Quality Management System
ISO 9001:2015 Implementation
kick off
Stimulus Consultancy Services Date- 17 Feb-2017
Agenda
QMS implementation kick off Meet
Quality Team
Mr Anupam Ray
( Quality Manager)
Mr XX
( Project Manager- QMS)
Mr. AKT
(Consultant- Quality )
External Consultant
Stimulus consultancy services
Certification Body
XXX
Quality is not an act, but a habit…
• Goal: to re-orient the team towards quality improvement and
process standardization. We want to continue our effort in
pushing quality to the forefront of everything we do.
What is Quality Management System ?
Quality management refer to, what the organization does
to-
• Ensure that its products and services satisfy the
quality requirements
• Comply with any regulations applicable to those
and services
• Enhance customer satisfaction
• Achieve continual improvement of its process
Objective Policy
Processes
“A system to direct and control an organization
with respect to quality !”
QMS expressed as the organizational goal and
aspirations
Quality management System
QMS Team will..
• Facilitate to implement ISO 9001:2015 standard within
organization
• Liaison with certification body and consultant for
organization
• Trained SPOCs (Single Point of contact) from each
/function to make implementation effective
• Assign start date and end date of each task.
• Coordinate and lead the ISO implementation project
SPOCs will
• Ensure awareness of QMS within the team
• Be single point of contact for particular process/
• Share daily progress report to Top management and
Team.
• Ready and available for Internal audit and other related
task.
• Be responsible for QMS implementation apart from
regular work
5 Major Steps for Implementation
• Preparation ( Gap Analysis etc.)
• Defining Quality processes.
• Implementation, training and work Instructions.
• Internal Audit
• Certification process
Preparation
• Gap Analysis
• Select SPOCs
• Familiarize team with ISO 9001.
• Determine scope of certification.
• Define Quality policy.
• Establish Quality objective
Quality and Standardization process
• Quality manual
• Quality Procedures
• Control of documented Information
• Internal Audit
• Control of nonconformity products
• CAPA
• Process flow chart
• Work Instructions
• Forms/ Template and checklist
Implementation, training and work
Instructions
• Quality and procedures manual are understood and
implemented throughout the organization.
• QMS awareness and Internal auditor training
• Work process are reviewed.
• Work process are improved.
• Documentation.
Internal Audit
• Audits are performed internally by SPOCs and/or
consultant.
• Designed to ensure continued quality effort.
• Identify any problem and nonconformity in the system
Certification
• Stage-1 Audit- document adequacy check
• Stage-2 Audit - Physical audit, Auditor will check evidence
of all process.
• If certification audit fail- Follow up audit
Time involved.
Time: depends upon these parameters:
• Size of the organization
• Number of site onsite and off site location
• Selection of certification body
Selection of certification body
• Certification body should be internationally recognized
• Should have experience to audit same kind organization
• Should have client base and acceptance globally
• Should be accredited by any IAF member accreditation
board.
QMS Implementation benefits
ISO requirements are ways to implement a sustainable and
effective quality management system within a company
A quality management system will
• Increase efficiency
• Lower costs
• Reduce rework
• Increase customer satisfaction
• Which will translate into increased profitability.
Project Objectives and Rationale:
 Achieve and maintain compliance with the requirements of
the ISO 9001:20015 standards
 Create consistency in quality management processes across
the organisation
 Providing increased level of accountability for staff in
contributing to the management of quality, safety and risk
 Improve audit trail and records/evidence keeping of how
quality processes are managed
 Ensure KPI’s/benchmarks are measured
Sr.
No. Activity
Days
Required Tentative Starting Date Last Date
1 Gap Analysis 7 Days 17-Feb-2017 27- Feb-2017
2 Identify Requirements 10 Days 28-Feb-2017 14-March-2017
3 Define scope 5 Days 15-March-2017 21-March-2017
4 Define procedure and process 15 Days 22-March-2017 11-April-2017
5 Implement Procedure and process 15 Days 12-April-2017 02- May-2017
6 Training and awareness 20 Days 03- May-2017 31- May-2017
7 Preparation for Internal audit 10 Days 01-June-2017 14-June-2017
8 Internal Audit 12 Days 15-June-2017 30-June-2017
9 Action plan for NC of IA 5 days 03-July-2015 07-July-2017
10 Closing of NCs 15 Days 10-July-2017 28-July-2017
11 Management Review Meeting 3 Days 31-July-2017 02-Aug-2017
12 Again Internal Audit Optional 10 Days 03-Aug-2017 17-Aug-2017
13 Call for Stage 1 Audit
14 Closing of NC if any
15 Call for Stage 2 Audit
Project Milestones
Start Date- 17-Feb-2017
Go-Live date- 30- August-2017
.
Risk Mitigation strategies
Key stakeholders are not
engaged and committed to
the project
• Authorised project plan
• Commitment of resources to
system setup
• Employee training
Communication about project
and software tool is not
effective
Employee meeting presentation by
Project Sponsor/Project Manager
Project milestones are not met Project plan and milestone
reporting
Project sponsor accountability
Project scope and deliverables
not understood by top
management
Authorised project plan
Risk Management
Assumptions and constraints:
 Managers and employee are committed to
supporting the implementation of the QMS in new
business processes.
 Commitment of top management towards Quality
management system
 Organization will strive for continual quality
improvement.
 SPOCs and other concern person will take extra
responsibility in implementation of QMS apart from
their daily operational work.
Contact for QMS Implementation for any
location
Email:- anupam@scs-groups.com,
anupam.ray951@gmail.com
Skype- anupam.rai3
Linkedin Id :
https://www.linkedin.com/in/anupam-ray-
059a112a/
Mobile:- 91-9999-133-689

More Related Content

What's hot

What's hot (20)

ISO 9001:2015 Awareness
 ISO 9001:2015 Awareness  ISO 9001:2015 Awareness
ISO 9001:2015 Awareness
 
Introduction to 9001 2015
Introduction to  9001 2015 Introduction to  9001 2015
Introduction to 9001 2015
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management System
 
ISO 9001: 2015
ISO 9001: 2015ISO 9001: 2015
ISO 9001: 2015
 
Iso9001training slide
Iso9001training slideIso9001training slide
Iso9001training slide
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 
Iso9001 2015
Iso9001 2015Iso9001 2015
Iso9001 2015
 
Iso 9001
Iso 9001Iso 9001
Iso 9001
 
Risk based thinking
Risk based thinkingRisk based thinking
Risk based thinking
 
Iso Internal Auditor
Iso Internal AuditorIso Internal Auditor
Iso Internal Auditor
 
Iso 9001 2015
Iso 9001 2015 Iso 9001 2015
Iso 9001 2015
 
ISO 9001:2015 Audit Checklist Preview
ISO 9001:2015 Audit Checklist PreviewISO 9001:2015 Audit Checklist Preview
ISO 9001:2015 Audit Checklist Preview
 
IMS Training Presentation
IMS Training PresentationIMS Training Presentation
IMS Training Presentation
 
QMS Principles ISO 9001 2015
QMS Principles ISO 9001 2015QMS Principles ISO 9001 2015
QMS Principles ISO 9001 2015
 
ISO 9001:2015 (QMS) Awareness Training
ISO 9001:2015 (QMS) Awareness TrainingISO 9001:2015 (QMS) Awareness Training
ISO 9001:2015 (QMS) Awareness Training
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
ISO 9001:2015
ISO 9001:2015ISO 9001:2015
ISO 9001:2015
 
ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions ISO 9001:2015 - Greendot Management Solutions
ISO 9001:2015 - Greendot Management Solutions
 
PRESENTATION ON ISO - 9001, 14001, & 45001 Clause - 5
PRESENTATION ON ISO - 9001, 14001, & 45001  Clause - 5 PRESENTATION ON ISO - 9001, 14001, & 45001  Clause - 5
PRESENTATION ON ISO - 9001, 14001, & 45001 Clause - 5
 
Iso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklistIso 9001-internal-audit-checklist
Iso 9001-internal-audit-checklist
 

Similar to Qms kick off meeting ppt

QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptxQMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
infoqtc
 
Managing software quality in an organization lecture 3
Managing software quality in an organization lecture 3Managing software quality in an organization lecture 3
Managing software quality in an organization lecture 3
Abdul Basit
 
Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMS
Arefin Khan
 

Similar to Qms kick off meeting ppt (20)

QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
 
QMS - GUIA PARA GESTION DE CALIDAD
QMS - GUIA PARA GESTION DE CALIDADQMS - GUIA PARA GESTION DE CALIDAD
QMS - GUIA PARA GESTION DE CALIDAD
 
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMSISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
 
Internal_Audit_Presentation.pptx
Internal_Audit_Presentation.pptxInternal_Audit_Presentation.pptx
Internal_Audit_Presentation.pptx
 
Introduction to ISO 9001-2008
Introduction to ISO 9001-2008Introduction to ISO 9001-2008
Introduction to ISO 9001-2008
 
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptxQMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
QMS UNDERSTANDING & IMPLEMENTING ISO 9001 2015.pptx
 
Learning from experience: Collaborative Journey towards CMMI
Learning from experience: Collaborative Journey towards CMMILearning from experience: Collaborative Journey towards CMMI
Learning from experience: Collaborative Journey towards CMMI
 
TAVHARE KISAN SOPAN RESUME EDITED ON 21122021.pdf
TAVHARE KISAN SOPAN RESUME EDITED ON 21122021.pdfTAVHARE KISAN SOPAN RESUME EDITED ON 21122021.pdf
TAVHARE KISAN SOPAN RESUME EDITED ON 21122021.pdf
 
Iso and tqm
Iso and tqmIso and tqm
Iso and tqm
 
How to realize Quality Management System as a Startup
How to realize Quality Management System as a StartupHow to realize Quality Management System as a Startup
How to realize Quality Management System as a Startup
 
9001 15 awareness v
9001 15 awareness v 9001 15 awareness v
9001 15 awareness v
 
Managing software quality in an organization lecture 3
Managing software quality in an organization lecture 3Managing software quality in an organization lecture 3
Managing software quality in an organization lecture 3
 
Awareness on QMS.pdf
Awareness on QMS.pdfAwareness on QMS.pdf
Awareness on QMS.pdf
 
Guide for the implementation of a Quality management
Guide for the implementation of a Quality managementGuide for the implementation of a Quality management
Guide for the implementation of a Quality management
 
Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMS
 
30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committee
 
Continuous Quality Improvement (CQI)
Continuous Quality Improvement (CQI)Continuous Quality Improvement (CQI)
Continuous Quality Improvement (CQI)
 
Understanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratoriesUnderstanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratories
 
QMS & ISO 9001:2000
QMS & ISO 9001:2000QMS & ISO 9001:2000
QMS & ISO 9001:2000
 

Recently uploaded

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 

Recently uploaded (20)

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 

Qms kick off meeting ppt

  • 1. Quality Management System ISO 9001:2015 Implementation kick off Stimulus Consultancy Services Date- 17 Feb-2017
  • 3. Quality Team Mr Anupam Ray ( Quality Manager) Mr XX ( Project Manager- QMS) Mr. AKT (Consultant- Quality ) External Consultant Stimulus consultancy services Certification Body XXX
  • 4. Quality is not an act, but a habit… • Goal: to re-orient the team towards quality improvement and process standardization. We want to continue our effort in pushing quality to the forefront of everything we do.
  • 5. What is Quality Management System ? Quality management refer to, what the organization does to- • Ensure that its products and services satisfy the quality requirements • Comply with any regulations applicable to those and services • Enhance customer satisfaction • Achieve continual improvement of its process
  • 6. Objective Policy Processes “A system to direct and control an organization with respect to quality !” QMS expressed as the organizational goal and aspirations Quality management System
  • 7. QMS Team will.. • Facilitate to implement ISO 9001:2015 standard within organization • Liaison with certification body and consultant for organization • Trained SPOCs (Single Point of contact) from each /function to make implementation effective • Assign start date and end date of each task. • Coordinate and lead the ISO implementation project
  • 8. SPOCs will • Ensure awareness of QMS within the team • Be single point of contact for particular process/ • Share daily progress report to Top management and Team. • Ready and available for Internal audit and other related task. • Be responsible for QMS implementation apart from regular work
  • 9. 5 Major Steps for Implementation • Preparation ( Gap Analysis etc.) • Defining Quality processes. • Implementation, training and work Instructions. • Internal Audit • Certification process
  • 10. Preparation • Gap Analysis • Select SPOCs • Familiarize team with ISO 9001. • Determine scope of certification. • Define Quality policy. • Establish Quality objective
  • 11. Quality and Standardization process • Quality manual • Quality Procedures • Control of documented Information • Internal Audit • Control of nonconformity products • CAPA • Process flow chart • Work Instructions • Forms/ Template and checklist
  • 12. Implementation, training and work Instructions • Quality and procedures manual are understood and implemented throughout the organization. • QMS awareness and Internal auditor training • Work process are reviewed. • Work process are improved. • Documentation.
  • 13. Internal Audit • Audits are performed internally by SPOCs and/or consultant. • Designed to ensure continued quality effort. • Identify any problem and nonconformity in the system
  • 14. Certification • Stage-1 Audit- document adequacy check • Stage-2 Audit - Physical audit, Auditor will check evidence of all process. • If certification audit fail- Follow up audit
  • 15. Time involved. Time: depends upon these parameters: • Size of the organization • Number of site onsite and off site location • Selection of certification body
  • 16. Selection of certification body • Certification body should be internationally recognized • Should have experience to audit same kind organization • Should have client base and acceptance globally • Should be accredited by any IAF member accreditation board.
  • 17. QMS Implementation benefits ISO requirements are ways to implement a sustainable and effective quality management system within a company A quality management system will • Increase efficiency • Lower costs • Reduce rework • Increase customer satisfaction • Which will translate into increased profitability.
  • 18. Project Objectives and Rationale:  Achieve and maintain compliance with the requirements of the ISO 9001:20015 standards  Create consistency in quality management processes across the organisation  Providing increased level of accountability for staff in contributing to the management of quality, safety and risk  Improve audit trail and records/evidence keeping of how quality processes are managed  Ensure KPI’s/benchmarks are measured
  • 19. Sr. No. Activity Days Required Tentative Starting Date Last Date 1 Gap Analysis 7 Days 17-Feb-2017 27- Feb-2017 2 Identify Requirements 10 Days 28-Feb-2017 14-March-2017 3 Define scope 5 Days 15-March-2017 21-March-2017 4 Define procedure and process 15 Days 22-March-2017 11-April-2017 5 Implement Procedure and process 15 Days 12-April-2017 02- May-2017 6 Training and awareness 20 Days 03- May-2017 31- May-2017 7 Preparation for Internal audit 10 Days 01-June-2017 14-June-2017 8 Internal Audit 12 Days 15-June-2017 30-June-2017 9 Action plan for NC of IA 5 days 03-July-2015 07-July-2017 10 Closing of NCs 15 Days 10-July-2017 28-July-2017 11 Management Review Meeting 3 Days 31-July-2017 02-Aug-2017 12 Again Internal Audit Optional 10 Days 03-Aug-2017 17-Aug-2017 13 Call for Stage 1 Audit 14 Closing of NC if any 15 Call for Stage 2 Audit Project Milestones Start Date- 17-Feb-2017 Go-Live date- 30- August-2017
  • 20. . Risk Mitigation strategies Key stakeholders are not engaged and committed to the project • Authorised project plan • Commitment of resources to system setup • Employee training Communication about project and software tool is not effective Employee meeting presentation by Project Sponsor/Project Manager Project milestones are not met Project plan and milestone reporting Project sponsor accountability Project scope and deliverables not understood by top management Authorised project plan Risk Management
  • 21. Assumptions and constraints:  Managers and employee are committed to supporting the implementation of the QMS in new business processes.  Commitment of top management towards Quality management system  Organization will strive for continual quality improvement.  SPOCs and other concern person will take extra responsibility in implementation of QMS apart from their daily operational work.
  • 22. Contact for QMS Implementation for any location Email:- anupam@scs-groups.com, anupam.ray951@gmail.com Skype- anupam.rai3 Linkedin Id : https://www.linkedin.com/in/anupam-ray- 059a112a/ Mobile:- 91-9999-133-689