The ferryboat complex Varna was built in 1978 at the west coast of Beloslav lake,
in 30 km from Varna. It has two piers with total length of 400 m and depth of 8,7
m. The complex serves ferry boats and RO-RO ships on the following lines: Varna
– Ilichevsk (Ukraine) – Poti/ Batumi (Georgia) and Varna – port Caucasus
(Russia). The complex is connected with the national railway and road network.
The Bulgarian three-decker ferry boats for carriage of goods in wagons, vehicles
and passengers “The Heroes of Odessa” and “The Heroes of Sevastopol” were
built in 1978 in Norway. They are equipped with a lift with capacity of 170 t (2
wagons), an universal shunting locomotive, supporting devices – jacks and
turnbuckles. The total length of the railway track onboard is 1692 m, the
transportation capacity: 108 standard 70-ton wagons (totally 7560 t), from which
on the upper deck – 43 wagons (3010 t), on the intermediate deck – 49 wagons
(3430 t) and on the below deck – 16 wagons (1120 t). The crew is 29 people. The
ferryboats have a hotel part with 95 places for the passengers and the crew.
2
HISTORY
3
The ships provide the opportunity for simultaneous combined
transportations of goods in wagons, trucks, containers, other deck
loads and automobiles.
CONNECTIONS
The railway ferry line Varna – Ilichevsk was established when the
economic relations between Bulgaria and the Soviet Union were very
active and the trade between them was significant. It started operating on
14 November 1978, providing the opportunity for alternative and more
efficient transportation without transshipment between two countries with
different track gauge.
From 1999, after the signature of the Trilateral Agreement between the
Governments of Bulgaria, Ukraine and Georgia on joint exploitation of
direct ferry service Varna – Ilichevsk – Poti/ Batumi, the Ferryboat
complex Varna is also connected with the Georgian ports Poti and
Batumi.
In 2009 was established the direct railway ferry line Varna – port
Caucasus connecting the Republic of Bulgaria with the Russian
Federation.
4
DOBRINISHTE
SANDANSKI
GENERAL
TODOROV
PETRICH
BLAGOEVGRA
D
DUPNICA
KJUSTENDI
LGJUESHEV
O
BOBOV
DOL
RADOMIR
SOFIA
BANKJA PODUJAN
E
ISKAR MUSASHEVO
CHUKUROVO
VAKARE
L PANAGJURISTE
KOSTENEC
SEPTEMVR
I TRAKIJAWARWARA STAMBOLIJSKI
PLOVDIV
PESHTER
A
MANOLE
BELOZE
M
ORIZOVO CHIRPAN
SVOBODACHERNA
GORA
ASENOVGRA
D HASKOVO
SIMEONOVGRA
D
DIMITROVGRAD
SVILENGRAD
KARDZHAL
I
PODKOVA
ELHOVO
СТАРА
ЗАГОРА ХАН
АСПАРУХ
JAMBOL
ZIMNICA
НОВА
ЗАГОРА
КЕРМЕН
STRALDZA
СЛИВЕН
ТВЪРДИЦА
ДЪБОВО
ТУЛОВО
КАRNOBAT
AJTOS
BURGAS
VLADIMIR
PAVLOV
POMORIE
KAZANLAK
KALOFER
KARLOVO
HISARJA
KLISURAРА
PIRDOP
KOPRIVSHIZAZLATIC
A
SOFIJA SEVER
VOLUJAK
PERNIK
BOLSHEVIK
DRAGOMA
N
KALOTIN
A
STANJANZ
I
SVOG
E
MEZDRA
VRACA
ROMAN
ZLATNA
PANEGA
CHERVEN
BRJAG
BERKOVICA
MONTAN
A
BOJCHINOVC
I
BRUSARC
I
LOM
DIMOVO
ORESHEC
VIDIN
Koshava
ORJAHOVO
JASEN
CHERKVICA
PLEVEN
TROJAN
BELENE
SVISHTO
VORESH
LEVSKI
PAVLIKENI
POLSKI
TRAMBESH
BOROVO
DVE MOGILI
IVANOVO
BJALA
RUS
E
RAZGRA
D
SAMUIL
SILISTRA
GORNA ORJAHOVICA
СТРАЖИЦА
ЕЛЕНА
ZAREVA LIVADA
GABROVO
VELIKO
TARNOVO
POPOVO
TARGOVISHT
E
PRESLAV
HAN
KRUM
SHUMEN
NOVI PAZAR
KASPICHAN
BELOSLAV
POVELJANOV
OSINDEL
PROVADIJA
DALGOPOL
KOMUNARI
STARO
ORJAHOVO
DOBRICH
KARDAM
VARNA
Turkey
Greece
Greece
Serbia Ukraine
Black sea
CONNECTIONS
Romania
Georgia
Russia
TECHNICAL CHARACTERISTICS AND EQUIPMENT
OF THE FERRYBOAT COMPLEX VARNA
The complex has two piers with total length of 400 m and depth of 8,7 m, equipped with
transitional bridges, each of which with 5 tracks with gauge of 1520 mm. Ferry boats
loaded with 108 wagons are handled for 8 hours, ferry boats loaded with 45 wagons – for
2 hours. The complex has a capacity for a simultaneous handling of two ships and also for
handling of two types of ships – with width 26 and 22 m.
TRANSITIONAL BRIDGE
Length – 40 m; Width from the side of the ferry boat – 18,5 m; Width from the side of
the ferryboat complex – 8,6 m; Weight – 300 t.
WORKSHOP FOR CHANGING BOGIES
The ferryboat complex Varna is the only place in the Black Sea region with possibility for
changing wagon bogies from European (1435 mm) to Russian standard (1520 mm)
gauge. The workshop is equiped with two universal tracks, with 12 positions each. It has
the capacity for changing the bogies of 280 wagons per day.
Track for changing bogies of wagons loaded with dangerous goods – with universal
track gauge and 2 positions with anti-explosion jacks. The handling capasity is 20
wagons per day.
TRANSSHIPMENT POINT
Technical capacity for direct transshipment of 80 wagons per day
Open site
2 tracks with gauge of 1435 mm and
2 tracks with gauge of 1520 mm
served by electric forklift with lifting
capacity of 20 t
Covered ramp
with1 track with gauge of 1435 mm
and 1 track with gauge of 1520 mm
Open ramp
with1 track with gauge of 1435 mm
and 1 track with gauge of 1520 mm
Storing facilities
Open and covered storehouses
registred as storehouses under
customs supervision.
TRANSPORT SERVICES RENDERED BY THE FERRYBOAT COMPLEX
Ferry lines served
 Varna - Ilichevsk
 Varna – Ilichevsk – Poti/ Batumi
 Varna – Caucasus
Combined transports:
 Transport of goods in wagons
 Transport of trucks/ semi-trailers
 Transport of container
 Other deck loads and automobiles
Services
 Mooring and unmooring of ferry boats and accompanying port services;
 Change of the wagon bogies from gauge 1520 mm to gauge 1435 mm for wagons
for import and from gauge 1435 mm to gauge 1520 mm for wagons for export;
 Transshipment, loading and unloading of wagons by various technologies: wagon
– wagon, truck-wagon, ramp – wagon, wagon – ramp;
 Storage of goods in a storehouses registered under customs supervision;
 Other services.
REPORTING DATA FOR 2015
Volume of the goods transported through the ferryboat complex Varna in 2015:
 - import – 140 340 t
 - export - 39 857 t
 - totally– 180 197 t
Including:
1. Railway ferry line Varna - Caucasus:
- import – 124 125 t (LPG, oils and lubricants, petroleum waste, fertilizers, chemicals,
glass and other building materials and food products);
- export and transit – 33 609 t (cables, bentonite, food products, equipment, refractory
cement, wooden panels, cosmetics, glucose, base oils, polyethylene).
Totally – 157 734 t
2. Railway ferry line Varna – Ilichevsk – Poti/ Batumi:
- import – 16 215 t (LPG, ferroalloys, fertilizers, automobiles BELAZ, glass,
equipment);
- export – 6 248 t (metals, cans, cigarettes, sugar, pipes, glass).
Totally – 22 463 t
12
THANK YOU FOR THE ATTENTTION!

More Related Content

What's hot

Classification of passenger stations
Classification of passenger stationsClassification of passenger stations
Classification of passenger stationsIvanIvanets
 
planning of central railway station
planning of central railway stationplanning of central railway station
planning of central railway stationUpasana Panchal
 
Commercial Sea Port of Ust-Luga
Commercial Sea Port of Ust-LugaCommercial Sea Port of Ust-Luga
Commercial Sea Port of Ust-Lugaandreyflex
 
Thrissur railway station development 2
Thrissur railway station development 2Thrissur railway station development 2
Thrissur railway station development 2nicenaison
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONDiaa Hilal
 
Vehicles Used In Cargo Handeling
Vehicles Used In Cargo HandelingVehicles Used In Cargo Handeling
Vehicles Used In Cargo HandelingDeepak
 
Suburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine StationSuburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine Stationlinda carroli
 
REP_2011_Retail_Railways
REP_2011_Retail_RailwaysREP_2011_Retail_Railways
REP_2011_Retail_RailwaysConnie Moser
 

What's hot (11)

Classification of passenger stations
Classification of passenger stationsClassification of passenger stations
Classification of passenger stations
 
Erevan Conference Program
Erevan Conference ProgramErevan Conference Program
Erevan Conference Program
 
planning of central railway station
planning of central railway stationplanning of central railway station
planning of central railway station
 
Commercial Sea Port of Ust-Luga
Commercial Sea Port of Ust-LugaCommercial Sea Port of Ust-Luga
Commercial Sea Port of Ust-Luga
 
Utb
UtbUtb
Utb
 
Thrissur railway station development 2
Thrissur railway station development 2Thrissur railway station development 2
Thrissur railway station development 2
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATION
 
Vehicles Used In Cargo Handeling
Vehicles Used In Cargo HandelingVehicles Used In Cargo Handeling
Vehicles Used In Cargo Handeling
 
Suburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine StationSuburban Train Station as Community Hub: Proposal for Carseldine Station
Suburban Train Station as Community Hub: Proposal for Carseldine Station
 
REP_2011_Retail_Railways
REP_2011_Retail_RailwaysREP_2011_Retail_Railways
REP_2011_Retail_Railways
 
Development of Ferry Boat Routes in Northeast Asia Utilizing European Example...
Development of Ferry Boat Routes in Northeast Asia Utilizing European Example...Development of Ferry Boat Routes in Northeast Asia Utilizing European Example...
Development of Ferry Boat Routes in Northeast Asia Utilizing European Example...
 

Similar to Ferryboat complex Varna_EN

BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013Vadim Shabarov
 
Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)EasyBusiness
 
romania_south_africa_final_final.ppt
romania_south_africa_final_final.pptromania_south_africa_final_final.ppt
romania_south_africa_final_final.pptRamonaIvan3
 
Effectiveness of the new Silk Road
Effectiveness of the new Silk RoadEffectiveness of the new Silk Road
Effectiveness of the new Silk RoadEugene Tkachenko
 
Transexpress Pres. English
Transexpress Pres. EnglishTransexpress Pres. English
Transexpress Pres. EnglishGeorgi Nedelchev
 
JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”Business Finland
 
Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)ustluga
 
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...PowerLift Events
 
Russia’s window onto Europe. Russian ports along the Baltic coast after trans...
Russia’s window onto Europe. Russian ports along the Baltic coast after trans...Russia’s window onto Europe. Russian ports along the Baltic coast after trans...
Russia’s window onto Europe. Russian ports along the Baltic coast after trans...Александр Головизнин
 
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0mohamed mohiy el deen
 
20150320-greencluster-sofia
20150320-greencluster-sofia20150320-greencluster-sofia
20150320-greencluster-sofiaStefan Roseanu
 

Similar to Ferryboat complex Varna_EN (20)

BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
 
Development of the Russian Seaport Infrastructure
Development of the Russian Seaport InfrastructureDevelopment of the Russian Seaport Infrastructure
Development of the Russian Seaport Infrastructure
 
Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)
 
Train(ing) up
Train(ing) upTrain(ing) up
Train(ing) up
 
Train(ing) up
Train(ing) upTrain(ing) up
Train(ing) up
 
romania_south_africa_final_final.ppt
romania_south_africa_final_final.pptromania_south_africa_final_final.ppt
romania_south_africa_final_final.ppt
 
Effectiveness of the new Silk Road
Effectiveness of the new Silk RoadEffectiveness of the new Silk Road
Effectiveness of the new Silk Road
 
Trans Eurasia 2014
Trans Eurasia 2014Trans Eurasia 2014
Trans Eurasia 2014
 
Transexpress Pres. English
Transexpress Pres. EnglishTransexpress Pres. English
Transexpress Pres. English
 
JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”
 
Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)
 
Development of the russian sea port infrastructure.
Development of the russian sea port infrastructure. Development of the russian sea port infrastructure.
Development of the russian sea port infrastructure.
 
5) 2015.03.23 presentation october railway_valinskiy oleg
5) 2015.03.23 presentation october railway_valinskiy oleg5) 2015.03.23 presentation october railway_valinskiy oleg
5) 2015.03.23 presentation october railway_valinskiy oleg
 
Презентация Инкотек Карго
Презентация Инкотек КаргоПрезентация Инкотек Карго
Презентация Инкотек Карго
 
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
 
USPA 2020 leaflet (Eng)
USPA 2020 leaflet (Eng)USPA 2020 leaflet (Eng)
USPA 2020 leaflet (Eng)
 
Russia’s window onto Europe. Russian ports along the Baltic coast after trans...
Russia’s window onto Europe. Russian ports along the Baltic coast after trans...Russia’s window onto Europe. Russian ports along the Baltic coast after trans...
Russia’s window onto Europe. Russian ports along the Baltic coast after trans...
 
The Ukrainian Sea Ports Authority (USPA):key facts & figures 2018
The Ukrainian Sea Ports Authority (USPA):key facts & figures 2018The Ukrainian Sea Ports Authority (USPA):key facts & figures 2018
The Ukrainian Sea Ports Authority (USPA):key facts & figures 2018
 
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0
 
20150320-greencluster-sofia
20150320-greencluster-sofia20150320-greencluster-sofia
20150320-greencluster-sofia
 

Ferryboat complex Varna_EN

  • 1. FERRYBOAT COMPLEX VARNA – POSSIBILITIES AND PROSPECTIVES 1
  • 2. The ferryboat complex Varna was built in 1978 at the west coast of Beloslav lake, in 30 km from Varna. It has two piers with total length of 400 m and depth of 8,7 m. The complex serves ferry boats and RO-RO ships on the following lines: Varna – Ilichevsk (Ukraine) – Poti/ Batumi (Georgia) and Varna – port Caucasus (Russia). The complex is connected with the national railway and road network. The Bulgarian three-decker ferry boats for carriage of goods in wagons, vehicles and passengers “The Heroes of Odessa” and “The Heroes of Sevastopol” were built in 1978 in Norway. They are equipped with a lift with capacity of 170 t (2 wagons), an universal shunting locomotive, supporting devices – jacks and turnbuckles. The total length of the railway track onboard is 1692 m, the transportation capacity: 108 standard 70-ton wagons (totally 7560 t), from which on the upper deck – 43 wagons (3010 t), on the intermediate deck – 49 wagons (3430 t) and on the below deck – 16 wagons (1120 t). The crew is 29 people. The ferryboats have a hotel part with 95 places for the passengers and the crew. 2 HISTORY
  • 3. 3 The ships provide the opportunity for simultaneous combined transportations of goods in wagons, trucks, containers, other deck loads and automobiles.
  • 4. CONNECTIONS The railway ferry line Varna – Ilichevsk was established when the economic relations between Bulgaria and the Soviet Union were very active and the trade between them was significant. It started operating on 14 November 1978, providing the opportunity for alternative and more efficient transportation without transshipment between two countries with different track gauge. From 1999, after the signature of the Trilateral Agreement between the Governments of Bulgaria, Ukraine and Georgia on joint exploitation of direct ferry service Varna – Ilichevsk – Poti/ Batumi, the Ferryboat complex Varna is also connected with the Georgian ports Poti and Batumi. In 2009 was established the direct railway ferry line Varna – port Caucasus connecting the Republic of Bulgaria with the Russian Federation. 4
  • 5. DOBRINISHTE SANDANSKI GENERAL TODOROV PETRICH BLAGOEVGRA D DUPNICA KJUSTENDI LGJUESHEV O BOBOV DOL RADOMIR SOFIA BANKJA PODUJAN E ISKAR MUSASHEVO CHUKUROVO VAKARE L PANAGJURISTE KOSTENEC SEPTEMVR I TRAKIJAWARWARA STAMBOLIJSKI PLOVDIV PESHTER A MANOLE BELOZE M ORIZOVO CHIRPAN SVOBODACHERNA GORA ASENOVGRA D HASKOVO SIMEONOVGRA D DIMITROVGRAD SVILENGRAD KARDZHAL I PODKOVA ELHOVO СТАРА ЗАГОРА ХАН АСПАРУХ JAMBOL ZIMNICA НОВА ЗАГОРА КЕРМЕН STRALDZA СЛИВЕН ТВЪРДИЦА ДЪБОВО ТУЛОВО КАRNOBAT AJTOS BURGAS VLADIMIR PAVLOV POMORIE KAZANLAK KALOFER KARLOVO HISARJA KLISURAРА PIRDOP KOPRIVSHIZAZLATIC A SOFIJA SEVER VOLUJAK PERNIK BOLSHEVIK DRAGOMA N KALOTIN A STANJANZ I SVOG E MEZDRA VRACA ROMAN ZLATNA PANEGA CHERVEN BRJAG BERKOVICA MONTAN A BOJCHINOVC I BRUSARC I LOM DIMOVO ORESHEC VIDIN Koshava ORJAHOVO JASEN CHERKVICA PLEVEN TROJAN BELENE SVISHTO VORESH LEVSKI PAVLIKENI POLSKI TRAMBESH BOROVO DVE MOGILI IVANOVO BJALA RUS E RAZGRA D SAMUIL SILISTRA GORNA ORJAHOVICA СТРАЖИЦА ЕЛЕНА ZAREVA LIVADA GABROVO VELIKO TARNOVO POPOVO TARGOVISHT E PRESLAV HAN KRUM SHUMEN NOVI PAZAR KASPICHAN BELOSLAV POVELJANOV OSINDEL PROVADIJA DALGOPOL KOMUNARI STARO ORJAHOVO DOBRICH KARDAM VARNA Turkey Greece Greece Serbia Ukraine Black sea CONNECTIONS Romania Georgia Russia
  • 6. TECHNICAL CHARACTERISTICS AND EQUIPMENT OF THE FERRYBOAT COMPLEX VARNA The complex has two piers with total length of 400 m and depth of 8,7 m, equipped with transitional bridges, each of which with 5 tracks with gauge of 1520 mm. Ferry boats loaded with 108 wagons are handled for 8 hours, ferry boats loaded with 45 wagons – for 2 hours. The complex has a capacity for a simultaneous handling of two ships and also for handling of two types of ships – with width 26 and 22 m.
  • 7. TRANSITIONAL BRIDGE Length – 40 m; Width from the side of the ferry boat – 18,5 m; Width from the side of the ferryboat complex – 8,6 m; Weight – 300 t.
  • 8. WORKSHOP FOR CHANGING BOGIES The ferryboat complex Varna is the only place in the Black Sea region with possibility for changing wagon bogies from European (1435 mm) to Russian standard (1520 mm) gauge. The workshop is equiped with two universal tracks, with 12 positions each. It has the capacity for changing the bogies of 280 wagons per day.
  • 9. Track for changing bogies of wagons loaded with dangerous goods – with universal track gauge and 2 positions with anti-explosion jacks. The handling capasity is 20 wagons per day.
  • 10. TRANSSHIPMENT POINT Technical capacity for direct transshipment of 80 wagons per day Open site 2 tracks with gauge of 1435 mm and 2 tracks with gauge of 1520 mm served by electric forklift with lifting capacity of 20 t Covered ramp with1 track with gauge of 1435 mm and 1 track with gauge of 1520 mm Open ramp with1 track with gauge of 1435 mm and 1 track with gauge of 1520 mm Storing facilities Open and covered storehouses registred as storehouses under customs supervision.
  • 11. TRANSPORT SERVICES RENDERED BY THE FERRYBOAT COMPLEX Ferry lines served  Varna - Ilichevsk  Varna – Ilichevsk – Poti/ Batumi  Varna – Caucasus Combined transports:  Transport of goods in wagons  Transport of trucks/ semi-trailers  Transport of container  Other deck loads and automobiles Services  Mooring and unmooring of ferry boats and accompanying port services;  Change of the wagon bogies from gauge 1520 mm to gauge 1435 mm for wagons for import and from gauge 1435 mm to gauge 1520 mm for wagons for export;  Transshipment, loading and unloading of wagons by various technologies: wagon – wagon, truck-wagon, ramp – wagon, wagon – ramp;  Storage of goods in a storehouses registered under customs supervision;  Other services.
  • 12. REPORTING DATA FOR 2015 Volume of the goods transported through the ferryboat complex Varna in 2015:  - import – 140 340 t  - export - 39 857 t  - totally– 180 197 t Including: 1. Railway ferry line Varna - Caucasus: - import – 124 125 t (LPG, oils and lubricants, petroleum waste, fertilizers, chemicals, glass and other building materials and food products); - export and transit – 33 609 t (cables, bentonite, food products, equipment, refractory cement, wooden panels, cosmetics, glucose, base oils, polyethylene). Totally – 157 734 t 2. Railway ferry line Varna – Ilichevsk – Poti/ Batumi: - import – 16 215 t (LPG, ferroalloys, fertilizers, automobiles BELAZ, glass, equipment); - export – 6 248 t (metals, cans, cigarettes, sugar, pipes, glass). Totally – 22 463 t 12
  • 13. THANK YOU FOR THE ATTENTTION!