SlideShare a Scribd company logo
1 of 2
Address:
Present Address : 68-Tipu road fauji towers FCCL Rawalpindi.
Permanent Address : District Abbottabad, Teh Hawelian, Post Office Lora Village Sherpur.
Profile Objective:
My goal is to become associated with a company where I can utilize my skills and gain further
experience while enhancing the company’s productivity and reputation.
Education:
Work Experience:
Areas of Expertise:
 Calibration of Instruments in Cement Industry.
 Calibration of Weigh Feeders (SHENCK), Belt Scales (SHENCK), Actuators (AUMA)
 Good knowledge of Electrical and Instrument Control Drawings
 Planning, Rectification and maintenance of all types of faults, Process instrumentation for dry process
cement plant.
 Calibration and Maintenance of Instruments in Power Generation Complex.
 ABB’s PLC management, control and troubleshooting.
 ABB’s PLC Hardware Configuration and Installation.
Zia ur Rehman
Citizenship: Pakistani
Date of birth: 20 Feb 1991
CNIC # 13101-6380231-9
Contact
Mobile : +92-300-4459970
e-mail : engrzia12@gmail.com.
2008 – 2012 B.Sc Electrical Engineering (Electronics)
CGPA : 3.19
University : FUUAST Islamabad
2008 Higher Secondary School Certificate (H.S.S.C)
Grade : A
College: F.G Sir Syed College the Mall Rawalpindi Cantt.
2006 Secondary School Certificate (S.S.C)
Grade : A+
School: Garrison Boys High school Lahore Cantt.
Fauji Cement Company limited
Fauji Kabirwala Power Company Limited
Fauji Cement Company limited
Fauji Cement Company limited
Internship
19/07/2011 – 31/08/2011
Apprenticeship
20/01/2013 – 20/04/2013
Trainee Engineer
07/05/2013 – 09/02/2014
Assistant Manager (I&C)
10/02/2014 – To the date
Instruments:
 Temperature Measurement
 Pressure Measurement
 Flow Measurement
 Actuators
 Dampers (AUMA)
 Level Measurement
 Level Switches
 Silo pilots
 Solenoid Valves
 Position Controllers (FAUFA)
 Speed Monitoring / Motion detector system
 Gas Analyzers (ABB AO2020)
 Analytical Measurement
 Gamma Pilot
 Weigh Bridge
 Vibration Sensors
 CCTV camera installation and commissioned.
 WHR plant instruments (Differential Pressure Flow Measurements)
Job Responsibilities:
 Responsible for the trouble shooting of faults related to field.
 Responsible for the maintenance and repairing of instruments.
 Responsible for the calibration of all instruments and verification.
 Trouble shoot the problem regarding PLC system of Plant.
 I am also responsible of rectification of problems regarding our Client / Server network.
 Working as a shift in-charge.
Key Skills:
 Proteus
 Trilogy
 AutoCAD
 Microwind
 Electrical Design and Simulation Software
 PLC ladder logic Design
 ABB’s control Builder & workplace (800xA)
 Assembly
Other Skills:
 Report writing
 Communication
 Ms Office
Educational Projects:
Final Year Project.
Computer Numeric Control (CNC) Milling Machine
Semester Projects.
 Electronic Siren, Analog Voltmeter, 15V Regulated Power Supply, Serial Communication using
microcontroller, Electronic Flasher, Dew Sensor (humidity Sensor), Water Level detector using PLC
(simulation Based).
Activities and Interests:
 Internet
 Hockey & Badminton

More Related Content

What's hot

Resume Abdul Malik
Resume Abdul MalikResume Abdul Malik
Resume Abdul Malik
Abdul Malik
 
Shereen Wajdy Abdelkareem
Shereen Wajdy AbdelkareemShereen Wajdy Abdelkareem
Shereen Wajdy Abdelkareem
Shereen Wajdy
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
Rajesh S
 
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEERS.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
Nagarajan Srinivasan
 

What's hot (20)

Eslam mohamed bahr
Eslam mohamed bahrEslam mohamed bahr
Eslam mohamed bahr
 
SHABID CV
SHABID CVSHABID CV
SHABID CV
 
ali
aliali
ali
 
NISHANK_UPDATED_CV_SI
NISHANK_UPDATED_CV_SINISHANK_UPDATED_CV_SI
NISHANK_UPDATED_CV_SI
 
Resume Abdul Malik
Resume Abdul MalikResume Abdul Malik
Resume Abdul Malik
 
Ramadan Ewaida CV 1
Ramadan Ewaida CV 1Ramadan Ewaida CV 1
Ramadan Ewaida CV 1
 
resume
resumeresume
resume
 
abuzar cv
abuzar cvabuzar cv
abuzar cv
 
Shahin Resume 2015-2016 (1)
Shahin Resume  2015-2016 (1)Shahin Resume  2015-2016 (1)
Shahin Resume 2015-2016 (1)
 
Shereen Wajdy Abdelkareem
Shereen Wajdy AbdelkareemShereen Wajdy Abdelkareem
Shereen Wajdy Abdelkareem
 
umair cv
umair cvumair cv
umair cv
 
Mansoor Ali Resume
Mansoor Ali ResumeMansoor Ali Resume
Mansoor Ali Resume
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
 
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEERS.NAGARAJAN-BE-ELECTRICAL ENGINEER
S.NAGARAJAN-BE-ELECTRICAL ENGINEER
 
Ravindra Resume
Ravindra ResumeRavindra Resume
Ravindra Resume
 
CV.
CV.CV.
CV.
 
kishan update
kishan updatekishan update
kishan update
 
Ahmed_C.V
Ahmed_C.VAhmed_C.V
Ahmed_C.V
 
AHMED HAMDY ELSHERBINI
AHMED HAMDY ELSHERBINIAHMED HAMDY ELSHERBINI
AHMED HAMDY ELSHERBINI
 
shailesh (2) (1)
shailesh (2) (1)shailesh (2) (1)
shailesh (2) (1)
 

Viewers also liked (7)

Charlie Harrigan Reference Letter
Charlie Harrigan Reference LetterCharlie Harrigan Reference Letter
Charlie Harrigan Reference Letter
 
Sales Engineer2
Sales Engineer2Sales Engineer2
Sales Engineer2
 
Fútbol
FútbolFútbol
Fútbol
 
alex_zhou_energy_week v2
alex_zhou_energy_week v2alex_zhou_energy_week v2
alex_zhou_energy_week v2
 
Zsuzsa Kovacs Translation of the diploma
Zsuzsa Kovacs Translation of the diplomaZsuzsa Kovacs Translation of the diploma
Zsuzsa Kovacs Translation of the diploma
 
Gaurav k gupta sr.test consultant
Gaurav k gupta sr.test consultantGaurav k gupta sr.test consultant
Gaurav k gupta sr.test consultant
 
NorthReading_Recommendation
NorthReading_RecommendationNorthReading_Recommendation
NorthReading_Recommendation
 

Similar to zia ur rehman 1 (1)

SidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineeringSidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineering
Silla Sidharth
 
C.V Muhammad Aamir Sardar
C.V Muhammad Aamir SardarC.V Muhammad Aamir Sardar
C.V Muhammad Aamir Sardar
Muhammad Aamir
 
Khoder Ahmad Bahry cv
Khoder Ahmad  Bahry cvKhoder Ahmad  Bahry cv
Khoder Ahmad Bahry cv
khoder bahry
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
LALIT KUMAR
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
LALIT KUMAR
 
LinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BELinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BE
Suresh Kumar
 

Similar to zia ur rehman 1 (1) (20)

Resume_Akhilesh
Resume_AkhileshResume_Akhilesh
Resume_Akhilesh
 
SidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineeringSidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineering
 
Shubham_updated
Shubham_updatedShubham_updated
Shubham_updated
 
C.V Muhammad Aamir Sardar
C.V Muhammad Aamir SardarC.V Muhammad Aamir Sardar
C.V Muhammad Aamir Sardar
 
GAURAV_CV
GAURAV_CVGAURAV_CV
GAURAV_CV
 
Muhammad Rizwan.
Muhammad Rizwan.Muhammad Rizwan.
Muhammad Rizwan.
 
DINESH parmar resume
DINESH parmar resumeDINESH parmar resume
DINESH parmar resume
 
Ritesh Resume
Ritesh ResumeRitesh Resume
Ritesh Resume
 
abhi updated
abhi updatedabhi updated
abhi updated
 
Khoder Ahmad Bahry cv
Khoder Ahmad  Bahry cvKhoder Ahmad  Bahry cv
Khoder Ahmad Bahry cv
 
012416 andrei k_resume_php
012416 andrei k_resume_php012416 andrei k_resume_php
012416 andrei k_resume_php
 
Resume raj bharath be
Resume raj bharath beResume raj bharath be
Resume raj bharath be
 
Hammad CV
Hammad CVHammad CV
Hammad CV
 
Matsa
MatsaMatsa
Matsa
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
LinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BELinkedinSuresh Kumar S BE
LinkedinSuresh Kumar S BE
 
Ally Machemba - CV
Ally Machemba - CVAlly Machemba - CV
Ally Machemba - CV
 
wordf (2)
wordf (2)wordf (2)
wordf (2)
 
VIJAY_RESUME
VIJAY_RESUMEVIJAY_RESUME
VIJAY_RESUME
 

zia ur rehman 1 (1)

  • 1. Address: Present Address : 68-Tipu road fauji towers FCCL Rawalpindi. Permanent Address : District Abbottabad, Teh Hawelian, Post Office Lora Village Sherpur. Profile Objective: My goal is to become associated with a company where I can utilize my skills and gain further experience while enhancing the company’s productivity and reputation. Education: Work Experience: Areas of Expertise:  Calibration of Instruments in Cement Industry.  Calibration of Weigh Feeders (SHENCK), Belt Scales (SHENCK), Actuators (AUMA)  Good knowledge of Electrical and Instrument Control Drawings  Planning, Rectification and maintenance of all types of faults, Process instrumentation for dry process cement plant.  Calibration and Maintenance of Instruments in Power Generation Complex.  ABB’s PLC management, control and troubleshooting.  ABB’s PLC Hardware Configuration and Installation. Zia ur Rehman Citizenship: Pakistani Date of birth: 20 Feb 1991 CNIC # 13101-6380231-9 Contact Mobile : +92-300-4459970 e-mail : engrzia12@gmail.com. 2008 – 2012 B.Sc Electrical Engineering (Electronics) CGPA : 3.19 University : FUUAST Islamabad 2008 Higher Secondary School Certificate (H.S.S.C) Grade : A College: F.G Sir Syed College the Mall Rawalpindi Cantt. 2006 Secondary School Certificate (S.S.C) Grade : A+ School: Garrison Boys High school Lahore Cantt. Fauji Cement Company limited Fauji Kabirwala Power Company Limited Fauji Cement Company limited Fauji Cement Company limited Internship 19/07/2011 – 31/08/2011 Apprenticeship 20/01/2013 – 20/04/2013 Trainee Engineer 07/05/2013 – 09/02/2014 Assistant Manager (I&C) 10/02/2014 – To the date
  • 2. Instruments:  Temperature Measurement  Pressure Measurement  Flow Measurement  Actuators  Dampers (AUMA)  Level Measurement  Level Switches  Silo pilots  Solenoid Valves  Position Controllers (FAUFA)  Speed Monitoring / Motion detector system  Gas Analyzers (ABB AO2020)  Analytical Measurement  Gamma Pilot  Weigh Bridge  Vibration Sensors  CCTV camera installation and commissioned.  WHR plant instruments (Differential Pressure Flow Measurements) Job Responsibilities:  Responsible for the trouble shooting of faults related to field.  Responsible for the maintenance and repairing of instruments.  Responsible for the calibration of all instruments and verification.  Trouble shoot the problem regarding PLC system of Plant.  I am also responsible of rectification of problems regarding our Client / Server network.  Working as a shift in-charge. Key Skills:  Proteus  Trilogy  AutoCAD  Microwind  Electrical Design and Simulation Software  PLC ladder logic Design  ABB’s control Builder & workplace (800xA)  Assembly Other Skills:  Report writing  Communication  Ms Office Educational Projects: Final Year Project. Computer Numeric Control (CNC) Milling Machine Semester Projects.  Electronic Siren, Analog Voltmeter, 15V Regulated Power Supply, Serial Communication using microcontroller, Electronic Flasher, Dew Sensor (humidity Sensor), Water Level detector using PLC (simulation Based). Activities and Interests:  Internet  Hockey & Badminton