Content…
• Introduction
• Dewatering methods
• Suitability of different dewatering methods
Introduction
• Dewatering means removal of excess water from saturated soil.
• Dewatering is a necessary process when it comes to many
construction projects, particularly when the construction is for
underground projects
Dewatering Methods
• Factors such as the type of soil and the nature of the construction
site will all influence which dewatering method will be best suited
to the project.
1. Sumps And Ditches
2. Shallow Well System
3. Deep Well System
4. Well Point System
5. Vacuum Method
6. Cement Grouting
7. Chemical Process
8. Freezing Process
9. Electro-Osmosis Method
Sumps and Ditches
• It is the simplest and most commonly used form of dewatering.
• In this method, shallow pits, called sumps are dug along the
periphery of the area and connected by
drains.
• The water from the slopes flows under
gravity and is collected in sumps from
which it is pumped out.
Shallow Well Dewatering
 A hole of 30 cm diameter or more is bored into the ground to a
depth not more than 10 m below the pump level. A strainer tube of
15 cm diameter is lowered in the bore hole having a casing tube.
 A gravel filter is formed around the strainer tube by gradually
removing the casing tube and simultaneously pouring the filter well
so formed.
 The suction pipe from a number of such wells may be connected to
one common header connected to the pumping unit.
Shallow Well Dewatering
[A typical layout of a shallow well system]
Applications for Shallow Well Dewatering
• Shallow wells can be installed with effective filters which can allow
them to pump ‘clean’ water with much lower levels of suspended
solids compared to sump pumping. This makes it easier to meet
water quality limits at the discharge point.
• Shallow wells, if installed to sufficient depth, can act as a form of
pre-drainage dewatering, where groundwater levels are lowered in
advance of excavation and can be held significantly below current
dig levels.
Deep Well Dewatering
 This system is more suitable when the depth of excavation is more
than the 16m or where artesian water is present.
 15 to 16 cm diameter hole is bored and a casing with a large screen
is provided. A submersible pump is installed near the bottom of the
well.
Deep Well Dewatering
[A typical layout of a deep well system]
Applications for Deep Well Dewatering
 Deep well dewatering is normally suited to relatively deep
excavations where permeability is between moderate (e.g. sands) to
high (e.g. gravels).
 Deep wells can be less effective is in low permeability soils. In these
cases the well yields can be very low. Such low well yields can
make it difficult to select suitable submersible pumps that can
operate reliably and efficiently at low flow rates.
Well Point System
• The main components of a well-point system are:
1. well points
2. Riser pipe
3. Swinger arm
4. Header pipe
5. pumps
Well Point System
• Well points are for lowering water table by 5-6 m in soils with a
coefficient of permeability between 10-4 to 10-6 m/sec.
• The riser is surrounded by a coarse sand filter in order to facilitate
the flow of water towards the well points.
Multi-Stage Well Point System
Multi-stage well point system is suitable for excavations up to 15 m.
Well Point System
Advantages:
• Installation is very rapid. The equipment is reasonably simple and
cheap.
• As water is filtered while removing from the ground, soil particles
are not washed away. Hence, there is no danger of subsidence of the
surrounding ground.
• As the water is drawn away by well points from the excavation, the
sides of excavation are stabilized and steeper side slopes can be
permitted.
Well Point System
Disadvantages:
• Single stage well point system is suitable for lowering water table by 5 to 6
m only. For deeper excavations, where water table is to be lowered for a
depth greater than 6 m, multi-stage well point system is required.
• It is essential to continue pumping once it has been started until the
excavation is complete. If it is stopped in between, it may prove to be
disastrous.
• In case of the ground consisting of stiff clay, gravel or boulders, well points
are installed in drilled holes, which increases the installation cost.
Vacuum System
Cement Grouting
Cement Grouting
• The material commonly used for grout include:
1) Cement And Water
2) Cement, Rock Flour and Water
3) Cement, Clay and Water
4) Cement, Clay, Sand and Water
5) Asphalt
6) Clay And Water
7) Chemicals
Chemical Grouting
• The desirable properties of chemical grouts:
1) It must be able to modify the properties of soil as desired
2) It may either increase the strength or decrease the permeability of
soil
3) It must be cheap, non-toxic, non-explosive
4) It must be in the form of a liquid with low viscosity so that it can be
readily placed in the soil
5) It must be non-corrosive, so that it can be handled with common
pumps and piping
6) It must be possible to control the gel time by suitable means
Chemical Grouting
Inorganic chemicals
• Sodium silicate
• Calcium chloride
• Ligno-chrome
• Ligno sulphate
• They are called silicate grouts
• They are cheaper
Organic chemicals
• Epoxy resins
• Polyester resins
• They are also called resin
grouts
• They possess advantage of low
viscosity, precise control of gel
time and high strength
Advantage
1) It can be used for sealing narrow cracks of about 0.5 mm width
2) It become hard in cold as well as warm temperature
3) It can bond the moist as well as dry surface
4) It has practically the same viscosity as water and hence it can be
injected into any soil and fine cracks into which the water can be
injected
GROUND FREEZING
Advantages and Limitations
Advantages:
• The freezing process is readily accomplished where other methods
may be difficult or impossible.
• The freezing does not affect the current water table.
Limitations:
• The area to be covered by this process should be as small as
possible.
• The freezing process is suited for work of comparatively short
duration.
Electro-Osmosis Process
Suitability of Different Methods of Ground
Water Conditions
METHOD CONDITIONS FOR SUITABILITY
1. Sumps and Ditches For shallow excavations in coarse
grained soils.
2. Well point system Suitable for lowering water table by 5-6
m in soils
3. Bored well system For coarse grained soils and depth of
excavation more than 16 m
4. Vacuum method Draining silty sands and fine sands
5. Cement grouting For coarse materials or rocks with
cracks
6. Freezing process Suitable for excavations in water logged
soils
7. Electro-osmosis process Suitable for fine grained cohesive soils
such as clays
Control of ground water in excavation

More Related Content

What's hot

Durability of concrete
Durability of concreteDurability of concrete
Durability of concreteSelva Prakash
 
SINKING , TILTING AND DISEASE OF CAISSON
SINKING , TILTING AND DISEASE OF CAISSONSINKING , TILTING AND DISEASE OF CAISSON
SINKING , TILTING AND DISEASE OF CAISSONjay lad
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundationSourabh Jain
 
Ground improvement techniques compaction vibration
Ground improvement techniques  compaction vibrationGround improvement techniques  compaction vibration
Ground improvement techniques compaction vibrationAnjana R Menon
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundationsDar Hilal
 
Dewatering
DewateringDewatering
DewateringJNTUK
 
Vibration method for ground improvement technique
Vibration method for ground improvement techniqueVibration method for ground improvement technique
Vibration method for ground improvement techniqueABHISHEK THAKKAE
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSShivananda Roy
 
Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)RAMPRASAD KUMAWAT
 

What's hot (20)

Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
SINKING , TILTING AND DISEASE OF CAISSON
SINKING , TILTING AND DISEASE OF CAISSONSINKING , TILTING AND DISEASE OF CAISSON
SINKING , TILTING AND DISEASE OF CAISSON
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Well foundation
Well foundationWell foundation
Well foundation
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
Ground improvement techniques compaction vibration
Ground improvement techniques  compaction vibrationGround improvement techniques  compaction vibration
Ground improvement techniques compaction vibration
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Dewatering
DewateringDewatering
Dewatering
 
Dewatering
DewateringDewatering
Dewatering
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 
Vibration method for ground improvement technique
Vibration method for ground improvement techniqueVibration method for ground improvement technique
Vibration method for ground improvement technique
 
Compaction of concrete
Compaction of concreteCompaction of concrete
Compaction of concrete
 
Embankment
EmbankmentEmbankment
Embankment
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
 
Grouting
Grouting Grouting
Grouting
 
Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)
 

Similar to Control of ground water in excavation

dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptxCarolTumaneng
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundationashishcivil098
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTUVATSAL PATEL
 
Dewatering process and control in building projects
Dewatering process and control in building projectsDewatering process and control in building projects
Dewatering process and control in building projectsUmar Faruk
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Controlnik kin
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point systemAnshuman Tyagi
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptxssusercbae26
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPrerak Ka.Patel
 
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...teseraaddis1
 
Design, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farmingDesign, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farmingDr. M. Kumaresan Hort.
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil explorationDYPCET
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement techniqueSatish Kambaliya
 
mordern soil_improvement.ppt
mordern soil_improvement.pptmordern soil_improvement.ppt
mordern soil_improvement.pptHabibFatimi
 

Similar to Control of ground water in excavation (20)

dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundation
 
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
 
5. Dewatering.pdf
5. Dewatering.pdf5. Dewatering.pdf
5. Dewatering.pdf
 
Dewatering process and control in building projects
Dewatering process and control in building projectsDewatering process and control in building projects
Dewatering process and control in building projects
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
 
BCT Module 5 ground water excavation PART 4
BCT Module 5 ground water excavation PART 4BCT Module 5 ground water excavation PART 4
BCT Module 5 ground water excavation PART 4
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptx
 
5. Dewatering F1.pdf
5. Dewatering F1.pdf5. Dewatering F1.pdf
5. Dewatering F1.pdf
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
 
De watering-ppt
De watering-pptDe watering-ppt
De watering-ppt
 
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
 
Soil Exploration.pdf
Soil Exploration.pdfSoil Exploration.pdf
Soil Exploration.pdf
 
Design, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farmingDesign, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farming
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil exploration
 
Ground improvement technique
Ground improvement techniqueGround improvement technique
Ground improvement technique
 
water wells.ppt
water wells.pptwater wells.ppt
water wells.ppt
 
mordern soil_improvement.ppt
mordern soil_improvement.pptmordern soil_improvement.ppt
mordern soil_improvement.ppt
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Control of ground water in excavation

  • 1. (Advanced Construction and Equipment) Control of Ground Water in Excavation L.D. College of Engineering, Ahmedabad-15 Semester- 6 Division-C Guided by.. Prof. J.S. Kamble
  • 2. Prepared by, Sr. No. Name of Student Roll No. Enrollment No. 1. Patel Keyur 6062013 130280106081 2. Patel Vedant 6062014 130280106089 3. Patel Vishesh 6062015 130280106090 4. Patni Mo.Aamir 6062016 130280106091
  • 3. Content… • Introduction • Dewatering methods • Suitability of different dewatering methods
  • 4. Introduction • Dewatering means removal of excess water from saturated soil. • Dewatering is a necessary process when it comes to many construction projects, particularly when the construction is for underground projects
  • 5. Dewatering Methods • Factors such as the type of soil and the nature of the construction site will all influence which dewatering method will be best suited to the project. 1. Sumps And Ditches 2. Shallow Well System 3. Deep Well System 4. Well Point System 5. Vacuum Method 6. Cement Grouting 7. Chemical Process 8. Freezing Process 9. Electro-Osmosis Method
  • 6. Sumps and Ditches • It is the simplest and most commonly used form of dewatering. • In this method, shallow pits, called sumps are dug along the periphery of the area and connected by drains. • The water from the slopes flows under gravity and is collected in sumps from which it is pumped out.
  • 7. Shallow Well Dewatering  A hole of 30 cm diameter or more is bored into the ground to a depth not more than 10 m below the pump level. A strainer tube of 15 cm diameter is lowered in the bore hole having a casing tube.  A gravel filter is formed around the strainer tube by gradually removing the casing tube and simultaneously pouring the filter well so formed.  The suction pipe from a number of such wells may be connected to one common header connected to the pumping unit.
  • 8. Shallow Well Dewatering [A typical layout of a shallow well system]
  • 9. Applications for Shallow Well Dewatering • Shallow wells can be installed with effective filters which can allow them to pump ‘clean’ water with much lower levels of suspended solids compared to sump pumping. This makes it easier to meet water quality limits at the discharge point. • Shallow wells, if installed to sufficient depth, can act as a form of pre-drainage dewatering, where groundwater levels are lowered in advance of excavation and can be held significantly below current dig levels.
  • 10. Deep Well Dewatering  This system is more suitable when the depth of excavation is more than the 16m or where artesian water is present.  15 to 16 cm diameter hole is bored and a casing with a large screen is provided. A submersible pump is installed near the bottom of the well.
  • 11. Deep Well Dewatering [A typical layout of a deep well system]
  • 12. Applications for Deep Well Dewatering  Deep well dewatering is normally suited to relatively deep excavations where permeability is between moderate (e.g. sands) to high (e.g. gravels).  Deep wells can be less effective is in low permeability soils. In these cases the well yields can be very low. Such low well yields can make it difficult to select suitable submersible pumps that can operate reliably and efficiently at low flow rates.
  • 13. Well Point System • The main components of a well-point system are: 1. well points 2. Riser pipe 3. Swinger arm 4. Header pipe 5. pumps
  • 14. Well Point System • Well points are for lowering water table by 5-6 m in soils with a coefficient of permeability between 10-4 to 10-6 m/sec. • The riser is surrounded by a coarse sand filter in order to facilitate the flow of water towards the well points.
  • 15. Multi-Stage Well Point System Multi-stage well point system is suitable for excavations up to 15 m.
  • 16. Well Point System Advantages: • Installation is very rapid. The equipment is reasonably simple and cheap. • As water is filtered while removing from the ground, soil particles are not washed away. Hence, there is no danger of subsidence of the surrounding ground. • As the water is drawn away by well points from the excavation, the sides of excavation are stabilized and steeper side slopes can be permitted.
  • 17. Well Point System Disadvantages: • Single stage well point system is suitable for lowering water table by 5 to 6 m only. For deeper excavations, where water table is to be lowered for a depth greater than 6 m, multi-stage well point system is required. • It is essential to continue pumping once it has been started until the excavation is complete. If it is stopped in between, it may prove to be disastrous. • In case of the ground consisting of stiff clay, gravel or boulders, well points are installed in drilled holes, which increases the installation cost.
  • 20. Cement Grouting • The material commonly used for grout include: 1) Cement And Water 2) Cement, Rock Flour and Water 3) Cement, Clay and Water 4) Cement, Clay, Sand and Water 5) Asphalt 6) Clay And Water 7) Chemicals
  • 21.
  • 22. Chemical Grouting • The desirable properties of chemical grouts: 1) It must be able to modify the properties of soil as desired 2) It may either increase the strength or decrease the permeability of soil 3) It must be cheap, non-toxic, non-explosive 4) It must be in the form of a liquid with low viscosity so that it can be readily placed in the soil 5) It must be non-corrosive, so that it can be handled with common pumps and piping 6) It must be possible to control the gel time by suitable means
  • 23. Chemical Grouting Inorganic chemicals • Sodium silicate • Calcium chloride • Ligno-chrome • Ligno sulphate • They are called silicate grouts • They are cheaper Organic chemicals • Epoxy resins • Polyester resins • They are also called resin grouts • They possess advantage of low viscosity, precise control of gel time and high strength
  • 24. Advantage 1) It can be used for sealing narrow cracks of about 0.5 mm width 2) It become hard in cold as well as warm temperature 3) It can bond the moist as well as dry surface 4) It has practically the same viscosity as water and hence it can be injected into any soil and fine cracks into which the water can be injected
  • 26. Advantages and Limitations Advantages: • The freezing process is readily accomplished where other methods may be difficult or impossible. • The freezing does not affect the current water table. Limitations: • The area to be covered by this process should be as small as possible. • The freezing process is suited for work of comparatively short duration.
  • 28. Suitability of Different Methods of Ground Water Conditions METHOD CONDITIONS FOR SUITABILITY 1. Sumps and Ditches For shallow excavations in coarse grained soils. 2. Well point system Suitable for lowering water table by 5-6 m in soils 3. Bored well system For coarse grained soils and depth of excavation more than 16 m 4. Vacuum method Draining silty sands and fine sands 5. Cement grouting For coarse materials or rocks with cracks 6. Freezing process Suitable for excavations in water logged soils 7. Electro-osmosis process Suitable for fine grained cohesive soils such as clays