SlideShare a Scribd company logo
1 of 16
Download to read offline
Modelling Water Yield, Sedimentation, and Flood 
  Dynamics in 2 sub‐basins of the Volta Basin 


    Emmanuel Obuobie, Fred Kizito, Christophe Le Page and Jean 
                        Philippe Venot
Location and background
Social aspects of IWRM
‐ Tool: Companion modeling
‐ Methodology: Stakeholders identify a collective challenge and use 
  conceptual frameworks to identify their systems in a play fashion 
‐ Collective identification of social and ecological dynamics
‐ Outcome: Identification of a shared representation of issues at stake 
  (actors, resources, dynamics and relationships) through local 
   stakeholder consultation
Conceptual System setup




                          Flood 
                     vulnerability and 
                    land use planning




                                          4
Modeling Water/Sediment Yields
         ‐ Study catchment in Ghana (Zebilla: 1,695 km2) ‐
         ‐ Modeling conducted to include 
           upstream inputs to‐ and downstream sinks 
           from study area
Model Calibration and Validation
  Calibration results                                                                               16
                                                                                                               Simulated     Measured                             R2=0.84




                                              Annual Total Water Yield (mm)
  for Yakala                                                                                        14
                                                                                                                                                                  NSE=0.77
                                                                                                    12                                                            PBIAS= 6.3%
                                                                                                    10
                                                                                                    8
                                                                                                    6
                                                                                                    4
                                                                                                    2
Conditions for successful calib.                                                                    0
R2 > 0.6                                                                                                     1980     1981     1982          1983   1984   1985

NSE > 0.50                                                                                                                            Year

PBIAS is + 25%
(Santhi et al., 2001; Moriasi et al., 2007)                                                              8                                                        R2=0.72
                                                                                                                 Simulated    Measured                            NSE=0.68
                                                                   Monthly Total Water Yield (mm)


                                                                                                         7                                                        PBIAS= 12.6%
                                                                                                         6
                                                                                                         5
                                                                                                         4
                                                                                                         3
                                                                                                         2
                                                                                                         1
                                                                                                         0
                                                                                                         janv.‐80 janv.‐81 janv.‐82 janv.‐83 janv.‐84 janv.‐85
                                                                                                                              Calibration Years
                                                                                                                                                                                 6
Model Calibration and Validation
                                                          70                                        R2=0.83
                                                               Simulated     Measured               NSE=0.82




                         Monthly Total Water Yield (mm)
                                                          60
                                                                                                    PBIAS= 4.4%
                                                          50

                                                          40

                                                          30

                                                          20

                                                          10

Calibration and                                            0

validation  results 
for Nawuni                                                                   Calibration Months

                                                          70
                                                                                                     R2=0.82
                       Monthly Total Water Yield (mm)




                                                          60     Simulated    Measured               NSE=0.78
                                                                                                     PBIAS= 15.5%
                                                          50

                                                          40

                                                          30

                                                          20

                                                          10

                                                          0



                                                                                Validation Months


                                                                                                                    7
Key water Yield Results
                                         Methodology: Simulated discharge in ‘cms’ was converted to ‘cmy’
                                         Outcome: Estimate of water fluxes that can be imported into WEAP 
                                         for allocation to the different water users in the basin
                                         Mean annual water yield: 1.4 Billion m3 of which 0.16 Billion m3 is generated 
                                         within the basin. The remaining 90% is generated upstream of the basin.


                           4500                                                                                               900
                                                   Zebila water yield    Total water yield
                           4000                                                                                               800
Annual Water Yield (Mm3)




                           3500                                                                                               700




                                                                                                    Total Water Yield (Mm3)
                           3000                                                                                               600

                           2500                                                                                               500

                           2000                                                                                               400

                           1500                                                                                               300
                           1000                                                                                               200
                           500                                                                                                100
                             0                                                                                                  0
                                  1971      1976      1981        1986   1991       1996     2001
Sediment Yield Estimation
   ‐ Methodology: Empirical relationship between water discharge and sediment 
     concentration yields sediment discharge.
   ‐ Sediment discharge is used to simulate and calibrate sediment transport (t/day) 
      in the catchment; yield is computed as a function of study area  t/ha
   ‐ Outcome: Estimate of sediment yields permits scenarios for interventions to 
     mitigate problem e.g. grass strips



Calibration and 
validation  
Results for 
Nawuni
Sediment Yield Estimation
  ‐ Average annual sediment yield for Zebila catchment: 3.4 t/ha/yr 
  ‐ Sediment yield by land use type: Cropland/woodland, Savanna


     Land use                                 Cropland/woodland        Savanna
     Sediment (t/ha/yr)                       4.7                      2.1
     Contribution to sedimentation (%)        69                       31


‐ Average sediment yield in reservoirs  in Zebila catchment: 0.012 t/ha/yr (2035 t/yr) 


  ‐ Global average sediment yield: 15 t/ha/yr
  ‐ Average for Africa: 9 t/ha/yr 
Flood Hazard Assessment 
                 GEO‐SFM Model
                                        Small reservoirs
Hydrograph
Characterizing Flood Risk
                                      Produce a
          Generate Daily               synthetic
        Historical Rainfall       streamflow record
     (1961-2003) by reanalysis




          Determine locations
         where bankfull storage
              Is exceeded


 ?

                            Compute Bankfull
                               storage
Next Steps

   Sediment modeling
o Model scenarios of interventions e.g., introducing grass 
  strips to ascertain impacts on erosion and sedimentation  

   Flood modeling
o Conduct data processing module, water balance routines 
  and flow routing modules
o Generate flood hazard map  
Concluding Remarks
‐ Modeling tools are useful for studying sedimentation/erosion and 
  flooding dynamics within the framework of Integrated Water 
  Resources Management (IWRM)

‐ Estimates indicate that 90% of the sub‐basin water resources are from 
  upstream sources which signifies implications for upstream‐
  downstream collaboration on IWRM issues

‐ Sedimentation control through interventions ensures that:
   ‐ Reservoirs are not subjected to uncontrollable siltation levels 
   ‐ Storage capacity of reservoirs is lengthened and they are used 
      more productively which
   ‐ Enhances community water provision and livelihoods in the Basin 
Concluding Remarks‐ 2
‐ Flood hazard modeling  is far advanced. When completed the 
  generated hazard maps will inform decision making regarding land use 
  planning in the study catchment. This will help reduce vulnerability to 
  flooding disasters. 

‐ Results from sedimentation and flood modeling feed  into multi‐
  stakeholder platform for policy and IWRM interventions
Thank you

More Related Content

Viewers also liked

1 lab physico-chemical_properties_of_drugs[1]
1 lab physico-chemical_properties_of_drugs[1]1 lab physico-chemical_properties_of_drugs[1]
1 lab physico-chemical_properties_of_drugs[1]Kym Anne Surmion II
 
Factors bioavailability by d hi man saab
Factors bioavailability by d hi man saabFactors bioavailability by d hi man saab
Factors bioavailability by d hi man saabMANISH KUMAR
 
Pharmaceutical suspensions... a brief review
Pharmaceutical suspensions... a brief reviewPharmaceutical suspensions... a brief review
Pharmaceutical suspensions... a brief reviewbk fatima
 
Pharmaceutics - suspension
Pharmaceutics -  suspensionPharmaceutics -  suspension
Pharmaceutics - suspensionAreej Abu Hanieh
 
Physicochemical Properties effect on Absorption of Drugs
Physicochemical Properties effect on Absorption of DrugsPhysicochemical Properties effect on Absorption of Drugs
Physicochemical Properties effect on Absorption of DrugsSuraj Choudhary
 
Factors Affecting Solubility
Factors Affecting SolubilityFactors Affecting Solubility
Factors Affecting Solubilityguestc3a88
 
Physiological factors of drug absorption
Physiological factors of drug absorptionPhysiological factors of drug absorption
Physiological factors of drug absorptionSirazum Munira
 
Solubility (Physical Pharmacy)
Solubility (Physical Pharmacy)Solubility (Physical Pharmacy)
Solubility (Physical Pharmacy)Areej Abu Hanieh
 
Pharmaceutical suspension
Pharmaceutical suspension Pharmaceutical suspension
Pharmaceutical suspension Muwela001
 

Viewers also liked (11)

1 lab physico-chemical_properties_of_drugs[1]
1 lab physico-chemical_properties_of_drugs[1]1 lab physico-chemical_properties_of_drugs[1]
1 lab physico-chemical_properties_of_drugs[1]
 
Factors bioavailability by d hi man saab
Factors bioavailability by d hi man saabFactors bioavailability by d hi man saab
Factors bioavailability by d hi man saab
 
Subsidence
SubsidenceSubsidence
Subsidence
 
Pharmaceutical suspensions... a brief review
Pharmaceutical suspensions... a brief reviewPharmaceutical suspensions... a brief review
Pharmaceutical suspensions... a brief review
 
Pharmaceutics - suspension
Pharmaceutics -  suspensionPharmaceutics -  suspension
Pharmaceutics - suspension
 
Physicochemical Properties effect on Absorption of Drugs
Physicochemical Properties effect on Absorption of DrugsPhysicochemical Properties effect on Absorption of Drugs
Physicochemical Properties effect on Absorption of Drugs
 
Factors Affecting Solubility
Factors Affecting SolubilityFactors Affecting Solubility
Factors Affecting Solubility
 
Physiological factors of drug absorption
Physiological factors of drug absorptionPhysiological factors of drug absorption
Physiological factors of drug absorption
 
Solubility (Physical Pharmacy)
Solubility (Physical Pharmacy)Solubility (Physical Pharmacy)
Solubility (Physical Pharmacy)
 
Pharmaceutical suspension
Pharmaceutical suspension Pharmaceutical suspension
Pharmaceutical suspension
 
Solid dispersion
Solid dispersionSolid dispersion
Solid dispersion
 

More from International Water Management Institute (IWMI)

More from International Water Management Institute (IWMI) (20)

Boosting Crop Intensification in Southern Bangladesh: How can surface water i...
Boosting Crop Intensification in Southern Bangladesh: How can surface water i...Boosting Crop Intensification in Southern Bangladesh: How can surface water i...
Boosting Crop Intensification in Southern Bangladesh: How can surface water i...
 
Rice-Rice-Rabi systems for low salinty regions of the coastal zone of Bangladesh
Rice-Rice-Rabi systems for low salinty regions of the coastal zone of BangladeshRice-Rice-Rabi systems for low salinty regions of the coastal zone of Bangladesh
Rice-Rice-Rabi systems for low salinty regions of the coastal zone of Bangladesh
 
Adaptation strategy for crop production in changing climate: Saline-prone Bar...
Adaptation strategy for crop production in changing climate: Saline-prone Bar...Adaptation strategy for crop production in changing climate: Saline-prone Bar...
Adaptation strategy for crop production in changing climate: Saline-prone Bar...
 
Triple rice in a year: Is it feasible for low salinity areas of the coastal z...
Triple rice in a year: Is it feasible for low salinity areas of the coastal z...Triple rice in a year: Is it feasible for low salinity areas of the coastal z...
Triple rice in a year: Is it feasible for low salinity areas of the coastal z...
 
Oilseed crops in rice-based farming systems in southern Bangladesh
Oilseed crops in rice-based farming systems in southern BangladeshOilseed crops in rice-based farming systems in southern Bangladesh
Oilseed crops in rice-based farming systems in southern Bangladesh
 
The Imposition of Participation? The Case of Participatory Water Management i...
The Imposition of Participation? The Case of Participatory Water Management i...The Imposition of Participation? The Case of Participatory Water Management i...
The Imposition of Participation? The Case of Participatory Water Management i...
 
Targeting Agricultural Water Management Interventions: the TAGMI Tool
Targeting Agricultural Water Management Interventions: the TAGMI ToolTargeting Agricultural Water Management Interventions: the TAGMI Tool
Targeting Agricultural Water Management Interventions: the TAGMI Tool
 
The Small Reservoirs Toolkit
The Small Reservoirs ToolkitThe Small Reservoirs Toolkit
The Small Reservoirs Toolkit
 
Goat Production and Marketing in Zimbabwe
Goat Production and Marketing in ZimbabweGoat Production and Marketing in Zimbabwe
Goat Production and Marketing in Zimbabwe
 
Decentralized surface water irrigation as a pathway for sustainable intensifi...
Decentralized surface water irrigation as a pathway for sustainable intensifi...Decentralized surface water irrigation as a pathway for sustainable intensifi...
Decentralized surface water irrigation as a pathway for sustainable intensifi...
 
Targeting Improved Cropping Systems in Poverty-Prone Coastal Zones of South Asia
Targeting Improved Cropping Systems in Poverty-Prone Coastal Zones of South AsiaTargeting Improved Cropping Systems in Poverty-Prone Coastal Zones of South Asia
Targeting Improved Cropping Systems in Poverty-Prone Coastal Zones of South Asia
 
Potential technology adoption: Index for improved targeting: A village level ...
Potential technology adoption: Index for improved targeting: A village level ...Potential technology adoption: Index for improved targeting: A village level ...
Potential technology adoption: Index for improved targeting: A village level ...
 
Boosting Crop Intensification in southern Bangladesh: how surface water irrig...
Boosting Crop Intensification in southern Bangladesh: how surface water irrig...Boosting Crop Intensification in southern Bangladesh: how surface water irrig...
Boosting Crop Intensification in southern Bangladesh: how surface water irrig...
 
Conservation Practice and Fertilizer Management to Improve Productivity of Wh...
Conservation Practice and Fertilizer Management to Improve Productivity of Wh...Conservation Practice and Fertilizer Management to Improve Productivity of Wh...
Conservation Practice and Fertilizer Management to Improve Productivity of Wh...
 
Strategies for Cropping System Intensification in a Moderately Saline Region ...
Strategies for Cropping System Intensification in a Moderately Saline Region ...Strategies for Cropping System Intensification in a Moderately Saline Region ...
Strategies for Cropping System Intensification in a Moderately Saline Region ...
 
Bringing Back Seasonality into Coastal Aquatic Agricultural Systems
Bringing Back Seasonality into Coastal Aquatic Agricultural SystemsBringing Back Seasonality into Coastal Aquatic Agricultural Systems
Bringing Back Seasonality into Coastal Aquatic Agricultural Systems
 
Rice-fish integration for high saline areas of the coastal zone of Bangladesh...
Rice-fish integration for high saline areas of the coastal zone of Bangladesh...Rice-fish integration for high saline areas of the coastal zone of Bangladesh...
Rice-fish integration for high saline areas of the coastal zone of Bangladesh...
 
Increasing agricultural and aquacultural productivity in the coastal zone of ...
Increasing agricultural and aquacultural productivity in the coastal zone of ...Increasing agricultural and aquacultural productivity in the coastal zone of ...
Increasing agricultural and aquacultural productivity in the coastal zone of ...
 
Aquaculture production systems in intertidal areas of Bangladesh: A review
Aquaculture production systems in intertidal areas of Bangladesh: A reviewAquaculture production systems in intertidal areas of Bangladesh: A review
Aquaculture production systems in intertidal areas of Bangladesh: A review
 
Growth and production performance of tade mullet, Liza tade (Forsskal, 1775) ...
Growth and production performance of tade mullet, Liza tade (Forsskal, 1775) ...Growth and production performance of tade mullet, Liza tade (Forsskal, 1775) ...
Growth and production performance of tade mullet, Liza tade (Forsskal, 1775) ...
 

Recently uploaded

Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 

Recently uploaded (20)

Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Modelling Water Yield, Sedimentation, and Flood Dynamics in 2 sub‐basins of the Volta Basin

  • 1. Modelling Water Yield, Sedimentation, and Flood  Dynamics in 2 sub‐basins of the Volta Basin  Emmanuel Obuobie, Fred Kizito, Christophe Le Page and Jean  Philippe Venot
  • 3. Social aspects of IWRM ‐ Tool: Companion modeling ‐ Methodology: Stakeholders identify a collective challenge and use  conceptual frameworks to identify their systems in a play fashion  ‐ Collective identification of social and ecological dynamics ‐ Outcome: Identification of a shared representation of issues at stake  (actors, resources, dynamics and relationships) through local  stakeholder consultation
  • 4. Conceptual System setup Flood  vulnerability and  land use planning 4
  • 5. Modeling Water/Sediment Yields ‐ Study catchment in Ghana (Zebilla: 1,695 km2) ‐ ‐ Modeling conducted to include  upstream inputs to‐ and downstream sinks  from study area
  • 6. Model Calibration and Validation Calibration results  16 Simulated Measured R2=0.84 Annual Total Water Yield (mm) for Yakala 14 NSE=0.77 12 PBIAS= 6.3% 10 8 6 4 2 Conditions for successful calib. 0 R2 > 0.6 1980 1981 1982 1983 1984 1985 NSE > 0.50  Year PBIAS is + 25% (Santhi et al., 2001; Moriasi et al., 2007) 8 R2=0.72 Simulated Measured NSE=0.68 Monthly Total Water Yield (mm) 7 PBIAS= 12.6% 6 5 4 3 2 1 0 janv.‐80 janv.‐81 janv.‐82 janv.‐83 janv.‐84 janv.‐85 Calibration Years 6
  • 7. Model Calibration and Validation 70 R2=0.83 Simulated Measured NSE=0.82 Monthly Total Water Yield (mm) 60 PBIAS= 4.4% 50 40 30 20 10 Calibration and  0 validation  results  for Nawuni Calibration Months 70 R2=0.82 Monthly Total Water Yield (mm) 60 Simulated Measured NSE=0.78 PBIAS= 15.5% 50 40 30 20 10 0 Validation Months 7
  • 8. Key water Yield Results Methodology: Simulated discharge in ‘cms’ was converted to ‘cmy’ Outcome: Estimate of water fluxes that can be imported into WEAP  for allocation to the different water users in the basin Mean annual water yield: 1.4 Billion m3 of which 0.16 Billion m3 is generated  within the basin. The remaining 90% is generated upstream of the basin. 4500 900 Zebila water yield Total water yield 4000 800 Annual Water Yield (Mm3) 3500 700 Total Water Yield (Mm3) 3000 600 2500 500 2000 400 1500 300 1000 200 500 100 0 0 1971 1976 1981 1986 1991 1996 2001
  • 9. Sediment Yield Estimation ‐ Methodology: Empirical relationship between water discharge and sediment  concentration yields sediment discharge. ‐ Sediment discharge is used to simulate and calibrate sediment transport (t/day)  in the catchment; yield is computed as a function of study area  t/ha ‐ Outcome: Estimate of sediment yields permits scenarios for interventions to  mitigate problem e.g. grass strips Calibration and  validation   Results for  Nawuni
  • 10. Sediment Yield Estimation ‐ Average annual sediment yield for Zebila catchment: 3.4 t/ha/yr  ‐ Sediment yield by land use type: Cropland/woodland, Savanna Land use Cropland/woodland Savanna Sediment (t/ha/yr) 4.7 2.1 Contribution to sedimentation (%) 69 31 ‐ Average sediment yield in reservoirs  in Zebila catchment: 0.012 t/ha/yr (2035 t/yr)  ‐ Global average sediment yield: 15 t/ha/yr ‐ Average for Africa: 9 t/ha/yr 
  • 11. Flood Hazard Assessment  GEO‐SFM Model Small reservoirs Hydrograph
  • 12. Characterizing Flood Risk Produce a Generate Daily synthetic Historical Rainfall streamflow record (1961-2003) by reanalysis Determine locations where bankfull storage Is exceeded ? Compute Bankfull storage
  • 13. Next Steps Sediment modeling o Model scenarios of interventions e.g., introducing grass  strips to ascertain impacts on erosion and sedimentation   Flood modeling o Conduct data processing module, water balance routines  and flow routing modules o Generate flood hazard map  
  • 14. Concluding Remarks ‐ Modeling tools are useful for studying sedimentation/erosion and  flooding dynamics within the framework of Integrated Water  Resources Management (IWRM) ‐ Estimates indicate that 90% of the sub‐basin water resources are from  upstream sources which signifies implications for upstream‐ downstream collaboration on IWRM issues ‐ Sedimentation control through interventions ensures that: ‐ Reservoirs are not subjected to uncontrollable siltation levels  ‐ Storage capacity of reservoirs is lengthened and they are used  more productively which ‐ Enhances community water provision and livelihoods in the Basin 
  • 15. Concluding Remarks‐ 2 ‐ Flood hazard modeling  is far advanced. When completed the  generated hazard maps will inform decision making regarding land use  planning in the study catchment. This will help reduce vulnerability to  flooding disasters.  ‐ Results from sedimentation and flood modeling feed  into multi‐ stakeholder platform for policy and IWRM interventions