SlideShare a Scribd company logo
1 of 2
Walter J Charczynski
Goodman Networks
Deployment Engineer III / Field Engineering
203 506 8707 cell
203 467 6200 home
wcharczynski@comcast.net
Telecom Installation Professional
My 28 year career encompassed all aspects involved in being a full service EF&I vendor
for all the major Telecom, Internet and Wireless service providers in the US. My primary
career focus being all aspects DC power systems, but also includes Switching, Transport,
Wireless and Networking, while maintain the highest Quality and Network Protection
standards in the industry.
CORE COMPETENCIES
* Installation Management * Project Management * Cost Containment and Reduction
* Logistics * Equipment Engineering * Field Engineering * Firm Price Quoting
* Customer Relations
Deployment Engineering / Field Engineer Nov. 2000 to 3/10/2015
* 2000, I accepted a lateral transfer to the Lucent Technologies Engineering
organization.
* I was responsible for interpreting the Telephone Equipment Orders for providing the
Focus Engineers and Spec Writers with detailed site surveys in multiple systems which
include all aspects of Transport, Wire-Line, Wireless, Cell Sites, Outside Plant, Power,
Grounding and much more.
* I’ve had full responsibility in providing firm price quotes for EF&I (engineer, furnish
and install) orders for Power, Outside Plant and Deregulated orders.
* Field Engineering responsibilities Included: Visiting with Customers on site,
Develop Scope of Work, Gathering Building, Construction and Infrastructure details
and measurements to facilitate Engineering Specs.
* With my strong background in DC Power and back up battery systems, I had Field
Engineering and Quoting responsibility for all power orders in the State of the CT.
Installations Operations Supervisor - Feb. 1997 to Nov. 2000
As an Operations Supervisor, I supported a team of up to 40 Installation Technicians
responsible for traditional Central Office installation work, as well off premise work for
multiple customers. Meet all quality standards for companies like, AT&T, Verizon,
Qwest and many more. I evaluated training needs, Allocated resources such as
Technicians, tools and equipment in order to meet objectives. Perform job planning
through effective scheduling & skills allocation; Projects were managed from
conception through test, integration and turnover. Established & continually improved
customer communication & relationships.
At my busiest period, I managed as many as 40 Installers on a daily/nightly basis on
multiple projects in multiple job locations. The largest of the projects I managed at this
time, was a 2.4 million Installation dollar COSMIC frame conversion project in
Stamford CT for AT&T.
1986 to 2000 - Started with AT&T, as a Communications Equipment Installer in
Connecticut. Promoted to 5 index Power installer (top level) in 5 ½ years. As a DC
Power Plant installer I was familiar with installation and live Transition requirements
for all DC plants, Inverters, Converters, Ringing & Tone plants, UPS plants, Lead acid
and Gel cell batteries, also extensive experience with Telco grounding requirements.
While Power was my primary focus, I also installed Wireline, Wireless, Networking
and Transport equipment.
Other
*Held a T1 Electrical Contractors License for the State of Connecticut.
*I have extensive company training on product installation and project management.
*Computer experience - Excel, Word, Powerpoint, AutoCAD, PowerPoint, Lync, etc.
*5 years Perfect Attendance award.
Education ; University of New Haven New Haven CT. Engineering
Extensive list of Telecommunication Training spanning my 28 year career.
ALSO have worked in fields of; Construction (framing, roofing, electrical, plumbing,
tile and flooring, Automotive and even worked 2 years as a Taxidermist.
Hobbies include; Golf, Archery, and some VERY serious Fishing in my spare time 

More Related Content

What's hot (20)

rob wilson2015
rob wilson2015rob wilson2015
rob wilson2015
 
tamer_CVnew (1)
tamer_CVnew (1)tamer_CVnew (1)
tamer_CVnew (1)
 
Dave Barnes Resume
Dave Barnes ResumeDave Barnes Resume
Dave Barnes Resume
 
RICHARD BURROUGHS
RICHARD BURROUGHSRICHARD BURROUGHS
RICHARD BURROUGHS
 
Engineering resume robert lee swink
Engineering resume   robert lee swinkEngineering resume   robert lee swink
Engineering resume robert lee swink
 
Resume
ResumeResume
Resume
 
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV new
 
4 years system
4 years system4 years system
4 years system
 
Resume_Mithilesh
Resume_MithileshResume_Mithilesh
Resume_Mithilesh
 
yama1 (1) (1) (1) (1) (1)
yama1 (1) (1) (1) (1) (1)yama1 (1) (1) (1) (1) (1)
yama1 (1) (1) (1) (1) (1)
 
B.Eng Resume_new
B.Eng Resume_newB.Eng Resume_new
B.Eng Resume_new
 
All Documents
All DocumentsAll Documents
All Documents
 
CV -Updated
CV -UpdatedCV -Updated
CV -Updated
 
Allen Resume
Allen ResumeAllen Resume
Allen Resume
 
DEspinoza_Resume
DEspinoza_ResumeDEspinoza_Resume
DEspinoza_Resume
 
Louis-Magyar-Resume
Louis-Magyar-ResumeLouis-Magyar-Resume
Louis-Magyar-Resume
 
Peter Scadding's CV 05.01.2016
Peter Scadding's CV 05.01.2016Peter Scadding's CV 05.01.2016
Peter Scadding's CV 05.01.2016
 
CV ravi jaswal - Copy
CV ravi jaswal - CopyCV ravi jaswal - Copy
CV ravi jaswal - Copy
 
NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815
 
S. Mercedes Baca - Vertex Innovations
S. Mercedes Baca - Vertex InnovationsS. Mercedes Baca - Vertex Innovations
S. Mercedes Baca - Vertex Innovations
 

Viewers also liked

Book Renault
Book RenaultBook Renault
Book Renaultclagan
 
Arquitectura de ordenadores
Arquitectura de ordenadores Arquitectura de ordenadores
Arquitectura de ordenadores Garciasandra
 
8. aagw opening srw
8. aagw opening srw8. aagw opening srw
8. aagw opening srwaagw2010
 
Media studies eval questrion 2
Media studies   eval questrion 2Media studies   eval questrion 2
Media studies eval questrion 2ValentinoPajarillo
 
Hunan university
Hunan universityHunan university
Hunan universitydoctorkais
 
Trabajo historia
Trabajo historiaTrabajo historia
Trabajo historiasarabaloco
 
ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...
ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...
ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...Дарья Каштанова
 
Processing JSON messages in highspeed
Processing JSON messages in highspeedProcessing JSON messages in highspeed
Processing JSON messages in highspeedIvan Kruglov
 
Ppt of clean india
Ppt of clean indiaPpt of clean india
Ppt of clean indiamann saxena
 
Research Fellow Project
Research Fellow ProjectResearch Fellow Project
Research Fellow ProjectOwen Donohoe
 
Donohoe et al 2015
Donohoe et al 2015Donohoe et al 2015
Donohoe et al 2015Owen Donohoe
 

Viewers also liked (13)

Book Renault
Book RenaultBook Renault
Book Renault
 
Arquitectura de ordenadores
Arquitectura de ordenadores Arquitectura de ordenadores
Arquitectura de ordenadores
 
8. aagw opening srw
8. aagw opening srw8. aagw opening srw
8. aagw opening srw
 
Media studies eval questrion 2
Media studies   eval questrion 2Media studies   eval questrion 2
Media studies eval questrion 2
 
Hunan university
Hunan universityHunan university
Hunan university
 
Trabajo historia
Trabajo historiaTrabajo historia
Trabajo historia
 
ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...
ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...
ПРОТОКОЛ № 10-15ок заседания Комиссии по вопросам градостроительства, землепо...
 
Sivamuthuraja_VS_cover_letter[1]
Sivamuthuraja_VS_cover_letter[1]Sivamuthuraja_VS_cover_letter[1]
Sivamuthuraja_VS_cover_letter[1]
 
Processing JSON messages in highspeed
Processing JSON messages in highspeedProcessing JSON messages in highspeed
Processing JSON messages in highspeed
 
Century tuna
Century tunaCentury tuna
Century tuna
 
Ppt of clean india
Ppt of clean indiaPpt of clean india
Ppt of clean india
 
Research Fellow Project
Research Fellow ProjectResearch Fellow Project
Research Fellow Project
 
Donohoe et al 2015
Donohoe et al 2015Donohoe et al 2015
Donohoe et al 2015
 

Similar to Resume wjc Linkedin

TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project Steve Troyan
 
Jmnappo resume-102015
Jmnappo resume-102015Jmnappo resume-102015
Jmnappo resume-102015Joseph Nappo
 
David Morse resume Manager Merced
David Morse resume Manager MercedDavid Morse resume Manager Merced
David Morse resume Manager MercedDavid Morse
 
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_ResumeAl Callahan
 
Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017Joseph Nappo
 
adamwraggCV 01 06 15
adamwraggCV 01 06 15adamwraggCV 01 06 15
adamwraggCV 01 06 15adam wragg
 
John DiNitto_resume
John DiNitto_resumeJohn DiNitto_resume
John DiNitto_resumeJohn DiNitto
 
Invertice CAP Statement rev 1
Invertice CAP Statement rev 1Invertice CAP Statement rev 1
Invertice CAP Statement rev 1Jeff Chehovits
 
Robert Clarizio Resume 4.2016
Robert Clarizio Resume 4.2016Robert Clarizio Resume 4.2016
Robert Clarizio Resume 4.2016Robert Clarizio
 
Robert A Frink 11 2016 (1)
Robert A Frink  11 2016 (1)Robert A Frink  11 2016 (1)
Robert A Frink 11 2016 (1)Robert Frink
 
Neil Todd CV
Neil Todd CVNeil Todd CV
Neil Todd CVNeil Todd
 
Steven Turner CV (Full) - 20160906
Steven Turner CV (Full) - 20160906Steven Turner CV (Full) - 20160906
Steven Turner CV (Full) - 20160906Steven Turner
 
Roberts Technicial Resume
Roberts Technicial ResumeRoberts Technicial Resume
Roberts Technicial ResumeRobert Canniff
 
finalrevPurcell Charles 042115
finalrevPurcell Charles 042115finalrevPurcell Charles 042115
finalrevPurcell Charles 042115chuck purcell
 

Similar to Resume wjc Linkedin (20)

TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project TROYAN,STEVEN1,Construction Project
TROYAN,STEVEN1,Construction Project
 
Jmnappo resume-102015
Jmnappo resume-102015Jmnappo resume-102015
Jmnappo resume-102015
 
David Morse resume Manager Merced
David Morse resume Manager MercedDavid Morse resume Manager Merced
David Morse resume Manager Merced
 
cj resume _update #1
cj resume _update #1cj resume _update #1
cj resume _update #1
 
Callahan_Allen_Resume
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_Resume
 
Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017Joseph M. Nappo-1-2017
Joseph M. Nappo-1-2017
 
adamwraggCV 01 06 15
adamwraggCV 01 06 15adamwraggCV 01 06 15
adamwraggCV 01 06 15
 
John DiNitto_resume
John DiNitto_resumeJohn DiNitto_resume
John DiNitto_resume
 
Invertice CAP Statement rev 1
Invertice CAP Statement rev 1Invertice CAP Statement rev 1
Invertice CAP Statement rev 1
 
Robert Clarizio Resume 4.2016
Robert Clarizio Resume 4.2016Robert Clarizio Resume 4.2016
Robert Clarizio Resume 4.2016
 
Robert A Frink 11 2016 (1)
Robert A Frink  11 2016 (1)Robert A Frink  11 2016 (1)
Robert A Frink 11 2016 (1)
 
Neil Todd CV
Neil Todd CVNeil Todd CV
Neil Todd CV
 
Greg's resume
Greg's resumeGreg's resume
Greg's resume
 
Steven Turner CV (Full) - 20160906
Steven Turner CV (Full) - 20160906Steven Turner CV (Full) - 20160906
Steven Turner CV (Full) - 20160906
 
Resume Purcell 0916
Resume Purcell 0916Resume Purcell 0916
Resume Purcell 0916
 
Jimmy Edwards Resume
Jimmy Edwards ResumeJimmy Edwards Resume
Jimmy Edwards Resume
 
Toms Resume
Toms ResumeToms Resume
Toms Resume
 
WNarcho Resume
WNarcho ResumeWNarcho Resume
WNarcho Resume
 
Roberts Technicial Resume
Roberts Technicial ResumeRoberts Technicial Resume
Roberts Technicial Resume
 
finalrevPurcell Charles 042115
finalrevPurcell Charles 042115finalrevPurcell Charles 042115
finalrevPurcell Charles 042115
 

Resume wjc Linkedin

  • 1. Walter J Charczynski Goodman Networks Deployment Engineer III / Field Engineering 203 506 8707 cell 203 467 6200 home wcharczynski@comcast.net Telecom Installation Professional My 28 year career encompassed all aspects involved in being a full service EF&I vendor for all the major Telecom, Internet and Wireless service providers in the US. My primary career focus being all aspects DC power systems, but also includes Switching, Transport, Wireless and Networking, while maintain the highest Quality and Network Protection standards in the industry. CORE COMPETENCIES * Installation Management * Project Management * Cost Containment and Reduction * Logistics * Equipment Engineering * Field Engineering * Firm Price Quoting * Customer Relations Deployment Engineering / Field Engineer Nov. 2000 to 3/10/2015 * 2000, I accepted a lateral transfer to the Lucent Technologies Engineering organization. * I was responsible for interpreting the Telephone Equipment Orders for providing the Focus Engineers and Spec Writers with detailed site surveys in multiple systems which include all aspects of Transport, Wire-Line, Wireless, Cell Sites, Outside Plant, Power, Grounding and much more. * I’ve had full responsibility in providing firm price quotes for EF&I (engineer, furnish and install) orders for Power, Outside Plant and Deregulated orders. * Field Engineering responsibilities Included: Visiting with Customers on site, Develop Scope of Work, Gathering Building, Construction and Infrastructure details and measurements to facilitate Engineering Specs. * With my strong background in DC Power and back up battery systems, I had Field Engineering and Quoting responsibility for all power orders in the State of the CT. Installations Operations Supervisor - Feb. 1997 to Nov. 2000 As an Operations Supervisor, I supported a team of up to 40 Installation Technicians responsible for traditional Central Office installation work, as well off premise work for multiple customers. Meet all quality standards for companies like, AT&T, Verizon, Qwest and many more. I evaluated training needs, Allocated resources such as Technicians, tools and equipment in order to meet objectives. Perform job planning through effective scheduling & skills allocation; Projects were managed from conception through test, integration and turnover. Established & continually improved customer communication & relationships. At my busiest period, I managed as many as 40 Installers on a daily/nightly basis on multiple projects in multiple job locations. The largest of the projects I managed at this time, was a 2.4 million Installation dollar COSMIC frame conversion project in Stamford CT for AT&T.
  • 2. 1986 to 2000 - Started with AT&T, as a Communications Equipment Installer in Connecticut. Promoted to 5 index Power installer (top level) in 5 ½ years. As a DC Power Plant installer I was familiar with installation and live Transition requirements for all DC plants, Inverters, Converters, Ringing & Tone plants, UPS plants, Lead acid and Gel cell batteries, also extensive experience with Telco grounding requirements. While Power was my primary focus, I also installed Wireline, Wireless, Networking and Transport equipment. Other *Held a T1 Electrical Contractors License for the State of Connecticut. *I have extensive company training on product installation and project management. *Computer experience - Excel, Word, Powerpoint, AutoCAD, PowerPoint, Lync, etc. *5 years Perfect Attendance award. Education ; University of New Haven New Haven CT. Engineering Extensive list of Telecommunication Training spanning my 28 year career. ALSO have worked in fields of; Construction (framing, roofing, electrical, plumbing, tile and flooring, Automotive and even worked 2 years as a Taxidermist. Hobbies include; Golf, Archery, and some VERY serious Fishing in my spare time 