficiency
2. Short-term of investment return (2
months or more)
3. Ecological safety
4. Reliable operation
Advantage of dealing with DPR
We undertake responsibility for complete set
of works, thus ensuring maximum efficiency at
each stage.
This significantly reduces the time of launch
production and increases profitability the
customer`s investment.
«We put your idea into result within 4 months»
Equipment
• As part of the project enrichment by
gravity jigging, the complexes are
equipped with production equipment
by NPP ―Gravikon‖
(Lugansk, Ukraine).
GRAVICON Modular Complexes
• The Gravicon Modular Complexes are
designed to enrich the dumps of non-
ferrous metals, coal heaps and also small
deposits of mineral resources.
Source product output — 50, 100, 200 t/h
Extraction of source raw material concentrate
— up to 99%
Advantages of GRAVICON Complexes
• High efficiency of separation;
• May be installed on unorganized areas,
near the object;
• Complete automation of all works by
complex;
• Low energy consumption
• Low operational costs.
Experience
In the Republic of Kazakhstan successfully function:
• Aktobe, Aktiubinsky Ferrous Alloys Plant, ‖JSC
«TNK KazKhrom»: 1set – 50 t/h, 2002
• 1set – 70 t/h, 2006, (slugs)
• Aksu, 2 sets – 70 t/h, 2011, (ferrochrome)
• Karaganda, ‖Arman-100‖:
• 350 t/h (enrichment of manganese ores)
• Republic of Guinea, Africa: enrichment complex
– 30 t/h, (gold, diamonds)
• Republic of Liberia, Africa: enrichment complex
– 50 t/h, (gold, diamonds)
Other countries:
DPR «Development Projects Realization»
Design and Engineering Center for Complex Construction of Industrial facilities.
Central Office in Ukraine:
Kiev, Poltavskaya Str., 9
+38(044) 484-12-62
info@dpr.biz.ua
www.dpr.biz.ua
Representative Office in Kazakhstan:
Almaty, Aouezova Str., 14a,
BC ―Bereket‖, 13 floor
+7(701) 959-97-91
+7(727) 356-23-2
sumarokov@dpr.biz.ua

More Related Content

Similar to Modular Enrichment Plants

Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nick Vukovich
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation Romelectro
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221Brad Young
 
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...Maghrenov
 
Equipment selection for high selective excavation surface coal mining
Equipment selection for high selective excavation surface coal miningEquipment selection for high selective excavation surface coal mining
Equipment selection for high selective excavation surface coal miningwybawa
 
AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAlkane Resources
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1RToet
 
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...Global CCS Institute
 
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in IlukaKristy Marshall
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...irvan septyan mulyana
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2RToet
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
Thermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap KielThermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap KielEBAconference
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...IRJET Journal
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CVJaco Botha
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...OECD Environment
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeriaRCREEE
 

Similar to Modular Enrichment Plants (20)

Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
CRTEN by Prof. AmenAllah Guizani - Maghrenov workshop on research infrastruct...
 
Equipment selection for high selective excavation surface coal mining
Equipment selection for high selective excavation surface coal miningEquipment selection for high selective excavation surface coal mining
Equipment selection for high selective excavation surface coal mining
 
AMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycleAMEC Convention 2017 - Driving the next cycle
AMEC Convention 2017 - Driving the next cycle
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...Apec workshop 2 presentation 8 3 vegar apec workshop 8  presentation v4 3.ppt...
Apec workshop 2 presentation 8 3 vegar apec workshop 8 presentation v4 3.ppt...
 
WQ-2
WQ-2WQ-2
WQ-2
 
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
 
Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2Linked In Pres R Toet Rev2
Linked In Pres R Toet Rev2
 
YURESUME
YURESUMEYURESUME
YURESUME
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
Thermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap KielThermal pretreatment of biomass/torrefaction - Jaap Kiel
Thermal pretreatment of biomass/torrefaction - Jaap Kiel
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CV
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeria
 

Recently uploaded

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 

Modular Enrichment Plants

  • 1.
  • 3. Technogenic fields Activities of Mining-and-Metallurgical Industry (MMI) lead to formation of waste – gigantic technogenic fields, which contain a valuable concentrate: - chrome - manganese - nickel - iron - copper - coal - rare-earth metals
  • 4. The highly-profitable possibilities The natural resources are exhausted while quantity of the technogenic fields is increasing. Modern enrichment* complexes allow to extract a valuable concentrate with a prime cost from $4 for ton. For example: With a market value of ferrochrome from $1000, the profitable of mining is 4800% Concentrate World-market value for ton Prime cost of enrichment for ton Enrichment`s profitability Coal $50 - 150 $12- 15 576% Ferrochrome $1097 - 3600 $40 - 50 4800% Ferromanganese $1300 - 2700 $45-55 4000% Iron ore from $130 $4 - 6 2600% *Ore enrichment is a set of methods of separation of metals and minerals from each other with a difference in their physical and/or chemical properties Total investment to build the plant is about $ 2,5 million The payback period is 2 months
  • 5. Extra resource these piles cover huge areas and cause serious ecological threat by: • Disengaging harmful and poisonous substances permeating ground waters; • Frequent occurrence of fires*. * A single burning pile disengages an average of 10 t carbon oxide, 1.5 t sulfurous anhydride and a considerable amount of other admixing gases. The investor can get financing and administrative support because
  • 6. High-profitable Business 1. Original material: - % of valuable concentrate - quality of concentrate (physical and chemical properties) - volume of concentrate stocks - concentrate market cost 2. Enrichment technology: - % of concentrate extraction - extraction prime cost (electricity, water, work and other) - complex productivity 3. Logistics: - site location (transport infrastructure) - communications - effinciency of equipment exploitation (loaders, dump- trucks) 4. Manufacturing organization: - administrative support - personal training - continuity of work - terms of building - distribution system The following related factors influence on general profitability of business:
  • 7. Stages of realization complex solution 1. Exploration - stock evaluation - concentrate analysis - locality rating 2. Technology engineering - technology choice - productivity calculation 3. Enterprise projection - production - infrastructure - logistics - communications 4. Building - paperwork - equipment production - construction 5. Starting- adjustment - personal training - complex adjustment - optimization of equipment work 6. Commissioning - service organization - project completion
  • 8. DPR enrichment plants The DPR designs modular enrichment plants and performs a complete the whole cycle of works at all project implementation stages: • Object survey: sampling, determining an enrichment technique; • Calculation of economical efficiency; • Providing for attraction of investments; • Complete set of development works; • Construction of plant; • Personnel preparing and training; • Logistics system establishment; • Commissioning; • Product distribution system establishment; • Establishment of service and maintenance department;
  • 9. Enrichment by gravitational jigging The available experience shows that enrichment by gravitational jigging may be efficient for the following raw materials: • Coal • Coal gob piles • Piles from metallurgical works • Manganese ore • Chromium ore • Piles of ferromanganese and ferrochrome • Vermiculite • Placer deposits (gold, titanic ores, etc.) • Iron ore • Diamonds
  • 10. The objects of Modular Enrichment Plants
  • 11. DPR plant characteristics 1. High economic efficiency 2. Short-term of investment return (2 months or more) 3. Ecological safety 4. Reliable operation
  • 12. Advantage of dealing with DPR We undertake responsibility for complete set of works, thus ensuring maximum efficiency at each stage. This significantly reduces the time of launch production and increases profitability the customer`s investment. «We put your idea into result within 4 months»
  • 13. Equipment • As part of the project enrichment by gravity jigging, the complexes are equipped with production equipment by NPP ―Gravikon‖ (Lugansk, Ukraine).
  • 14. GRAVICON Modular Complexes • The Gravicon Modular Complexes are designed to enrich the dumps of non- ferrous metals, coal heaps and also small deposits of mineral resources. Source product output — 50, 100, 200 t/h Extraction of source raw material concentrate — up to 99%
  • 15. Advantages of GRAVICON Complexes • High efficiency of separation; • May be installed on unorganized areas, near the object; • Complete automation of all works by complex; • Low energy consumption • Low operational costs.
  • 16. Experience In the Republic of Kazakhstan successfully function: • Aktobe, Aktiubinsky Ferrous Alloys Plant, ‖JSC «TNK KazKhrom»: 1set – 50 t/h, 2002 • 1set – 70 t/h, 2006, (slugs) • Aksu, 2 sets – 70 t/h, 2011, (ferrochrome) • Karaganda, ‖Arman-100‖: • 350 t/h (enrichment of manganese ores) • Republic of Guinea, Africa: enrichment complex – 30 t/h, (gold, diamonds) • Republic of Liberia, Africa: enrichment complex – 50 t/h, (gold, diamonds) Other countries:
  • 17. DPR «Development Projects Realization» Design and Engineering Center for Complex Construction of Industrial facilities. Central Office in Ukraine: Kiev, Poltavskaya Str., 9 +38(044) 484-12-62 info@dpr.biz.ua www.dpr.biz.ua Representative Office in Kazakhstan: Almaty, Aouezova Str., 14a, BC ―Bereket‖, 13 floor +7(701) 959-97-91 +7(727) 356-23-2 sumarokov@dpr.biz.ua