The section of EMS where Checking is done. it includes details of all the sub-clauses, responsibilities, people in charge, protocols etc. for a Engineering Parts Manufacturing Company. Prepared this as my assignment on Corporate Environmental Management.
2. The department supervisor(s) are responsible for generating environmental monitoring and measurement data to be submitted in the Monthly Operating Report (MOR).
3.
4. A monthly report shall be established for department heads/supervisors to submit monitoring and measuring information to support performance of the EMS. The report is to be structured as a minimum to:
5. Provide status of environmental management programs designed to fulfil environmental objectives and targets,
6. Provide status of performance indicators as related to targeted timeframes,
7. Provide compliance status of environmental operating permits issued by environmental regulatory agencies.
10. Municipal environmental by-laws will be reviewed on a monthly basis to identify amendments to municipal by-laws or the passing of new municipal by-laws.
11. Non-regulatory requirements will be reviewed to identify amendments to nonregulatory requirements or the passing of non-regulatory requirements. The frequency of reviews will depend on ACME Co.'s level of commitment, possible liabilities, and the ranking of the associated significant aspect
12.
13. Departments maintain a process for the identification, collection, indexing, access, filing, storage, maintenance, and disposition of department level environmental records.
14. All environmental records are legible, retrievable, and maintained in a suitable environment to prevent deterioration, damage, or loss.
15. Retention of records is in accordance with regulatory requirements unless otherwise specified in the procedure producing the record.
21. Opening Meeting, prior to the audit convened by the Lead Auditor in presence of the Audit Team and representatives of the Audited section. Discussions on the audit process and communication channels are to be established
23. Closing Meeting, post the audit to share a draft list of findings and observations with the audited section. Clarification of misunderstandings may take place.
25. Review of Corrective/Preventive Action Responses by the lead auditor, once this is approved by the lead auditor, it is communicated to the EMR and the Audit is considered closed.