SlideShare a Scribd company logo
1 of 34
of 131
An Effort by:
Arvind Kumar Singh
•26 December 2015 •1•Aerodrome Operating Minima
of 131
References: DGCA Regulation/ICAO Docs
 CAR Section 8-Aircraft Operations-Series C-Part I dated 13-6-2013-
All Weather Operations (AWO)
 ICAO Document - All Weather Operations (DOC 9365)
 ATMC 8 of 2013
 This Civil Aviation Requirement (CAR) provides methodology of
calculating AOM-
 Scheduled, Non-scheduled and General Aviation operators and
 the procedure for obtaining approval of Aerodrome Operating
Minima.
•26 December 2015 •2•Aerodrome Operating Minima
of 131
Aerodrome Operating Minima
 Aerodrome Operating Minima is established
 To ensure desired level of safety in aeroplane operations at
an aerodrome by limiting these operations in specified
weather conditions.
 The weather limits of usability of an aerodrome for
 Take off-
RVR and/or visibility and if necessary cloud conditions
 Landing in precision approach and with vertical guidance –
Visibility and/or RVR and DA/H
 Landing in non –precision-
 Visibility and/or RVR
 MDA/H and,
 If necessary, cloud conditions.
•26 December 2015 •3•Aerodrome Operating Minima
of 131
Categories of Aeroplane
 Vat Speed at threshold based on 1.3 times stall speed
Vso or 1.23 times stall speed Vslg in the landing
configuration at maximum certificated landing mass.
Category of aircraft Speeds (IAS) at threshold (Vat) Kt
A <91
B 91 to 120
C 121 to 140
D 141 to 165
E 166 to 210
•26 December 2015 •4•Aerodrome Operating Minima
of 131
ILS Operations
 CAT I operation
 DA/H  60m(200ft)
 Visibility  800m or RVR  550m
 CAT II operation
 60m(200ft) DA/H  30m(100ft)
 RVR  300m
 CAT III operation
CAT IIIA : DA/H  30m(100ft) and RVR  175m
CAT IIIB : DA/H  15m(50ft) and 175m > RVR 50m
CAT IIIC : No DA/H and No RVR limitations
•5•26 December 2015 •Aerodrome Operating Minima
of 131
Low visibility procedures (LVP)
 Specific procedures
During Categories II and III approaches
and/or low visibility take-offs.
Low visibility take-off (LVTO)
Take-off on a runway where the RVR is less
than 400 m.
•26 December 2015 •6•Aerodrome Operating Minima
of 131
Aerodrome Operating Minima -General
By Indian operators and at Indian aerodromes.
•Normal AOM
• To be applied by scheduled operators.
•Restricted AOM (additives of height and visibility to the normal
AOM)
• By non-scheduled and general aviation operators.
• By PICs when operating to an aerodrome as required by
CAR Section 8 Series O Part II Para 9.4.3.3 (a).
• By PICs till they have gained command experience of 100
hours on type.
•26 December 2015 •7•Aerodrome Operating Minima
of 131
Considerations for Calculation of AOM by Airline
 Type, performance and handling characteristics of the aeroplane
 Composition of the flight crew, their competence and experience
 Dimensions and characteristics of the runway in use
 Adequacy and performance of the available visual and non-
visual ground aids
 Equipment available on the aeroplane for the purpose of
navigation and/or control of the flight path, as appropriate,
during take-off, approach, flare, landing, roll-out and missed
approach
•26 December 2015 •8•Aerodrome Operating Minima
of 131
Considerations for Calculation of AOM by Airline (2)
 Obstacles in the approach, missed approach and the climb-out
areas required for the execution of contingency procedures and
necessary clearance
 Obstacle clearance altitude/height for the instrument approach
procedures
 Means to determine and report meteorological conditions
 Flight technique to be used during the final approach.
•26 December 2015 •Aerodrome Operating Minima
of 131
Commencement and Continuation of Approach
(Approach Ban Policy)
 Shall not commence an instrument approach if the reported RVR/Visibility is
below the applicable minimum.
 After commencing an instrument approach, the reported RVR/Visibility falls
below the applicable minimum, the approach shall not be continued:
 below 1000 ft above the aerodrome; or
 into the final approach segment in the case where the DA/H or MDA/H is
more than 1000 ft above the aerodrome.
 After passing 1000 ft above the aerodrome elevation, the reported
RVR/visibility falls below the applicable minimum, the approach may be
continued to DA/H or MDA/H.
 RVR is not available, RVR values may be derived by converting the
reported visibility.
•26 December 2015 •10•Aerodrome Operating Minima
of 131
Non-precision Approaches.
 All non-precision approaches shall be flown using (CDFA)
technique
 Calculating the minima the operator shall ensure that
 Applicable minimum RVR is increased
 by 200m for Cat A/B aeroplanes and
 by 400m for Cat C/D
 aeroplanes for approaches not flown using the
CDFA technique,
 providing that the resulting RVR/CMV value does not
exceed 5000m.
•26 December 2015 •11•Aerodrome Operating Minima
of 131
Multiple RVR
 The touch-down zone RVR is always
controlling.
 Mid-point and stop-end RVR are
also controlling.
 Minimum RVR value for the mid-
point is 125 m or the RVR required
for the touch-down zone if less, and
50 m for the stop-end.
 For aeroplanes equipped with a
stop-end (roll-out) guidance or
control system, the minimum RVR
value for the mid-point is 50 m.
The values in bold font are required for the
type of operation.
•26 December 2015 •12•Aerodrome Operating Minima
of 131
CMV/Derived RVR
 In cases where theRVR is not reported, a pilot may derive
RVR/CMV by using a mathematical conversion depending upon
type of approach lighting and day/night conditions.
 RVR/CMV may be used to commence or continue an approach to
the applicable DA/MDA.
 The minimum length of approach lights for application of CMV-
420m.
•26 December 2015 •13•Aerodrome Operating Minima
of 131
CMV/Derived RVR (2)
 An Operator should ensure that a meteorological visibility to RVR
conversion is not used;
 for take-off
 for calculating any other required RVR minimum less than 800 m
 for visual/circling approaches
 when reported RVR is available
 RVR is reported above the maximum value, e.g. “RVR more than 1500 metres”, it is
not considered to be a reported value of RVR.
 CMV is not to be used for any RVR minimum below 800m.
 May be used for a visibility minimum of 800m,
 if the reported visibility is below 800m and the RVR is not reported or not
available.
•26 December 2015 •14•Aerodrome Operating Minima
of 131
CMV/Derived RVR Calculation (Table 1 CAR)
•26 December 2015 •15•Aerodrome Operating Minima
of 131
Low Visibility Operations — Aerodrome
Considerations
 An operator shall not use an aerodrome for Category II or
III operations unless the aerodrome is approved for such
operations.
 An operator shall verify that low visibility procedures
(LVP) have been established, and will be enforced, at
those aerodromes where low visibility operations are to
be conducted.
 PIC shall satisfy that LVPs are in force according to
information received from Air Traffic Services, before
commencing a low visibility take-off.
•26 December 2015 •16•Aerodrome Operating Minima
of 131
Aerodrome Operating minima - Landing
Normal Aerodrome Operating Minima
 Calculated based on the latest information of airport
facilities, procedures and OCAs.
Restricted Aerodrome Operating Minima.
 Restricted AOM shall be based on additives applied to the
Normal AOM as
Restricted AOM = Normal AOM DA(H)/MDA (H) + 100 ft
and normal AOM Visibility/RVR + 400 m .
•26 December 2015 •17•Aerodrome Operating Minima
of 131
Visual Reference
 A pilot may not continue an approach below MDA/MDH
unless at least one of the following visual references for
the intended runway is distinctly visible and identifiable
to the pilot:
elements of the approach light system;
threshold;
threshold markings;
threshold lights;
threshold identification lights;
visual glide slope indicator;
touchdown zone or touchdown zone markings;
touchdown zone lights;
runway edge lights
•26 December 2015 •18•Aerodrome Operating Minima
of 131
Approach Lighting System – Class of facility
•26 December 2015 •19•Aerodrome Operating Minima
of 131
System Minima (Table 3-CAR)
•26 December 2015 •20•Aerodrome Operating Minima
of 131
Required RVR/Visibility
(m) = [(DH/MDH (ft) x
0.3048) / tanα] - length of
approach lights (m)
 where α is the calculation
angle, being a default
value of 3.00° increasing
in steps of 0.10° for
each line in Table 5 up
to 3.77° and then
remaining constant.
Calculation of Minima
•26 December 2015 •21•Aerodrome Operating Minima
of 131
Failed or Downgraded Equipment – Effect on
Landing Minima
•26 December 2015 •22•Aerodrome Operating Minima
of 131
Failed or Downgraded Equipment – Effect on
Landing Minima
•26 December 2015 •23•Aerodrome Operating Minima
of 131
Use of RVR 750M for Cat-I operations
An RVR less than 750 m as indicated in Table 4 may be used
for:
• Cat-I operations to runways with FALS, runway touchdown
zone lights (RTZL) and runway centre line lights (RCLL); or
• Cat-I operations to runways without RTZL and RCLL when
an approved HUDLS, or equivalent approved system, or
when conducting a coupled approach or flight-director-
flown approach to the DH; or
• RNAV with approved vertical guidance approach procedures
to runways with FALS, RTZL and RCLL when using an
approved HUD
•26 December 2015 •24Aerodrome Operating Minima
of 131
Visual Approach
 Higher of the associated non-precision approach minima
or minimum visibility/RVR of
 2800 m for Category A/B aeroplanes,
 3200 m for Category C aeroplanes and
 3600 m for Category D aeroplanes.
 If visual approach is requested for a runway which has
only a circling approach, the ground visibility shall not be
less than 5 Km.
26 December 2015 25Aerodrome Operating Minima
of 131
 Circling approach and the associated minima will be authorized
for Operators by Flight Standards Directorate as per the training
programme implemented by Operators.
Circling Approach
•26 December 2015 •26•Aerodrome Operating Minima
of 131
Aerodrome Operating Minima – Take off
 Take-off minima expressed as
Visibility or RVR limits,
Factors for each aerodrome planned to be used and
 Aeroplane characteristics.
 Specific need to see and avoid-
Obstacles on departure,
Cloud base limits.
•26 December 2015 •27•Aerodrome Operating Minima
of 131
Aerodrome Operating Minima – Take off
 Avoidance of such obstacles may be accomplished by
Alternate procedural means, such as use of climb
gradients or specified departure paths,
Cloud base restrictions need not be applied.
 Availability of air traffic services to ensure separation of
aircraft and timely and accurate provision of weather,
NOTAM, and other safety information
•26 December 2015 •28•Aerodrome Operating Minima
of 131
RVR/Visibility for Take-off (Commercial Transport
Aeroplanes)
•26 December 2015 •29•Aerodrome Operating Minima
of 131
Procedure as per ATMC 08 of 2013
 Ensure that “Aerodrome operating Minima” of the airport
concerned published by AAI are available in all ATC Units.
 Subject to provisions of the CAR, the ‘AOM ’ of Airlines may be
lower than the minima published by AAI
 The current visibility and RVR and any significant changes shall be
passed
 When Visibility/RVR is at or above the AAI published Minima for
the instrument approach, the arriving aircraft may be cleared for
the approach.
 When Visibility/RVR is below the AAI published Minima for the
instrument approach, the ATCO shall check the minima from the
aircraft;
 If the Visibility/RVR is above the minima reported by the aircraft,
the aircraft may be cleared for the approach.
•26 December 2015 •30•Aerodrome Operating Minima
of 131
Procedure as per ATMC 08 of 2013
 If the Visibility/RVR is below the minima reported by the
aircraft, the aircraft shall be asked for its intentions;
 If the aircraft reports intention to continue the flight for
landing.
 The ATCO shall issue clearance using following
phraseology:
CLEARED FOR (type of approach) APPROACH [RUNWAY
(number)] SUBJECT TO MINIMA.
 In such case, when aircraft makes an approach, a log entry
shall be made.
Occurrence reporting form (Annexure A) shall be
completed by the concerned ATCO and submitted to ATS in-
charge through WSO.
The ATS In-charge, after verification, shall send such
occurrence report to DGCA and ED (ATM).
•26 December 2015 •31•Aerodrome Operating Minima
of 131
Procedure as per ATMC 08 of 2013
 Aircraft reports intention to hold for improvement of
weather, or to divert to an alternate aerodrome,
Appropriate clearances shall be issued
 Visibility/RVR reduces below the AAI published Minima
after the arriving aircraft has commenced approach, ATCO
shall immediately pass the current visibility / RVR to the
aircraft.
 The aircraft is expected to follow the provisions of CAR
and take appropriate actions. If aircraft reports its
intention to continue approach, landing clearance may be
issued at the appropriate time.
•26 December 2015 •32•Aerodrome Operating Minima
of 131
•26 December 2015 •33•Aerodrome Operating Minima
of 131
END
•26 December 2015 •34Aerodrome Operating Minima

More Related Content

What's hot

Implementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptxImplementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptxARVIND KUMAR SINGH
 
9. approach and landing
9. approach and landing9. approach and landing
9. approach and landingchococrispis37
 
Lecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towerLecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towertitu11
 
Air traffic control & air navigation
Air traffic control & air navigationAir traffic control & air navigation
Air traffic control & air navigationKelvin Lam
 
Cat iii presentation
Cat iii presentationCat iii presentation
Cat iii presentationAmit Kumar
 
Instrument landing system
Instrument landing system Instrument landing system
Instrument landing system Itchan Urbano
 
Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)ARVIND KUMAR SINGH
 
Air Traffic Control and Nav Aids
Air Traffic Control and Nav AidsAir Traffic Control and Nav Aids
Air Traffic Control and Nav AidsEmmanuel Fuchs
 
Airspace Classification
Airspace ClassificationAirspace Classification
Airspace Classificationalpha_sherdil
 
Instrument approach procedures GSR 751 E provision & PANS OPS ops
Instrument approach procedures GSR 751 E provision & PANS OPS  opsInstrument approach procedures GSR 751 E provision & PANS OPS  ops
Instrument approach procedures GSR 751 E provision & PANS OPS opsARVIND KUMAR SINGH
 
Air Traffic Control
Air Traffic ControlAir Traffic Control
Air Traffic ControlParth Desani
 
Traffic alert and Collision Avoidance System
Traffic alert and Collision Avoidance System Traffic alert and Collision Avoidance System
Traffic alert and Collision Avoidance System greeshma6225
 
Procedure for Safe Ground Handling Practices - (Sample for Edition)
Procedure for Safe Ground Handling Practices - (Sample for Edition)Procedure for Safe Ground Handling Practices - (Sample for Edition)
Procedure for Safe Ground Handling Practices - (Sample for Edition)Andrew Louis
 
Ramp safety officer
Ramp safety officerRamp safety officer
Ramp safety officerAd Suryana
 
V.o.r ppt
V.o.r pptV.o.r ppt
V.o.r pptbtinus
 
FAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield ConstructionFAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield Constructionoffthewallsafety
 

What's hot (20)

Atc complete unit
Atc complete unitAtc complete unit
Atc complete unit
 
Implementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptxImplementation of RNP_PBN Instrument Approach Procedure.pptx
Implementation of RNP_PBN Instrument Approach Procedure.pptx
 
Atc unit 3
Atc unit 3Atc unit 3
Atc unit 3
 
9. approach and landing
9. approach and landing9. approach and landing
9. approach and landing
 
Lecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towerLecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+tower
 
滑空スポーツ講習会2018大阪 グライダーの山岳とウェーブフライト
滑空スポーツ講習会2018大阪 グライダーの山岳とウェーブフライト滑空スポーツ講習会2018大阪 グライダーの山岳とウェーブフライト
滑空スポーツ講習会2018大阪 グライダーの山岳とウェーブフライト
 
Air traffic control & air navigation
Air traffic control & air navigationAir traffic control & air navigation
Air traffic control & air navigation
 
Cat iii presentation
Cat iii presentationCat iii presentation
Cat iii presentation
 
Instrument landing system
Instrument landing system Instrument landing system
Instrument landing system
 
Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)Traffic Alert and collision avoidance system (TCAS)
Traffic Alert and collision avoidance system (TCAS)
 
Air Traffic Control and Nav Aids
Air Traffic Control and Nav AidsAir Traffic Control and Nav Aids
Air Traffic Control and Nav Aids
 
Airspace Classification
Airspace ClassificationAirspace Classification
Airspace Classification
 
Instrument approach procedures GSR 751 E provision & PANS OPS ops
Instrument approach procedures GSR 751 E provision & PANS OPS  opsInstrument approach procedures GSR 751 E provision & PANS OPS  ops
Instrument approach procedures GSR 751 E provision & PANS OPS ops
 
Air Traffic Control
Air Traffic ControlAir Traffic Control
Air Traffic Control
 
Traffic alert and Collision Avoidance System
Traffic alert and Collision Avoidance System Traffic alert and Collision Avoidance System
Traffic alert and Collision Avoidance System
 
ATC
ATCATC
ATC
 
Procedure for Safe Ground Handling Practices - (Sample for Edition)
Procedure for Safe Ground Handling Practices - (Sample for Edition)Procedure for Safe Ground Handling Practices - (Sample for Edition)
Procedure for Safe Ground Handling Practices - (Sample for Edition)
 
Ramp safety officer
Ramp safety officerRamp safety officer
Ramp safety officer
 
V.o.r ppt
V.o.r pptV.o.r ppt
V.o.r ppt
 
FAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield ConstructionFAA Safety Requirements for Airfield Construction
FAA Safety Requirements for Airfield Construction
 

Similar to Aerodrome Operating Minima

Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...IBAS International Brazil Air Show
 
Proposed RWY21 RESA at YIA
Proposed RWY21 RESA at YIAProposed RWY21 RESA at YIA
Proposed RWY21 RESA at YIAKozarni Koko
 
Presentation1
Presentation1Presentation1
Presentation1alsats
 
Rcapa proposal2
Rcapa proposal2Rcapa proposal2
Rcapa proposal2sUAS News
 
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).IHSTFAA
 
Terminal Part 2
Terminal Part 2Terminal Part 2
Terminal Part 2tomrickard
 
Visual approach
Visual approachVisual approach
Visual approachAbuRoma
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures PROuD Project
 
Const cranes 9 3 10
Const cranes 9 3 10Const cranes 9 3 10
Const cranes 9 3 10vtsiri
 
uav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.pptuav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.pptTESTFALTU
 
uav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.pptuav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.pptyomafi9978
 
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdfFLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdfssuser1edd921
 
IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit' IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit' Stephen Clouston
 

Similar to Aerodrome Operating Minima (20)

FINAL ROPS (1).pptx
FINAL ROPS (1).pptxFINAL ROPS (1).pptx
FINAL ROPS (1).pptx
 
Atc unit 2
Atc unit 2Atc unit 2
Atc unit 2
 
Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
Sergio Martins - AIR TRAFFIC CONTROL WORKSHOP - Panel 3: Air traffic control ...
 
Separation Standard
Separation StandardSeparation Standard
Separation Standard
 
Proposed RWY21 RESA at YIA
Proposed RWY21 RESA at YIAProposed RWY21 RESA at YIA
Proposed RWY21 RESA at YIA
 
Presentation1
Presentation1Presentation1
Presentation1
 
2.2-2 Egypt B0-SURF
2.2-2 Egypt B0-SURF2.2-2 Egypt B0-SURF
2.2-2 Egypt B0-SURF
 
Rcapa proposal2
Rcapa proposal2Rcapa proposal2
Rcapa proposal2
 
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
2017 Heli-Expo "Seeing is Believing" (Advanced Vision Systems).
 
Terminal Part 2
Terminal Part 2Terminal Part 2
Terminal Part 2
 
Visual approach
Visual approachVisual approach
Visual approach
 
Using EGNOS in the General Aviation Community
Using EGNOS in the General Aviation CommunityUsing EGNOS in the General Aviation Community
Using EGNOS in the General Aviation Community
 
Seperation Methods & Minima.pdf
Seperation Methods & Minima.pdfSeperation Methods & Minima.pdf
Seperation Methods & Minima.pdf
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures
 
Const cranes 9 3 10
Const cranes 9 3 10Const cranes 9 3 10
Const cranes 9 3 10
 
uav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.pptuav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.ppt
 
uav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.pptuav-presentation-precision-ag-slides.ppt
uav-presentation-precision-ag-slides.ppt
 
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdfFLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
FLIGHT INSPECTION of CNS FACILITIES [Compatibility Mode].pdf
 
01 - Introduction to RNAV.pdf
01 - Introduction to RNAV.pdf01 - Introduction to RNAV.pdf
01 - Introduction to RNAV.pdf
 
IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit' IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit'
 

Recently uploaded

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 

Recently uploaded (20)

80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Aerodrome Operating Minima

  • 1. of 131 An Effort by: Arvind Kumar Singh •26 December 2015 •1•Aerodrome Operating Minima
  • 2. of 131 References: DGCA Regulation/ICAO Docs  CAR Section 8-Aircraft Operations-Series C-Part I dated 13-6-2013- All Weather Operations (AWO)  ICAO Document - All Weather Operations (DOC 9365)  ATMC 8 of 2013  This Civil Aviation Requirement (CAR) provides methodology of calculating AOM-  Scheduled, Non-scheduled and General Aviation operators and  the procedure for obtaining approval of Aerodrome Operating Minima. •26 December 2015 •2•Aerodrome Operating Minima
  • 3. of 131 Aerodrome Operating Minima  Aerodrome Operating Minima is established  To ensure desired level of safety in aeroplane operations at an aerodrome by limiting these operations in specified weather conditions.  The weather limits of usability of an aerodrome for  Take off- RVR and/or visibility and if necessary cloud conditions  Landing in precision approach and with vertical guidance – Visibility and/or RVR and DA/H  Landing in non –precision-  Visibility and/or RVR  MDA/H and,  If necessary, cloud conditions. •26 December 2015 •3•Aerodrome Operating Minima
  • 4. of 131 Categories of Aeroplane  Vat Speed at threshold based on 1.3 times stall speed Vso or 1.23 times stall speed Vslg in the landing configuration at maximum certificated landing mass. Category of aircraft Speeds (IAS) at threshold (Vat) Kt A <91 B 91 to 120 C 121 to 140 D 141 to 165 E 166 to 210 •26 December 2015 •4•Aerodrome Operating Minima
  • 5. of 131 ILS Operations  CAT I operation  DA/H  60m(200ft)  Visibility  800m or RVR  550m  CAT II operation  60m(200ft) DA/H  30m(100ft)  RVR  300m  CAT III operation CAT IIIA : DA/H  30m(100ft) and RVR  175m CAT IIIB : DA/H  15m(50ft) and 175m > RVR 50m CAT IIIC : No DA/H and No RVR limitations •5•26 December 2015 •Aerodrome Operating Minima
  • 6. of 131 Low visibility procedures (LVP)  Specific procedures During Categories II and III approaches and/or low visibility take-offs. Low visibility take-off (LVTO) Take-off on a runway where the RVR is less than 400 m. •26 December 2015 •6•Aerodrome Operating Minima
  • 7. of 131 Aerodrome Operating Minima -General By Indian operators and at Indian aerodromes. •Normal AOM • To be applied by scheduled operators. •Restricted AOM (additives of height and visibility to the normal AOM) • By non-scheduled and general aviation operators. • By PICs when operating to an aerodrome as required by CAR Section 8 Series O Part II Para 9.4.3.3 (a). • By PICs till they have gained command experience of 100 hours on type. •26 December 2015 •7•Aerodrome Operating Minima
  • 8. of 131 Considerations for Calculation of AOM by Airline  Type, performance and handling characteristics of the aeroplane  Composition of the flight crew, their competence and experience  Dimensions and characteristics of the runway in use  Adequacy and performance of the available visual and non- visual ground aids  Equipment available on the aeroplane for the purpose of navigation and/or control of the flight path, as appropriate, during take-off, approach, flare, landing, roll-out and missed approach •26 December 2015 •8•Aerodrome Operating Minima
  • 9. of 131 Considerations for Calculation of AOM by Airline (2)  Obstacles in the approach, missed approach and the climb-out areas required for the execution of contingency procedures and necessary clearance  Obstacle clearance altitude/height for the instrument approach procedures  Means to determine and report meteorological conditions  Flight technique to be used during the final approach. •26 December 2015 •Aerodrome Operating Minima
  • 10. of 131 Commencement and Continuation of Approach (Approach Ban Policy)  Shall not commence an instrument approach if the reported RVR/Visibility is below the applicable minimum.  After commencing an instrument approach, the reported RVR/Visibility falls below the applicable minimum, the approach shall not be continued:  below 1000 ft above the aerodrome; or  into the final approach segment in the case where the DA/H or MDA/H is more than 1000 ft above the aerodrome.  After passing 1000 ft above the aerodrome elevation, the reported RVR/visibility falls below the applicable minimum, the approach may be continued to DA/H or MDA/H.  RVR is not available, RVR values may be derived by converting the reported visibility. •26 December 2015 •10•Aerodrome Operating Minima
  • 11. of 131 Non-precision Approaches.  All non-precision approaches shall be flown using (CDFA) technique  Calculating the minima the operator shall ensure that  Applicable minimum RVR is increased  by 200m for Cat A/B aeroplanes and  by 400m for Cat C/D  aeroplanes for approaches not flown using the CDFA technique,  providing that the resulting RVR/CMV value does not exceed 5000m. •26 December 2015 •11•Aerodrome Operating Minima
  • 12. of 131 Multiple RVR  The touch-down zone RVR is always controlling.  Mid-point and stop-end RVR are also controlling.  Minimum RVR value for the mid- point is 125 m or the RVR required for the touch-down zone if less, and 50 m for the stop-end.  For aeroplanes equipped with a stop-end (roll-out) guidance or control system, the minimum RVR value for the mid-point is 50 m. The values in bold font are required for the type of operation. •26 December 2015 •12•Aerodrome Operating Minima
  • 13. of 131 CMV/Derived RVR  In cases where theRVR is not reported, a pilot may derive RVR/CMV by using a mathematical conversion depending upon type of approach lighting and day/night conditions.  RVR/CMV may be used to commence or continue an approach to the applicable DA/MDA.  The minimum length of approach lights for application of CMV- 420m. •26 December 2015 •13•Aerodrome Operating Minima
  • 14. of 131 CMV/Derived RVR (2)  An Operator should ensure that a meteorological visibility to RVR conversion is not used;  for take-off  for calculating any other required RVR minimum less than 800 m  for visual/circling approaches  when reported RVR is available  RVR is reported above the maximum value, e.g. “RVR more than 1500 metres”, it is not considered to be a reported value of RVR.  CMV is not to be used for any RVR minimum below 800m.  May be used for a visibility minimum of 800m,  if the reported visibility is below 800m and the RVR is not reported or not available. •26 December 2015 •14•Aerodrome Operating Minima
  • 15. of 131 CMV/Derived RVR Calculation (Table 1 CAR) •26 December 2015 •15•Aerodrome Operating Minima
  • 16. of 131 Low Visibility Operations — Aerodrome Considerations  An operator shall not use an aerodrome for Category II or III operations unless the aerodrome is approved for such operations.  An operator shall verify that low visibility procedures (LVP) have been established, and will be enforced, at those aerodromes where low visibility operations are to be conducted.  PIC shall satisfy that LVPs are in force according to information received from Air Traffic Services, before commencing a low visibility take-off. •26 December 2015 •16•Aerodrome Operating Minima
  • 17. of 131 Aerodrome Operating minima - Landing Normal Aerodrome Operating Minima  Calculated based on the latest information of airport facilities, procedures and OCAs. Restricted Aerodrome Operating Minima.  Restricted AOM shall be based on additives applied to the Normal AOM as Restricted AOM = Normal AOM DA(H)/MDA (H) + 100 ft and normal AOM Visibility/RVR + 400 m . •26 December 2015 •17•Aerodrome Operating Minima
  • 18. of 131 Visual Reference  A pilot may not continue an approach below MDA/MDH unless at least one of the following visual references for the intended runway is distinctly visible and identifiable to the pilot: elements of the approach light system; threshold; threshold markings; threshold lights; threshold identification lights; visual glide slope indicator; touchdown zone or touchdown zone markings; touchdown zone lights; runway edge lights •26 December 2015 •18•Aerodrome Operating Minima
  • 19. of 131 Approach Lighting System – Class of facility •26 December 2015 •19•Aerodrome Operating Minima
  • 20. of 131 System Minima (Table 3-CAR) •26 December 2015 •20•Aerodrome Operating Minima
  • 21. of 131 Required RVR/Visibility (m) = [(DH/MDH (ft) x 0.3048) / tanα] - length of approach lights (m)  where α is the calculation angle, being a default value of 3.00° increasing in steps of 0.10° for each line in Table 5 up to 3.77° and then remaining constant. Calculation of Minima •26 December 2015 •21•Aerodrome Operating Minima
  • 22. of 131 Failed or Downgraded Equipment – Effect on Landing Minima •26 December 2015 •22•Aerodrome Operating Minima
  • 23. of 131 Failed or Downgraded Equipment – Effect on Landing Minima •26 December 2015 •23•Aerodrome Operating Minima
  • 24. of 131 Use of RVR 750M for Cat-I operations An RVR less than 750 m as indicated in Table 4 may be used for: • Cat-I operations to runways with FALS, runway touchdown zone lights (RTZL) and runway centre line lights (RCLL); or • Cat-I operations to runways without RTZL and RCLL when an approved HUDLS, or equivalent approved system, or when conducting a coupled approach or flight-director- flown approach to the DH; or • RNAV with approved vertical guidance approach procedures to runways with FALS, RTZL and RCLL when using an approved HUD •26 December 2015 •24Aerodrome Operating Minima
  • 25. of 131 Visual Approach  Higher of the associated non-precision approach minima or minimum visibility/RVR of  2800 m for Category A/B aeroplanes,  3200 m for Category C aeroplanes and  3600 m for Category D aeroplanes.  If visual approach is requested for a runway which has only a circling approach, the ground visibility shall not be less than 5 Km. 26 December 2015 25Aerodrome Operating Minima
  • 26. of 131  Circling approach and the associated minima will be authorized for Operators by Flight Standards Directorate as per the training programme implemented by Operators. Circling Approach •26 December 2015 •26•Aerodrome Operating Minima
  • 27. of 131 Aerodrome Operating Minima – Take off  Take-off minima expressed as Visibility or RVR limits, Factors for each aerodrome planned to be used and  Aeroplane characteristics.  Specific need to see and avoid- Obstacles on departure, Cloud base limits. •26 December 2015 •27•Aerodrome Operating Minima
  • 28. of 131 Aerodrome Operating Minima – Take off  Avoidance of such obstacles may be accomplished by Alternate procedural means, such as use of climb gradients or specified departure paths, Cloud base restrictions need not be applied.  Availability of air traffic services to ensure separation of aircraft and timely and accurate provision of weather, NOTAM, and other safety information •26 December 2015 •28•Aerodrome Operating Minima
  • 29. of 131 RVR/Visibility for Take-off (Commercial Transport Aeroplanes) •26 December 2015 •29•Aerodrome Operating Minima
  • 30. of 131 Procedure as per ATMC 08 of 2013  Ensure that “Aerodrome operating Minima” of the airport concerned published by AAI are available in all ATC Units.  Subject to provisions of the CAR, the ‘AOM ’ of Airlines may be lower than the minima published by AAI  The current visibility and RVR and any significant changes shall be passed  When Visibility/RVR is at or above the AAI published Minima for the instrument approach, the arriving aircraft may be cleared for the approach.  When Visibility/RVR is below the AAI published Minima for the instrument approach, the ATCO shall check the minima from the aircraft;  If the Visibility/RVR is above the minima reported by the aircraft, the aircraft may be cleared for the approach. •26 December 2015 •30•Aerodrome Operating Minima
  • 31. of 131 Procedure as per ATMC 08 of 2013  If the Visibility/RVR is below the minima reported by the aircraft, the aircraft shall be asked for its intentions;  If the aircraft reports intention to continue the flight for landing.  The ATCO shall issue clearance using following phraseology: CLEARED FOR (type of approach) APPROACH [RUNWAY (number)] SUBJECT TO MINIMA.  In such case, when aircraft makes an approach, a log entry shall be made. Occurrence reporting form (Annexure A) shall be completed by the concerned ATCO and submitted to ATS in- charge through WSO. The ATS In-charge, after verification, shall send such occurrence report to DGCA and ED (ATM). •26 December 2015 •31•Aerodrome Operating Minima
  • 32. of 131 Procedure as per ATMC 08 of 2013  Aircraft reports intention to hold for improvement of weather, or to divert to an alternate aerodrome, Appropriate clearances shall be issued  Visibility/RVR reduces below the AAI published Minima after the arriving aircraft has commenced approach, ATCO shall immediately pass the current visibility / RVR to the aircraft.  The aircraft is expected to follow the provisions of CAR and take appropriate actions. If aircraft reports its intention to continue approach, landing clearance may be issued at the appropriate time. •26 December 2015 •32•Aerodrome Operating Minima
  • 33. of 131 •26 December 2015 •33•Aerodrome Operating Minima
  • 34. of 131 END •26 December 2015 •34Aerodrome Operating Minima