SlideShare a Scribd company logo
1 of 17
Download to read offline
ETP Group
Presentation
Values
• High quality of our services
• Satisfaction of our partners
• Flexibility
• Transparency
• Team working
• Safety of our employees
• Environmentally-friendly
company
FL
OUR APPROACH
2
ETP’s goal is to become better and better at everything we do for our customers.
We believe in zero defect philosophy.We will always push ourselves for continuous improvement. Our dreams are to
become a worldwide company with a strong recognizable brand, providing great services to customers worldwide. At
the same time, we would like to take care of our employees and respect natural environment we operate in.
FL
OUR FIGURES
3
€ -
€ 1000 000,00
€ 2000 000,00
€ 3000 000,00
€ 4000 000,00
€ 5000 000,00
€ 6000 000,00
€ 7000 000,00
€ 8000 000,00
2013 2014 2015 2016 2017
Annual Sales
0
50
100
150
200
250
2013 2014 2015 2016 2017
Employment
FL
OUR HISTORY
4
ELECTRO-TEAM
shipbuilding
projects in Norway
and Sweden
ISO 9001 granted
Quality
Management
System
ELECTRO-TEAM
Switchboard
department
Electro Team
Partners Sp. Z o.o.
AÜG license -
Arbeitnehmerüber
lassungsgesetz
license
ETP GmbH
Germany
ETP Purveyor Sp.
z o.o.
ETP Service AS
Norway
ETP Energy ApS
Denmark
ETP Marine &
Offshore
United Kingdom
2007 2008 2009 2012 2013 2014 2015 2017 2018
FL
OUR SERVICE
5
certificates: SEP VCA DSB GWO HUET BOSIET FSE MIG, MAG TIG MMA others
Marine & Offshore
Department
Onshore
Department
Switchboard
Department
Services
Department
Metal works:
•Preparation of Switchboard frames
•Cable trays, ladder assembly
•Foundation preparation and assembly
•Individual cable tray solution
•Grinding
•Service work
Welding
services:
•Preparing welding contact surfaces according to WPS
•(cutting, bevelling, grinding, cleaning)
•MIG, MAG, TIG
•Service work
Electrical
installations:
•Cable pulling
•Installation of electrical equipment
•Connection and initiation of electrical equipment
•Renovation, maintenance, inspections of electrical machines
•Servicee work
Mechanics
woks:
•mechanics and hydraulics part fitting
• installation of hydraulic components
• installation of hydraulic power systems
•mounting on devices
•bending and installation of pipelines
•service work
FL
OUR QUALITY SYSTEM
6
ISO 9001
ISOTS 16949 – PPAP, SPC, MSA, FMEA, CTQ, R&R, CTP, 8D, Control Plan, Flow Chart
PPM level monitoring
Code of Conduct,Corporate Social Responsibility
SIX SIGMA
Cause and Effect Analysis
Corporate Social Responsibility,Code of Conduct
FL
OUR CERTYFICATES
7
FL
OUR PROJECTS 2013-2015
8
1. Oceanex – ConroVessel
2. 2x Rolldock- Special Cargo
Vessel
3. 2x SeismicVessels
4. Caledonian- Ropax Ferry
5. Ace – Megayacht
6. Quattroelle - Megayacht
7. Solandge – Megayacht
8. Kismet - Megayacht
9. Ester III – Megayacht
10. MY Sasha – Megayacht
11. MonteVideo Ecpress-
ContainerVessel
12. DANTYSK-Accomodation
platform
13. White Pearl- Megayacht
1. Panel building mechanics
2. OSX – Offshore Support
Vessel
3. Pioneering Spirit – Heavy
Lift ConstructionVessel
4. Multi PurposeTowers
1. Grand Canyon – Multi
PurposeOffshoreVessel
2. Main Switchboard
Production
1. R-15 Navy
FL
OUR PROJECTS 2016-2018
9
1. Color Fantasy –
CruiseFerry
2. DFDS – RoRo Ferry
3. Color Magic – Cruise Ferry
4. Siem Offshore Hilux I –
Offshore vessel
5. LNGVessel AnthonyVeder
6. Radiant – Megayacht
7. Rasinig Sun - Megayacht
8. Albatros - Megayacht
1. Multi PurposeTowers
2. Spartacus
1. Nordnorge – Cruise Ferry
2. West Hercules
1. Bleigh Bank platform
2. Maersk Guardian-
Accomodation platform
3. LNGVessel Coral
Methane
4. Nissum
5. Hornsea Project One – 3x
Substations , RCS
1. MaerskViking
2. Service Noble ReginaAllen
3. Maersk Developer
4. Maersk Drilling
FL
HORNSEA ONE - OFFSHORE PROJECT EXAMPLE
10
The electrical installation services required for completion of Hornsea One Project offshore platforms
being built at Bladt Industries yard facilities in Aalborg, Denmark, duration 13 months:
•Installation of cable ways and supports (FRP)
•Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc.
•Preparation and mounting of steel supports for HV
•Closing of penetrations ROXTEC
•Pulling of LowVoltage cables
•Pulling of LAN cables
•Fastening of cables using cable ties
•Mounting of cable tray covers
•Mounting and connection of electrical panels, cabinets and switchboards
•Mounting and connection of earth cable, fire protection systems, PAGA, sensors, generators and motors
•Connection of HVAC systems
•Connection of LV rooms
•Connection of batteries, emergency power, 24V installation
•Commissioning of electrical connections and cables
FL
LNG VESSEL – NEW CONSTRUCTION PROJECT EXAMPLE
11
The electrical installation services required for completion of LNG vessel for AnthonyVeder being
built at NeptunWerft facilities in Rostock,Germany, duration 10 months :
• Installation of cable ways and supports ( SS, ALU )
•Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc.
•Welding of penetrations
•Closing of penetrations ROXTEC
•Pulling of LowVoltage cables
•Pulling of LAN cables
•Fastening of cables using cable ties
•Mounting and connection of electrical panels, cabinets and switchboards
•Mounting and connection of earth cable, fire protection systems, PAGA, sensors, generators and motors
•Connection of main switchboard
•Connection of batteries, emergency power,
•Commissioning of electrical connections and cables
FL
MEARSK OFFSHORE PLATFORM - SERVICE PROJECT EXAMPLE
12
The electrical installation services required for analysis of the actual condition of the MearskViking Offshore
Platform, duration 1 month:
• Insulation resistance and electrical testing for all switchboards and transformers at an applied voltage of 500V
• Cleaning of switchboards and transformers
FL
OUR ONSHORE PROJECTS 2008-2018
13
1. VWWolfsburg
2. Werl Prison
FL
OUR ONSHORE PROJECTS 2008-2018
14
FL
WIND OFFSHORE MANPOWER
15
Our employees abilities: :
•Construction and switching of MV Switchgear incl. LOTTO and maintenance
•Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc.
•Safe use equipment for the detection of deenergized state on MV and LV installations
•Electrical fields and stress control on MV cables up to 36kV
•Work on Pre-molded Tconnector and EndTerminations for XLPE (PEX) and EPR (Rubber) insulated cables
•Examination of transformers incl.Troubleshooting and Maintenance
•Insulation (Megger) test of cables andTransformer with test voltage up to 10kV
•Protection relays knowledge incl. primary and secondary test with Megger 75 relay tester
•Installation of wind turbines VESTAS Denmark, GE General Electric U.S
•Electrical installation low (690V) and medium (6kV) also Ethernet/Optical data connetions
FL
OUR REFERENCES
16
FL
OUR CONTACT DETAILS
17
Further information available on ETP website :Electro Team Partners
Contact information available on ETP website: http://www.etpartners.pl/contact

More Related Content

Similar to ETP Group Presentation

Kvaerner corporate brochure
Kvaerner corporate brochureKvaerner corporate brochure
Kvaerner corporate brochure
Kjell Brataas
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
robinking277
 
Acona flow technology blowout and wellkill competence
Acona flow technology blowout and wellkill competenceAcona flow technology blowout and wellkill competence
Acona flow technology blowout and wellkill competence
Trygve Rinde
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
Denis Cremin
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016
Skare Sigbjørn
 
DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013
dtegroup
 

Similar to ETP Group Presentation (20)

Kvaerner corporate brochure
Kvaerner corporate brochureKvaerner corporate brochure
Kvaerner corporate brochure
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
YH profile (E)
YH profile (E)YH profile (E)
YH profile (E)
 
Presentation_eng
Presentation_engPresentation_eng
Presentation_eng
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
 
Discovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressedDiscovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressed
 
Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021
 
Acona flow technology blowout and wellkill competence
Acona flow technology blowout and wellkill competenceAcona flow technology blowout and wellkill competence
Acona flow technology blowout and wellkill competence
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
 
CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016CV Skare Sigbjørn 2016_13062016
CV Skare Sigbjørn 2016_13062016
 
CV_mki2015Nov
CV_mki2015NovCV_mki2015Nov
CV_mki2015Nov
 
CV 010516
CV 010516CV 010516
CV 010516
 
Eurohull LTD presentation
Eurohull LTD presentationEurohull LTD presentation
Eurohull LTD presentation
 
Michael-Mount-CV 4
Michael-Mount-CV 4Michael-Mount-CV 4
Michael-Mount-CV 4
 
Michael-Mount-CV 4
Michael-Mount-CV 4Michael-Mount-CV 4
Michael-Mount-CV 4
 
DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013DTE Group Capability Statement - June 2013
DTE Group Capability Statement - June 2013
 
G & M Tex Brochure
G & M Tex Brochure G & M Tex Brochure
G & M Tex Brochure
 

Recently uploaded

How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀
How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀
How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀
Victoria Olsina
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di PasuruanWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
infoobataborsi24
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Sampang
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di SampangWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Sampang
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Sampang
infoobataborsi24
 
Licença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdf
Licença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdfLicença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdf
Licença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdf
Lotter Pro Brasil
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Magetan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di MagetanWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Magetan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Magetan
infoobataborsi24
 

Recently uploaded (20)

Passive Income System 2.0 Digital: Effortless Earnings
Passive Income System 2.0 Digital: Effortless EarningsPassive Income System 2.0 Digital: Effortless Earnings
Passive Income System 2.0 Digital: Effortless Earnings
 
Klaus Schweighofer, Zakaj je digitalizacija odlična priložnost za medije, Sty...
Klaus Schweighofer, Zakaj je digitalizacija odlična priložnost za medije, Sty...Klaus Schweighofer, Zakaj je digitalizacija odlična priložnost za medije, Sty...
Klaus Schweighofer, Zakaj je digitalizacija odlična priložnost za medije, Sty...
 
Mastering Email Marketing - A Comprehensive Guide.pdf
Mastering Email Marketing - A Comprehensive Guide.pdfMastering Email Marketing - A Comprehensive Guide.pdf
Mastering Email Marketing - A Comprehensive Guide.pdf
 
Killer Packaging | PrintAction
Killer Packaging | PrintActionKiller Packaging | PrintAction
Killer Packaging | PrintAction
 
Why Digital Marketing Important for our Business.pdf
Why Digital Marketing Important for our Business.pdfWhy Digital Marketing Important for our Business.pdf
Why Digital Marketing Important for our Business.pdf
 
The Majestic Salar de Uyuni A Natural Wonder of Bolivia.pptx
The Majestic Salar de Uyuni A Natural Wonder of Bolivia.pptxThe Majestic Salar de Uyuni A Natural Wonder of Bolivia.pptx
The Majestic Salar de Uyuni A Natural Wonder of Bolivia.pptx
 
Impacts Of Smart Watch & Wearable Technology On Daily Life
Impacts Of Smart Watch & Wearable Technology On Daily LifeImpacts Of Smart Watch & Wearable Technology On Daily Life
Impacts Of Smart Watch & Wearable Technology On Daily Life
 
How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀
How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀
How To Structure Your Web3 Website For Max Visibility In The Bull Market🚀
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di PasuruanWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
 
Intelligent Cryptocurrency VIP Digital - Membership Area
Intelligent Cryptocurrency VIP Digital - Membership AreaIntelligent Cryptocurrency VIP Digital - Membership Area
Intelligent Cryptocurrency VIP Digital - Membership Area
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Sampang
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di SampangWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Sampang
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Sampang
 
Unit 3 - Liberalization, Privatization & Globalization
Unit 3 - Liberalization, Privatization & GlobalizationUnit 3 - Liberalization, Privatization & Globalization
Unit 3 - Liberalization, Privatization & Globalization
 
Fantasy Cricket Apps: A New Viewpoint for Online Cricket Betting Apps
Fantasy Cricket Apps: A New Viewpoint for Online Cricket Betting AppsFantasy Cricket Apps: A New Viewpoint for Online Cricket Betting Apps
Fantasy Cricket Apps: A New Viewpoint for Online Cricket Betting Apps
 
Marketing Automation Insights - Unlocking Success
Marketing Automation Insights - Unlocking SuccessMarketing Automation Insights - Unlocking Success
Marketing Automation Insights - Unlocking Success
 
youtube_marketing_partner_vling_service_introduction
youtube_marketing_partner_vling_service_introductionyoutube_marketing_partner_vling_service_introduction
youtube_marketing_partner_vling_service_introduction
 
Licença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdf
Licença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdfLicença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdf
Licença Lotter Pro - Conheça o Certificado Oficial da Licença Lotter Pro.pdf
 
ATRIUM GAMING : SLOT GACOR MUDAH MENANG TERBARU
ATRIUM GAMING : SLOT GACOR MUDAH MENANG TERBARUATRIUM GAMING : SLOT GACOR MUDAH MENANG TERBARU
ATRIUM GAMING : SLOT GACOR MUDAH MENANG TERBARU
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Magetan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di MagetanWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Magetan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Magetan
 
The BoF Brand Magic Index Volume Two — Preview.pdf
The BoF Brand Magic Index Volume Two — Preview.pdfThe BoF Brand Magic Index Volume Two — Preview.pdf
The BoF Brand Magic Index Volume Two — Preview.pdf
 
Niche Analysis for Client Outreach Outside Marketplace.pptx
Niche Analysis for Client Outreach Outside Marketplace.pptxNiche Analysis for Client Outreach Outside Marketplace.pptx
Niche Analysis for Client Outreach Outside Marketplace.pptx
 

ETP Group Presentation

  • 2. Values • High quality of our services • Satisfaction of our partners • Flexibility • Transparency • Team working • Safety of our employees • Environmentally-friendly company FL OUR APPROACH 2 ETP’s goal is to become better and better at everything we do for our customers. We believe in zero defect philosophy.We will always push ourselves for continuous improvement. Our dreams are to become a worldwide company with a strong recognizable brand, providing great services to customers worldwide. At the same time, we would like to take care of our employees and respect natural environment we operate in.
  • 3. FL OUR FIGURES 3 € - € 1000 000,00 € 2000 000,00 € 3000 000,00 € 4000 000,00 € 5000 000,00 € 6000 000,00 € 7000 000,00 € 8000 000,00 2013 2014 2015 2016 2017 Annual Sales 0 50 100 150 200 250 2013 2014 2015 2016 2017 Employment
  • 4. FL OUR HISTORY 4 ELECTRO-TEAM shipbuilding projects in Norway and Sweden ISO 9001 granted Quality Management System ELECTRO-TEAM Switchboard department Electro Team Partners Sp. Z o.o. AÜG license - Arbeitnehmerüber lassungsgesetz license ETP GmbH Germany ETP Purveyor Sp. z o.o. ETP Service AS Norway ETP Energy ApS Denmark ETP Marine & Offshore United Kingdom 2007 2008 2009 2012 2013 2014 2015 2017 2018
  • 5. FL OUR SERVICE 5 certificates: SEP VCA DSB GWO HUET BOSIET FSE MIG, MAG TIG MMA others Marine & Offshore Department Onshore Department Switchboard Department Services Department Metal works: •Preparation of Switchboard frames •Cable trays, ladder assembly •Foundation preparation and assembly •Individual cable tray solution •Grinding •Service work Welding services: •Preparing welding contact surfaces according to WPS •(cutting, bevelling, grinding, cleaning) •MIG, MAG, TIG •Service work Electrical installations: •Cable pulling •Installation of electrical equipment •Connection and initiation of electrical equipment •Renovation, maintenance, inspections of electrical machines •Servicee work Mechanics woks: •mechanics and hydraulics part fitting • installation of hydraulic components • installation of hydraulic power systems •mounting on devices •bending and installation of pipelines •service work
  • 6. FL OUR QUALITY SYSTEM 6 ISO 9001 ISOTS 16949 – PPAP, SPC, MSA, FMEA, CTQ, R&R, CTP, 8D, Control Plan, Flow Chart PPM level monitoring Code of Conduct,Corporate Social Responsibility SIX SIGMA Cause and Effect Analysis Corporate Social Responsibility,Code of Conduct
  • 8. FL OUR PROJECTS 2013-2015 8 1. Oceanex – ConroVessel 2. 2x Rolldock- Special Cargo Vessel 3. 2x SeismicVessels 4. Caledonian- Ropax Ferry 5. Ace – Megayacht 6. Quattroelle - Megayacht 7. Solandge – Megayacht 8. Kismet - Megayacht 9. Ester III – Megayacht 10. MY Sasha – Megayacht 11. MonteVideo Ecpress- ContainerVessel 12. DANTYSK-Accomodation platform 13. White Pearl- Megayacht 1. Panel building mechanics 2. OSX – Offshore Support Vessel 3. Pioneering Spirit – Heavy Lift ConstructionVessel 4. Multi PurposeTowers 1. Grand Canyon – Multi PurposeOffshoreVessel 2. Main Switchboard Production 1. R-15 Navy
  • 9. FL OUR PROJECTS 2016-2018 9 1. Color Fantasy – CruiseFerry 2. DFDS – RoRo Ferry 3. Color Magic – Cruise Ferry 4. Siem Offshore Hilux I – Offshore vessel 5. LNGVessel AnthonyVeder 6. Radiant – Megayacht 7. Rasinig Sun - Megayacht 8. Albatros - Megayacht 1. Multi PurposeTowers 2. Spartacus 1. Nordnorge – Cruise Ferry 2. West Hercules 1. Bleigh Bank platform 2. Maersk Guardian- Accomodation platform 3. LNGVessel Coral Methane 4. Nissum 5. Hornsea Project One – 3x Substations , RCS 1. MaerskViking 2. Service Noble ReginaAllen 3. Maersk Developer 4. Maersk Drilling
  • 10. FL HORNSEA ONE - OFFSHORE PROJECT EXAMPLE 10 The electrical installation services required for completion of Hornsea One Project offshore platforms being built at Bladt Industries yard facilities in Aalborg, Denmark, duration 13 months: •Installation of cable ways and supports (FRP) •Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc. •Preparation and mounting of steel supports for HV •Closing of penetrations ROXTEC •Pulling of LowVoltage cables •Pulling of LAN cables •Fastening of cables using cable ties •Mounting of cable tray covers •Mounting and connection of electrical panels, cabinets and switchboards •Mounting and connection of earth cable, fire protection systems, PAGA, sensors, generators and motors •Connection of HVAC systems •Connection of LV rooms •Connection of batteries, emergency power, 24V installation •Commissioning of electrical connections and cables
  • 11. FL LNG VESSEL – NEW CONSTRUCTION PROJECT EXAMPLE 11 The electrical installation services required for completion of LNG vessel for AnthonyVeder being built at NeptunWerft facilities in Rostock,Germany, duration 10 months : • Installation of cable ways and supports ( SS, ALU ) •Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc. •Welding of penetrations •Closing of penetrations ROXTEC •Pulling of LowVoltage cables •Pulling of LAN cables •Fastening of cables using cable ties •Mounting and connection of electrical panels, cabinets and switchboards •Mounting and connection of earth cable, fire protection systems, PAGA, sensors, generators and motors •Connection of main switchboard •Connection of batteries, emergency power, •Commissioning of electrical connections and cables
  • 12. FL MEARSK OFFSHORE PLATFORM - SERVICE PROJECT EXAMPLE 12 The electrical installation services required for analysis of the actual condition of the MearskViking Offshore Platform, duration 1 month: • Insulation resistance and electrical testing for all switchboards and transformers at an applied voltage of 500V • Cleaning of switchboards and transformers
  • 13. FL OUR ONSHORE PROJECTS 2008-2018 13 1. VWWolfsburg 2. Werl Prison
  • 14. FL OUR ONSHORE PROJECTS 2008-2018 14
  • 15. FL WIND OFFSHORE MANPOWER 15 Our employees abilities: : •Construction and switching of MV Switchgear incl. LOTTO and maintenance •Installation of standard electrical equipment such as lights, sockets, detectors, JB, heaters, switches etc. •Safe use equipment for the detection of deenergized state on MV and LV installations •Electrical fields and stress control on MV cables up to 36kV •Work on Pre-molded Tconnector and EndTerminations for XLPE (PEX) and EPR (Rubber) insulated cables •Examination of transformers incl.Troubleshooting and Maintenance •Insulation (Megger) test of cables andTransformer with test voltage up to 10kV •Protection relays knowledge incl. primary and secondary test with Megger 75 relay tester •Installation of wind turbines VESTAS Denmark, GE General Electric U.S •Electrical installation low (690V) and medium (6kV) also Ethernet/Optical data connetions
  • 17. FL OUR CONTACT DETAILS 17 Further information available on ETP website :Electro Team Partners Contact information available on ETP website: http://www.etpartners.pl/contact