SlideShare a Scribd company logo
1 of 20
Download to read offline
 
	
  
Guide	
  for	
  implementing	
  
AS9100	
  Rev	
  C	
  
By	
  
ASHISH	
  JUDE	
  MICHAEL,	
  MBA,	
  IIM	
  Shillong	
  	
  
	
  
	
   	
  
2	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
Introduction	
  
I	
  am	
  writing	
  this	
  document	
  to	
  help	
  out	
  managers,	
  who	
  think	
  AS9100	
  is	
  a	
  very	
  
complicated	
  system	
  to	
  install,	
  implement	
  and	
  follow.	
  They	
  have	
  an	
  apprehension	
  
that	
  it	
  requires	
  tons	
  of	
  documentation	
  and	
  record	
  keeping.	
  	
  	
  
I	
   will	
   be	
   bringing	
   the	
   basic	
   outlines	
   of	
   how	
   to	
   implement	
   a	
   QMS	
   (Quality	
  
Management	
  System)	
  from	
  scratch,	
  which	
  adhere	
  to	
  AS9100	
  Rev	
  C	
  requirements	
  
in	
  a	
  very	
  basic	
  manner.	
  This	
  document	
  alone	
  cannot	
  be	
  used	
  to	
  implement	
  the	
  
AS9100	
  Rev	
  C;	
  the	
  aim	
  of	
  this	
  document	
  is	
  to	
  familiarize	
  the	
  managers	
  about	
  the	
  
basics	
  of	
  implementation	
  of	
  AS9100	
  Rev	
  C.	
  I	
  have	
  used	
  many	
  illustrations	
  and	
  
also	
  used	
  project	
  management	
  concept	
  to	
  implement	
  AS9100	
  Rev	
  C.	
  
I	
   have	
   used	
   my	
   own	
   experience;	
   I	
   played	
   an	
   important	
   role	
   in	
   implementing	
  
AS9100	
  Rev	
  C	
  in	
  my	
  SBU	
  (Strategic	
  Business	
  Unit),	
  which	
  is	
  EW&A	
  (Electronics	
  
Warfare	
  &	
  Avionics)	
  at	
  Bharat	
  Electronics.	
  Our	
  SBU	
  was	
  one	
  of	
  the	
  first	
  SBUs	
  in	
  
India	
   to	
   get	
   AS9100	
   certification	
   among	
   PSUs.	
   Our	
   Head	
   of	
   Team	
   for	
  
Implementation	
   of	
   	
   AS9100	
   was	
   our	
   QM	
   (Quality	
   Management)	
   DGM	
   Mr.	
  
Satyanarayana	
  and	
  I	
  was	
  a	
  directly	
  reporting	
  to	
  him.	
  
I	
  will	
  divide	
  this	
  document	
  in	
  14	
  steps	
  (These	
  steps	
  are	
  inspired	
  from	
  “How	
  to	
  
implement	
  AS9100?”)	
  and	
  will	
  be	
  elaborating	
  on	
  each	
  step	
  and	
  add	
  if	
  any	
  thing	
  is	
  
missing.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   3	
  
	
  
	
  
Table	
  of	
  Contents	
  
	
  
Management	
  Responsibilities	
  
Step	
  1:	
  Determine	
  which	
  Quality	
  standard	
  to	
  adopted	
  
Step	
  2:	
  Assemble	
  the	
  Team,	
  Purchase	
  the	
  Standard	
  &	
  select	
  registrar	
  
Step	
  3:	
  Set	
  targets	
  and	
  periodically	
  review	
  them	
  
	
  
Implementation	
  Team	
  Responsibilities	
  
Step	
  4:	
  Review	
  support	
  literature	
  and	
  software	
  
Step	
  5:	
  Make	
  a	
  strategy	
  
Step	
  6:	
  Plan	
  the	
  implementation	
  
Step	
  7:	
  Documentation	
  
Step	
  8:	
  Draft	
  QMSP	
  (Level	
  1	
  Document)	
  
Step	
  9:	
  Training	
  
Departmental	
  Responsibilities	
  
Step	
  10:	
  Level	
  2	
  ,	
  3	
  &	
  4	
  level	
  Documents	
  
Step	
  11:	
  Implement	
  &	
  adhere	
  to	
  Quality	
  Management	
  System	
  (QMS)	
  
	
  
QM	
  Responsibility	
  
Step	
  12:	
  Invite	
  registrar/auditor	
  for	
  a	
  pre-­‐assessment	
  
Step	
  13:	
  Gain	
  registration	
  
Step	
  14:	
  Continual	
  assessment	
  
	
  
Conclusion	
  
	
  
	
  
	
  
	
  
	
  
	
  
4	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
Management	
  Responsibilities	
  
Step	
  1:	
  Determine	
  which	
  Quality	
  standard	
  to	
  adopted	
  
This	
  is	
  a	
  strategic	
  decision	
  to	
  be	
  taken	
  by	
  senior	
  management.	
  One	
  should	
  not	
  
seek	
  certification	
  for	
  the	
  sake	
  of	
  getting	
  it.	
  Understand	
  how	
  this	
  will	
  help	
  you	
  in	
  a	
  
long	
  run.	
  AS9100	
  is	
  necessity	
  if	
  you	
  are	
  planning	
  to	
  enter	
  aerospace	
  &	
  defence	
  
industry	
  or	
  space	
  industry.	
  ISO9001	
  is	
  just	
  70%	
  of	
  AS9100.	
  
Let	
  me	
  give	
  you	
  a	
  brief	
  introduction	
  about	
  various	
  types	
  of	
  Certification	
  you	
  can	
  
go	
  ahead.	
  
1.	
  ISO9001:	
  is	
  a	
  quality	
  standard	
  maintained	
  by	
  the	
  International	
  Organization	
  
for	
  Standardization	
  (ISO)	
  and	
  is	
  administered	
  by	
  accreditation	
  and	
  certification	
  
bodies	
   like	
   PRI	
   Registrar.	
   The	
   rules	
   are	
   updated	
   periodically	
   to	
   accommodate	
  
changes	
  in	
  the	
  business	
  environment.	
  Some	
  of	
  the	
  requirements	
  include:	
  	
  
• Procedures	
  that	
  cover	
  all	
  key	
  practices	
  in	
  the	
  business	
  
• Monitoring	
  those	
  procedures	
  to	
  ensure	
  effectiveness	
  
• Keeping	
  adequate	
  records	
  
• Checking	
   output	
   for	
   defects,	
   and	
   implementing	
   corrective	
   actions	
   as	
  
needed	
  to	
  Prevent	
  recurrence	
  if	
  defects	
  are	
  found	
  
• Periodic	
   review	
   of	
   the	
   overall	
   quality	
   management	
   system	
   and	
   the	
  
processes	
  within	
  the	
  system	
  to	
  measure	
  effectiveness	
  
• Implementing	
  a	
  continuous	
  improvement	
  program	
  
When	
  an	
  organization	
  is	
  certified	
  and	
  found	
  to	
  be	
  in	
  conformance	
  with	
  ISO	
  9001	
  
that	
  organization	
  may	
  publicly	
  state	
  that	
  it	
  is	
  "ISO	
  9001	
  certified"	
  or	
  "ISO	
  9001	
  
registered".	
  Certification	
  to	
  an	
  ISO	
  9001	
  quality	
  standard	
  does	
  not	
  guarantee	
  
quality	
   of	
   end	
   products	
   and	
   services;	
   however,	
   it	
   certifies	
   that	
   formalized	
  
business	
  processes	
  are	
  being	
  applied.	
  
Although	
  the	
  ISO	
  9001	
  quality	
  standard	
  originated	
  in	
  manufacturing,	
  it	
  can	
  be	
  
applied	
  to	
  a	
  variety	
  of	
  products,	
  not	
  just	
  physical	
  objects,	
  but	
  products	
  such	
  as	
  
services	
  or	
  software.	
  
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   5	
  
	
  
2.	
   AS9100:	
   is	
   an	
   aerospace	
   standard	
   based	
   on	
   the	
   ISO	
   9001	
   quality	
   system	
  
requirements.	
  AS9100	
  takes	
  the	
  ISO	
  9001	
  requirements	
  and	
  supplements	
  them	
  
with	
   additional	
   quality	
   system	
   requirements,	
   which	
   are	
   established	
   by	
   the	
  
aerospace	
  industry	
  in	
  order	
  to	
  satisfy	
  DOD,	
  NASA	
  and	
  FAA	
  quality	
  requirements.	
  
The	
  intent	
  of	
  AS9100	
  is	
  to	
  establish	
  a	
  single	
  quality	
  management	
  system	
  for	
  use	
  
within	
  the	
  aerospace	
  industry.	
  	
  
The	
   standard	
   was	
   developed	
   by	
   Working	
   Group	
   11	
   of	
   ISO	
   TC20	
   and	
   was	
  
supported	
  by	
  the	
  International	
  Aerospace	
  Quality	
  Group	
  (IAQG).	
  The	
  official	
  title	
  
of	
  AS9100	
  is	
  "AS9100	
  Quality	
  Management	
  Systems	
  -­‐	
  Requirements	
  for	
  Aviation,	
  
Space	
  and	
  Defense	
  Organizations".	
  
The	
  AS9100	
  standard	
  is	
  recognized	
  worldwide,	
  however,	
  participating	
  countries	
  
can	
   use	
   their	
   own	
   numbering	
   conventions.	
   For	
   example,	
   the	
   standard	
   was	
  
released	
  as	
  EN9100	
  in	
  Europe.	
  Regardless	
  of	
  the	
  number,	
  the	
  standard	
  should	
  be	
  
identical	
  in	
  content.	
  
The	
  industry	
  has	
  moved	
  toward	
  requiring	
  their	
  subcontractors	
  and	
  suppliers	
  to	
  
be	
  AS9100	
  compliant	
  and/or	
  certified.	
  By	
  becoming	
  registered	
  to	
  AS9100	
  or	
  by	
  
conforming	
   to	
   the	
   standard,	
   suppliers	
   can	
   gain	
   a	
   competitive	
   advantage	
   and	
  
benefit	
   from	
   the	
   improved	
   processes	
   and	
   continuous	
   improvement	
   that	
   is	
   the	
  
foundation	
  of	
  ISO	
  9001	
  certified	
  Quality	
  Management	
  Systems.	
  
3.	
   AS9110:	
   	
   The	
   AS9110	
   aerospace	
   standard	
   is	
   based	
   on	
   AS9100	
   but	
   adds	
  
specific	
   requirements	
   that	
   are	
   critical	
   for	
   the	
   maintenance	
   of	
   commercial,	
  
private,	
   and	
   military	
   aircrafts.	
   This	
   standard	
   defines	
   the	
   quality	
   system	
  
requirements	
   based	
   on	
   AS9100	
   and	
   includes	
   additional	
   criteria	
   for	
  
maintenance	
   repair	
   and	
   overhaul	
   facilities	
   (MRO's)	
   serving	
   the	
   aircraft	
  
industry.	
   The	
   AS9110	
   standard	
   was	
   published	
   by	
   SAE	
   International.	
   It	
   is	
  
formally	
   titled	
   "AS9110	
   Quality	
   Maintenance	
   Systems	
   -­‐	
   Aerospace	
   -­‐	
  
Requirements	
   for	
   Maintenance	
   Organizations"	
   by	
   the	
   Americas	
   Aerospace	
  
Quality	
  Group	
  (AAQG).	
  The	
  prime	
  candidates	
  to	
  seek	
  certification	
  to	
  the	
  AS9110	
  
standard	
   are	
   FAA	
   145	
   certified	
   repair	
   stations.	
   Those	
   seeking	
   Parts	
  
Manufacturing	
  Approval	
  (PMA)	
  from	
  the	
  FAA	
  to	
  manufacture	
  aircraft	
  parts	
  and	
  
6	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
components	
   are	
   also	
   likely	
   to	
   seek	
   AS9110	
   certification.	
   Some	
   of	
   the	
   areas	
   of	
  
emphasis	
  in	
  the	
  AS9110	
  standard	
  include	
  detecting	
  and	
  preventing	
  counterfeit	
  
and	
  suspect	
  unapproved	
  parts,	
  human	
  factors	
  (recognizing	
  human	
  factors	
  that	
  
affect	
   workers),	
   safety	
   management	
   systems,	
   technical	
   data,	
   project	
  
management	
  and	
  risk	
  management.	
  
4.	
  AS9120:	
  Quality	
  Management	
  Systems	
  -­‐	
  Requirements	
  for	
  Aviation,	
  Space	
  
and	
   Defense	
   Distributors."	
   is	
   an	
   aerospace	
   standard	
   based	
   on	
   AS9100	
   that	
  
adds	
   specific	
   requirements	
   that	
   are	
   relevant	
   for	
   stockiest	
   or	
   pass-­‐through	
  
distributors	
   for	
   the	
   aerospace	
   industry.	
   SAE	
   International	
   published	
   the	
  
AS9120	
  standard.	
  This	
  standard	
  addresses	
  chain	
  of	
  custody,	
  traceability,	
  control	
  
and	
  availability	
  of	
  records.	
  AS9120	
  would	
  be	
  applicable	
  for	
  organizations	
  that	
  
resell,	
   distribute,	
   and	
   warehouse	
   parts	
   found	
   in	
   aircraft	
   and	
   other	
   aerospace	
  
components.	
  The	
  standard	
  is	
  not	
  applicable	
  to	
  value-­‐added	
  distributors	
  due	
  to	
  
customer-­‐product	
   changes	
   nor	
   is	
   it	
   intended	
   for	
   organizations	
   that	
   rework	
   or	
  
repair	
   products.	
   Organizations	
   that	
   perform	
   work	
   that	
   affect	
   or	
   could	
   affect	
  
product	
   characteristics	
   or	
   conformity	
   should	
   use	
   AS9100	
   or	
   another	
   general	
  
quality	
  management	
  system	
  standard.	
  
AS9120	
  is	
  based	
  on	
  ISO	
  9001	
  but	
  it	
  includes	
  nearly	
  100	
  additional	
  requirements	
  
specific	
   to	
   aerospace	
   distributors.	
   AS9120	
   provides	
   suppliers	
   with	
   a	
  
comprehensive	
   quality	
   system	
   focused	
   on	
   areas	
   directly	
   impacting	
   product	
  
safety	
  and	
  reliability.	
  	
  
Some	
  of	
  the	
  areas	
  covered	
  in	
  AS9120	
  include	
  splitting	
  (specific	
  requirements	
  for	
  
batch	
  and	
  lot	
  splitting),	
  control	
  of	
  records,	
  traceability	
  (tracking	
  from	
  receipt	
  of	
  
product	
   to	
   delivery),	
   and	
   evidence	
   of	
   conformance	
   (distributors	
   must	
   meet	
  
document	
  specifications).	
  	
  
5.	
  AS9003	
  The	
  intent	
  of	
  the	
  AS9003,	
  Inspection	
  and	
  Test	
  Quality	
  System;	
  is	
  to	
  
ensure	
   that	
   the	
   inspection,	
   conformity	
   and	
   airworthiness	
   of	
   products	
   are	
  
maintained.	
   The	
   AS9003	
   standard	
   contains	
   the	
   minimum	
   requirements	
   for	
   an	
  
Inspection	
   and	
   Test	
   Quality	
   System	
   and	
   was	
   intended	
   for	
   use	
   by	
   small	
  
build/machine	
  to	
  print	
  organizations.	
  A	
  quality	
  system	
  structured	
  to	
  include	
  the	
  
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   7	
  
	
  
AS9003	
  requirements	
  provides	
  the	
  supplier	
  with	
  a	
  system	
  that	
  defines	
  activities	
  
necessary	
  to	
  support	
  product	
  integrity	
  such	
  as:	
  
1. Management	
  Responsibility	
  
2. Documentation	
  of	
  the	
  Quality	
  System	
  
3. Controlled	
   Contract	
   Review	
   and	
   communication	
   of	
   requirements	
   to	
  
production	
  
4. Document	
  and	
  Data	
  Control	
  
5. Purchasing:	
  Guidelines	
  for	
  choosing	
  
6. Control	
  of	
  Customer	
  Supplier	
  Product,	
  tooling	
  and	
  raw	
  materials	
  
7. Product	
  Identification	
  and	
  Traceability	
  
8. Process	
  Control	
  -­‐	
  Methods	
  for	
  controlling	
  manufacturing/build	
  processes	
  
9. Inspection	
   and	
   Testing,	
   In-­‐process,	
   Final	
   Inspections,	
   Test	
   and	
   the	
  
associated	
  documentation	
  of	
  status	
  and	
  results	
  
10. Control	
  of	
  Inspection,	
  Measuring	
  and	
  Test	
  Equipment	
  
11. Control	
  of	
  Nonconforming	
  Product	
  
12. Corrective	
  Action	
  processes	
  
13. Handling,	
  Storage,	
  Packaging,	
  Preservation	
  and	
  Delivery	
  
14. Control	
  of	
  Records	
  -­‐	
  Internal	
  Quality	
  Audits	
  to	
  monitor	
  your	
  system	
  
15. Training	
  
#	
   OASIS	
   Database:	
   	
   The	
   OASIS	
   database	
   is	
   a	
   product	
   of	
   the	
   International	
  
Aerospace	
   Quality	
   Group	
   (IAQG).	
   OASIS	
   houses	
   supplier	
   and	
   audit	
   assessment	
  
data	
  for	
  all	
  companies	
  who	
  hold	
  an	
  accredited	
  certification	
  in	
  any	
  of	
  the	
  AQMS	
  
series	
  of	
  Standards	
  (i.e.	
  -­‐	
  AS9100,	
  AS9110	
  and	
  AS9120).	
  The	
  IAQG	
  has	
  set	
  firm	
  
requirements	
   regarding	
   the	
   inclusion	
   of	
   aerospace	
   certified	
   suppliers	
   in	
   the	
  
OASIS	
   database.	
   Simply	
   put,	
   it	
   is	
   not	
   optional	
   -­‐	
   if	
   you	
   hold	
   an	
   accredited	
  
certificate	
  to	
  AS9100,	
  AS9110	
  or	
  AS9120	
  -­‐	
  you	
  must	
  be	
  entered	
  into	
  the	
  OASIS	
  
database.	
  SAE	
  International	
  document	
  AS9104	
  details	
  the	
  Certification	
  Bodies'	
  
requirements	
   for	
   Aerospace	
   Certification	
   Programs.	
   We	
   are	
   bound	
   by	
   these	
  
requirements	
  as	
  stated	
  on	
  our	
  aerospace	
  certificates,	
  "The	
  audit	
  was	
  conducted	
  
in	
   accordance	
   with	
   the	
   requirements	
   of	
   SAE	
   AS9104	
   Rev.	
   A."	
   (Reference	
   SAE	
  
AS9104	
  -­‐	
  Requirements	
  for	
  Aerospace	
  Quality	
  Management	
  System	
  Certification	
  
/	
  Registrations	
  Programs).	
  	
  
8	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
Additionally,	
  any	
  supplier	
  listed	
  in	
  the	
  OASIS	
  database	
  must	
  set	
  someone	
  up	
  as	
  
the	
  OASIS	
  Administrator.	
  This	
  designated	
  person	
  will	
  be	
  the	
  contact	
  point	
  with	
  
regards	
  to	
  OASIS,	
  and	
  is	
  responsible	
  for	
  maintaining	
  accurate	
  supplier	
  data	
  in	
  the	
  
system	
  (i.e.	
  -­‐	
  supplier	
  name,	
  address,	
  etc.).	
  This	
  person	
  is	
  also	
  the	
  only	
  contact	
  
who	
  can	
  grant	
  access	
  to	
  view	
  pertinent	
  audit	
  assessment	
  details.	
  An	
  OASIS	
  user	
  
cannot	
   access	
   audit	
   data	
   without	
   first	
   gaining	
   permission	
   from	
   the	
   suppliers'	
  
listed	
  OASIS	
  administrator.	
  	
  
If	
  any	
  aerospace	
  certified	
  supplier	
  refuses	
  to	
  be	
  a	
  part	
  of	
  OASIS,	
  or	
  refuses	
  
to	
  set	
  up	
  an	
  OASIS	
  administrator,	
  Certification	
  Bodies	
  are	
  required	
  by	
  the	
  
IAQG	
  to	
  revoke	
  the	
  certificate	
  of	
  registration.	
  	
  
The	
   very	
   first	
   step	
   to	
   get	
   involved	
   with	
   OASIS	
   is	
   to	
   become	
   a	
   registered	
   user.	
  
Anyone	
   can	
   become	
   a	
   registered	
   user,	
   and	
   you	
   do	
   not	
   need	
   to	
   hold	
   an	
   active	
  
aerospace	
   certificate	
   in	
   order	
   to	
   become	
   a	
   user.	
   Visit	
   the	
   OASIS	
   database	
   at	
  
http://www.iaqg.org/oasis	
  and	
  click	
  on	
  the	
  "Register	
  to	
  get	
  Access"	
  link.	
  	
  
In	
  Brief:	
  
Sl	
  No.	
   Standard	
   Applicable	
  Industries	
  
1	
   ISO9001	
   All	
  manufacturing	
  and	
  any	
  industry	
  from	
  service	
  to	
  product	
  based.	
  
2.	
   AS9100	
   Specifically	
   for	
   organizations	
   developing,	
   manufacturing	
   and	
   selling	
   aerospace	
  
equipments/components.	
  
3.	
   AS9110	
   For	
  organizations	
  into	
  maintenance	
  &	
  repairs	
  (MRO)	
  of	
  Aircrafts.	
  
4.	
   AS9120	
   For	
  Organizations	
  which	
  sell	
  &	
  stock	
  airborne	
  equipment’s	
  or	
  components	
  such	
  as	
  
stockiest	
  &	
  distributers.	
  
5	
   AS9003	
   For	
   organizations	
   which	
   provide	
   third	
   party	
   inspection	
   or	
   testing	
   facilities	
   for	
  
airborne	
  equipments/components.	
  	
  
One	
  has	
  to	
  be	
  prepared	
  for	
  the	
  cost	
  of	
  quality,	
  	
  which	
  will	
  be	
  high	
  during	
  initial	
  
phase	
  of	
  3-­‐4	
  years	
  but	
  after	
  that	
  you	
  can	
  reap	
  the	
  benefits	
  in	
  the	
  long	
  run.	
  But	
  if	
  
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   9	
  
	
  
you	
  are	
  into	
  Aerospace	
  &	
  Defence	
  /Space	
  business,	
  AS9100	
  is	
  critical	
  for	
  your	
  
future.	
  	
  
For	
   implementing	
   AS9100	
   senior	
   management	
   should	
   support	
   its	
   Quality	
  
Management	
  Department	
  to	
  fullest.	
  Initially	
  things	
  will	
  be	
  difficult	
  to	
  implement	
  
but	
  perseverance	
  pays	
  off,	
  you	
  have	
  to	
  understand	
  “Rome	
  was	
  not	
  built	
  in	
  a	
  Day”	
  
and	
   so	
   is	
   for	
   AS9100	
   implementation.	
   Unless	
   you	
   adhere	
   it	
   from	
   within	
   the	
  
organization	
  its	
  difficult	
  to	
  maintain.	
  
	
  
Step	
  2:	
  Assemble	
  the	
  Team	
  &	
  Purchase	
  the	
  Standard	
  
The	
   road	
   to	
   implementing	
   starts	
   with	
   assembling	
   the	
   right	
   team.	
   Depending	
  
upon	
  your	
  organization,	
  you	
  can	
  make	
  an	
  official	
  of	
  a	
  rank	
  DGM/AVP/Manager	
  
to	
   head	
   of	
   team,	
   the	
   team	
   should	
   be	
   cross-­‐functional	
   with	
   employees	
  
representing	
  each	
  department.	
  Head	
  of	
  team	
  should	
  have	
  first	
  hand	
  experience	
  
of	
   implementing	
   AS9100	
   and	
   has	
   good	
   personal	
   skills.	
   Provide	
   him	
   necessary	
  
resources.	
   Try	
   to	
   visit	
   the	
   companies,	
   which	
   have	
   already	
   established	
   AS9100	
  
certified	
  systems,	
  have	
  a	
  look	
  on	
  their	
  processes.	
  	
  
Next	
  thing	
  is	
  to	
  purchase	
  the	
  Standard,	
  and	
  to	
  select	
  a	
  registrar	
  such	
  as	
  UL	
  etc.	
  
Consult	
  the	
  registrar	
  whenever	
  it	
  is	
  required	
  so.	
  Give	
  enough	
  time	
  for	
  the	
  team	
  to	
  
understand	
  the	
  standard,	
  the	
  standard	
  itself	
  is	
  vast	
  and	
  requires	
  lots	
  of	
  time	
  to	
  
read	
  all	
  the	
  clauses	
  and	
  requirements.	
  	
  
	
  
Step	
  3:	
  Set	
  targets	
  and	
  periodically	
  review	
  them	
  
Set	
  the	
  targets	
  for	
  Implementation	
  team	
  and	
  review	
  them	
  periodically	
  to	
  ensure	
  
that	
  we	
  are	
  on	
  right	
  track	
  and	
  this	
  will	
  also	
  help	
  the	
  team	
  to	
  put	
  forward	
  their	
  
requirements	
  or	
  suggestions	
  where	
  senior	
  management	
  can	
  help	
  them.	
  
I	
   suggest	
   we	
   should	
   apply	
   project	
   management	
   concept	
   while	
   implementing	
  
AS9100	
  Rev	
  C.	
  Lets	
  define:	
  
Project:	
  AS9100	
  Rev	
  C	
  Implementation	
  
10	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
First	
  we	
  should	
  use	
  PPM	
  (Project	
  Priority	
  Matrix)	
  to	
  define	
  our	
  utmost	
  priorities	
  
in	
  this	
  project.	
  
For	
  example	
  in	
  given	
  
illustration	
  of	
  PPM	
  
maximum	
  priority	
  is	
  
given	
  to	
  
performance	
  then	
  
comes	
  time	
  and	
  
finally	
  cost/Budget.	
  
This	
  means	
  we	
  want	
  
that	
  we	
  have	
  to	
  by	
  all	
  means	
  improve	
  systems	
  to	
  implement	
  AS	
  9100	
  Rev	
  C	
  and	
  it	
  
may	
  take	
  a	
  little	
  bit	
  more	
  time	
  and	
  we	
  want	
  to	
  reduce	
  the	
  cost	
  by	
  saving	
  more,	
  
provided	
  we	
  are	
  successful	
  in	
  implementing	
  our	
  project	
  AS9100	
  Rev	
  C.
	
  
Above	
  is	
  the	
  PERT	
  Activity	
  Diagram,	
  is	
  gives	
  the	
  activities	
  and	
  gives	
  the	
  most	
  
effective	
  time	
  for	
  each	
  activity.	
  You	
  can	
  refer	
  the	
  illustration	
  in	
  figure,	
  which	
  
defines	
  this	
  PERT	
  Network	
  Diagram.	
  
A	
  (5)	
  
B	
  (5)	
  
C	
  (5)	
  
D	
  (4)	
   E	
  (1)	
  
F	
  (5)	
  
G	
  (5)	
  
H	
  (5)	
   I	
  (5)	
  
J	
  (5)	
  
K(3)	
  
L(6)	
   M(6)	
  
N(6)	
  
O(6)	
  
P(5)	
   Q(5)	
  
R(4)	
  
S(5)	
  
T(5)	
  
	
   Constrain	
   Accept	
   Enhance	
  
	
  Time	
   ✖	
   ✔	
   ✖	
  
Cost/Budget	
   ✖	
   ✖	
   ✔	
  
Performance	
   ✔	
   ✖	
   ✖	
  
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   11	
  
	
  
Activity Task
Optimistic(
Time((To)
Pessimistic(
Time((Tp)
Most(Likely(
time((Tm)
Effective(
Time((Te)
Precedence(
Activity
A
Derermine Quality Standard to be
implemented 4 6 5 5 NULL
B
Assemble Team,Purchase Standard &
Select Registrar 4 6 5 5 A
C Recruit Quality Manager 4 6 5 5 B
D Assemble Team 3 5 4 4 C
E
Purchase Standard &Select
Registrar 0.5 1.5 1 1 D
F
Set Targets & Schedule Periodical
Reviews 4 6 5 5 E
G Review support Literature &Software 4 6 5 5 F
H Make Strategy 4 6 5 5 G
I Plan The Implementation 4 6 5 5 H
J Draft QMSP 4 6 5 5 I
K Training 2 4 3 3 J
L Prepare Level 2,3& 4 documents 4 8 6 6 K
M Send to QM department for Checking 4 8 6 6 L
N
Upgrade documents & Get them
approved 4 8 6 6 M
O Implement & Adhere to QMS 4 8 6 6 N
P Internal Assesment 4 6 5 5 O
Q
Invite Registrar/Auditor for Pre-
Assesment 4 6 5 5 P
R Implement feedback of Auditors 3 5 4 4 Q
S Registration Assessment 4 6 5 5 R
T
Implement suggestions &
Improvements of Auditor 4 6 5 5 S
96TotalJExpectedJImplimentationJTimeJinJDays
Above	
  illustration	
  gives	
  the	
  details	
  for	
  PERT	
  Activity	
  Diagram.	
  
Implementation	
  Team	
  Responsibilities	
  
Step	
  4:	
  Review	
  support	
  literature	
  and	
  software	
  provided	
  with	
  Standard	
  
There	
  are	
  a	
  large	
  number	
  of	
  tools	
  that	
  can	
  be	
  very	
  helpful	
  at	
  every	
  stage	
  of	
  the	
  
process	
  of	
  implementing	
  AS9100	
  there	
  are	
  many	
  suggested	
  formats,	
  which	
  we	
  
have	
  to	
  modify	
  as	
  per	
  requirement.	
  We	
  have	
  to	
  segregate	
  the	
  formats	
  which	
  we	
  
can	
  use	
  as	
  it	
  is	
  and	
  on	
  which	
  we	
  have	
  to	
  do	
  some	
  modification.	
  
Step	
  5:	
  Make	
  a	
  strategy	
  
I	
  again	
  will	
  stress,	
  process	
  towards	
  implementing	
  AS9100	
  must	
  start	
  with	
  
commitment	
  from	
  top	
  management.	
  As	
  part	
  of	
  this,	
  an	
  organizational	
  strategy	
  
should	
  be	
  developed,	
  and	
  an	
  implementation	
  by	
  the	
  team	
  formed.	
  
	
  Think	
  of	
  constrains	
  which	
  you	
  are	
  going	
  to	
  face	
  and	
  find	
  the	
  solutions	
  before	
  
12	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
hand.	
  Its	
  better	
  to	
  spend	
  more	
  time	
  in	
  planning	
  and	
  perfecting	
  the	
  things	
  than	
  
rush	
  into	
  implementation	
  phase	
  and	
  mess	
  up	
  the	
  things.	
  
Step	
  6:	
  Plan	
  the	
  implementation	
  
AS9100 Rev C Implementation
XYZ Today's Date: Thursday
(vertical red line)
Project Lead:
Start Date: Monday
[42] First Day of Week (Mon=2): 2
WBS Tasks
Task
Lead Start End
Duration(Days)
%Complete
WorkingDays
DaysComplete
DaysRemaining
1
Management
Responsiblities CEO 1/2/12 1/25/12 24 100% 18 24 0
1.1
Derermine Quality
Standard to be
implemented 1/2/12 1/6/12 5 100% 5 5 0
1.2
Assemble Team,Purchase
Standard & Select
Registrar 1/7/12 1/11/12 5 100% 3 5 0
1.2.1
Recruit Quality
Manager 1/12/12 1/16/12 5 100% 3 5 0
1.2.2 Assemble Team 1/17/12 1/20/12 4 100% 4 4 0
1.2.3
Purchase Standard
&Select Registrar 1/21/12 1/21/12 1 100%
1.3
Set Targets & Schedule
Periodical Reviews 1/21/12 1/25/12 5 100% 5 5 0
2
Implementation Team
Responsiblities Manager Quality 2/2/12 2/24/12 23 100% 17 23 0
2.1
Review support Literature
&Software 2/2/12 2/6/12 5 100% 3 5 0
2.2 Make Strategy 2/7/12 2/11/12 5 100% 4 5 0
2.3 Plan The Implementation 2/13/12 2/17/12 5 100% 5 5 0
2.4 Draft QMSP 2/20/12 2/24/12 5 100% 5 5 0
2.5 Training 2/24/12 2/28/2012 3 100% 4 3 0
3
Departmental
Responsiblities Demartmantal Heads 3/1/12 3/28/12 28 100% 20 28 0
3.1
Prepare Level 2,3& 4
documents 3/1/12 3/6/12 6 100% 4 6 0
3.2
Send to QM department for
Checking 3/9/12 3/14/12 6 100% 4 6 0
3.3
Upgrade documents & Get
them approved 3/16/12 3/21/12 6 100% 4 6 0
3.4
Implement & Adhere to
QMS 3/23/12 3/28/12 6 100% 4 6 0
4 QM Responsibility Quality Manager 4/2/12 4/27/12 26 100% 20 26 0
4.1 Internal Assesment 4/2/12 4/6/12 5 100% 5 5 0
4.2
Invite Registrar/Auditor for
Pre-Assesment 4/7/12 4/11/12 5 100% 3 5 0
4.3
Implement feedback of
Auditors 4/12/12 4/15/12 4 100% 4 4 0
4.4 Registration Assessment 4/17/12 4/21/12 5 100% 4 5 0
4.5
Implement suggestions &
Improvements of Auditor 4/23/12 4/27/12 5 100% 5 5 0
24/11/11
30-Jan-12
06-Feb-12
02-Jan-12
09-Jan-12
16-Jan-12
23-Jan-12
27-Feb-12
05-Mar-12
12-Mar-12
19-Mar-12
16-Apr-12
23-Apr-12
30-Apr-12
02/01/12
Ashish Jude Michael
13-Feb-12
26-Mar-12
02-Apr-12
09-Apr-12
20-Feb-12
	
  
Use	
  the	
  scheduling	
  tools	
  as	
  Gantt	
  chart	
  to	
  schedule	
  the	
  implementation.	
  Better	
  to	
  
go	
  through	
  modular	
  approach.	
  Which	
  means	
  implement	
  in	
  phases.	
  First	
  
concentrate	
  on	
  management	
  Responsibilities	
  then	
  comes	
  Implementation	
  Team	
  
Responsibilities	
  next	
  comes	
  departmental	
  responsibilities	
  and	
  finally	
  the	
  Quality	
  
Management	
  Responsibilities	
  in	
  last	
  phase.	
  In	
  the	
  above	
  figure	
  I	
  have	
  shown	
  an	
  
example	
  of	
  scheduling	
  of	
  activities	
  for	
  AS9100	
  implementation.	
  
	
  Once	
  Implementation	
  plan	
  is	
  ready	
  its	
  time	
  to	
  start	
  documentation.	
  But	
  first	
  of	
  
all	
  QMSP	
  (Quality	
  Management	
  System	
  Procedure)	
  should	
  be	
  drafted	
  before	
  
going	
  into	
  department	
  level.	
  
	
  
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   13	
  
	
  
Step	
  7:	
  Documentation	
  
In	
  AS9100	
  we	
  generally	
  follow	
  four	
  levels	
  of	
  documentation.	
  
	
  
1. Level	
  1:	
  An	
  Organizational	
  level	
  Quality	
  Manual:	
  We	
  can	
  call	
  it	
  a	
  QMSP	
  
(Quality	
  Management	
  System	
  Procedure).	
  If	
  it	
  is	
  too	
  big	
  you	
  can	
  make	
  it	
  in	
  
volumes.	
  It	
  is	
  a	
  controlled	
  copy,	
  and	
  must	
  clearly	
  define	
  the	
  Major	
  Quality	
  
Procedures	
   followed	
   by	
   each	
   department	
   in	
   an	
   organization.	
   It’s	
   the	
  
responsibility	
   of	
   Head	
   of	
   Implementation	
   of	
   AS9100	
   team	
   to	
   get	
   inputs	
  
from	
  the	
  department	
  heads	
  and	
  formulate.	
  Its	
  like	
  a	
  “Master	
  document	
  for	
  
the	
  QMS	
  (Quality	
  Management	
  System)”.	
  It	
  should	
  contain	
  the	
  generalized	
  
procedures	
  and	
  formats	
  such	
  as	
  CA/PA	
  (Corrective	
  Action	
  /Preventive),	
  
Engineering	
   Change	
   Request	
   (ECR),	
   Approved	
   Deviation,	
   Process	
  
Improvement,	
  Document	
  Upgrading	
  Requirement	
  etc.	
  	
  	
  
We	
   should	
   also	
   give	
   details	
   about	
   the	
   yearly	
   cycles	
   of	
   periodic	
  
assessments	
  both	
  internal	
  and	
  external.	
  	
  	
  
2. 	
  Level	
   2:	
   Department	
   level	
   Quality	
   Documents:	
   This	
   includes	
   the	
  
Turtle	
  Charts;	
  Risk	
  Mitigation	
  plans	
  for	
  each	
  department.	
  Turtle	
  chart	
  is	
  a	
  
one-­‐page	
  document,	
  which	
  defines	
  the	
  all	
  the	
  activities	
  in	
  a	
  department	
  as	
  
process.	
   There	
   are	
   inputs/Outputs,	
   Process,	
   Targets,	
   Suppliers,	
   and	
  
14	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
Customers	
  etc.	
  OTD	
  (On	
  Time	
  Delivery)	
  and	
  Risk	
  Mitigation	
  Plan	
  are	
  the	
  
two	
  important	
  parameters,	
  which	
  are	
  specially	
  focused	
  in	
  AS9100	
  Rev	
  C.	
  
	
  
	
  
Process'Name:' Process'Owner:'
Cri1cal'Success'Factors:' Start'event:'
End'Event:'
Process'Input'
'
'
'
'
'
Resources/material'
(with'what?)'
Process'personnel'
(with'whom?)'
Interfaces'for'
input'
'
'
'
'
'
'
'
Supplier'for'
process'/'
Previous'
process'
Process'indicators'
(how'many?)'
Process'objec1ves'/'
Purpose'
Process:'
'''''''''Process'steps/main'ac1vi1es'
BLANK PROCESS TURTLE DIAGRAM
Interfaces'for'
Output'
'
'
'
'
'
'
'
Process'
Output'
'
'
'
' Customer'of''
process'/'
Next'process'
TOOL''which'can'help'in'defining'the'process'as'per'Rev.C'and'a'tool'for'conduc1ng'internal'audit'
SWOT'
Analysis'
'
Process'
Improvement'
'
Reference'Documents'(how?)'
'
'
Process'map' Notes'
How?%
How$is$this$process$controlled,$including$the$use$of$
procedures,$work$instruc5ons,$and$methods?$
Control$of$produc5on$and$Service$provision$(7.5.1)$
Control$of$Produc5on$Process$changes$($7.5.1.2)$
Control$of$Produc5on$Equipment,$Tools$and$
SoGware$Programes(7.5.1.3)$
Nonconforming$product$procedure$($8.3)$
Document$contorl/records(4.2.3/4)$
%%%%%%%%%%%%%%%%What%Results%?%
$Measurements/analysis$of$the$product$of$
$this$process$and$of$this$process$effec5veness$
Monitoring$and$measurement$$
of$product$($8.2.4)$
Customer$Sa5sfac5on$(8.2.1)$
Monitoring$and$measurement$of$processes$(8.2.3)$
Analysis$of$data$(8.4)$$
with%What%?%
What%are%the%Materials,%Equipment%and%other%resources%needed%by%
this%process?%
Plant$and$machinery$(6.3)$
Process$equipment$($6.3)$
Measuring$equipment$(7.6)$
Packaging$Storage$(7.5.5)$
Customer$Property$(7.5.4)$
Transporta5on$of$materials$in$this$process$(6.3)$
Raw$materials$needed$in$this$process($7.4)$
with%%Who%?%
Who% owns %this%process,%who%works%in%this%process,%
and%who%directly%assists%this%process?%
%
Responsibility$and$authority$($5.5.1)$
Competence$criteria$($6.2.1)$
Training$records$($6.2.2)$
Training$effec5veness$($6.2.2)$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
$
(Who$Helps?$
Departments$and$
Individuals)$
IT$
HR$
Logis5cs$$
Sales$
Quality$$
Maintenance$$
Personnel$
Inputs%
What%is%the%need%the%customer%of%this%process%
has%and%what%are%the%requirements%to%meet%
that%need?%
Product$needs$to$be$produced$according$to:$
Customer$requirements$($7.2.1)$
Statutory/Regulatory$
Requirements$($7.2.1)$
Organiza5onal$requirements$($7.2.1)$
Outputs%
$
The$ customer s$ need$ is$ met$ at$ the$
characteris5c$level.$
A$sa5sfied$customer$($8.2.1)$
Receives$product$from$the$process$that$
conforms$ to$ the$ requirements$ in$ the$
input$($7.2.1)$
Process%%
(Suppor5ng$Processes)$
$
Computer$equipment$
support$processes$$
Training$
Hiring/Firing$
Purchasing$Processes$
Materials$movement$
Processes$Inspec5on$
Calibra5ng$
$
The$term$procedure$and$process'are$not$necessarily$synonymous.$A$$procedure$may$be$one$way$to$describe$a$$process$in$text;$however,$most$organiza5ons$have$many$more$
processes$than$the$procedures$required$by$the$standard.$
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   15	
  
	
  
The	
  beauty	
  of	
  turtle	
  diagram	
  is	
  that	
  you	
  can	
  see	
  the	
  overall	
  holistic	
  view	
  
of	
  a	
  department	
  and	
  can	
  be	
  represented	
  on	
  a	
  single	
  sheet	
  of	
  paper	
  concise	
  
,	
  complete	
  and	
  crisp.	
  We	
  can	
  define	
  entire	
  department	
  as	
  a	
  process,	
  we	
  
can	
  clearly	
  see	
  in	
  the	
  above	
  illustration.	
  	
  	
  
A	
   unique	
   reference	
   number	
   should	
   link	
   all	
   Level	
   2	
   documents	
   to	
  
QMSP,	
  which	
  reflect	
  the	
  revision	
  number	
  and	
  date	
  of	
  revision.	
  
3. Level	
  3	
  Documents:	
  Process	
  Definition	
  Documents	
  (PDDs),	
  Standard	
  
Operating	
   Procedures	
   (SOPs),Work	
   Instructions	
   (WI):	
   These	
   are	
  
basically	
  the	
  set	
  of	
  documents,	
  which	
  are	
  used	
  by	
  operators	
  to	
  perform	
  
various	
  processes.	
  These	
  are	
  made	
  &	
  controlled	
  by	
  related	
  section	
  head	
  
or	
  process	
  engineer	
  but	
  approved	
  by	
  Quality	
  Management	
  Department.	
  
4. Level	
   4	
   Documents:	
   Checklists,	
   Process	
   Validation	
   Reports	
   &	
   PRCs	
  
(Product	
  Route	
  Card)/OARCs	
  (Operation	
  Analysis	
  Route	
  Card):	
  These	
  
are	
   mostly	
   the	
   records	
   maintained	
   to	
   keep	
   control	
   on	
   product/process	
  
quality	
  and	
  traceability.	
  Traceability	
  is	
  very	
  important	
  parameters,	
  which	
  
is	
  required	
  for	
  Aerospace	
  Products	
  as	
  they	
  are	
  very	
  critical.	
  By	
  looking	
  a	
  
batch	
  number	
  or	
  SL.	
  No	
  of	
  a	
  product	
  we	
  should	
  be	
  able	
  to	
  find	
  all	
  related	
  
checklist,	
   PRC	
   (Product	
   Route	
   card)/OARC	
   (Operation	
   Analysis	
   Route	
  
Card)	
  and	
  reports	
  with	
  details	
  as	
  who	
  was	
  the	
  operator	
  and	
  who	
  was	
  the	
  
inspector	
  responsible.	
  
The	
  difference	
  between	
  PRC	
  &	
  OARC	
  is	
  that	
  PRC	
  only	
  records	
  the	
  details	
  
of	
   the	
   precedence	
   activities	
   done	
   on	
   project	
   and	
   by	
   whom.	
   Where	
   else	
  
OARC	
  is	
  an	
  ERP	
  generated	
  document,	
  which	
  gives	
  instructions	
  and	
  also	
  
records	
   the	
   details	
   of	
   the	
   precedence	
   activities	
   done	
   on	
   project	
   and	
   by	
  
whom.	
  
16	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
	
  
Above	
   illustration	
   shows	
   a	
   sample	
   checklist,	
   which	
   fulfills	
   all	
   requirements	
   of	
  
AS9100	
  Rev	
  C.	
  
All	
  level	
  3	
  &	
  4	
  documents	
  needed	
  to	
  be	
  upgraded	
  as	
  and	
  when	
  the	
  
product	
  requirement	
  change.	
  All	
  these	
  documents	
  are	
  to	
  be	
  linked	
  to	
  
Level	
  3	
  &	
  4	
  documents	
  by	
  a	
  unique	
  reference	
  number,	
  which	
  reflect	
  
the	
  revision	
  number	
  and	
  date	
  of	
  revision.	
  
All	
  Level	
  1,	
  2	
  ,3	
  &	
  4	
  documents	
  are	
  controlled	
  copies	
  and	
  are	
  needed	
  to	
  be	
  
controlled	
  by	
  designated	
  authority	
  that	
  will	
  be	
  responsible	
  for	
  them.	
  Also	
  
they	
  are	
  auditable	
  and	
  the	
  documents	
  are	
  to	
  be	
  retained	
  for	
  a	
  minimum	
  
period	
   of	
   5	
   years	
   or	
   as	
   defined	
   in	
   P.O.	
   (Production	
   Order)	
   terms	
   by	
  
customer	
  which	
  ever	
  is	
  minimum.	
  
All	
  documents	
  needed	
  to	
  be	
  complete	
  and	
  ensured	
  that	
  no	
  loopholes	
  are	
  left.	
  
It	
  is	
  said	
  for	
  AS9100	
  documentation	
  “They	
  say	
  what	
  you	
  do	
  and	
  you	
  do	
  what	
  
they	
  say”.	
  
	
  
	
  
	
  
QUALITY(MANAGEMENT/_____(
((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((Ref:(No:(12345Crimp/CKL/V(0((
(((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((Date:(
Crimping(Tool(Part(No:. ( ( (Tool(Sl.No.(
Locater(PN: ( ( ( (Locater(PosiLon:(
Contact(PN: ( ( ( (Wire(Size(
UTM(Asset(No:. ( ( (((((((((((((((((((((((((((((((((((((UTM(CalibraLon(Date:(
(
Procedure:(
1.Annexure(1((Crimping(Process(validaLon(((Ref(PQRS/ABC/QP/IXYZVO:(dt:(
2.(Five(samples(of(plug(to(be(crimped.(
3.(Five(samples((of(socket(pins(to(be(crimped.(
4.(Every(week(on(Monday(this(acLvity(to(be(done.(
5.(A^er(Samples(are(collected(they(are(to(be(sent(to(MTD,(QA(for(pull(test(with(SAP(request.(
6.(Collect(the(reports(from(MTD,QA(and(verify(if(they(are(meeLng(the(requirements(and(collect(the(samples.(
7.(If(reading(are(meeLng(proceed(to(next(step(els(go(to(step(1(and(repeat(the(acLvity(unless(required(results(are(achieved.(
8.(Visually(inspect(the(samples(before(pull(test(and(mark(them(with(SL.Nos.(
9.Insepct(the(samples(a^er(pull(test(and(fill(Table(1.(
( Sl#
No. Sample#Details Visual#Inspec4on#
before#pull#test
Type#of#separa4ons#
observed. Pull force Applied
1 Plug(pin(sample(1
2 Plug(pin(sample(2
3 Plug(pin(sample(3
4 Plug(pin(sample(4
5 Plug(pin(sample(5
6 Socket(pin(sample(1
7 Socket(pin(sample(2
8 Socket(pin(sample(3
9 Socket(pin(sample(4
10 Socket(pin(sample(5
Type#of#separa4on Deno4on
Slip((Pull(out) A
Conductor(broken(in(crimp(area. B
Contact(broken(in(crimp(area. C
Conductor(broken(outside(crimp(area. D
Contact(broken(outside((crimp(area. E
Any(other(defect((Specify(in(Remarks) F
Remarks#
Inspector(
Name:(
Staff(No(
Operator(
Name:(
Staff(No:(
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   17	
  
	
  
Step	
  8:	
  Draft	
  QMSP	
  (Level	
  1	
  Document)	
  
Take	
   help	
   of	
   department	
   heads	
   and	
   give	
   responsibility	
   to	
   each	
   related	
   team	
  
member	
  of	
  related	
  department	
  to	
  formulate	
  module	
  for	
  his/her	
  department.	
  It’s	
  
the	
   responsibility	
   of	
   Team	
   Lead/Head	
   to	
   verify	
   and	
   compile	
   the	
   QMSP	
   as	
   a	
  
complete	
  document.	
  
Once	
   QMSP	
   is	
   finalized	
   discuss	
   it	
   with	
   the	
   registrar/auditor	
   and	
   take	
   his	
  
feedback.	
  
	
  
Step	
  9:	
  Training	
  
Plan	
  for	
  awareness	
  training	
  for	
  the	
  entire	
  organization,	
  better	
  to	
  be	
  done	
  in	
  
modules	
  such	
  as	
  for	
  QM,	
  Production	
  Control,	
  Engineering,	
  Manufacturing,	
  
Marketing,	
  Material	
  management,	
  Plant	
  Maintenance,	
  Finance,	
  Purchase,	
  Sub-­‐
contract	
  &	
  Human	
  Resource	
  etc.	
  
Better	
  keep	
  QM	
  all	
  levels	
  (1,2	
  &3)	
  documents	
  ready	
  so	
  that	
  they	
  may	
  use	
  them	
  as	
  
sample	
  documents	
  and	
  related	
  persons	
  can	
  make	
  their	
  own	
  level	
  2	
  &	
  3	
  level	
  
documents.	
  
Step	
  10:	
  Level	
  2	
  ,3	
  &4	
  level	
  Documents	
  
These	
  documents	
  are	
  to	
  be	
  prepared	
  by	
  related	
  department	
  heads	
  &	
  
process/line	
  in-­‐charge	
  or	
  engineers.	
  It	
  is	
  responsibility	
  of	
  the	
  representative	
  of	
  
department	
  in	
  AS9100	
  implementation	
  team	
  to	
  scrutinize	
  and	
  help	
  in	
  
development	
  of	
  these	
  documents.	
  
	
  
Step	
  11:	
  Implement	
  your	
  Quality	
  Management	
  System	
  
Once	
   the	
   foundations	
   have	
   been	
   laid,	
   you	
   should	
   implement	
   your	
   quality	
  
management	
  system.	
  Its	
  important	
  that	
  you	
  make	
  the	
  process	
  owners	
  and	
  the	
  
operators	
  believe	
  in	
  the	
  new	
  system.	
  They	
  should	
  be	
  trained	
  and	
  told	
  how	
  it	
  will	
  
beneficial	
   for	
   them.	
   AS9100	
   requires	
   lots	
   of	
   records	
   to	
   me	
   maintain	
   and	
   the	
  
operators	
  and	
  process	
  owners	
  have	
  lot	
  of	
  Inertia	
  to	
  do.	
  They	
  think	
  it	
  is	
  done	
  to	
  
keep	
  check	
  on	
  them	
  and	
  will	
  be	
  used	
  as	
  evidence	
  against	
  them.	
  
18	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
We	
  should	
  make	
  them	
  very	
  clear	
  that	
  it	
  is	
  only	
  for	
  process	
  improvement.	
  AS9100	
  
gives	
   us	
   process	
   approach.	
   We	
   should	
   always	
   remember	
   no	
   operator	
   or	
  
process	
   owner	
   commits	
   a	
   mistake	
   deliberately	
   is	
   always	
   a	
   loophole	
   in	
  
process,	
   which	
   has	
   made	
   him	
   commit	
   mistake,	
   so	
   make	
   process	
   perfect.	
  	
  
If	
   you	
   can	
   understand	
   the	
   above	
   statement	
   you	
   got	
   the	
   real	
   understanding	
   of	
  
AS9100	
  that	
  its	
  never	
  about	
  product/people	
  its	
  only	
  about	
  process	
  you	
  follow.	
  
	
  
Step	
  12:	
  Invite	
  registrar/auditor	
  for	
  a	
  pre-­‐assessment	
  
A	
  pre-­‐assessment	
  normally	
  takes	
  place	
  about	
  6	
  weeks	
  into	
  the	
  implementation	
  
of	
  the	
  quality	
  system.	
  The	
  purpose	
  of	
  the	
  pre-­‐assessment	
  is	
  to	
  identify	
  areas	
  
where	
  you	
  may	
  not	
  be	
  operating	
  to	
  the	
  standard.	
  This	
  allows	
  you	
  to	
  correct	
  any	
  
areas	
  of	
  concern	
  you	
  may	
  have	
  before	
  the	
  initial	
  assessment.	
  Take	
  their	
  feedback	
  
and	
  implement.	
  
	
  
Step	
  13:	
  Gain	
  registration	
  
Once	
   the	
   preparation	
   and	
   implementation	
   has	
   been	
   completed,	
   registration	
   to	
  
the	
  standard	
  can	
  take	
  place.	
  The	
  key	
  to	
  this	
  is	
  a	
  registration	
  assessment.	
  During	
  
this	
   process,	
   the	
   registrar	
   will	
   comprehensively	
   review	
   your	
   management	
  
system,	
  and	
  should	
  you	
  pass,	
  you	
  will	
  be	
  recommended	
  for	
  registration	
  and	
  be	
  
awarded	
  your	
  certificate.	
  	
  
You	
  need	
  a	
  Management	
  Representative	
  on	
  behalf	
  of	
  senior	
  management	
  he	
  may	
  
be	
  an	
  Additional	
  General	
  Manager/	
  COO.	
  	
  
Certification	
  allows	
  you	
  to	
  advertise	
  your	
  success	
  and	
  promote	
  your	
  business	
  
and	
  its	
  commitment	
  to	
  quality	
  management.	
  
	
  
Step	
  14:	
  Continual	
  assessment	
  
Maintaining	
   your	
   registration	
   requires	
   only	
   that	
   you	
   continue	
   to	
   use	
  and	
   be	
  
committed	
   to	
   your	
   quality	
   system.	
   This	
   will	
   be	
   periodically	
   checked	
   by	
   your	
  
registrar	
  it	
  can	
  be	
  done	
  bi-­‐annually	
  or	
  annually.	
  But	
  number	
  of	
  man-­‐days	
  fixed	
  
for	
  a	
  year	
  for	
  assessment	
  is	
  constant.	
  	
  
Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
   19	
  
	
  
Beside	
  that	
  you	
  need	
  to	
  do	
  minimum	
  of	
  two	
  internal	
  audits	
  as	
  per	
  the	
  schedule	
  
or	
  frequency	
  defined	
  in	
  QMSP.	
  
Once	
   you	
   are	
   certified	
   you	
   will	
   receive	
   a	
   score	
   and	
   you	
   should	
   always	
   try	
   to	
  
improve	
   upon	
   the	
   score.	
   You	
   can	
   use	
   the	
   AS9100	
   certified	
   logo	
   and	
   show	
   the	
  
entire	
  industry	
  about	
  your	
  capabilities.	
  
	
  
	
  
Conclusion:	
  
	
  
I	
  sincerely	
  hope	
  that	
  this	
  document	
  has	
  definitely	
  brought	
  some	
  clarity	
  about	
  the	
  
process	
  of	
  implementing	
  AS9100	
  Rev	
  C	
  in	
  your	
  own	
  organizations,	
  cleared	
  some	
  
apprehensions	
  about	
  AS9100	
  Rev	
  C.	
  
One	
  thing	
  I	
  will	
  assure	
  you	
  that	
  if	
  you	
  implement	
  AS9100	
  Rev	
  C	
  and	
  make	
  the	
  
install	
  systems	
  that	
  meet	
  the	
  requirement,	
  life	
  will	
  be	
  very	
  easy	
  for	
  you.	
  Initial	
  
cost	
  of	
  implementation	
  can	
  be	
  a	
  bit	
  high	
  but	
  you	
  can	
  see	
  the	
  returns	
  within	
  5	
  
years.	
  One	
  of	
  the	
  best	
  ways	
  to	
  maintain	
  AS9100	
  Rev	
  C	
  system	
  is	
  by	
  implementing	
  
ERP	
  systems.	
  It	
  will	
  reduce	
  your	
  record	
  keeping	
  and	
  standardize	
  the	
  processes	
  
as	
  well.	
  
	
  
	
  
	
  
***	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
20	
   Guide	
  for	
  implementing	
  AS9100	
  Rev	
  C	
  
	
  
Compiled	
  By:	
  
	
  
	
  
	
  
MBA from IIM Shillong with 5 Years of Experience in
Aerospace /Electronics Industry (Quality & Production)
ASHISH JUDE MICHAEL
!  5 years of experience in Quality, Manufacturing & SCM
activities of Aerospace /Electronics Industry.
!  One Year MBA in International Business from Indian
Institute Of Management, Shillong and a Mechanical
Engineering Graduate.
!  Worked with companies such as Bharat Electronics Ltd, ITC
Ltd.
!  Served clients such as Boeing, UTC, Indian Air Force, Indian
Navy.
!  Worked on prestigious Light Combat Aircraft (LCA) Project
which is of national importance.
Skill Set:
TQM, AS9100, ISO14001,ISO9001,AS9102, 8D, SPSS, Mini-Tab, PPAP,FMEA,
GAP Analysis, APQP, RRCA, Quality Clinic, Project Management, Kaizen, LEAN
manufacturing, SPC, Vendor Management, Process Improvement, Poka-Yoke,
Benchmarking, FAI, Production Management, Cross Culture Team Management,
Negotiation Skills.

More Related Content

What's hot

Control of-documented-information-procedure-sample
Control of-documented-information-procedure-sampleControl of-documented-information-procedure-sample
Control of-documented-information-procedure-sample
mvijay Kumar
 

What's hot (20)

Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949
 
ISO 9001 2015 Quality Management System (Implementation)
ISO 9001 2015 Quality Management System (Implementation)ISO 9001 2015 Quality Management System (Implementation)
ISO 9001 2015 Quality Management System (Implementation)
 
AS9100 Lead Auditor Training - Download Demo
AS9100 Lead Auditor Training - Download DemoAS9100 Lead Auditor Training - Download Demo
AS9100 Lead Auditor Training - Download Demo
 
Road map to iso 9001 certification
Road map to iso 9001 certification  Road map to iso 9001 certification
Road map to iso 9001 certification
 
ISO 9001:2015 Awareness course
ISO 9001:2015 Awareness courseISO 9001:2015 Awareness course
ISO 9001:2015 Awareness course
 
QMS Principles ISO 9001 2015
QMS Principles ISO 9001 2015QMS Principles ISO 9001 2015
QMS Principles ISO 9001 2015
 
Iso9001training slide
Iso9001training slideIso9001training slide
Iso9001training slide
 
Iso 9001:2015 internal auditor Course
Iso 9001:2015  internal auditor Course Iso 9001:2015  internal auditor Course
Iso 9001:2015 internal auditor Course
 
Iso 9001 2015 clause 5 leadership
Iso 9001 2015 clause 5 leadershipIso 9001 2015 clause 5 leadership
Iso 9001 2015 clause 5 leadership
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
ISO 9001:2015 awareness.
ISO 9001:2015 awareness. ISO 9001:2015 awareness.
ISO 9001:2015 awareness.
 
ISO 9001:2015 Introduction & Awareness Training
ISO  9001:2015 Introduction & Awareness Training ISO  9001:2015 Introduction & Awareness Training
ISO 9001:2015 Introduction & Awareness Training
 
IATF Awareness
IATF AwarenessIATF Awareness
IATF Awareness
 
ISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul IslamISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul Islam
 
ISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training Presentation
 
Iso9001 2015
Iso9001 2015Iso9001 2015
Iso9001 2015
 
Iso 9001 2015 Understanding
Iso 9001 2015 Understanding Iso 9001 2015 Understanding
Iso 9001 2015 Understanding
 
AS9100 Auditor Training Presentation Kit
AS9100 Auditor Training Presentation KitAS9100 Auditor Training Presentation Kit
AS9100 Auditor Training Presentation Kit
 
ISO 9001-2015 QMS Awareness & Interpretation Training.pdf
ISO 9001-2015 QMS Awareness & Interpretation Training.pdfISO 9001-2015 QMS Awareness & Interpretation Training.pdf
ISO 9001-2015 QMS Awareness & Interpretation Training.pdf
 
Control of-documented-information-procedure-sample
Control of-documented-information-procedure-sampleControl of-documented-information-procedure-sample
Control of-documented-information-procedure-sample
 

Viewers also liked

1st Article Linked In
1st Article Linked In1st Article Linked In
1st Article Linked In
alspread
 
As9100 quality management system
As9100 quality management systemAs9100 quality management system
As9100 quality management system
selinasimpson331
 
AS 9100C Registration Certificate
AS 9100C Registration CertificateAS 9100C Registration Certificate
AS 9100C Registration Certificate
Andrew Katic
 
AS9100 Certificate
AS9100 CertificateAS9100 Certificate
AS9100 Certificate
Steven Liu
 
Iso 9001 understanding rev3
Iso 9001 understanding rev3Iso 9001 understanding rev3
Iso 9001 understanding rev3
jlcadarian
 
STRATEGIC MANAGEMENT
STRATEGIC MANAGEMENTSTRATEGIC MANAGEMENT
STRATEGIC MANAGEMENT
Garg Eshank
 

Viewers also liked (20)

1st Article Linked In
1st Article Linked In1st Article Linked In
1st Article Linked In
 
FIRST ARTICLE INSPECTION
FIRST ARTICLE INSPECTIONFIRST ARTICLE INSPECTION
FIRST ARTICLE INSPECTION
 
AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?
AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?
AS 9100:2016 and ISO 9001:2015 - Clause 9.3 Management Review : What's New?
 
AS9100:2016 Update and Review
AS9100:2016 Update and ReviewAS9100:2016 Update and Review
AS9100:2016 Update and Review
 
ISO 9001:2008 training
ISO 9001:2008 trainingISO 9001:2008 training
ISO 9001:2008 training
 
Aerospace QMS
Aerospace QMSAerospace QMS
Aerospace QMS
 
As9100 quality management system
As9100 quality management systemAs9100 quality management system
As9100 quality management system
 
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
The Five Things You Must Do To Have A Bona Fide Quality Management System Tha...
 
ISO 9001 2015 | Management Reviews | The Five Rules To Business Excellence
ISO 9001 2015 | Management Reviews | The Five Rules To Business ExcellenceISO 9001 2015 | Management Reviews | The Five Rules To Business Excellence
ISO 9001 2015 | Management Reviews | The Five Rules To Business Excellence
 
AS 9100C Registration Certificate
AS 9100C Registration CertificateAS 9100C Registration Certificate
AS 9100C Registration Certificate
 
As9100c
As9100cAs9100c
As9100c
 
Competency Modeling for Business Process Review
Competency Modeling for Business Process ReviewCompetency Modeling for Business Process Review
Competency Modeling for Business Process Review
 
AS9100 Certificate
AS9100 CertificateAS9100 Certificate
AS9100 Certificate
 
PECB Webinar: Process based auditing
PECB Webinar: Process based auditingPECB Webinar: Process based auditing
PECB Webinar: Process based auditing
 
Advanced qualitymanual s9100
Advanced qualitymanual s9100Advanced qualitymanual s9100
Advanced qualitymanual s9100
 
TQM- Quality management system
TQM- Quality management systemTQM- Quality management system
TQM- Quality management system
 
Iso 9001 understanding rev3
Iso 9001 understanding rev3Iso 9001 understanding rev3
Iso 9001 understanding rev3
 
STRATEGIC MANAGEMENT
STRATEGIC MANAGEMENTSTRATEGIC MANAGEMENT
STRATEGIC MANAGEMENT
 
Overview Section 1,2,3
Overview Section 1,2,3Overview Section 1,2,3
Overview Section 1,2,3
 
7 Tips to Avoid Poor Quality Production
7 Tips to Avoid Poor Quality Production7 Tips to Avoid Poor Quality Production
7 Tips to Avoid Poor Quality Production
 

Similar to Guide to implement AS9100 Rev C

Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
Omnex Inc.
 
Aerospace pre registration tips
Aerospace pre registration tipsAerospace pre registration tips
Aerospace pre registration tips
Intertek CE
 
Ch13 Iso 9000
Ch13 Iso 9000Ch13 Iso 9000
Ch13 Iso 9000
ajithsrc
 
Boeing quality management system
Boeing quality management systemBoeing quality management system
Boeing quality management system
selinasimpson1801
 
Iso9000 pvcgmp roll no. 01
Iso9000  pvcgmp roll no. 01Iso9000  pvcgmp roll no. 01
Iso9000 pvcgmp roll no. 01
Hetal Hinglajia
 

Similar to Guide to implement AS9100 Rev C (20)

AS 9100 Certification What You Need to Know.pdf
AS 9100 Certification What You Need to Know.pdfAS 9100 Certification What You Need to Know.pdf
AS 9100 Certification What You Need to Know.pdf
 
AS9100 Requirements that Aerospace Businesses Need to Meet
AS9100 Requirements that Aerospace Businesses Need to MeetAS9100 Requirements that Aerospace Businesses Need to Meet
AS9100 Requirements that Aerospace Businesses Need to Meet
 
TQM Unit 7, VTU Syallabus
TQM Unit 7, VTU SyallabusTQM Unit 7, VTU Syallabus
TQM Unit 7, VTU Syallabus
 
ISO 9000 certification(Quality Management System)
ISO 9000 certification(Quality Management System)ISO 9000 certification(Quality Management System)
ISO 9000 certification(Quality Management System)
 
Qms iso 9000 (ISO 9000 series of quality systems standards)
Qms  iso 9000 (ISO 9000 series of quality systems standards)Qms  iso 9000 (ISO 9000 series of quality systems standards)
Qms iso 9000 (ISO 9000 series of quality systems standards)
 
As9100 c 2009-standard
As9100 c 2009-standardAs9100 c 2009-standard
As9100 c 2009-standard
 
AS 9100.pdf
AS 9100.pdfAS 9100.pdf
AS 9100.pdf
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
 
Aerospace pre registration tips
Aerospace pre registration tipsAerospace pre registration tips
Aerospace pre registration tips
 
ISO 9001 executive brief
ISO 9001 executive briefISO 9001 executive brief
ISO 9001 executive brief
 
Iso 9000 An Introduction By C.Eashwer
Iso 9000   An Introduction By C.EashwerIso 9000   An Introduction By C.Eashwer
Iso 9000 An Introduction By C.Eashwer
 
AS9100 Certification What You Need to Know.pdf
AS9100 Certification What You Need to Know.pdfAS9100 Certification What You Need to Know.pdf
AS9100 Certification What You Need to Know.pdf
 
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION(ISO)
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION(ISO)INTERNATIONAL ORGANIZATION FOR STANDARDIZATION(ISO)
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION(ISO)
 
QMS.pdf
QMS.pdfQMS.pdf
QMS.pdf
 
What is AS 9100 Certification and Why is it Important..pdf
What is AS 9100 Certification and Why is it Important..pdfWhat is AS 9100 Certification and Why is it Important..pdf
What is AS 9100 Certification and Why is it Important..pdf
 
M ove act training list 2
M ove act training list 2M ove act training list 2
M ove act training list 2
 
Ch13 Iso 9000
Ch13 Iso 9000Ch13 Iso 9000
Ch13 Iso 9000
 
Boeing quality management system
Boeing quality management systemBoeing quality management system
Boeing quality management system
 
iso9000-140817005427-phpapp02-converted.pptx
iso9000-140817005427-phpapp02-converted.pptxiso9000-140817005427-phpapp02-converted.pptx
iso9000-140817005427-phpapp02-converted.pptx
 
Iso9000 pvcgmp roll no. 01
Iso9000  pvcgmp roll no. 01Iso9000  pvcgmp roll no. 01
Iso9000 pvcgmp roll no. 01
 

More from Ashish Michael

Royal Enfield: Brand Analysis
Royal  Enfield: Brand AnalysisRoyal  Enfield: Brand Analysis
Royal Enfield: Brand Analysis
Ashish Michael
 

More from Ashish Michael (14)

The Great Indian Start-ups Goof-up.pdf
The Great Indian Start-ups Goof-up.pdfThe Great Indian Start-ups Goof-up.pdf
The Great Indian Start-ups Goof-up.pdf
 
Disrupting Lean Six Sigma; How to make Lean Six Sigma relevant to Start-Ups?
Disrupting Lean Six Sigma; How to make Lean Six Sigma relevant to Start-Ups?Disrupting Lean Six Sigma; How to make Lean Six Sigma relevant to Start-Ups?
Disrupting Lean Six Sigma; How to make Lean Six Sigma relevant to Start-Ups?
 
Advantage of 100% FDI in Indian Defence Production
Advantage of 100% FDI in Indian Defence ProductionAdvantage of 100% FDI in Indian Defence Production
Advantage of 100% FDI in Indian Defence Production
 
Brand analysis of Royal Enfield
Brand analysis of Royal EnfieldBrand analysis of Royal Enfield
Brand analysis of Royal Enfield
 
Brand activation: Bajaj Auto
Brand activation: Bajaj AutoBrand activation: Bajaj Auto
Brand activation: Bajaj Auto
 
Six sigma and PMP: How can they help you togethere?
Six sigma and PMP: How can they help you togethere?Six sigma and PMP: How can they help you togethere?
Six sigma and PMP: How can they help you togethere?
 
Understanding Business Culture of Shandong Machinery I&E Corporation (SDMIEC)...
Understanding Business Culture of Shandong Machinery I&E Corporation (SDMIEC)...Understanding Business Culture of Shandong Machinery I&E Corporation (SDMIEC)...
Understanding Business Culture of Shandong Machinery I&E Corporation (SDMIEC)...
 
PGPEx IIM Shillong
PGPEx   IIM ShillongPGPEx   IIM Shillong
PGPEx IIM Shillong
 
DPP and its Impact on Indian Aerospace & Defence Industry
DPP and its Impact on Indian Aerospace & Defence IndustryDPP and its Impact on Indian Aerospace & Defence Industry
DPP and its Impact on Indian Aerospace & Defence Industry
 
Royal Enfield: Brand Analysis
Royal  Enfield: Brand AnalysisRoyal  Enfield: Brand Analysis
Royal Enfield: Brand Analysis
 
Challenges for marketing in china
Challenges for marketing in chinaChallenges for marketing in china
Challenges for marketing in china
 
Case analysis boeing 787
Case analysis boeing 787Case analysis boeing 787
Case analysis boeing 787
 
Eurozone Crisis:Impact on Chinese & Indian Economy
Eurozone Crisis:Impact on Chinese & Indian EconomyEurozone Crisis:Impact on Chinese & Indian Economy
Eurozone Crisis:Impact on Chinese & Indian Economy
 
Aerospace&Defence in BRIC Nations
Aerospace&Defence in BRIC NationsAerospace&Defence in BRIC Nations
Aerospace&Defence in BRIC Nations
 

Recently uploaded

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 

Recently uploaded (20)

Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Guide to implement AS9100 Rev C

  • 1.     Guide  for  implementing   AS9100  Rev  C   By   ASHISH  JUDE  MICHAEL,  MBA,  IIM  Shillong          
  • 2. 2   Guide  for  implementing  AS9100  Rev  C     Introduction   I  am  writing  this  document  to  help  out  managers,  who  think  AS9100  is  a  very   complicated  system  to  install,  implement  and  follow.  They  have  an  apprehension   that  it  requires  tons  of  documentation  and  record  keeping.       I   will   be   bringing   the   basic   outlines   of   how   to   implement   a   QMS   (Quality   Management  System)  from  scratch,  which  adhere  to  AS9100  Rev  C  requirements   in  a  very  basic  manner.  This  document  alone  cannot  be  used  to  implement  the   AS9100  Rev  C;  the  aim  of  this  document  is  to  familiarize  the  managers  about  the   basics  of  implementation  of  AS9100  Rev  C.  I  have  used  many  illustrations  and   also  used  project  management  concept  to  implement  AS9100  Rev  C.   I   have   used   my   own   experience;   I   played   an   important   role   in   implementing   AS9100  Rev  C  in  my  SBU  (Strategic  Business  Unit),  which  is  EW&A  (Electronics   Warfare  &  Avionics)  at  Bharat  Electronics.  Our  SBU  was  one  of  the  first  SBUs  in   India   to   get   AS9100   certification   among   PSUs.   Our   Head   of   Team   for   Implementation   of     AS9100   was   our   QM   (Quality   Management)   DGM   Mr.   Satyanarayana  and  I  was  a  directly  reporting  to  him.   I  will  divide  this  document  in  14  steps  (These  steps  are  inspired  from  “How  to   implement  AS9100?”)  and  will  be  elaborating  on  each  step  and  add  if  any  thing  is   missing.                              
  • 3. Guide  for  implementing  AS9100  Rev  C   3       Table  of  Contents     Management  Responsibilities   Step  1:  Determine  which  Quality  standard  to  adopted   Step  2:  Assemble  the  Team,  Purchase  the  Standard  &  select  registrar   Step  3:  Set  targets  and  periodically  review  them     Implementation  Team  Responsibilities   Step  4:  Review  support  literature  and  software   Step  5:  Make  a  strategy   Step  6:  Plan  the  implementation   Step  7:  Documentation   Step  8:  Draft  QMSP  (Level  1  Document)   Step  9:  Training   Departmental  Responsibilities   Step  10:  Level  2  ,  3  &  4  level  Documents   Step  11:  Implement  &  adhere  to  Quality  Management  System  (QMS)     QM  Responsibility   Step  12:  Invite  registrar/auditor  for  a  pre-­‐assessment   Step  13:  Gain  registration   Step  14:  Continual  assessment     Conclusion              
  • 4. 4   Guide  for  implementing  AS9100  Rev  C     Management  Responsibilities   Step  1:  Determine  which  Quality  standard  to  adopted   This  is  a  strategic  decision  to  be  taken  by  senior  management.  One  should  not   seek  certification  for  the  sake  of  getting  it.  Understand  how  this  will  help  you  in  a   long  run.  AS9100  is  necessity  if  you  are  planning  to  enter  aerospace  &  defence   industry  or  space  industry.  ISO9001  is  just  70%  of  AS9100.   Let  me  give  you  a  brief  introduction  about  various  types  of  Certification  you  can   go  ahead.   1.  ISO9001:  is  a  quality  standard  maintained  by  the  International  Organization   for  Standardization  (ISO)  and  is  administered  by  accreditation  and  certification   bodies   like   PRI   Registrar.   The   rules   are   updated   periodically   to   accommodate   changes  in  the  business  environment.  Some  of  the  requirements  include:     • Procedures  that  cover  all  key  practices  in  the  business   • Monitoring  those  procedures  to  ensure  effectiveness   • Keeping  adequate  records   • Checking   output   for   defects,   and   implementing   corrective   actions   as   needed  to  Prevent  recurrence  if  defects  are  found   • Periodic   review   of   the   overall   quality   management   system   and   the   processes  within  the  system  to  measure  effectiveness   • Implementing  a  continuous  improvement  program   When  an  organization  is  certified  and  found  to  be  in  conformance  with  ISO  9001   that  organization  may  publicly  state  that  it  is  "ISO  9001  certified"  or  "ISO  9001   registered".  Certification  to  an  ISO  9001  quality  standard  does  not  guarantee   quality   of   end   products   and   services;   however,   it   certifies   that   formalized   business  processes  are  being  applied.   Although  the  ISO  9001  quality  standard  originated  in  manufacturing,  it  can  be   applied  to  a  variety  of  products,  not  just  physical  objects,  but  products  such  as   services  or  software.  
  • 5. Guide  for  implementing  AS9100  Rev  C   5     2.   AS9100:   is   an   aerospace   standard   based   on   the   ISO   9001   quality   system   requirements.  AS9100  takes  the  ISO  9001  requirements  and  supplements  them   with   additional   quality   system   requirements,   which   are   established   by   the   aerospace  industry  in  order  to  satisfy  DOD,  NASA  and  FAA  quality  requirements.   The  intent  of  AS9100  is  to  establish  a  single  quality  management  system  for  use   within  the  aerospace  industry.     The   standard   was   developed   by   Working   Group   11   of   ISO   TC20   and   was   supported  by  the  International  Aerospace  Quality  Group  (IAQG).  The  official  title   of  AS9100  is  "AS9100  Quality  Management  Systems  -­‐  Requirements  for  Aviation,   Space  and  Defense  Organizations".   The  AS9100  standard  is  recognized  worldwide,  however,  participating  countries   can   use   their   own   numbering   conventions.   For   example,   the   standard   was   released  as  EN9100  in  Europe.  Regardless  of  the  number,  the  standard  should  be   identical  in  content.   The  industry  has  moved  toward  requiring  their  subcontractors  and  suppliers  to   be  AS9100  compliant  and/or  certified.  By  becoming  registered  to  AS9100  or  by   conforming   to   the   standard,   suppliers   can   gain   a   competitive   advantage   and   benefit   from   the   improved   processes   and   continuous   improvement   that   is   the   foundation  of  ISO  9001  certified  Quality  Management  Systems.   3.   AS9110:     The   AS9110   aerospace   standard   is   based   on   AS9100   but   adds   specific   requirements   that   are   critical   for   the   maintenance   of   commercial,   private,   and   military   aircrafts.   This   standard   defines   the   quality   system   requirements   based   on   AS9100   and   includes   additional   criteria   for   maintenance   repair   and   overhaul   facilities   (MRO's)   serving   the   aircraft   industry.   The   AS9110   standard   was   published   by   SAE   International.   It   is   formally   titled   "AS9110   Quality   Maintenance   Systems   -­‐   Aerospace   -­‐   Requirements   for   Maintenance   Organizations"   by   the   Americas   Aerospace   Quality  Group  (AAQG).  The  prime  candidates  to  seek  certification  to  the  AS9110   standard   are   FAA   145   certified   repair   stations.   Those   seeking   Parts   Manufacturing  Approval  (PMA)  from  the  FAA  to  manufacture  aircraft  parts  and  
  • 6. 6   Guide  for  implementing  AS9100  Rev  C     components   are   also   likely   to   seek   AS9110   certification.   Some   of   the   areas   of   emphasis  in  the  AS9110  standard  include  detecting  and  preventing  counterfeit   and  suspect  unapproved  parts,  human  factors  (recognizing  human  factors  that   affect   workers),   safety   management   systems,   technical   data,   project   management  and  risk  management.   4.  AS9120:  Quality  Management  Systems  -­‐  Requirements  for  Aviation,  Space   and   Defense   Distributors."   is   an   aerospace   standard   based   on   AS9100   that   adds   specific   requirements   that   are   relevant   for   stockiest   or   pass-­‐through   distributors   for   the   aerospace   industry.   SAE   International   published   the   AS9120  standard.  This  standard  addresses  chain  of  custody,  traceability,  control   and  availability  of  records.  AS9120  would  be  applicable  for  organizations  that   resell,   distribute,   and   warehouse   parts   found   in   aircraft   and   other   aerospace   components.  The  standard  is  not  applicable  to  value-­‐added  distributors  due  to   customer-­‐product   changes   nor   is   it   intended   for   organizations   that   rework   or   repair   products.   Organizations   that   perform   work   that   affect   or   could   affect   product   characteristics   or   conformity   should   use   AS9100   or   another   general   quality  management  system  standard.   AS9120  is  based  on  ISO  9001  but  it  includes  nearly  100  additional  requirements   specific   to   aerospace   distributors.   AS9120   provides   suppliers   with   a   comprehensive   quality   system   focused   on   areas   directly   impacting   product   safety  and  reliability.     Some  of  the  areas  covered  in  AS9120  include  splitting  (specific  requirements  for   batch  and  lot  splitting),  control  of  records,  traceability  (tracking  from  receipt  of   product   to   delivery),   and   evidence   of   conformance   (distributors   must   meet   document  specifications).     5.  AS9003  The  intent  of  the  AS9003,  Inspection  and  Test  Quality  System;  is  to   ensure   that   the   inspection,   conformity   and   airworthiness   of   products   are   maintained.   The   AS9003   standard   contains   the   minimum   requirements   for   an   Inspection   and   Test   Quality   System   and   was   intended   for   use   by   small   build/machine  to  print  organizations.  A  quality  system  structured  to  include  the  
  • 7. Guide  for  implementing  AS9100  Rev  C   7     AS9003  requirements  provides  the  supplier  with  a  system  that  defines  activities   necessary  to  support  product  integrity  such  as:   1. Management  Responsibility   2. Documentation  of  the  Quality  System   3. Controlled   Contract   Review   and   communication   of   requirements   to   production   4. Document  and  Data  Control   5. Purchasing:  Guidelines  for  choosing   6. Control  of  Customer  Supplier  Product,  tooling  and  raw  materials   7. Product  Identification  and  Traceability   8. Process  Control  -­‐  Methods  for  controlling  manufacturing/build  processes   9. Inspection   and   Testing,   In-­‐process,   Final   Inspections,   Test   and   the   associated  documentation  of  status  and  results   10. Control  of  Inspection,  Measuring  and  Test  Equipment   11. Control  of  Nonconforming  Product   12. Corrective  Action  processes   13. Handling,  Storage,  Packaging,  Preservation  and  Delivery   14. Control  of  Records  -­‐  Internal  Quality  Audits  to  monitor  your  system   15. Training   #   OASIS   Database:     The   OASIS   database   is   a   product   of   the   International   Aerospace   Quality   Group   (IAQG).   OASIS   houses   supplier   and   audit   assessment   data  for  all  companies  who  hold  an  accredited  certification  in  any  of  the  AQMS   series  of  Standards  (i.e.  -­‐  AS9100,  AS9110  and  AS9120).  The  IAQG  has  set  firm   requirements   regarding   the   inclusion   of   aerospace   certified   suppliers   in   the   OASIS   database.   Simply   put,   it   is   not   optional   -­‐   if   you   hold   an   accredited   certificate  to  AS9100,  AS9110  or  AS9120  -­‐  you  must  be  entered  into  the  OASIS   database.  SAE  International  document  AS9104  details  the  Certification  Bodies'   requirements   for   Aerospace   Certification   Programs.   We   are   bound   by   these   requirements  as  stated  on  our  aerospace  certificates,  "The  audit  was  conducted   in   accordance   with   the   requirements   of   SAE   AS9104   Rev.   A."   (Reference   SAE   AS9104  -­‐  Requirements  for  Aerospace  Quality  Management  System  Certification   /  Registrations  Programs).    
  • 8. 8   Guide  for  implementing  AS9100  Rev  C     Additionally,  any  supplier  listed  in  the  OASIS  database  must  set  someone  up  as   the  OASIS  Administrator.  This  designated  person  will  be  the  contact  point  with   regards  to  OASIS,  and  is  responsible  for  maintaining  accurate  supplier  data  in  the   system  (i.e.  -­‐  supplier  name,  address,  etc.).  This  person  is  also  the  only  contact   who  can  grant  access  to  view  pertinent  audit  assessment  details.  An  OASIS  user   cannot   access   audit   data   without   first   gaining   permission   from   the   suppliers'   listed  OASIS  administrator.     If  any  aerospace  certified  supplier  refuses  to  be  a  part  of  OASIS,  or  refuses   to  set  up  an  OASIS  administrator,  Certification  Bodies  are  required  by  the   IAQG  to  revoke  the  certificate  of  registration.     The   very   first   step   to   get   involved   with   OASIS   is   to   become   a   registered   user.   Anyone   can   become   a   registered   user,   and   you   do   not   need   to   hold   an   active   aerospace   certificate   in   order   to   become   a   user.   Visit   the   OASIS   database   at   http://www.iaqg.org/oasis  and  click  on  the  "Register  to  get  Access"  link.     In  Brief:   Sl  No.   Standard   Applicable  Industries   1   ISO9001   All  manufacturing  and  any  industry  from  service  to  product  based.   2.   AS9100   Specifically   for   organizations   developing,   manufacturing   and   selling   aerospace   equipments/components.   3.   AS9110   For  organizations  into  maintenance  &  repairs  (MRO)  of  Aircrafts.   4.   AS9120   For  Organizations  which  sell  &  stock  airborne  equipment’s  or  components  such  as   stockiest  &  distributers.   5   AS9003   For   organizations   which   provide   third   party   inspection   or   testing   facilities   for   airborne  equipments/components.     One  has  to  be  prepared  for  the  cost  of  quality,    which  will  be  high  during  initial   phase  of  3-­‐4  years  but  after  that  you  can  reap  the  benefits  in  the  long  run.  But  if  
  • 9. Guide  for  implementing  AS9100  Rev  C   9     you  are  into  Aerospace  &  Defence  /Space  business,  AS9100  is  critical  for  your   future.     For   implementing   AS9100   senior   management   should   support   its   Quality   Management  Department  to  fullest.  Initially  things  will  be  difficult  to  implement   but  perseverance  pays  off,  you  have  to  understand  “Rome  was  not  built  in  a  Day”   and   so   is   for   AS9100   implementation.   Unless   you   adhere   it   from   within   the   organization  its  difficult  to  maintain.     Step  2:  Assemble  the  Team  &  Purchase  the  Standard   The   road   to   implementing   starts   with   assembling   the   right   team.   Depending   upon  your  organization,  you  can  make  an  official  of  a  rank  DGM/AVP/Manager   to   head   of   team,   the   team   should   be   cross-­‐functional   with   employees   representing  each  department.  Head  of  team  should  have  first  hand  experience   of   implementing   AS9100   and   has   good   personal   skills.   Provide   him   necessary   resources.   Try   to   visit   the   companies,   which   have   already   established   AS9100   certified  systems,  have  a  look  on  their  processes.     Next  thing  is  to  purchase  the  Standard,  and  to  select  a  registrar  such  as  UL  etc.   Consult  the  registrar  whenever  it  is  required  so.  Give  enough  time  for  the  team  to   understand  the  standard,  the  standard  itself  is  vast  and  requires  lots  of  time  to   read  all  the  clauses  and  requirements.       Step  3:  Set  targets  and  periodically  review  them   Set  the  targets  for  Implementation  team  and  review  them  periodically  to  ensure   that  we  are  on  right  track  and  this  will  also  help  the  team  to  put  forward  their   requirements  or  suggestions  where  senior  management  can  help  them.   I   suggest   we   should   apply   project   management   concept   while   implementing   AS9100  Rev  C.  Lets  define:   Project:  AS9100  Rev  C  Implementation  
  • 10. 10   Guide  for  implementing  AS9100  Rev  C     First  we  should  use  PPM  (Project  Priority  Matrix)  to  define  our  utmost  priorities   in  this  project.   For  example  in  given   illustration  of  PPM   maximum  priority  is   given  to   performance  then   comes  time  and   finally  cost/Budget.   This  means  we  want   that  we  have  to  by  all  means  improve  systems  to  implement  AS  9100  Rev  C  and  it   may  take  a  little  bit  more  time  and  we  want  to  reduce  the  cost  by  saving  more,   provided  we  are  successful  in  implementing  our  project  AS9100  Rev  C.   Above  is  the  PERT  Activity  Diagram,  is  gives  the  activities  and  gives  the  most   effective  time  for  each  activity.  You  can  refer  the  illustration  in  figure,  which   defines  this  PERT  Network  Diagram.   A  (5)   B  (5)   C  (5)   D  (4)   E  (1)   F  (5)   G  (5)   H  (5)   I  (5)   J  (5)   K(3)   L(6)   M(6)   N(6)   O(6)   P(5)   Q(5)   R(4)   S(5)   T(5)     Constrain   Accept   Enhance    Time   ✖   ✔   ✖   Cost/Budget   ✖   ✖   ✔   Performance   ✔   ✖   ✖  
  • 11. Guide  for  implementing  AS9100  Rev  C   11     Activity Task Optimistic( Time((To) Pessimistic( Time((Tp) Most(Likely( time((Tm) Effective( Time((Te) Precedence( Activity A Derermine Quality Standard to be implemented 4 6 5 5 NULL B Assemble Team,Purchase Standard & Select Registrar 4 6 5 5 A C Recruit Quality Manager 4 6 5 5 B D Assemble Team 3 5 4 4 C E Purchase Standard &Select Registrar 0.5 1.5 1 1 D F Set Targets & Schedule Periodical Reviews 4 6 5 5 E G Review support Literature &Software 4 6 5 5 F H Make Strategy 4 6 5 5 G I Plan The Implementation 4 6 5 5 H J Draft QMSP 4 6 5 5 I K Training 2 4 3 3 J L Prepare Level 2,3& 4 documents 4 8 6 6 K M Send to QM department for Checking 4 8 6 6 L N Upgrade documents & Get them approved 4 8 6 6 M O Implement & Adhere to QMS 4 8 6 6 N P Internal Assesment 4 6 5 5 O Q Invite Registrar/Auditor for Pre- Assesment 4 6 5 5 P R Implement feedback of Auditors 3 5 4 4 Q S Registration Assessment 4 6 5 5 R T Implement suggestions & Improvements of Auditor 4 6 5 5 S 96TotalJExpectedJImplimentationJTimeJinJDays Above  illustration  gives  the  details  for  PERT  Activity  Diagram.   Implementation  Team  Responsibilities   Step  4:  Review  support  literature  and  software  provided  with  Standard   There  are  a  large  number  of  tools  that  can  be  very  helpful  at  every  stage  of  the   process  of  implementing  AS9100  there  are  many  suggested  formats,  which  we   have  to  modify  as  per  requirement.  We  have  to  segregate  the  formats  which  we   can  use  as  it  is  and  on  which  we  have  to  do  some  modification.   Step  5:  Make  a  strategy   I  again  will  stress,  process  towards  implementing  AS9100  must  start  with   commitment  from  top  management.  As  part  of  this,  an  organizational  strategy   should  be  developed,  and  an  implementation  by  the  team  formed.    Think  of  constrains  which  you  are  going  to  face  and  find  the  solutions  before  
  • 12. 12   Guide  for  implementing  AS9100  Rev  C     hand.  Its  better  to  spend  more  time  in  planning  and  perfecting  the  things  than   rush  into  implementation  phase  and  mess  up  the  things.   Step  6:  Plan  the  implementation   AS9100 Rev C Implementation XYZ Today's Date: Thursday (vertical red line) Project Lead: Start Date: Monday [42] First Day of Week (Mon=2): 2 WBS Tasks Task Lead Start End Duration(Days) %Complete WorkingDays DaysComplete DaysRemaining 1 Management Responsiblities CEO 1/2/12 1/25/12 24 100% 18 24 0 1.1 Derermine Quality Standard to be implemented 1/2/12 1/6/12 5 100% 5 5 0 1.2 Assemble Team,Purchase Standard & Select Registrar 1/7/12 1/11/12 5 100% 3 5 0 1.2.1 Recruit Quality Manager 1/12/12 1/16/12 5 100% 3 5 0 1.2.2 Assemble Team 1/17/12 1/20/12 4 100% 4 4 0 1.2.3 Purchase Standard &Select Registrar 1/21/12 1/21/12 1 100% 1.3 Set Targets & Schedule Periodical Reviews 1/21/12 1/25/12 5 100% 5 5 0 2 Implementation Team Responsiblities Manager Quality 2/2/12 2/24/12 23 100% 17 23 0 2.1 Review support Literature &Software 2/2/12 2/6/12 5 100% 3 5 0 2.2 Make Strategy 2/7/12 2/11/12 5 100% 4 5 0 2.3 Plan The Implementation 2/13/12 2/17/12 5 100% 5 5 0 2.4 Draft QMSP 2/20/12 2/24/12 5 100% 5 5 0 2.5 Training 2/24/12 2/28/2012 3 100% 4 3 0 3 Departmental Responsiblities Demartmantal Heads 3/1/12 3/28/12 28 100% 20 28 0 3.1 Prepare Level 2,3& 4 documents 3/1/12 3/6/12 6 100% 4 6 0 3.2 Send to QM department for Checking 3/9/12 3/14/12 6 100% 4 6 0 3.3 Upgrade documents & Get them approved 3/16/12 3/21/12 6 100% 4 6 0 3.4 Implement & Adhere to QMS 3/23/12 3/28/12 6 100% 4 6 0 4 QM Responsibility Quality Manager 4/2/12 4/27/12 26 100% 20 26 0 4.1 Internal Assesment 4/2/12 4/6/12 5 100% 5 5 0 4.2 Invite Registrar/Auditor for Pre-Assesment 4/7/12 4/11/12 5 100% 3 5 0 4.3 Implement feedback of Auditors 4/12/12 4/15/12 4 100% 4 4 0 4.4 Registration Assessment 4/17/12 4/21/12 5 100% 4 5 0 4.5 Implement suggestions & Improvements of Auditor 4/23/12 4/27/12 5 100% 5 5 0 24/11/11 30-Jan-12 06-Feb-12 02-Jan-12 09-Jan-12 16-Jan-12 23-Jan-12 27-Feb-12 05-Mar-12 12-Mar-12 19-Mar-12 16-Apr-12 23-Apr-12 30-Apr-12 02/01/12 Ashish Jude Michael 13-Feb-12 26-Mar-12 02-Apr-12 09-Apr-12 20-Feb-12   Use  the  scheduling  tools  as  Gantt  chart  to  schedule  the  implementation.  Better  to   go  through  modular  approach.  Which  means  implement  in  phases.  First   concentrate  on  management  Responsibilities  then  comes  Implementation  Team   Responsibilities  next  comes  departmental  responsibilities  and  finally  the  Quality   Management  Responsibilities  in  last  phase.  In  the  above  figure  I  have  shown  an   example  of  scheduling  of  activities  for  AS9100  implementation.    Once  Implementation  plan  is  ready  its  time  to  start  documentation.  But  first  of   all  QMSP  (Quality  Management  System  Procedure)  should  be  drafted  before   going  into  department  level.    
  • 13. Guide  for  implementing  AS9100  Rev  C   13     Step  7:  Documentation   In  AS9100  we  generally  follow  four  levels  of  documentation.     1. Level  1:  An  Organizational  level  Quality  Manual:  We  can  call  it  a  QMSP   (Quality  Management  System  Procedure).  If  it  is  too  big  you  can  make  it  in   volumes.  It  is  a  controlled  copy,  and  must  clearly  define  the  Major  Quality   Procedures   followed   by   each   department   in   an   organization.   It’s   the   responsibility   of   Head   of   Implementation   of   AS9100   team   to   get   inputs   from  the  department  heads  and  formulate.  Its  like  a  “Master  document  for   the  QMS  (Quality  Management  System)”.  It  should  contain  the  generalized   procedures  and  formats  such  as  CA/PA  (Corrective  Action  /Preventive),   Engineering   Change   Request   (ECR),   Approved   Deviation,   Process   Improvement,  Document  Upgrading  Requirement  etc.       We   should   also   give   details   about   the   yearly   cycles   of   periodic   assessments  both  internal  and  external.       2.  Level   2:   Department   level   Quality   Documents:   This   includes   the   Turtle  Charts;  Risk  Mitigation  plans  for  each  department.  Turtle  chart  is  a   one-­‐page  document,  which  defines  the  all  the  activities  in  a  department  as   process.   There   are   inputs/Outputs,   Process,   Targets,   Suppliers,   and  
  • 14. 14   Guide  for  implementing  AS9100  Rev  C     Customers  etc.  OTD  (On  Time  Delivery)  and  Risk  Mitigation  Plan  are  the   two  important  parameters,  which  are  specially  focused  in  AS9100  Rev  C.       Process'Name:' Process'Owner:' Cri1cal'Success'Factors:' Start'event:' End'Event:' Process'Input' ' ' ' ' ' Resources/material' (with'what?)' Process'personnel' (with'whom?)' Interfaces'for' input' ' ' ' ' ' ' ' Supplier'for' process'/' Previous' process' Process'indicators' (how'many?)' Process'objec1ves'/' Purpose' Process:' '''''''''Process'steps/main'ac1vi1es' BLANK PROCESS TURTLE DIAGRAM Interfaces'for' Output' ' ' ' ' ' ' ' Process' Output' ' ' ' ' Customer'of'' process'/' Next'process' TOOL''which'can'help'in'defining'the'process'as'per'Rev.C'and'a'tool'for'conduc1ng'internal'audit' SWOT' Analysis' ' Process' Improvement' ' Reference'Documents'(how?)' ' ' Process'map' Notes' How?% How$is$this$process$controlled,$including$the$use$of$ procedures,$work$instruc5ons,$and$methods?$ Control$of$produc5on$and$Service$provision$(7.5.1)$ Control$of$Produc5on$Process$changes$($7.5.1.2)$ Control$of$Produc5on$Equipment,$Tools$and$ SoGware$Programes(7.5.1.3)$ Nonconforming$product$procedure$($8.3)$ Document$contorl/records(4.2.3/4)$ %%%%%%%%%%%%%%%%What%Results%?% $Measurements/analysis$of$the$product$of$ $this$process$and$of$this$process$effec5veness$ Monitoring$and$measurement$$ of$product$($8.2.4)$ Customer$Sa5sfac5on$(8.2.1)$ Monitoring$and$measurement$of$processes$(8.2.3)$ Analysis$of$data$(8.4)$$ with%What%?% What%are%the%Materials,%Equipment%and%other%resources%needed%by% this%process?% Plant$and$machinery$(6.3)$ Process$equipment$($6.3)$ Measuring$equipment$(7.6)$ Packaging$Storage$(7.5.5)$ Customer$Property$(7.5.4)$ Transporta5on$of$materials$in$this$process$(6.3)$ Raw$materials$needed$in$this$process($7.4)$ with%%Who%?% Who% owns %this%process,%who%works%in%this%process,% and%who%directly%assists%this%process?% % Responsibility$and$authority$($5.5.1)$ Competence$criteria$($6.2.1)$ Training$records$($6.2.2)$ Training$effec5veness$($6.2.2)$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ $ (Who$Helps?$ Departments$and$ Individuals)$ IT$ HR$ Logis5cs$$ Sales$ Quality$$ Maintenance$$ Personnel$ Inputs% What%is%the%need%the%customer%of%this%process% has%and%what%are%the%requirements%to%meet% that%need?% Product$needs$to$be$produced$according$to:$ Customer$requirements$($7.2.1)$ Statutory/Regulatory$ Requirements$($7.2.1)$ Organiza5onal$requirements$($7.2.1)$ Outputs% $ The$ customer s$ need$ is$ met$ at$ the$ characteris5c$level.$ A$sa5sfied$customer$($8.2.1)$ Receives$product$from$the$process$that$ conforms$ to$ the$ requirements$ in$ the$ input$($7.2.1)$ Process%% (Suppor5ng$Processes)$ $ Computer$equipment$ support$processes$$ Training$ Hiring/Firing$ Purchasing$Processes$ Materials$movement$ Processes$Inspec5on$ Calibra5ng$ $ The$term$procedure$and$process'are$not$necessarily$synonymous.$A$$procedure$may$be$one$way$to$describe$a$$process$in$text;$however,$most$organiza5ons$have$many$more$ processes$than$the$procedures$required$by$the$standard.$
  • 15. Guide  for  implementing  AS9100  Rev  C   15     The  beauty  of  turtle  diagram  is  that  you  can  see  the  overall  holistic  view   of  a  department  and  can  be  represented  on  a  single  sheet  of  paper  concise   ,  complete  and  crisp.  We  can  define  entire  department  as  a  process,  we   can  clearly  see  in  the  above  illustration.       A   unique   reference   number   should   link   all   Level   2   documents   to   QMSP,  which  reflect  the  revision  number  and  date  of  revision.   3. Level  3  Documents:  Process  Definition  Documents  (PDDs),  Standard   Operating   Procedures   (SOPs),Work   Instructions   (WI):   These   are   basically  the  set  of  documents,  which  are  used  by  operators  to  perform   various  processes.  These  are  made  &  controlled  by  related  section  head   or  process  engineer  but  approved  by  Quality  Management  Department.   4. Level   4   Documents:   Checklists,   Process   Validation   Reports   &   PRCs   (Product  Route  Card)/OARCs  (Operation  Analysis  Route  Card):  These   are   mostly   the   records   maintained   to   keep   control   on   product/process   quality  and  traceability.  Traceability  is  very  important  parameters,  which   is  required  for  Aerospace  Products  as  they  are  very  critical.  By  looking  a   batch  number  or  SL.  No  of  a  product  we  should  be  able  to  find  all  related   checklist,   PRC   (Product   Route   card)/OARC   (Operation   Analysis   Route   Card)  and  reports  with  details  as  who  was  the  operator  and  who  was  the   inspector  responsible.   The  difference  between  PRC  &  OARC  is  that  PRC  only  records  the  details   of   the   precedence   activities   done   on   project   and   by   whom.   Where   else   OARC  is  an  ERP  generated  document,  which  gives  instructions  and  also   records   the   details   of   the   precedence   activities   done   on   project   and   by   whom.  
  • 16. 16   Guide  for  implementing  AS9100  Rev  C       Above   illustration   shows   a   sample   checklist,   which   fulfills   all   requirements   of   AS9100  Rev  C.   All  level  3  &  4  documents  needed  to  be  upgraded  as  and  when  the   product  requirement  change.  All  these  documents  are  to  be  linked  to   Level  3  &  4  documents  by  a  unique  reference  number,  which  reflect   the  revision  number  and  date  of  revision.   All  Level  1,  2  ,3  &  4  documents  are  controlled  copies  and  are  needed  to  be   controlled  by  designated  authority  that  will  be  responsible  for  them.  Also   they  are  auditable  and  the  documents  are  to  be  retained  for  a  minimum   period   of   5   years   or   as   defined   in   P.O.   (Production   Order)   terms   by   customer  which  ever  is  minimum.   All  documents  needed  to  be  complete  and  ensured  that  no  loopholes  are  left.   It  is  said  for  AS9100  documentation  “They  say  what  you  do  and  you  do  what   they  say”.         QUALITY(MANAGEMENT/_____( ((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((Ref:(No:(12345Crimp/CKL/V(0(( (((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((Date:( Crimping(Tool(Part(No:. ( ( (Tool(Sl.No.( Locater(PN: ( ( ( (Locater(PosiLon:( Contact(PN: ( ( ( (Wire(Size( UTM(Asset(No:. ( ( (((((((((((((((((((((((((((((((((((((UTM(CalibraLon(Date:( ( Procedure:( 1.Annexure(1((Crimping(Process(validaLon(((Ref(PQRS/ABC/QP/IXYZVO:(dt:( 2.(Five(samples(of(plug(to(be(crimped.( 3.(Five(samples((of(socket(pins(to(be(crimped.( 4.(Every(week(on(Monday(this(acLvity(to(be(done.( 5.(A^er(Samples(are(collected(they(are(to(be(sent(to(MTD,(QA(for(pull(test(with(SAP(request.( 6.(Collect(the(reports(from(MTD,QA(and(verify(if(they(are(meeLng(the(requirements(and(collect(the(samples.( 7.(If(reading(are(meeLng(proceed(to(next(step(els(go(to(step(1(and(repeat(the(acLvity(unless(required(results(are(achieved.( 8.(Visually(inspect(the(samples(before(pull(test(and(mark(them(with(SL.Nos.( 9.Insepct(the(samples(a^er(pull(test(and(fill(Table(1.( ( Sl# No. Sample#Details Visual#Inspec4on# before#pull#test Type#of#separa4ons# observed. Pull force Applied 1 Plug(pin(sample(1 2 Plug(pin(sample(2 3 Plug(pin(sample(3 4 Plug(pin(sample(4 5 Plug(pin(sample(5 6 Socket(pin(sample(1 7 Socket(pin(sample(2 8 Socket(pin(sample(3 9 Socket(pin(sample(4 10 Socket(pin(sample(5 Type#of#separa4on Deno4on Slip((Pull(out) A Conductor(broken(in(crimp(area. B Contact(broken(in(crimp(area. C Conductor(broken(outside(crimp(area. D Contact(broken(outside((crimp(area. E Any(other(defect((Specify(in(Remarks) F Remarks# Inspector( Name:( Staff(No( Operator( Name:( Staff(No:(
  • 17. Guide  for  implementing  AS9100  Rev  C   17     Step  8:  Draft  QMSP  (Level  1  Document)   Take   help   of   department   heads   and   give   responsibility   to   each   related   team   member  of  related  department  to  formulate  module  for  his/her  department.  It’s   the   responsibility   of   Team   Lead/Head   to   verify   and   compile   the   QMSP   as   a   complete  document.   Once   QMSP   is   finalized   discuss   it   with   the   registrar/auditor   and   take   his   feedback.     Step  9:  Training   Plan  for  awareness  training  for  the  entire  organization,  better  to  be  done  in   modules  such  as  for  QM,  Production  Control,  Engineering,  Manufacturing,   Marketing,  Material  management,  Plant  Maintenance,  Finance,  Purchase,  Sub-­‐ contract  &  Human  Resource  etc.   Better  keep  QM  all  levels  (1,2  &3)  documents  ready  so  that  they  may  use  them  as   sample  documents  and  related  persons  can  make  their  own  level  2  &  3  level   documents.   Step  10:  Level  2  ,3  &4  level  Documents   These  documents  are  to  be  prepared  by  related  department  heads  &   process/line  in-­‐charge  or  engineers.  It  is  responsibility  of  the  representative  of   department  in  AS9100  implementation  team  to  scrutinize  and  help  in   development  of  these  documents.     Step  11:  Implement  your  Quality  Management  System   Once   the   foundations   have   been   laid,   you   should   implement   your   quality   management  system.  Its  important  that  you  make  the  process  owners  and  the   operators  believe  in  the  new  system.  They  should  be  trained  and  told  how  it  will   beneficial   for   them.   AS9100   requires   lots   of   records   to   me   maintain   and   the   operators  and  process  owners  have  lot  of  Inertia  to  do.  They  think  it  is  done  to   keep  check  on  them  and  will  be  used  as  evidence  against  them.  
  • 18. 18   Guide  for  implementing  AS9100  Rev  C     We  should  make  them  very  clear  that  it  is  only  for  process  improvement.  AS9100   gives   us   process   approach.   We   should   always   remember   no   operator   or   process   owner   commits   a   mistake   deliberately   is   always   a   loophole   in   process,   which   has   made   him   commit   mistake,   so   make   process   perfect.     If   you   can   understand   the   above   statement   you   got   the   real   understanding   of   AS9100  that  its  never  about  product/people  its  only  about  process  you  follow.     Step  12:  Invite  registrar/auditor  for  a  pre-­‐assessment   A  pre-­‐assessment  normally  takes  place  about  6  weeks  into  the  implementation   of  the  quality  system.  The  purpose  of  the  pre-­‐assessment  is  to  identify  areas   where  you  may  not  be  operating  to  the  standard.  This  allows  you  to  correct  any   areas  of  concern  you  may  have  before  the  initial  assessment.  Take  their  feedback   and  implement.     Step  13:  Gain  registration   Once   the   preparation   and   implementation   has   been   completed,   registration   to   the  standard  can  take  place.  The  key  to  this  is  a  registration  assessment.  During   this   process,   the   registrar   will   comprehensively   review   your   management   system,  and  should  you  pass,  you  will  be  recommended  for  registration  and  be   awarded  your  certificate.     You  need  a  Management  Representative  on  behalf  of  senior  management  he  may   be  an  Additional  General  Manager/  COO.     Certification  allows  you  to  advertise  your  success  and  promote  your  business   and  its  commitment  to  quality  management.     Step  14:  Continual  assessment   Maintaining   your   registration   requires   only   that   you   continue   to   use  and   be   committed   to   your   quality   system.   This   will   be   periodically   checked   by   your   registrar  it  can  be  done  bi-­‐annually  or  annually.  But  number  of  man-­‐days  fixed   for  a  year  for  assessment  is  constant.    
  • 19. Guide  for  implementing  AS9100  Rev  C   19     Beside  that  you  need  to  do  minimum  of  two  internal  audits  as  per  the  schedule   or  frequency  defined  in  QMSP.   Once   you   are   certified   you   will   receive   a   score   and   you   should   always   try   to   improve   upon   the   score.   You   can   use   the   AS9100   certified   logo   and   show   the   entire  industry  about  your  capabilities.       Conclusion:     I  sincerely  hope  that  this  document  has  definitely  brought  some  clarity  about  the   process  of  implementing  AS9100  Rev  C  in  your  own  organizations,  cleared  some   apprehensions  about  AS9100  Rev  C.   One  thing  I  will  assure  you  that  if  you  implement  AS9100  Rev  C  and  make  the   install  systems  that  meet  the  requirement,  life  will  be  very  easy  for  you.  Initial   cost  of  implementation  can  be  a  bit  high  but  you  can  see  the  returns  within  5   years.  One  of  the  best  ways  to  maintain  AS9100  Rev  C  system  is  by  implementing   ERP  systems.  It  will  reduce  your  record  keeping  and  standardize  the  processes   as  well.         ***                                        
  • 20. 20   Guide  for  implementing  AS9100  Rev  C     Compiled  By:         MBA from IIM Shillong with 5 Years of Experience in Aerospace /Electronics Industry (Quality & Production) ASHISH JUDE MICHAEL !  5 years of experience in Quality, Manufacturing & SCM activities of Aerospace /Electronics Industry. !  One Year MBA in International Business from Indian Institute Of Management, Shillong and a Mechanical Engineering Graduate. !  Worked with companies such as Bharat Electronics Ltd, ITC Ltd. !  Served clients such as Boeing, UTC, Indian Air Force, Indian Navy. !  Worked on prestigious Light Combat Aircraft (LCA) Project which is of national importance. Skill Set: TQM, AS9100, ISO14001,ISO9001,AS9102, 8D, SPSS, Mini-Tab, PPAP,FMEA, GAP Analysis, APQP, RRCA, Quality Clinic, Project Management, Kaizen, LEAN manufacturing, SPC, Vendor Management, Process Improvement, Poka-Yoke, Benchmarking, FAI, Production Management, Cross Culture Team Management, Negotiation Skills.