Lesson Title Grade Quarter Week Learning
Outcome
Code
INSTALL STANDARD ELECTRICAL
PROTECTION SYSTEM FOR
LIGHTING AND GROUNDING (EP)
11 1- 2 10 1
2
TLE_IAEI11EPIa-j-1
TLE_IAEI11EPIIa-j-2
INSTALL ELECTRICAL LIGHTING
SYSTEMS, AUXILIARY OUTLETS
AND LIGHTING FIXTURES (EL)
11 3-4 10 1 TLE_IAEI11ELIIIa-IVj-1
INSTALL ELECTRICAL LIGHTING
SYSTEMS, AUXILIARY OUTLETS
AND LIGHTING FIXTURES (EL)
12 1 10 1 TLE_IAEI12ELIa-IIj-1
PERFORM MAINTENANCE AND
TROUBLESHOOTING WORK (TW)
12 3 40 1
1
2
3
TLE_IAEI12ELIa-IIj-1
TLE_IAEI12TWIIIa-IVj-1
TLE_IAEI12TWIIIa-IVj-2
TLE_IAEI12TWIIIa-IVj-3
ACTIVITY NO. 1
3. Lesson Title Grade Quarter Week LO Code
Install Electrical Lighting Systems,
Auxiliary Outlets and Lighting
Fixtures
12 1-2 1-10 1 TLE-IAEI12EL-
Ia-IIj-1
Perform Maintenance and
Troubleshooting Works
12 3-4 1-10 1 TLE-
IAEI12TW-
IIIa-IVj-1
Perform Maintenance and
Troubleshooting Works
12 3-4 1-10 2 TLE-
IAEI12TW-
IIIa-IVj-2
Perform Maintenance and
Troubleshooting Works
12 3-4 1-10 3 TLE-
IAEI12TW-
IIIa-IVj-3
ACTIVITY NO. 1 (Continuation)
4. CONTENT STRATEGIES ASSESSMENT NUMBER
OF DAYS
REFERENCE
Electrical tools,
equipment and
materials for specific
job order
Discussion
Lecturette
Pen and paper
Oral Questioning
2 PEC
TG
LM’s
ACTIVITY NO. 2
5. CONTENT LEARNING COMPETENCIES NUMBER OF
DAYS
REFERENCE
Electrical tools,
equipment and
materials for specific
job order
Install electrical systems,
auxiliary outlets and lighting
fixtures
40 PEC
TG
CG
LM’s
CBLM
ACTIVITY NO. 3
Specialization : EIM
Pre-Requisite : G11 No. of Hours: 80